    NOTE: All material and workmanship shthe current Oregon Standard Spec

    OREGON STANDARD

    DATE REVISION DESC

    BASELINE REPORT DATEALC. BOOK NO.

    BR2

    FLUSH MOUNCOMBINATION BRI

    3152

    2008

    01-JUL

    Effective Date: June 1, 2011 - November 30, 2011ffective Date: June 1, 2011 - November 30, 2011

    Pay length for combination bridge rail Guardrail Transition, each

    5 s pa c es @ 1 -6 3 /4 " = 7 - 9 3/ 4 " 3 s pa c es @ 3 - 1 1/ 2 " = 9 -4 1 /2 "

    Use 4-6" height for bikeways when called for on project plans.

    BB

    End of bridgeend panel , seeproject plans.

    See dwg. BR203(NOTE 3 andSEC TION D-D)

    8"x8" timberblocks (typ.)

    Provide reinforcing s t eel conforming to ASTM Speci f i cat ion A706, or AASHTOA615) Grade 60. Splice #4 bars 1-4" min.

    Provide steel posts and plates conforming to AASHTO Specification M183 orunless otherwise noted.

    Cont inuous horizontal s t ructuraltubing over 2 or more posts.

    Provide concrete C lass 3300 - 1 1 /2 " or 3 /4 " .

    W6x9

    W8x15

    Provide steel tubing conforming to ASTM Specification A500, Grade B, A50

    Construct rail (posts and parapet) normal to grade in the longitudinal directionthe transverse direction.

    min BB

    B

    BBB

    BB

    B

    8

    3/4 " V-groove

    see project plans

    114

    Typical deck steel,

    B

    bars @ 9"

    Accompanied by dwgs. BR203, BR223, RD400, RD405, RD410#5 x 7-0" w/std.

    w/ful l l ength

    Finishgrade

    180^ hook @ 18"al t ernate

    Drill horiz. bolt holes(bolt dia. + 1/8 ") inhardened conc. wi thlow impact rotary drill.

    b2d

    00

    10"

    Ebme

    10 1/2 "

    typ.

    g112

    Level ing nut s

    4 3/8 "

    BB

    1/8

    34-6" Rail

    ESTIM ATED QUANTITIES

    23.39 23.39

    Deta i l "B " Detail "C" Detail "D"

    Construction joint

    1 1/2 "cl.

    1/8

    7 1/2 "

    18""#4 @ 8"

    Scoring joint, see bridge plansfor locat ion . P lace at equalspaces 15-0" max. betweenopen, Type "B" and expans ionjoints.

    2 extra #4 bent barsat ends, and each sideof all joints, and ateach pos t .

    B

    112

    1 1/2 "cl.

    1 1/2 "

    B

    B

    C

    C

    D

    D

    1 1/2 "

    43 1/16 " 3 1/16 "

    1 1/2 "cl.

    1 1/2 "cl.

    312

    2.26 2.26

    10 1/2 "

    2~#4 w/std. hks.each end

    hks . each end2~#4 bent bars w/std.

    Term ina lconnector

    10-#4long barsas shown

    1~#4 bar (each side) x cont.thru scoring and Type "B"joints, stop 2" clear at ends,open joints and expansion joints

    Type "B" jo in t . P laceat { interior bent withcont inuous deck

    Construction joint

    HSS4 x 3 x 0.25 for bike heigh

    typ.

    Top ofconc.rail

    Tack weld plate to bolthead two places (typ.)

    #4 L-bars @ 8"w/18" legs

    Open orexpansionjoint

    4~#4 bar (eachside) stop 2" cl.at all joints.

    #4 U-bars @ 8"w/12" legs

    #4 L-bars @8" w/6" legs

    10-#4 long bars as shown

    HSS4 x 3 x 0.25HSS4 x 4 x 0.1875Posts @ 6-8"max. ctrs.

    1/2 " dia. x 8 1/2 "long round head(A307) bol t s wi thwasher and nut

    1/2 " dia. postdrain hole thrugrout pad Anchor \ 1 /2 see dwg. BR223

    Cap\ 3/16 x3 3/4 x3 3/4 "cope corners 3/4 "to provide zincdrains

    3-6 1/2 " Rail

    Se eGradingP lans

    *C ONC R ETE INSER TS:Hot-dip galvanized expanded coilconcrete inserts with closed-backferrule threaded to receive 3/4 "dia. bol t s , Gr36 (ASTM A307).Minimum insert length= 4 1/2 "Minimum safe working load intension= 4000 lbs.

    Hot-dip galvanize structural steel including fasteners after fabrication. ProvidControl Silicon posts and horizontal rail steel tubing according to ODOT SpeTap nuts and inserts 0.021" oversize after galvanizing in accordance with A

    3"

    B

    2-2"

    See Base Plate Detail,dwg. BR223 for details

    4~ 3/4 " dia. bolts into*concrete inserts

    1-7"

    HSS4 x 3 x 0.25

    L

    Rail splice

    12"L/4 |6"

    312

    2"112

    2-2"

    Terminal connector(1-0 .135" th ick) element .

    A

    A

    B

    B

    112

    11 1/2 "1-7"3-9"

    See Detail "A", dwg. BR223for plate details.

    Uniform spacing , 6-8" max.

    Ctr. ofbolts

    Ctr. ofpost

    6~ 7/8 " dia. galv. bolts (A325) w/std. (galv.)washers and lock nuts or jam nuts

    2~ 5/8 " dia. galv. bolts (A307)w/s td . (galv . ) washers (back s ideonly) and lock nuts or jam nuts.

    See dwg. RD410

    HSS4 x 3 x 0.25

    HSS4 x 3 x 0.25HSS4 x 4 x 0.1875

    ELEVATION ~ TRANSITION RAIL DETAIL

    4-0

    "R.

    2"

    Finishgrade

    ELEVATION ~ CONCRETE BRIDGE RAIL

    PLA N ~ TR A N SI TI O N R A I L D ETA I L

    GENERAL NOTES:

    NOTE:

    SEC TIO N A -A

    TYPICAL RAIL SECTION

    31.18.0t ructural S teel Weight ( lbs / f t)Reinforcement Weight ( lbs / f t)Concrete Volume (ft /ft)

    Design Capaci t i esLRFD A13.3 .1Rw= 59.2 kipsLc= 8.24 ft (within panel)Lc= 4.57 ft (end of panel)Mc= 17.3 k-ft/ft

    37057otal Rail Weight (lbs/ft)Center of Gravity (cg, ft) 0.572 0.581

    c.g.

    NOTE:For Sections B-B, C-C, and D-Dand Detai l s A, B , C , and Dsee dwg. BR223

    12 3/4 "

    12 3/4 "

    1 07-09

    1

    1

    Provide High Strength anchor bolts (Grade 105) according to ODOT Specifica

    14~ 5/8 " dia. x 1-3" H.S.anchor bolts threaded5" min. w/washer & nut

    Added note, H.S. and changed 12 5/8 " to 1

    Thrie beam transition doublethickness (2-0.105" thick) elements

    Thrie beam rail double thickness(2-0.105" thick) elements

    See top end rail plate detail, dwg. BR223