  • STADIUMS & ARENASSOLID CONSTRUCTION TO PERFECTION

  • 2

    SOLID CONSTRUCTION TO PERFECTION

    QUALITY PRECISION EFFICIENCY

    FLEXIBILITY ON-TIME DELIVERY

    SOLID MANAGEMENT DIVERSITY

    COST EFFECTIVE INDIVIDUALITY

    INNOVATION DEPENDABLE EXPE-

    RIENCE SUSTAINABLE PATENTED

    DESIGN RELIABILITY PRODUCTION

    EVERYTHING FROM A SINGLE SOURCE

  • We have been a sound and solvent partner for precast reinforced concrete construction for more than 60 years. We erect buildings up to any performance limit required.

    The precast concrete elements for our con-struction projects are designed and produced at our own works, which is one of the largest and most modern precast reinforced concrete plants in the world. Many of the precast elements are based on our own designs and patents.

    With a portfolio of more than 2,500 facilities every single one completed successfully on deadline we are a powerful partner for cli-ents in industry, logistics and trade.

    All the expertise needed for contract execution is available in-house. Our team of around 350 employees, including 100 graduate engineers and architects for design, structural analysis and project implementation, are distinguished by their high qualifications.

    BREMER creates turnkey facilities, if required, and also acts as general contractor. The result, for example, is a modern stadium with a ca-pacity of approx. 25,000, constructed in 15 months for a price of around 23 million.

    A medium-scale company with an internation-al orientation and annual revenues of 300 million, we operate throughout Europe under the central management of our head office in Paderborn.

    Our top priority is full satisfaction for every client.

    3

    SOLID CONSTRUCTION TO PERFECTION

  • CONTENTS

    Page 03 SOLID CONSTRUCTION TO PERFECTION

    Page 05 BREMER STADIUMS & ARENAS Customised, efficient and completed on deadline

    Page 06 BREMER STADIUM TYPES The future already built in

    Page 12 PADERBORN ARENA First of its kind built to the latest standards

    Page 14 OFFENBACH STADIUM Newbuild during the fixture season

    Page 16 KASSEL STADIUM UPGRADE Grandstand with versatile function building

    Page 18 MNSTER STADIUM UPGRADE New stand in record time

    Page 20 GLIWICE ARENA DESIGN First-hand expertise

    Page 22 The BREMER PRINCIPLE

    4

  • STADIUMS AND ARENAS

    Customised, efficient andcompleted on deadline

    Solid, systemised precast construction is parti-cularly well suited for the creation of stadiums and arenas. Our method of construction not only provides endless scope for customised de-sign but also permits the economical realisa-tion of sports and event facilities on any scale.

    BREMER constructed the first small arena-style stadium in Germany that meets all national and international soccer association stipula-tions. Its modern Bundesliga-standard specifi-cations include a pitch with undersoil heating, sprinkler system and rolled turf.

    Apart from realising stands with seating and standing space tailored to individual require-ments, stadium construction also involves creat- ing function buildings for team rooms, VIP areas, catering facilities and office premises as well as fan shops and the whole range of facilities for media coverage of events.

    As general contractor, BREMER offers full turn-key solutions from a single source. Innovative design and end-to-end planning provide the sound foundation needed for efficient con-struction based on BREMERs own precast con-crete construction patents.

    Your benefits Design, fabrication and assembly from a single source Solid construction League-standard and FIFA-compliant specifications Very short construction period Integration of exterior facilities and gardens Upgradeable at any time

    5

  • Versatile, flexible and upgradeable

    BREMER STADIUM TYPES

  • BREMER STADIUM TYPES

    BREMER stadiums and arenas are available in three types, offering lots of design options for seating and standing plans. What is special about our stadium concepts is their flexibility. They are designed from the outset with pos-sible upgrades in mind, so they are already primed to meet future needs. At the same time, we also take account of function buildings and the special requirements they need to meet to cater for players, VIPs and the media.

    The three stadium types, with different capa-cities, not only fulfil all international soccer association requirements; they can also be upgraded to accommodate more spectators in the future.

    BREMER arena construction is based on ground-breaking systemised precast construc-tion patents that permit smaller stadiums and arenas to be realised within a short construc-tion period on unbeatable terms. Depending on requirements, the facilities can also be used for other sporting or cultural events.

    BREMER constructs turnkey facilities and sup-plies all services, including finishing work, from a single source.

    The future already built in

  • BREMER STADIUM TYPES

    8

    TYPE A4-stand stadium: 15,000 seated or 10,000 seated and 8,000 standing

    4-stand stadium, main view, function building

    TYPE A18,000 capacity

  • 9

    4-stand stadium, cross-section

    TYPE B4-stand stadium: 18,000 seated or 14,000 seated and 8,000 standing (approx. 1,000 capacity view obstructed)

    TYPE B22,000 capacity

  • Function building, player and coach areas

    TYPE CArena: 20,000 seated or 16,000 seated and 8,000 standing view obstruction (approx. 1,000 capacity view obstructed)

    TYPE C24,000 capacity

  • First of its kind built tothe latest standards

    12

    PADERBORN ARENA

  • The Arena in Paderborn is built to meet all the specifications of the DFB, DFL and FIFA. The exterior walls are completely closed for bet-ter noise abatement. The pitch is furnished with undersoil heating, a sprinkler system and rolled turf. The function building offers space for club offices and catering.

    The BREMER construction method is unique in Germany. The Paderborn Arena is the first small closed-design stadium that fulfils all soc-cer association guidelines and complies with the latest Bundesliga standards. It has thus been selected as a DFL reference facility for out-standing cost/benefit performance as well as efficient stadium construction and operation.

    Arena specificationsSeated 4,891Standing 9,260Business and VIP 734Disabled 30Carers 30Press 52Total capacity 14,997

    Year of construction 2009Construction period 11 monthsNet contract sum 10.0 million

    Scope of supply and servicesTurnkey realisation including architectural design and final planning as well as all engi-neering services.

    The arena can be upgraded to accommodate approx. 3,000 more spectators.

    13

  • Newbuild duringthe fixture season

    OFFENBACH STADIUM

    14

  • With four stands and open corners, the new Offenbach Stadium is a British-style facility. It accommodates around 20,500 spectators and meets all the requirements of the national soccer associations as well as FIFA. Standing space, for around 9,500, is comparatively generous and, in line with tradition, partially located around the centre line.

    One of the special features of this project is that the construction schedule runs through the fixture season. The speed and precision of the BREMER construction method makes it possi-ble for stands to be erected in four construc-tion phases without interfering with matches. Architectural accents such as the drawer in the grandstand increase the 2nd floor business area to more than 1,500 square metres.

    Stadium specificationsSeated 9,401Standing 9,923Business and VIP 920Disabled 40Carers 40Press 56Total capacity 20,380

    Year of construction 2011Construction period Feb 11 - July 12 Net contract sum 22.0 million

    Scope of supply and servicesTurnkey realisation including architectural de-sign and final planning as well as all engineer-ing services

    The Stadium can be upgraded to accommodate approx. 4,000 more spectators.

    15

  • For the Auestadion in Kassel, BREMER cons-tructed a new roofed grandstand as well as a three-storey function building that meets all the specifications of the DFB, DFL and German Athletics Association. The facility is thus suit-able for use not only for soccer but also as a venue for athletic championship events, which require significantly more changing facilities, media rooms and sanitary facilities.

    The new stand offers seating for more than 2,600 spectators, with dedicated seating ar-eas for VIPs and press. Realised by BREMER as a turnkey contract, it was completed right down to the finishing work in just eight months.

    Stadium specificationsSeated 2,612Standing -Business and VIP 20Disabled 15Carers 15Press 20Previous capacity 15,341Total capacity 17,993

    Year of construction 2010Construction period Feb 10 - Oct 10 Net contract sum 7.0 million

    Scope of supply and serviceTurnkey realisation including final construction planning and structural analysis.

    Grandstand with versatilefunction building

    KASSEL STADIUM

    16

  • 17

  • The new grandstand for the Mnster Stadium incorporates not only a stand roof but also a three-storey function building designed to meet DFB and DFL requirements. Among other things, it offers space for up to 700 VIP guests and was completed within a construction peri-od of just six months. The 3,000 capacity stand, including roof, was finished in six months.

    BREMER was awarded the contract because its bid was within the 5 million budget limit. The competing bid was 1 million m