1
E. THOMPSON RD. S. SHERMAN DR. SHELBYVILLE RD. SHELBYVILLE RD. S. ARLINGTON AVE. E. EDGEWOOD AVE. E. SOUTHPORT RD. E. STOP 11 RD. E. COUNTY LINE RD. FIVE POINTS RD. S. FRANKLIN RD. ACTON RD. ACTON RD. SOUTHEASTERN AVE. INTERSTATE 74 INTERSTATE 65 INTERSTATE 65 INTERSTATE 465 S. FRANKLIN RD. HICKORY RD. S. EMERSON AVE. E. SOUTHPORT RD. COMBS RD. INDIAN CREEK RD. SIGNED DETOUR ROUTE 2 STOP 11 RD. DETOUR COMBS RD. DETOUR FRANKLIN RD. DETOUR Franklin Rd. Bridge Closure from April 2020 to October 2020. Stop 11 / Combs closure from April to June 2020. Southeastern Ave (Southeast Bound) Closure from mid March to early May 2020. CONSTRUCTED 2019 CONSTRUCTED 2019 CONSTRUCTED 2019 CONSTRUCTED 2019 1 1 2 2 BRIDGE REHABILITAION 2020 INTERSECTION IMPROVEMENT 2020 INTERSECTION IMPROVEMENT 2019 CONSTRUCTION 2020 PH II CONSTRUCTION 2020 PH II CONSTRUCTION 2020 PH II ROAD CLOSURE 2020 CONSTRUCTION 2020 CLOSURE DURATIONS SOUTHEASTERN AVE. DETOUR

BRIDGE REHABILITAION SOUTHEASTERN AVE.INTERSTATE 74 ...€¦ · southeastern ave (southeast bound) closure from mid march to early may 2020. constructed constructed 2019 2019 constructed

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BRIDGE REHABILITAION SOUTHEASTERN AVE.INTERSTATE 74 ...€¦ · southeastern ave (southeast bound) closure from mid march to early may 2020. constructed constructed 2019 2019 constructed

E. THOMPSON RD.

S. S

HERM

AN D

R.

SHELBYVILLE RD.

SHELBYVILLE RD.

S. A

RLIN

GTO

N A

VE.

E. EDGEWOOD AVE.

E. SOUTHPORT RD.

E. STOP 11 RD.

E. COUNTY LINE RD.

FIVE

PO

INTS

RD.

S. F

RANK

LIN

RD.

ACTO

N RD

.AC

TON

RD.

SOUTHEASTERN AVE.

INTERSTATE 74

INTERSTATE 65

INTE

RSTA

TE 6

5

INTERSTATE 465

S. F

RANK

LIN

RD.

HICK

ORY

RD.

S. E

MER

SON

AVE.

E. SOUTHPORT RD.

COM

BS R

D.

INDIAN CREEK RD.

SIGNED DETOUR ROUTE

2

STOP 11 RD. DETOUR

COMBS RD. DETOUR

FRANKLIN RD. DETOUR

Franklin Rd. Bridge Closurefrom April 2020 to October2020.

Stop 11 / Combs closure fromApril to June 2020.

Southeastern Ave(Southeast Bound) Closurefrom mid March to early May2020.

CONSTRUCTED2019CONSTRUCTED

2019

CONSTRUCTED2019

CONSTRUCTED2019

1

1

2

2

BRIDGE REHABILITAION2020

INTERSECTIONIMPROVEMENT2020

INTERSECTIONIMPROVEMENT2019

CONSTRUCTION2020 PH II CONSTRUCTION

2020 PH II

CONSTRUCTION2020 PH II

ROAD CLOSURE2020

CONSTRUCTION2020

CLOSURE DURATIONS

SOUTHEASTERN AVE.DETOUR