www.bristoltemplequarter.com. www.bristoltemplequarter.com. EZ facts, objectives and targets. One of the largest place projects in the UK 70 hectares of land including Temple Meads railway station Superb opportunity to create business gateway to Bristol and the West of England - PowerPoint PPT Presentation

Citation preview

Page 1: bristoltemplequarter

www.bristoltemplequarter.com

Page 2: bristoltemplequarter

www.bristoltemplequarter.com

Page 3: bristoltemplequarter

EZ facts, objectives and targets• One of the largest place projects in the UK• 70 hectares of land including Temple Meads railway

station• Superb opportunity to create business gateway to Bristol

and the West of England• Focus on creative, digital, low carbon sectors and

financial and business services• Target: 4,000 new jobs in 5 years and 17,000 new jobs by

2037• Potential to develop 240,000 m2 of new or refurbished

space featuring offices, homes, retail and a redeveloped railway station

www.bristoltemplequarter.com

Page 4: bristoltemplequarter
Page 5: bristoltemplequarter
Page 6: bristoltemplequarter

Investment• £250m Temple Meads Station redevelopment• HCA funded £11m bridge to unlock site• Engine shed - £1.5m high-tech business office

space• £7m digital and creative campus by TCN Ltd.• Delivery of Metrobus and Metrorail by 2017• Delivery of Gigabit Bristol project• Delivery of District Heating• £90m Arena – No. 1 catalyst for development of

the zone

Page 7: bristoltemplequarter

Arena Island and Cattle Market Road Site

Page 8: bristoltemplequarter

Specification

• 12,000 capacity (seating and standing) • 10,000 capacity (fully seated)• Horse shoe configuration offers flexibility• Operator support for this facility mix • £91m cost envelope• A commercially led operation and development

Page 9: bristoltemplequarter
Page 10: bristoltemplequarter

Project Vision

• Creation of a key cultural asset for the city and sub-region

• A venue that every major act will want to play • One of the top European entertainment

venues • Catalyst for BTQEZ development

Page 11: bristoltemplequarter
Page 12: bristoltemplequarter

Benefit (Bristol Figures in brackets)

During Construction

Operational Phase

Gross temporary construction jobs 656

Net additional construction jobs 831

Net additional GVA £55.6m (£46.3m)

Gross direct jobs (WoE) 343

Gross indirect jobs (WoE) 568

Total Gross employment 911 (804)

Total Net additional employment 387 (274)

Net additional, cumulative, discounted GVA – over 25 years

£157.3m (£110m)

Estimated £20m minimum annual additional income coming in to the City

Page 13: bristoltemplequarter

ProgrammeDate Activity

April 2014 – December 2014 Procure Arena Operator

September 2014 – January 2015 Procure design team

February 2015 – July 2015 Design development and planning application

October 2014 – January 2016 Building contractor procurement and design development

January 2016 – Summer 2017 Construction and fit out

Summer 2017 Facility opens