74
7KH &OLPDWH &ULVLV²3KRWR LQ 1RUWK 3ROH E\ %52$' &KDLUPDQ RQ 0D\ BROAD AIR CONDITIONING Leadership in Cooling, Heating & Power Integrated Systems

BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

BROAD AIR CONDITIONING Leadership in Cooling, Heating & Power Integrated Systems

Page 2: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

CONTENT

1. BROAD overview 2. CHP Products 3. The Working Principle 4. Why CHP?

. BROAD Project References

Page 3: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

1. BROAD overview

Page 4: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Developing Milestones

First direct-fired non-electric chiller (DFA) manufactured in China (1992) World's largest manufacturer and seller of non-electric chillers (since 1996) World's only manufacturer remotely monitoring all chillers (since 1996) World's first exhaust-fired non-electric chiller (1999) World's first multi-energy non-electric chiller (2001) World's smallest non-electric chiller (2002) & largest central air conditioning (2003)

A private group with 2,400+ employees. Established in 1988 with US$3,000 by Mr. Zhang Yue. No.1 global seller of absorption chillers since 1996 25,000+ installations in 70+ countries. No. 1 global market share. Nineteen straight years profitable, fourteen straight years loan-free and eleven straight years top tax payer among Chinese private companies.

BROAD covers an area of 1 km2 / 100 hectares

Page 5: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process
Page 6: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process
Page 7: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process
Page 8: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

••

Page 9: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

10th generation IFA

BROAD Commitment in Absorption Technology All self-developed technologies; over 100 patents; international certificates; world’s largest manufacturing and testing base...

Page 10: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

2 . CHP Products

Page 11: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Absorption chillers/ non-electric air conditioning: more than 300 models. Energy sources: natural gas, town gas, biogas, diesel fuel, steam, hot water, exhaust,

industrial waste streams (any thermal heat over 95 ) Functions: cooling, heating, hot water Cooling/heating capacity: 233kW (66 Rt) 11,630kW (3,307 Rt)

10th generation DFA

Page 12: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process
Page 13: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

BROAD CHP Modes

Page 14: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

BROAD CHP Modes

Page 15: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

3 . The Working Principle

Page 16: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

heating water 65/55�

hot water 80/60�

heat energy

flow meter

vapor

condensed waterheating water

no operation

hot water

solution

hot w

ater

pum

p

heat

ing

wat

er p

ump

1. high temperature generator (HTG)

Table�

1

The cooling principle

The input heat energy heats LiBr solution to 140°C and generate vapor, which is then condensed into water by cooling water. When the refrigerant water enters evaporator (in high vacuum condition), its temperature goes down immediately to 5°C. And it is sprayed over the copper tubes, and chilled water from 14°C drop down 7°C to make cooling. The water absorbs heat from air conditioning system and evaporates, then is absorbed by concentrated LiBr solution from the generators. The cooling water takes away the heat and rejects it into the air. Diluted solution is pumped into HTG and LTG separately to be heated to begin the process all over again.

The heating principle

The input heat energy heats the LiBr solution. The vapor produced by the solution heats the heating water or hot water in tubes, while condensate returns to the solution to be heated and the cycle repeats. As "separate heating" is adopted, the heating cycle becomes very simple, just like a vacuum boiler. Therefore, the life span of the chiller can be doubled.

A separate heat exchanger can provide dedicated hot water while cooling or heating operation is stopped.So, only BROAD has the unique technology in the world that can realize "three functions in one unit".

1

2

3

4 5

6

7

chilled water 7/14�

hot water 80/60�

flow meter

diluted solutionrefrigerant water

refrigerant steam

chilled watercooling waterhot water

concentrated solution

Table�

hot w

ater

pum

p

chille

d w

ater

pum

p

cool

ing

wat

er p

ump

auto

dos

ing

wat

er so

ftene

r

cooling tower

pumpset

chiller

heat energy

1. high temperature generator (HTG)2. low temperature generator (LTG)3. condenser4. absorber5. evaporator 6. high temperature heat exchanger 7. low temperature heat exchanger

Notes: Lithium Bromide is high water absorbent salt nontoxic and harmless.

Page 17: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

4. Why CHP?

Page 18: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Conventional Centralized Power & Thermal Generation

Emission

Electricity

68% Waste Heat

(Remote from Thermal Users)

Centralized Power Plant 32% Fuel 100%

Page 19: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Distributed Energy/ Cooling, Heating and Power (CHP)

>80% Fuel 100%

Steam

Electricity

Chilled Water

Waste Heat & Mechanical Losses

(On or Near Thermal User Sites)

CHP Plants

<20%

Emission

Page 20: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

California Blackout 1999 New York Blackout August 2003

Energy is a problem in almost every country, our aim is not developing new energy but using the existing energy more efficiently!

Page 21: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Distributed Energy / CHP Role Expanding

• Relieve Grid Constraints • Improve grid utilization from 30% - 60%

– avoid upgrades • Improve power quality and reliability

– voltage, power factor, interruptions • Ensure that Cooling, Heating, and Power are available – security and safety • Lower central generation prices – Efficiency

Page 22: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

No heat recovery boiler

• Low operating costs - Higher efficiency: no intermediate energy conversion process • Lower investment - Save the cost for heat recovery boilers & boiler men • Smaller footprint • Simpler system design, implement & management

• BROAD with a wide experience in different CHP applications, exhaust type, exhaust + jacket water type, steam type, hot water type, etc.

Page 23: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

. BROAD & The World

Page 24: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

HH Sheikh Mohammed bin Zayed Al Nahyan at BROAD Pavilion

Page 25: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

BROAD is the only private group among all the Global Partners of Shanghai EXPO, we supply district cooling for all the 250 pavilions in the EXPO garden, there are 22 machine rooms distributed in the EXPO area. Total cooling capacity is 150MW (42,657 RT)

BROAD is a “Global Partner of Shanghai EXPO 2010”

Page 26: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

BROAD Air Conditioning helped Shanghai EXPO passed the toughest test: 1, The hottest summer in Shanghai history. 2, The most visitor among the EXPO history. Oct. 16th, the peak load is 1.03 million. In those machine rooms, some are CHP applications, by supporting the EXPO, CHP concept was widely spread.

Page 27: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

The fifth “China After SalesService Awards” was holdingin National Guest Hotel onApril 2nd.

BROAD, Haier, ZoomLion andSinoTruck awarded “ChineseMeritorious ServiceEnterprises”, the top aftersales service awards in China.

Other 30 enterprises awarded“Top 10 service” by theirproducts, service and sales.

Page 28: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process
Page 29: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process
Page 30: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

BROAD approaches and achievements in energy-saving technologies have been widely acknowledged by the world.

Page 31: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Being UNEP SBCI Vice Chairman, BROAD Chairman is intensively involved in various international activities in energy crisis, climate changes, building energy-saving, etc.

Page 32: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

. BROAD Project References

Page 33: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

BROAD has got 25,000+ installations in 70+ countries around the world

Page 34: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The tallest building in Jeddah, Saudi Arabia• Chiller model: 3 x BZHE332XB-400-90/100-40/34.4-6/14.9-d-500• Cooling capacity: 11,600kW • Power generator capacity: 6,000kW (3 x Taihao diesel engine) • Power generation efficiency 38%• Yearly energy saving equivalent: 2400 ton oil• Yearly CO2 cutting: 6,780 ton

Equivalent of planting: 358,000 trees

• BROAD CHP type: Hot water & exhaust & direct-fired chiller Energy efficiency: Cooling + Electricity = 82%

Exhaust400

Hot water & exhaust & direct-fired chiller Oil tank

Diesel engine

Jacket water 100

Chilled water 6Efficiency 43%

ElectricityEfficiency 38%

Page 35: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• A 7 star hotel in New Delhi, BROAD chiller recycles exhaust for cooling.• Chiller model: 1 x BZE219XBD500-k-250• Total cooling capacity: 2,547kW• Gas engine capacity: 2,200 kW (1 x MWM gas engine)• Power generation efficiency: 39%• Payback period: 2.7 years• Yearly energy saving equivalent: 440 ton oil • Yearly CO2 cutting: 1,320 ton Equivalent of planting: 71,440 trees

• BROAD CHP type: Exhaust & direct-fired chiller Energy efficiency: Cooling + Electricity =69%

Natural gas Gas engine

Exhaust500

Chilled water 7Efficiency 30%

Heating water 65Efficiency 24%

ElectricityEfficiency 39%

Exhaust & direct-fired chiller

Page 36: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• A famous shopping mall in Gurgaon,• Chiller model: 2 x BZHE181IXBD-500-88/98-d-200• Total cooling capacity: 4,210kW• Gas engine capacity: 1,400 kW (2 x CAT gas engine) • Power generation efficiency: 38%• Payback period: 2.5 years• Yearly energy saving equivalent: 775 ton oil • Yearly CO2 cutting: 2,320 ton

Equivalent of planting: 126,160 trees

• BROAD CHP type: Hot water & exhaust &direct-fired chiller Energy efficiency: Cooling + Electricity = 85%

Natural gas

Gas engine

Exhaust500

Jacket water 98

Hot water,exhaust&direct-fired chiller

Chilled water 7Efficiency 47%

ElectricityEfficiency 38%

Page 37: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The futuristic IT SEZ campus, provide high standard workspaces for IT companies

• Chiller model: 4 x BZHE333XBD-463-80/90-k-400• Cooling capacity: 15,491kW• Power generator capacity: 4,200 KW (4 x CAT gas engine)• Power generation efficiency: 38% • Payback period: 5.5 years• Yearly energy saving equivalent:

1,020 ton oil • Yearly CO2 cutting: 3,100 ton

Equivalent of planting: 166,000 trees

• BROAD CHP type: Hot water & exhaust &direct-fired chiller Energy efficiency: Cooling + Electricity = 83%

Natural gas

Gas engine

Exhaust463

Jacket water 90

Hot water,exhaust&direct-fired chiller

Chilled water 7Efficiency 45%

Heating water 65Efficiency 42%

ElectricityEfficiency 38%

Page 38: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• One of the finest and largest retail & commercial complex in New Delhi • Chiller model: 3 x BZHE150IXDB485-92/98-d • Cooling capacity: 5,233kW• Power generator capacity: 1,400 KW (3 x CAT gas engines)• Power generation efficiency: 38%• Payback period: 2 years• Yearly energy saving equivalent: 858 ton oil • Yearly CO2 cutting: 2,575 ton

Equivalent of planting: 140,000 trees

• BROAD CHP type: Hot water & exhaust &direct-fired chiller Energy efficiency: Cooling + Electricity = 85%

Natural gas

Gas engine

Exhaust485

Jacket water 98

Hot water,exhaust&direct-fired chiller

Chilled water 7Efficiency 47%

ElectricityEfficiency 38%

Page 39: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• One of the Delhi’s premier architectural and commercial landmarks • Chiller model: 3 x BZHE150IXBD485-92/98-d • Cooling capacity: 5,233kW • Power generator capacity: 1,400 KW (3 x CAT gas engines)• Power generation efficiency: 38%• Payback period: 2 years• Yearly energy saving equivalent: 858 ton oil • Yearly CO2 cutting: 2,575 ton

Equivalent of planting: 139,840 trees

• BROAD CHP type: Hot water & exhaust &direct-fired chiller Energy efficiency: Cooling + Electricity = 85%

Natural gas

Gas engine

Exhaust485

Jacket water 98

Hot water,exhaust&direct-fired chiller

Chilled water 7Efficiency 47%

Heating water 65Efficiency 45%

ElectricityEfficiency 38%

Page 40: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The biggest tower manufacturer in Asia• Chiller model: 1 x BZHE381IXD-415-85/90-d-B2-500• Cooling capacity: 4,431 kW• Power generator capacity: 4,500 kW (1 x Jenbacher gas engine)• Power generation efficiency: 38%• Payback period: 1.8 years• Yearly energy saving equivalent:1,125 ton oil • Yearly CO2 cutting: 3,374ton

Equivalent of planting: 184,000 trees

• BROAD CHP type: Hot water, Exhaust & direct-fired chiller Energy efficiency: Cooling + Electricity = 81%

Natural gas

Gas engine

Exhaust415

Jacket water 90

Hot water,exhaust&direct-fired chiller

Chilled water 7Efficiency 43%

ElectricityEfficiency 38%

Page 41: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• One of the famous film manufacturer in the world• Chiller model: 6 x BE106X440-d-B2-125• Total Cooling Capacity: 7,398 kW• Power generator capacity: 2,055 kW (6 x CAT gas engine) • Power generation efficiency: 38%• Payback period: 3.4 years• Yearly energy saving equivalent:1,460 ton oil • Yearly CO2 cutting: 4,400 ton

Equivalent of planting: 238,640 trees

• BROAD CHP type: Exhaust chiller Energy efficiency: Cooling + Electricity = 67%

Gas engine

Exhaust440

Chilled water 7Efficiency 29%

ElectricityEfficiency 38%

Natural gasExhaust chiller

Page 42: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• Office Building of the Thailand Federal Government• Chiller model: 2 x BE907X533-38/32-6/13-d-1000• Cooling capacity: 21MW • Power generator capacity: 5,500 KW (2 x Turbomach gas turbine)• Power generation efficiency: 32%• Payback period: 4 years• Yearly energy saving equivalent: 14,060ton oil • Yearly CO2 cutting: 42,140 ton

Equivalent of planting: 2,287,600 trees

• BROAD CHP type: Exhaust chiller Energy efficiency: Cooling + Electricity = 94%

Gas turbine

Exhaust533

Chilled water 6Efficiency 62%

ElectricityEfficiency 32%

Natural gas

Page 43: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The first & biggest CHP project in Iran and it uses sea water directly as cooling water which can save water consumption and energy• Chiller model: 3 x BS303X1.0-40/34-7/12-500• Cooling capacity: 10,600kW• Power generator capacity: 125,000 kW (6 x Hitachi gas turbine)• Power generation efficiency: 30%• Payback period: 3 years• Yearly energy saving equivalent:17,695 ton oil • Yearly CO2 cutting: 53,090 ton

Equivalent of planting: 2,080,000 trees

• BROAD CHP type: Steam chiller Energy efficiency: Cooling + Electricity = 81%

Burn garbage

Natural gas

Heat recovery boiler

Steam chiller

Chilled water7Efficiency 51%

ElectricityEfficiency 30%

Gas turbine

Page 44: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The most advanced airport in North Africa • Chiller model: 2 x BHEY187X464-88/98-90/70-37/32-6/12-w-250• Cooling capacity: 4,350kW • Power generator capacity: 4,349 kW (2 x CAT gas engine)• Power generation efficiency: 38%• Payback period: 3.2 years• Yearly energy saving equivalent: 2,560 ton oil • Yearly CO2 cutting: 7,900 ton

Equivalent of planting: 420,000 trees

• BROAD CHP type: Hot water & exhaust chiller Energy efficiency: Cooling + Electricity = 84%

Exhaust464

Hot water&exhaust chiller Natural gas

Gas engine

Jacket water 98

Chilled water 6Efficiency 46%

Heating water 65Efficiency 45%

ElectricityEfficiency 38%

Page 45: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The newest & biggest entertainment center in Istanbul• Chiller model: 3 x BE110X477-80/60-35/28-7/12-k-125 1 x BDH159X80/90-35/28-7/12-200• Cooling capacity: 5,690kW• Power generator capacity: 4,500 kW (3 x CAT gas engine)• Power generation efficiency: 38%• Payback period: 2.5 years• Yearly energy saving equivalent:3,390 ton oil • Yearly CO2 cutting: 10,180 ton Equivalent of planting:578,000trees

• BROAD CHP type: Exhaust & hot water chiller Energy efficiency: Cooling + Electricity = 69%

Natural gas

Gas engine

Exhaust477

Exhaust chiller

Chilled water 7Efficiency 31%

Heating water 65Efficiency 24%

ElectricityEfficiency 38%

Page 46: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The global leader in digital wireless technologies, CDMA patent owner• Chiller model: 1 x BE400X377-82/71-k • Cooling capacity: 4,600kW• Power generator capacity: 4,500 kW (1 x Solar gas turbine)• Power generation efficiency: 30% • Payback period: 1.7 years• Yearly energy saving equivalent: 2,330 ton oil • Yearly CO2 cutting: 7,000 ton

Equivalent of planting: 380,000 trees

Natural gas

Gas turbine

Exhaust380

Exhaust chiller

Chilled water 7Efficiency 48%

Heating water 65Efficiency 39%

ElectricityEfficiency 30%

• BROAD CHP type: Exhaust fired chiller Energy efficiency: Cooling + Electricity = 78%

Page 47: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• Main airport for Los Angeles, CA• Chiller model: 2x BDH162 X-81/110-34.4/26.6-5.6/15.6-200• Cooling capacity: 4,652kW• Power generator capacity: 4,614kW (3 x Cummins gas engine)• Power generation efficiency: 38% • Payback period: 2.1 year• Yearly energy saving equivalent:

1,200 ton oil • Yearly CO2 cutting:3,600ton

Equivalent of planting: 200,800 trees

• BROAD CHP type: Hot water chiller Energy efficiency: Cooling + Electricity = 70%

Heating water 65Efficiency 51%Heating water 65Efficiency 51%

Natural gasGas engine

Jacket water 110

Hot water chiller

Chilled water 5.6Efficiency 32%

ElectricityEfficiency 38%

Page 48: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The first community college in New Jersey sponsored by two different counties

• Chiller model: 1 x BHE103IX451-76.6/88.8-82.2/71.1-k-125• Cooling capacity: 1,454kW • Power generator capacity: 1,413kW (1 x Cummins gas engine)• Power generation efficiency 38%• Payback period: 2.3 years• Yearly energy saving equivalent: 390 ton oil • Yearly CO2 cutting: 1,170 ton Equivalent of planting: 64,200 trees

• BROAD CHP type: Hot water & Exhaust chiller Energy efficiency: Cooling + Electricity = 83%

Exhaust451

Hot water&exhaust chiller Natural gas

Gas engine

Jacket water 88.8

Chilled water 7Efficiency 45%

Heating water 82.2Efficiency 43%

ElectricityEfficiency 38%

Page 49: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• US military base of the 82nd Airborne Division, one of key air force bases• Chiller model: 1 x BE300VIII515-35.1/29.4-6.7/12.2-d • Cooling capacity: 3,500kW • Power generator capacity: 5,200 kW (1 x Solar gas turbine)• Power generation efficiency 30%• Payback period: 4 years• Yearly energy saving equivalent:

808 ton oil • Yearly CO2 cutting: 2,420 ton

Equivalent of planting: 131,480trees

• BROAD CHP type: Exhaust fired chiller Energy efficiency: Cooling + Electricity = 88%

Natural gas

Gas turbine

Exhaust515

Exhaust chiller

Chilled water 7Efficiency 58%

ElectricityEfficiency 30%

Page 50: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• One of the most famous universities in US

• Chiller model: 2 x BYS287X0.9-36.6/29.4-6.7/12.7-300

• Cooling capacity: 7,000kW

• Payback period: 5.6 years

• Yearly energy saving equivalent: 990 ton oil

• Yearly CO2 cutting: 2,970ton

Equivalent of planting: 161,120 trees

Page 51: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• BROAD CHP type: Hot water & Exhaust chiller Energy efficiency: Cooling + Electricity = 82%

• A private co-educational research university , one of the eight universities of Ivy League.

• Chiller model: 1x BHE177X440-92/98.9-38/29.4-7.2/15.6-d-200• Cooling capacity: 2,326kW• Power generator capacity: 4,555kW (2 x CAT gas engine)• Power generation efficiency 38%• Payback period: 2.4 years• Yearly energy saving equivalent: 626 ton oil • Yearly CO2 cutting: 1,880 ton

Equivalent of planting: 102,000 trees

ElectricityEfficiency 38%

Chilled water7.2Efficiency 44%

Exhaust440

Jacket water 98.9

Natural gas

Page 52: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• One of the biggest textile mill in Indonesia,BROAD Packaged systems are implemented

• Chiller model: 8 x BHE148X454-81/88-7/13-d-200• Cooling capacity: 13.7MW • Power generator capacity: 2, 000KW (8 x MTU gas engine)• Power generation efficiency: 38%• Payback period: 1.1 years• Yearly energy saving equivalent:3,590 ton oil • Yearly CO2 cutting: 10,710 ton

Equivalent of planting: 580,000 trees

• BROAD CHP type: Hot water & exhaust chiller Energy efficiency: Cooling + Electricity = 82%

Natural gas Gas engine

Exhaust454

Jacket water 88

Hot water, exhaust& direct-fired chiller

Chilled water 7Efficiency 43%

ElectricityEfficiency 38%

Page 53: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The biggest shopping mall in Serpong city Indonesia• Chiller model: 2 x BZHE121IXBD-421-80/90-36/31-d-125• Cooling capacity: 4,210kW• Power generator capacity: 2,200KW (2 x MWM gas engines)• Power generation efficiency: 38%• Payback period: 1.7 years• Yearly energy saving equivalent: 867 ton oil • Yearly CO2 cutting: 2,600 ton

Equivalent of planting: 140,980 trees

• BROAD CHP type: Hot water & exhaust &direct-fired chiller Energy efficiency: Cooling + Electricity = 82%

Natural gas

Gas engine

Exhaust421

Jacket water 90

Hot water,exhaust&direct-fired chiller

Chilled water 7Efficiency 44%

ElectricityEfficiency 38%

Page 54: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• Security and expertise in banknotes, security documents, andsmartcard solutions for communication and payment

• Chiller model: 1 x BHE65IX440-85/95-33/28-6/12-d• Cooling capacity: 756kW• Power generator capacity: 1,170 kW (1 x Deutz gas engine)• Power generation efficiency 38%• Payback period: 2.5 years• Yearly energy saving equivalent:1,190 ton oil • Yearly CO2 cutting: 3,570 ton

Equivalent of planting: 193,800 trees

• BROAD CHP type: Hot water & exhaust chiller Energy efficiency: Cooling + Electricity = 83%

Exhaust440

Hot water&exhaust chiller

Natural gas

Gas engine

Jacket water 95

Chilled water 6Efficiency 45%

ElectricityEfficiency 38%

Page 55: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The biggest producer of coking coal in Poland and owned by Mittal Mill • Chiller model: 3 x BS450IX0.5-35/26-12/21-400 3 x BS360IX0.5-35/25-12/21-300• Cooling capacity: 28,260kW• Power generator capacity: 80,000 kW (2 x Siemens steam Turbine)• Power generation efficiency: 35%• Payback period: 3.3 years• Yearly energy saving equivalent: 3,290 ton oil • Yearly CO2 cutting: 9,870 ton

Equivalent of planting: 535,800 trees

• BROAD CHP type: Steam chiller Energy efficiency: Cooling + Electricity = 68%

Coke coal

Boiler

High pressure steam

Steam turbine

Low pressure steam

Steam chiller

Chilled water12Efficiency 33%

ElectricityEfficiency 35%

Page 56: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• One of the largest shopping and leisure malls in Europe, Including dozens of restaurants, health club, multiplex cinema, funfair

• Chiller model: 2 x BE155X410-33/28-6/12-d-200• Cooling capacity: 3,600kW • Power generator capacity: 6,000 kW (2 x Jenbacher gas engine)• Power generation efficiency: 39%• Payback period: 4.2years• Yearly energy saving equivalent: 2,180 ton oil • Yearly CO2 cutting: 6,300 ton

Equivalent of planting: 331,720 trees

• BROAD CHP type: Hot water chiller Energy efficiency: Cooling + Electricity = 66%

Exhaust410

Exhaust chiller

Natural gas Gas engine

Chilled water 6Efficiency 27%

ElectricityEfficiency 39%

Page 57: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Biogas

Boiler

High pressure steam

Steam turbine

Low pressure steam

Steam chiller

Chilled water6Efficiency 32%

ElectricityEfficiency 34%

• One of the biggest private producer of renewable energy in Italia including on wind energy, solar, biomasses and merchant line

• Chiller model: 1x BS500X0.8-35/29-6/12• Cooling capacity: 5,815kW• Power generator capacity: 2874kW (1 x Steam Turbine)• Power generation efficiency: 34%• Payback period: 3.2years• Yearly energy saving equivalent:798ton oil • Yearly CO2 cutting: 2,800 ton Equivalent of planting: 96,720 trees

• BROAD CHP type: Steam chiller Energy efficiency: Cooling + Electricity = 66%

Page 58: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• One of the biggest aviation center in Europe• Chiller model: 6 x BDH284IX80/120-35/29-6.5/13.5-300• Cooling capacity: 19,800kW• Power generator capacity: 33,000 kW (6 x Wartsila gas engine)• Power generation efficiency: 41%• Payback period: 3.6 years• Yearly energy saving equivalent:1,250ton oil • Yearly CO2 cutting: 3,480 ton

Equivalent of planting: 178,400 trees

• BROAD CHP type: Hot water chiller Energy efficiency: Cooling + Electricity = 77%

Hot water chiller

Natural gas

Gas engine

Hot water 120 ElectricityEfficiency 41%

Chilled water 6.5Efficiency 36%

Exhaust

Page 59: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• A Spain-Japanese JV for chemical products. The free cooling is for Turbine Inlet Air Cooling to increase the heat efficiency of turbine.• Chiller model: 1x BDH252X100/115-36/30-5.5/10.5-300• Cooling capacity: 2,930kW• Power generator capacity: 13,430kW (1 x GE gas turbine)• Power generation efficiency: 28%• Payback period: 2.3 years• Yearly energy saving equivalent: 284 ton oil • Yearly CO2 cutting: 847 ton Equivalent of planting: 45,980 trees

• BROAD CHP type: Hot water chiller Energy efficiency: Cooling + Electricity = 66%

Hot water chiller

Natural gas

Gas turbine

Hot water 115

Chilled water.5Efficiency 38%

ElectricityEfficiency 28%

Exhaust

Page 60: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The second biggest public hospital in Palma de Mallorca, Spain• Chiller model : 1x BE152X410-35/29-6/12-d-200• Cooling capacity: 1,766kW• Power generator capacity: 3,041kW (1 x GE Jenbacher Gas Engine)• Power generation efficiency: 41%• Payback period: 2.8years• Yearly energy saving equivalent:968 ton oil • Yearly CO2 cutting: 1,390 ton Equivalent of planting: 35,900 trees

• BROAD CHP type: Exhaust chiller Energy efficiency: Cooling + Electricity = 68%

Exhaust410

Exhaust chiller

Natural gas

Gas engine

Chilled water 6Efficiency 27%

ElectricityEfficiency 41%

Page 61: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• A famous local shopping complex• Chiller model: 4x BE64IX489-95/70-k-65• Total cooling capacity: 3,000kW• Power generator capacity: 2,000 kW (4 x CAT gas engine)• Power generation efficiency : 38%• Payback period: 4.2years• Yearly energy saving equivalent:54,300 ton oil • Yearly CO2 cutting: 2,500 ton Equivalent of planting: 91,840 trees

• BROAD CHP type: Exhaust chiller Energy efficiency: Cooling + Electricity = 68%

Natural gas

Gas engine

Exhaust489

Exhaust chiller

Chilled water 7Efficiency 30%

Heating water 90Efficiency 24%

ElectricityEfficiency 38%

Page 62: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• World famous special chemical fiber manufacturer• Chiller model: 2 x BDH215X70/85-31/26-250 2 x BDH240X70/85-31/26-300 2 x BS200X0.8-35/29• Total cooling capacity: 15,000kW• Power generator capacity: 36,000kW(12 x GE Jenbacher gas engine)• Power generation efficiency: 38%• Payback period: 3.5 years• Yearly energy saving equivalent: 54,300 ton oil • Yearly CO2 cutting: 9,100 ton, Equivalent of planting: 402,840 trees

• BROAD CHP type: Hot water chiller Energy efficiency: Cooling + Electricity = 61%

Gas engine

Natural gas

Exhaust

hot water 85

hot water chiller

Chilled water 7Efficiency 33%

ElectricityEfficiency 38%

Page 63: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• Australian capital airport. Gas generators supply electricity and waste heat of exhaust and jacket water are recycled by BROAD for free cooling. • Chiller model: 3 x BZHE95XD-454-80/88-33/27.5-5/13-70/50-k-100• Cooling capacity: 3,315kW• Power generator capacity: 3,600 kW (3 x MWM gas engine)• Power generation efficiency : 39%• Payback period: 1.2 years • Yearly energy saving equivalent:1,100ton oil • Yearly CO2 cutting: 3,300 ton

Equivalent of tree planting: 180,000 trees

• BROAD CHP type: Hot water & exhaust&direct-fired chiller Energy efficiency: Cooling + Electricity = 83%

Natural gas

Gas engine

Exhaust454

Jacket water 88

Hot water,exhaust&direct-fired chiller

Chilled water 5Efficiency 44%

ElectricityEfficiency 39%

Heating water 70Efficiency 44%

Page 64: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• 40 floors tall, a famous green commercial building in Melbourne• Chiller model: 1x BZHE86XD-454-84/88-35/29.5-7/12.5-d-100• Cooling capacity: 1,000kW• Power generator capacity: 1,200 kW (1 x MWM gas engine)• Power generation efficiency: 39%• Payback period: 2.2 years• Yearly energy saving equivalent:233 ton oil • Yearly CO2 cutting: 700 ton

Equivalent of tree planting: 38,500 trees

• BROAD CHP type: Hot water & exhaust & direct-fired chiller Energy efficiency: Cooling + Electricity = 83%

Natural gas

Gas engine

Exhaust454

Jacket water 88

Hot water,exhaust&direct-fired chiller

Chilled water 7Efficiency 44%

ElectricityEfficiency 39%

Page 65: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• National Bank, top3 in Australia• Chiller model: 1 x BHE167X453-84/92-35/29.5-d-200• Cooling capacity: 1,940kW• Power generator capacity: 1,100 kW (1 x Cummins gas engine)• Power generation efficiency : 38%• Payback period: 2.3years• Yearly energy saving equivalent:1,280ton oil • Yearly CO2 cutting: 3,680 ton

Equivalent of tree planting: 186,380 trees

• BROAD CHP type: Hot water& exhaust chiller Energy efficiency: Cooling + Electricity = 83%

Exhaust453

Hot water&exhaust chiller

Natural gas

Gas engine

Jacket water 92

Chilled water 7Efficiency 45%

ElectricityEfficiency 38%

Page 66: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• With over 140 years history and providing outstanding care for Victoria'schildren and their families

• Chiller model: 2 x BHE108X470-85/95-35/29.5-6.5/13-70/52-k-125• Cooling capacity: 2,550kW• Power generator capacity: 2,320 kW (2 x Cummins gas engine)• Power generation efficiency 38%• Payback period: 1.2 years• Yearly energy saving equivalent: 988ton oil • Yearly CO2 cutting: 2,960 ton

Equivalent of tree planting: 162,000 trees

• BROAD CHP type: Hot water & exhaust chiller Energy efficiency: Cooling + Electricity = 84%

Exhaust470

Hot water&exhaust chiller Natural gas

Gas engine

Jacket water 95

Chilled water 6.5Efficiency 46%

Heating water 70Efficiency 44%

ElectricityEfficiency 38%

Page 67: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• The leading leisure venue in Sydney• Chiller model: 1 x BHE75X433-84/93-85/70-k-100• Cooling capacity: 870kW• Power generator capacity: 1,100 kW (1 x GE Jenbacher gas engine)• Power generation efficiency 38%• Payback period: 2.4 years• Yearly energy saving equivalent: 185ton oil • Yearly CO2 cutting: 560 ton

Equivalent of tree planting: 30,600 trees

• BROAD CHP type: Hot water & exhaust chiller Energy efficiency: Cooling + Electricity = 82%

Exhaust433

Hot water&exhaust chiller

Natural gas

Gas engine

Jacket water 93

Chilled water 7Efficiency 44%

Heating water 85Efficiency 44%

ElectricityEfficiency 38%

Page 68: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• A famous Mexican refrigerator plant• Chiller model: 3 x BE65X438-30.6/23.9-10/15.6-d-50• Cooling capacity: 2,268kW• Power generator capacity: 930 kW (3 x diesel engine)• Power generation efficiency: 35%• Payback period: 1.8 years• Yearly energy saving equivalent:

430 ton oil • Yearly CO2 cutting: 3400 ton

Equivalent of planting: 186,000

• BROAD CHP type: Exhaust chiller Energy efficiency: Cooling + Electricity = 65%

Diesel oil tank

Diesel Engine

Exhaust438

Exhaust chiller

Chilled water 10Efficiency 30%

Heating water 65Efficiency 23%

ElectricityEfficiency 35%

Page 69: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Natural gas

Gas engine

Exhaust424

Jacket water 90

Hot water,exhaust&direct-fired chiller

Chilled water 5.5Efficiency 44%

ElectricityEfficiency 38%

• The tallest building in the South America• Chiller model:5 x BZHE500IXBD-424-80/90-33/27-5.5/15.5-k • Cooling capacity: 30,000kW• Power generator capacity:

4,000 kW(6 x Cummins gas engine)• Power generation efficiency: 38%• Payback period: 1.3 years• Yearly energy saving equivalent:8,333 ton oil • Yearly CO2 cutting: 25,000 ton

Equivalent of planting: 1,370,000

• BROAD CHP type: Hot water & exhaust & direct-fired chiller Energy efficiency: Cooling + Electricity = 82%

Heating water 65Efficiency 43%

Page 70: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• A well-known Colombian ferronickel factory• Chiller model: 1 x BZE125IXD-500-d • Cooling capacity: 1,454kW• Power generator capacity: 1,750 kW (1 x Cummins gas engine)• Power generation efficiency 38%• Payback period: 1.7years• Yearly energy saving equivalent: 276 ton oil • Yearly CO2 cutting: 2,200ton

Equivalent of planting: 120,000 trees

• BROAD CHP type: Exhaust & direct-fired chiller Energy efficiency: Cooling + Electricity = 71%

Natural gas

Exhaust

Exhaust & direct-fired chiller

Chilled water 7Efficiency 33%

ElectricityEfficiency 38%

Gas engine

Page 71: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• Landmark of Anyang CBD in Seoul. BROAD chillers use the waste heat from CHP system and serve cooling to this area. Up till now it is the biggest waste heat cooling system in Korea• Chiller model: 2 x BDH91X82/97-36.5/31-7/12-100 2 x BDH157X82/97-36.5/31-7/12-200 1 x BDH110X82/97-36.5/31-7/12-125 3 x BDH243X82/97-36.5/31-6/12-300 • Total cooling capacity: 15,452kW• Payback period: 5.6 years• Yearly energy saving equivalent: 3,220ton oil• Yearly CO2 cutting: 9,080 ton

Equivalent of planting: 532,000 trees

Gas turbineNatural gas

Exhaust

hot water 97

hot water chiller

Chilled water 7Efficiency 20%

ElectricityEfficiency 32%

• BROAD type: Hot water chiller Energy efficiency: Cooling + Electricity = 52%

Page 72: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

Korea Hyundai I'PARK, Korea

• Located at the Busan Olympic Sailing Centre and it’s the highest building at seaside. It is owned by Hyundai Group and six star hotel

office and shopping mall are all included. • Chiller model: 2 x BS65X0.8-6/13-37.5/32-75• Total cooling capacity: 1,520kW• Payback period: 6.2 years• Yearly energy saving equivalent: 520ton oil• Yearly CO2 cutting: 1,230 ton Equivalent of planting: 62,000 trees

• BROAD type: Steam chiller Energy efficiency: Cooling = 135%

Boiler

steam chiller

Chilled water 6Efficiency 135%

Page 73: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

• It is a renovation for Korea central government buildings including energydepartment financial department Ministry of the Environment MLTMministry of justice ministry of labor etc..BROAD chiller are applied to use

hot water from District Heating Grid to supply cooling for the buildings which can reduce 15% CO2 emission. • Chiller model: 4 x BDH242X80/95-7/12-300 1 x BDH45X80/95-7/12-75• Total cooling capacity: 11,780kW• Payback period: 5.2 years• Yearly energy saving equivalent: 984 ton oil• Yearly CO2 cutting: 5,200ton

Equivalent of planting: 290,080 trees

• BROAD type: Hot water chiller Energy efficiency: Cooling = 75%

Hot water chiller

Chilled water 7Efficiency 75% Buildings

District heating grid

Page 74: BROAD AIR CONDITIONING Leadership in Cooling, Heating ... - Profile.pdf · No heat recovery boiler • Low operating costs - Higher efficiency: no intermediate energy conversion process

THANK YOU