1
ST. GREGORY’S CATHOLIC PRIMARY SCHOOL We were contacted by St. Gregory’s CP School with a view to supplying and installing a timber trail within their school grounds. Having discussed a couple of options, the school went with our Budget Trail 2 manufactured from Quarter Sawn timber, which was installed onto grass with no additional safer surfacing (as this is all low-level equipment). We also installed a bespoke timber Traverse Wall onto an existing frame underneath a raised outdoor classroom. Installed in October 2018 Value £7,325.00 + Vat Budget Trail 2 in timber - installed onto grass - with a bespoke Traverse Wall. Copyright © 2018 PlayQuest Adventure Play Ltd. before after after before after after

Budget Trail 2 in timber - installed onto grass - with a ...€¦ · We were contacted by St. Gregory’s CP School with a view to supplying and installing a timber trail within their

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Budget Trail 2 in timber - installed onto grass - with a ...€¦ · We were contacted by St. Gregory’s CP School with a view to supplying and installing a timber trail within their

ST. GREGORY’S CATHOLIC PRIMARY SCHOOL

We were contacted by St. Gregory’s CP School with a view to supplying and installing a timber trail

within their school grounds.

Having discussed a couple of options, the school went with our Budget Trail 2 manufactured from

Quarter Sawn timber, which was installed onto grass with no additional safer surfacing (as this is

all low-level equipment). We also installed a bespoke timber Traverse Wall onto an existing frame

underneath a raised outdoor classroom.

Installed in October 2018 Value £7,325.00 + Vat

Budget Trail 2 in timber - installed onto grass - with a bespoke Traverse Wall.