    BUILDING APPLICATION

    APPROVAL PROCESS

    Presented by

    City Engineer

    Norman Shand

  • 7/30/2019 Building Application Approval Process From City Engineer

    2/32

    The Building Act

    Permission is required for any of thefollowing

    Construction/ Erection of building

    Addition/ alterations and external repairs

    Demolition of building

    Temporary building and Farm House

    Change in use of building from one useclass to another eg. Residential tocommercial

  • 7/30/2019 Building Application Approval Process From City Engineer

    3/32

    Requirements for Applying

    Detailed Construction Drawings for proposed development

    including: Site Plan (showing building layout and footprint; accessand exit) , Elevation, section, electrical, sewage, roof etc.

    Single Family Dwelling House 4 sets

    Multi-Family Town House 4-9 sets

    Apartment Building 4-9 sets

    Commercial Structure 4-9 sets

    Change of Use 4-6 sets

    Institutional 4- 9 sets

    Industrial 4-9 sets

    Telecommunication 4-9 sets

  • 7/30/2019 Building Application Approval Process From City Engineer

    4/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    5/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    6/32

    Criteria for Drawings

    Location map at required scale and showing where thedevelopment is located in relation to surrounding areas.

    Site Plans must be drawn to a minimum scale of 1:500

    (depending on the size of the site). Define all survey pegs to the lot (s) involved. Show and

    calculate all areas of impermeable site coverageshowing all trees over 6m in height and/ or 600mm girth.

    The Length and bearing of all boundaries. Dimensions must be shown for parking space, where

    applicable car parking spaces and vehicularmaneuvering on the property.

  • 7/30/2019 Building Application Approval Process From City Engineer

    7/32

    Criteria for Drawings contd

    Site Plans contd

    Any existing or proposed buildings to be clearly defined anddimensioned from boundaries and other buildings (setback)

    Contour lines for Gradient 15 degrees (1:4) and over where the land issusceptible to flooding and landslide (existing land contours at amaximum of 3m increments or as required by your Local Planning

    Authority).

    Road Alignment (Center Line) and significant features such as poles,hydrants

    Access and egress

  • 7/30/2019 Building Application Approval Process From City Engineer

    8/32

    Criteria for Drawings contd

    Construction drawings must be drawn to a minimum scale of 1:100 (1:75 for complex drawings, where a building is too large to fit on a24x36paper). All legends & drawings are required to be visible andaccurately labelled.

    - Floor plan: The entire floor layout including existing as

    well as proposed floor plans (use of rooms,doorways, windows, opening etc.)

    - Foundation plan: shows all structural members includingstiffeners, column pad footings etc.

    - Roof plan: shows all structural members (sizes, spacingtypes, roof pitch, drainage etc.)

  • 7/30/2019 Building Application Approval Process From City Engineer

    9/32

    Criteria for Drawings contd

    - Elevations: Label all exterior finishes (walls, roof material),highlighting ground levels both existing and final (Allelevation details for new development, alterations orextensions).

    - Sections: a minimum of 2 (1 longitudinal & 1 cross-sectional)sections through a critical part of the buildingdepicting interior details and showing ground andfinish floor levels.

    - Structural details: Include details of all structural components:foundations, columns, beams, footing, lintel,stiffeners, staircase plan (reinforce andsection), roof vent detail, etc

  • 7/30/2019 Building Application Approval Process From City Engineer

    10/32

    Criteria for Drawings contd

    - Drainage details: Must include grease trap, trap gully basin,septic tank, absorption pit, title field,

    manhole etc.

    - Drainage Plan: The existing and proposed storm water

    drainage and Plumbing layout. Position ofexisting and proposed features such assanitary drains, septic tanks, absorption pit,soak away pit, tile field, surface/ storm watercollection, containment and final disposal pointetc. must include grease trap, trap gully basin.

    - Electrical plan: Layout of all electrical components, electricaloutlets, lighting fixtures etc.

    - Other Infrastructure Retaining walls, swimming pools andboundary walls.

  • 7/30/2019 Building Application Approval Process From City Engineer

    11/32

    TYPICAL PROBLEMS/ DEFICIENCIES ASSOCIATED WITH

    BUILDING APPLICATION APPROVAL PROCESS

    Lack of critical information dimensions on floor plan, roof plans and sections.

    Location map (showing proposal location / site)

    Site plan not a true reflection of the physical site

    Legibility improper font size

    Critical sections and missing details

  • 7/30/2019 Building Application Approval Process From City Engineer

    12/32

    Lack of critical information Contd

    Misrepresentation of the topography site profile ( not true

    reflection of slope)

    Incorrect sewer systems or poor details - conflictinginformation of detail

    Civic number for property (Required for applications in urban,suburban areas.

    Inadequate storm water drainage system

    Lack of comment from NWC regarding supply of portablewater for multi-family

    Letter from NWC for sewer connection / sewage treatment.

  • 7/30/2019 Building Application Approval Process From City Engineer

    13/32

    Concerns/ deficiencies in the presentation of structural

    detailing

    Reinforced concrete slab:

    - Main bottom bars in slabs in wrong direction.

    - Incorrect placement of distribution bars

    a) above over-support bars and anti-crack bars

    - Missing over-support bars in slab

    - Guessing of reinforcement in slab, beams, columns. (commonreinforcement used in slab dia. @ 6c/c, 13mm dia. @

    150mmc/c) in both directions

  • 7/30/2019 Building Application Approval Process From City Engineer

    14/32

    TYPICAL PROBLEMS/ DEFICIENCIES ASSOCIATED WITH

    BUILDING APPLICATION APPROVAL PROCESS contd

    Reinforced concrete slab contd:

    - Incorrect sections through slabs and reinforcement

    - Incorrect calling up of reinforcement

    Foundations:

    - Incorrect placing of reinforcement in different types of foundations

    a) conventional strip foundation

    b) isolated pad foundationc) raft foundation

    d) step foundation

    - Incorrect Labeling and dimensioning of foundations

  • 7/30/2019 Building Application Approval Process From City Engineer

    15/32

    TYPICAL PROBLEMS/ DEFICIENCIES ASSOCIATED WITH

    BUILDING APPLICATION APPROVAL PROCESS

    Concrete Beams & Columns

    - Improper sections and detailinga) stirrups

    b) splicing of reinforcement

    c) main bar placing

    - Dimensioning and calling up of reinforcement

    Stairs

    - Incorrect placing and calling up of reinforcement in stairs.

    Reinforced concrete frame and steel structure.

    - Detailing requirements

    a) Improper dimensioning

    b) Improper detailing and sections

  • 7/30/2019 Building Application Approval Process From City Engineer

    16/32

    STRUCTURALCOMPONENTS

    OF A BUILDING

  • 7/30/2019 Building Application Approval Process From City Engineer

    17/32

    Sheet 1

  • 7/30/2019 Building Application Approval Process From City Engineer

    18/32Sheet 2

  • 7/30/2019 Building Application Approval Process From City Engineer

    19/32

    Sheet 3

  • 7/30/2019 Building Application Approval Process From City Engineer

    20/32

    Sheet 4

  • 7/30/2019 Building Application Approval Process From City Engineer

    21/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    22/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    23/32

    Poorly Constructed Building

    Without Approval King Weston St. Andrew

  • 7/30/2019 Building Application Approval Process From City Engineer

    24/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    25/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    26/32

    Building that does not

    meet the criteria of

    adequate distance from

    road way and making

    adequate space for

    pedestrians

  • 7/30/2019 Building Application Approval Process From City Engineer

    27/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    28/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    29/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    30/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    31/32

  • 7/30/2019 Building Application Approval Process From City Engineer

    32/32

    End of PresentationThank you