16
1 NORTHWEST HIGHWAY AND PRESTON ROAD AREA PLAN Advisory Task Force Meeting # 4 February 16, 2016

Building Prototype Handout

Embed Size (px)

DESCRIPTION

Handout from the North Central Texas Council of Governments (NCTCOG) Preston Center Task Force meeting on Feb. 16.

Citation preview

Page 1: Building Prototype Handout

1

NORTHWEST HIGHWAY AND

PRESTON ROAD AREA PLANAdvisory Task Force Meeting # 4

February 16, 2016

Page 2: Building Prototype Handout

2

Building Prototypes and Development Scenarios

Developed a set of building

prototypes that follow current

zoning regulations.

These buildings are used to test

land use scenarios and traffic

impacts. They are not specific

development proposals, or design

renderings.

Buildings are placed to test

assumptions and impacts within

zones, not specific development

parcels.

3D renderings are meant to outline

density massing, not specific

building designs

Page 3: Building Prototype Handout

3

Data & Assumptions

All existing land use and valuation data from DCAD.

New valuation based on local market costs and revenues.

Commercial building sqft from DCAD.

Multifamily unit counts from DCAD; single family units

assumed to be 1 per parcel.

Existing parking figures based on assumption of 2.0/unit,

3.0/1000 sqft office, 5.0/1000 sqft retail (zoning

regulations), parking for parking garage from parking study.

Existing entitlement buildings built according to existing

zoning maximums.

Page 4: Building Prototype Handout

4

Prototype Description - Mixed use tower

retail/residential 15 story

Alternative Scenario C – Mixed-Use Center Focus (Zone 1)

FAR = 9.46

Sq Ft = 481,474

0% Office

81% Residential

9% Retail

Dwelling Units Per Acre = 361

Jobs Per Acre = 40

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 5: Building Prototype Handout

5

Prototype Description - Parking garage 6 story

Alternative Scenario C – Mixed-Use Center Focus (Zone 1)

FAR = 5.4

Sq Ft = 235,224

0% Office

0% Residential

0% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 12

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 6: Building Prototype Handout

6

Prototype Description - Mixed use tower

retail/office 6 story

Alternative Scenario C – Mixed-Use Center Focus (Zone 1)

FAR = 3.39

Sq Ft = 147,454

80% Office

0% Residential

20% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 336

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 7: Building Prototype Handout

7

Prototype Description - Mixed use tower

retail/residential 6 story

Alternative Scenario C – Mixed-Use Center Focus (Zone 1)

FAR = 5.4

Sq Ft = 235,224

80% Office

0% Residential

20% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 336

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 8: Building Prototype Handout

8

Prototype Description – 4 story apartment

Alternative Scenario C – Mixed-Use Center Focus (Zone 1)

FAR = 1.22

Sq Ft = 53,218

0% Office

100% Residential

0% Retail

Dwelling Units Per Acre = 45

Jobs Per Acre = 0

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 9: Building Prototype Handout

9

Prototype Description - Office tower 15 story

Alternative Scenario D – Office Center Focus (Zone1)

FAR = 11.36

Sq Ft = 494,747

100% Office

0% Residential

0% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 1,278

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 10: Building Prototype Handout

10

Prototype Description - Mixed use tower

retail/office 15 story

Alternative Scenario D – Office Center Focus (Zone1)

FAR = 11.05

Sq Ft = 481,474

95% Office

0% Residential

5% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 1,207

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 11: Building Prototype Handout

11

Prototype Description - Parking garage 6 story

Alternative Scenario D – Office Center Focus (Zone1)

FAR = 5.4

Sq Ft = 235,224

0% Office

0% Residential

0% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 12

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 12: Building Prototype Handout

12

Prototype Description - Mixed use tower retail/office 6 story

Alternative Scenario D – Office Center Focus (Zone1)

FAR = 3.39

Sq Ft = 147,454

80% Office

0% Residential

20% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 336

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 13: Building Prototype Handout

13

Prototype Description - 4 story office

Alternative Scenario D – Office Center Focus (Zone1)

FAR = 1.25

Sq Ft = 54,422

100% Office

0% Residential

0% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 123

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 14: Building Prototype Handout

14

Prototype Description - 4 story office

Alternative Scenario E – Office Focus (Zone 2)

FAR = 1.25

Sq Ft = 54,422

100% Office

0% Residential

0% Retail

Dwelling Units Per Acre = 0

Jobs Per Acre = 123

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 15: Building Prototype Handout

15

Prototype Description - 3 story luxury townhomes

Alternative Scenario F – Mixed Residential (Zone 2)

FAR = 1.15

Sq Ft = 291,615

0% Office

100% Residential

0% Retail

Dwelling Units Per Acre = 42

Jobs Per Acre = 0

Note: These alternative scenarios and their resulting implications are intended to isolate the implications of differing land use decisions in the study

area - they are not to be considered as future plans for the area.

Page 16: Building Prototype Handout

16

NORTHWEST HIGHWAY AND

PRESTON ROAD AREA PLANAdvisory Task Force Meeting # 4

February 16, 2016