Business PartnerJune 2012, Copyright 2012, 4Clicks Solutions, LLC
What is
The BEST electronic presentation of RSMeans Cost Data
Software Technology to efficiently deploy and manage Job Order Contracting (JOC) programs, SABER, IDIQ, SATOC, MATOC, MACC, POCA, BOA …
2
Who Uses
Building Owners, Contractors, and AE’s doing a lot of RSMeans-based line item cost estimating.
Contractors, AE’s working with and hoping to work with and/or improve work on DOD/non-DOD Federal Government, State/Local/County Government, Education, Healthcare, or Airport/Transportation - Renovation, Repair, Sustainability, and Minor New Construction Projects
#1
#2 Anyone sharing or collaborating on RSMeans-based line item cost estimates
#3
3
Over 80% of United States CONUS Air Bases, and rapidly growing numbers of other DOD and non-DOD Federal Real Property Owners.
#4
Built to enable Collaboration among Owners, Contractors, Subs, & AE’s.
Enhanced 400,000 Line Item RSMeans Cost Data*
Integrated Estimate, Project, Contract, & Document Management
Automated Owner/Contractor Estimate Comparisons
*Including Full Descriptions and Modifiers. References, Graphics, and Specifications are also electronically available.
Exclusive Features of
4
Set Contract Coefficients
Manage Multiple Projects with Multiple Coefficients
Track and Report RSMeans Line Items and non-RSMeans Items (Priced and non-Priced)
Specifications Linked to Cost Estimate (Summary and Detailed)
Track Project Status – From Concept Through Warranty
Additional e4Clicks Project Estimator Features
5
Software Overview
6
Rapid ImplementationEasy-to-use, Single seat to Network/INTERNET deployment
Consistent UsageOrganization’s JOC, SABER, etc. procedures embedded in software
TransparencySystem-wide RSMeans-based UPB (North American Standard), or your own cost guide
CollaborationBuilt-in estimate/project/document/contract management
Performance GainsEstimate re-use, shorter project timelines
Benefits of
7
e4Clicks BASICTargets Sub-Contractors who estimate and don’t require contract, document, or project management features. Includes the Basic Version of eTakeoff.
e4Clicks PROFESSIONALFor General Contractors and Sub-Contractors who require multiple project management, document management, contract management, advanced estimating features, exporting to Adobe PDF and Microsoft Excel importing other external databases. Includes the Pro Version of eTakeoff.
e4Clicks PREMIERFor Owners to estimate and manage entire contracts or programs in a single product. Premier is used through-out the country on single and multiple award contracts (MACC, MATOC, JOC, SABER, BOA, etc). Estimate Comparison and Technical Evaluation features are included in this version. Includes the Premier Version of eTakeoff.
Subscription Pricing ModelSoftware Versions
8
Studies have readily demonstrated the errors and lack of productivity related to spreadsheets – date entry and formulae errors, costly data maintenance, lack of collaboration, and miscommunication.
CostWorks and e4Clicks Project Estimator are NOT competitive. CostWorks delivers excellent electronic access to RSMeans
Cost Books without modifiers, enhancements, etc. e4Clicks Project Estimator is an advanced and
collaborative cost estimating, project management, contract management, document management package inclusive of visual estimating.
Are you using SpreadSheets or CostWorksTM?
9
e4Clicks Project Estimator Software – Subscription pricing models
Custom Unit Price Book / Cost Data Engineering Services
Software Training* - Owners, Contractors, and AEs
Consulting and Marketing to Support JOC Programs
* Regional, On-site, Virtual/Remote
Full Product & Services Offerings
10
What is the cost of e4Clicks Project Estimator?
The annual cost of e4Clicks ranges from approximately $850/year to $2500/year per concurrent users and is dependent upon the software version and RSMeans cost
databases required. Can I create custom line items in addition to RSMeans line items?
a. Custom line items can be created for the Owners UPB, or an entirely custom UPB.
b. Once a UPB is created and the JOC program is running, and non-priced items are noted and appropriately handled. How often is are the UPB cost updated.
This is entirely up to the Owner when establishing the JOC contract. We recommend annual price updates at a minimum, with quarterly updates via CCI available.
FAQs
11
How long has JOC – Job Order Contracting been available?
JOC was first deployed in the 1980’s and is used to efficiently manage billions of dollars of project annually, with documented savings coming via more efficient procurement, shorter overall project timelines, and better/long term owner/contractor relationships.
A Primer for Job Order Contracting (JOC)
12
A Primer for Job Order Contracting (JOC)(Source - Material adapted from worked done by Lisa Cooley, formerly with Centennial Contractors)
“Job Order Contracting (JOC) is a method of managing multiple details of renovation, rehabilitation, repair, and other construction projects on a predetermined set of pricing and standards. By using JOC customers take advantage of a process that is fast and responsive to their needs while providing excellent quality construction.”
--Center for Job Order Contracting Excellence (www.jocexellence.org)
13
Contractor Definitions?
Contractor: A gambler who never gets to shuffle, cut or deal.
Bid Opening: A poker game in which the losing hand wins.
Low Bidder: A contractor who is wondering what he left out.
Engineer's Estimate: The cost of construction in Heaven.
14
Low-bid Contractor?
15
Smaller projects easily can take up to 1 year to procure
Up to 22% of project costs are consumed in design and procurement
Change orders can increase project costs by 50%
Claims and litigation are the “Status Quo”
Large backlogs and inefficiencies negatively impact an organization's mission.
A World Without JOC
16
Federal Government Army Navy Air Force Veteran’s Administration GSA / Department of Homeland
Security US Postal ServiceHigher Education University of New Mexico Northern Arizona University City Colleges of Chicago Georgia Tech Healthcare Harris County Hospital District University of Washington Hospital
SystemTransportation Phoenix Metrorail DFW Airport
State/County/Local Government State of Washington State of Arizona City of Phoenix City of Houston Baltimore Housing Authority Los Angeles County (DPW)K-12 Independent School Districts (IDSs) Hartford County Schools Loudon County Schools Dallas Public Schools Houston ISD Mesa Public Schools (AZ)
Who is using JOC? (partial listing)
17
Faster project delivery (3-9 months less) Streamlined engineering and design Cost visibility/transparency Better contractor performance Integrated Team - Partnering/collaborative
owner/contractor relationship More opportunities for local business Effective use of year-end funds
Higher overall satisfaction*
JOC Benefits / Results
Series1
0%50%
100%
Non-Partnered/Low BidNon-partnered/Best Value Selec-tionPartnered/Best Value Selection
*Mulcahy, Francis S. The Effectiveness of Partnering and Source Selection in Job Order Contracting. Master’s Thesis, University of Washington, 2000.
18
JOC / non-JOC Timeline Comparison
19
Long-term contracts foster a higher level of investment in making the working relationship yield successful results
A JOC program not a project Allows for the development of a
trusted partner
JOC - Establishing a Fiscally Beneficial Relationship
20
Pricing structure relies on a Unit Price Book ( UPB )For example - Standardized, but enhanced
400,000 line item RS Means Cost DataCustom and/or localized UPB and/or line items.Competitively-bid coefficient (multiplier, factor)
establishes pricing at the outset of the contract.Coefficient includes all costs including materials,
labor, overhead, profit, and sometimes bond and tax.
Example:1 SF Drywall $1.00Coefficient .92 -0.08Contractual Price $0.92
The Pricing of JOC Projects
21
Delivery orders are firm fixed price, lump sum
UPB is an estimating tool
Unit price proposals represent contractor’s committed price—it converts to lump sum
Change orders rare, and with consistent pricing structure
Brings IPD/CM advantages to smaller projects but in an efficient way with an at-risk incentive to perform.
22
JOC Delivery Order Pricing
Items not appearing in the Unit • Price Book are considered Non
Pre-priced Items (NPP) Typical NPP options:
• NPP coefficient serves as a markup on three transparent subcontractor bids
• NPP markup can be set per contract provisions • Once a new unit price is negotiated it can be
incorporated into the contract• Some contracts will prohibit or limit NPP items as a
percentage of delivery orders.
Sample Contractor Bid:UPB Coefficient .92 applied to line itemsNPP Coefficient 1.18 applied to actual sub costs
Non-priced Items
23
Either the Unit Price Book or the Coefficient is usually adjusted annually
Dynamic cost databases generally maintain the same coefficient
Customized price books typically adjust coefficient annually according to an industry benchmark (RSMeans City Cost Index-CCI), and/or add customer-specific unit price line items
Goal is to help contractor and owner manage risk
Dynamic vs. Static Costs
24
Change Orders are rare in JOC• Owner-initiated• Truly unforeseen conditions
UPB governs original scope of work and scope added after• Puts owners at an advantage when directing
changes in the work
Change Orders and JOC
25
Analyzing potential JOC volume• Review historic project data (2-3 years) and reconcile with
budget projections. Segregate projects by size, location, type, etc.
• What will your JOC “bandwidth” be?• All-inclusive, or selective? As defined by scope, or urgency.• Size limits? Consider in-house capabilities, other contract vehicles, and
political influences
• Define contract footprint, including potential regionalization• Single or multiple award
Numbers to consider.• $3M—minimum annual volume for standalone JOC program• $6M—maximum efficiencies are achieved, allowing addition of
support staff• Many owners with less volume can access JOC through
purchasing cooperatives
Owners Preparing for JOC
26
Assess in-house capabilities• Project Management Capacity• Skillsets
• Line-item estimating, or ability to review estimates, Proactive definition of scope, In-house maintenance crews
• Training Plan How will JOC interface with your design
professionals? Flowcharting how JOC process will interface with
purchasing, management and board approvals
One Owner’s Management Plan:Each PM manages 15-20 projects simultaneously, up to 50 per year
Owners Preparing for JOC
27
Company culture of high performance needed to succeed in JOC?
Ability and capacity to create productive teams? Proactive rather than reactive? Line item estimating capabilities?
Contractors Preparing for JOC
28
Considerations that drive the coefficient: Contract volume (higher volume = ⇩) Geographic dispersion of projects (further apart = ⇧) Type of work Average size and size range of delivery orders Three S’s: Supervision, Security, Safety Contract Administration Cost For RS Means, Division 1 provisions and column used
(Bare Costs vs. O&P column) UPB used Marketing costs Look at historic coefficients, but beware of changes
that can impact the coefficient!
Contractors Preparing for JOC
29
Bidding the Coefficient: Historic CostsReconcile 2-3 historic projects where final costs are known against a line item estimate generated from UPB Focus on Divisions 2, 9, Mechanical and
Electrical?Program CostsCalculate total personnel and overhead costs to manage the program, reconcile with typical project costs and then reconcile unit costs with select line items
Contractors Preparing for JOC
30
Once a JOC Program is in place, client project demands/requests happen over the contract term. This starts the JOC Process:
The JOC Process
31
Scope Variability - Detail of Owner scope preparation varies according to: Owner preference and skillset Owner people resources available When in planning cycle project was identified for JOC
Owner Provides:Project Need, Target Budget
Owner Provides:Defined Scope
Document
Owner Provides:Complete Bid Documents
More turnkey, contractor led More proactive owner involvement
Range of Owner Participation
The JOC Process - SCOPE
32
Typically within days Collaborative Process Goal of capturing
every necessary component of work
Site Visits
33
• Demo / dispose of 3 existing lights Reuse existing circuit for new lights.
• Remove & replace 2 existing HVAC grilles
• Install gyp ceiling at 8' 8" with 4 new surface mounted explosion proof lights. Relocate existing smoke detector to new ceiling
• Demo CMU for 42" opening min. (exist opening +/- 36")
• Demo & dispose of existing metal partitions and replace with new 4" CMU covered completely with ceramic tile, with one block
scupper at bottom of each
• Remove and reinstall existing 3 urinals and 2 commodes
• Demo ceramic tile, floors and walls, (exist ceramic on walls is approx. 8'-0" high)
Owner/Contractor-Joint Scope Development /Documentation
34
Performed in-house
Included in coefficient
Will engage design professional when needed Major building
system engineering
Structural Life-safety
Targeted or Incidental Design
35
Presented to owner for approval
Important confirmation step for aligning vision and expectations prior to proceeding with labor-intensive line item proposal
Scope and Work Plan Submitted to Owner
36
The JOC Process - PROPOSAL
37
Generation of the line item estimate Assurance of a fair price:
– Are the line items appropriate?– Are the quantities correct?
Owner has to understand the process and have faith that it provides competitive value
Proposal Format
38
39
Project Execution
40
The Program First used JOC through a cooperative,
then solicited their own contract Sophisticated owner that uses JOC in a
targeted way RSMeans UPBThe Value Badged and screened contractor and
subcontractors who understand the security logistics of working in an airport environment
A contractor who will go the extra mile to meet ambitious schedules
Faster, Faster, Faster!
Case Study – DFW Airport (Dallas/Fort Worth)
41
JOC is a form of IPD – Integrated Project Delivery Emphasis on Pricing Transparency Integration Across the Building Lifecycle JOC of the Future Blog Technology Changes:
– Link to Building Information Modeling– Cost Databases and Estimating Approaches will
further evolve to reveal lifecycle costs “Greater Good” goals
– Small and disadvantaged business utilization– Sustainability
The Future of JOC
42
Center for Job Order Contracting Excellencewww.jocexcellence.org RS Means—Unit Price Books, Training, JOC Consultinghttp://www.rsmeans.com/consulting/joboc.asp 4clicks—Estimating/Management software for JOC
programshttp://www.4clicks.com/ Kosten-Technik International—JOC estimating services
for owners and contractorshttp://www.kosten-technik.com/
Job Order Contracting - RESOURCES
43