Dear Resident SITE INVESTIGATION NIGHT WORKS IN YOUR AREA THURSDAY 17 DECEMBER 2015 The CityLink Tulla Widening project involves adding lanes and other measures to improve the flow of traffic across the 24 kilometre section of freeway from the CityLink tunnels to Melbourne Airport. The project will also provide travel time savings per trip between Melbourne Airport and the West Gate Freeway during peak periods. The project will deliver a safer, more reliable freeway. Generally, an additional lane is being added in each direction, as well as upgrades at key interchanges including Bell Street, Mount Alexander Road/Flemington Road and on the Bolte Bridge to West Gate Freeway entry ramp. Leighton Contractors is the construction contractor for the Bulla Road to Power Street section of the project. Where we will be On the traffic island of Flemington Road, as indicated in red on the map below.

citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewDear Resident . SITE INVESTIGATION NIGHT WORKS IN YOUR AREA. THURSDAY 17 DECEMBER

  • Upload
    phambao

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewDear Resident . SITE INVESTIGATION NIGHT WORKS IN YOUR AREA. THURSDAY 17 DECEMBER

Dear Resident

SITE INVESTIGATION NIGHT WORKS IN YOUR AREATHURSDAY 17 DECEMBER 2015

The CityLink Tulla Widening project involves adding lanes and other measures to improve the flow of traffic across the 24 kilometre section of freeway from the CityLink tunnels to Melbourne Airport. The project will also provide travel time savings per trip between Melbourne Airport and the West Gate Freeway during peak periods.

The project will deliver a safer, more reliable freeway. Generally, an additional lane is being added in each direction, as well as upgrades at key interchanges including Bell Street, Mount Alexander Road/Flemington Road and on the Bolte Bridge to West Gate Freeway entry ramp.

Leighton Contractors is the construction contractor for the Bulla Road to Power Street section of the project.

Where we will beOn the traffic island of Flemington Road, as indicated in red on the map below.

When works will occurFrom 7pm Thursday 17 to 5am Friday 18 December 2015.

Page 2: citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewDear Resident . SITE INVESTIGATION NIGHT WORKS IN YOUR AREA. THURSDAY 17 DECEMBER

What we are doingCollecting further information about underground services located in the area. This will involve:

Installing traffic management signs and bollards Cutting holes in the traffic island using a specialised vacuum truck (non-destructive

digging) to safely uncover underground pipes and services Recording the location of pipes and services Reinstating our work areas.

What to expect A small team of construction personnel at work Noise from the non-destructive digging truck when in use Traffic management personnel will direct footpath pedestrians safely around the works No vegetation will be removed as part of these works These works will not impact your property.

This work may be rescheduled in the event of unsuitable weather or other unavoidable circumstances.

We apologise for any inconvenience and appreciate your understanding.

If you have any questions or concerns regarding this notification, please phone 1300 783 947 and select 1 or email us at [email protected]

131 450

Yours sincerely,

Community Relations TeamLeighton ContractorsCityLink Tulla Widening: Bulla Road to Power Street

10/12/2015, Ref: 0040 F02

Page 3: citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewDear Resident . SITE INVESTIGATION NIGHT WORKS IN YOUR AREA. THURSDAY 17 DECEMBER