L 4 International Drive Rye Brook, NY 10573 Toll Free: 1 888.764.7681 Phone: 914.934.2075 Fax: 914.934.2190 MonoSystems.com 04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL Manufactured by MonoSystems, Inc. PowerTray Install INSTALLATION Cable Tray / Ladder Tray General Installation Guidelines: For more information refer to the latest NEMA standards and local building codes. Trough tray field support and frequency depends on the weight and construction (splice locations, elbow fittings, etc.) Of the tray being mounted. Supports should provide strength and working load sufficient to the load requirements of the cable tray system being supported. Structural building members should never be cut, and cable trays should not be installed in hoist ways or where subject to physical damage. Cable tray systems are to be installed so that they are accessible. If possible, leave 12” [300mm] of space minimum free above and to the side of the tray to allow for cable installation and maintenance. INSTALLATION INSTRUCTIONS COVER INSTRUCTIONS: 1.) Use to enclose cable tray and protect cable and wiring from damage or debris. 2.) Provided with self-tapping tek screws to mount into siderails. 3.) Additional cover styles such as vented, peaked, diamond plate, and others are available. Speak with MonoSystems for more information. COVER CLAMP INSTRUCTIONS: 1.) Recommended for indoor applications only. For outdoor applications see wrap around cover clamps, P/N: XX-2094-XX 2.) To install, make sure tray cover is centered about tray. Place cover clamps as shown and tighten bolt until snug. WRAP-AROUND COVER HOLD DOWN INSTRUCTIONS: 1.) Each provided with (2x) 3/8” hex bolts and (2X) 3/8” serrated flanged nuts for securing in place. 2.) Recommended for outdoor applications. For tray length of 72” or less, or with horizontal elbows or vertical bends: (2) straps are recommended. For tray length of 120”, 144”, or with horizontal tees: (3) Straps are recommended. 3.) To install, make sure tray cover is centered about tray. Place cover clamps as shown and tighten bolt until snug. X0-X052-XX-XXX | FLAT COVER X0-X053-XX-XXX | PEAKED COVER X0-X054-XX-XXX | VENTED COVER POWER TRAY TRAY WIDTH CABLE TRAY HEIGHT X0-2055-H HOLD DOWN CLAMP COVER POWER TRAY TRAY STYLE STEEL AND STYLE X0-2056-X X0-2056-X COVER CLAMP XX-2094-X WRAP-AROUND COVER TRAY WIDTH TRAY HEIGHT ALUMINUM POWER TRAY TRAY WIDTH WALKABLE DIAMOND PLATE COVER INSTRUCTIONS: 1.) Use to enclose cable tray and protect cable and wiring from damage or debris. 2.) All mounting hardware (by others). MonoSystems recommends fastening cover to power tray fitting using 1/4” hardware. Feed screws thru hole in cover, mark and drill thru top siderail flange of tray and attach on other side with 1/4-20 nylon lock nut. Or install self tapping screws through holes in cover into tray. Be sure to completely align cover to tray before drilling and installing. COVER CLAMP INSTRUCTIONS: 1.) For indoor applications only. Ordered in pairs. 2.) To install, align flush against edge of cover flange. Install 3/8”mounting hardware (by others) into mounting support (by others).

Cable Tray / Ladder Tray INSTALLATION PowerTray...Cable tray systems are to be installed so that they are accessible. If possible, leave 12” [300mm] of space minimum free above and

  • Upload
    others

  • View
    13

  • Download
    2

Embed Size (px)

Citation preview

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

General Installation Guidelines:For more information refer to the latest NEMA standards and local building codes. Trough tray field support and frequency depends on the weight and construction (splice locations, elbow fittings, etc.) Of the tray being mounted. Supports should provide strength and working load sufficient to the load requirements of the cable tray system being supported. Structural building members should neverbe cut, and cable trays should not be installed in hoist ways or where subject to physical damage. Cable tray systems are to be installed so that they are accessible. If possible, leave 12” [300mm] of space minimum free above and to the side of the tray to allow for cable installation and maintenance.

INSTALLATION INSTRUCTIONS

COVER INSTRUCTIONS:1.) Use to enclose cable tray and protect cable and wiring from damage or debris.2.) Provided with self-tapping tek screws to mount into siderails.3.) Additional cover styles such as vented, peaked, diamond plate, and others are available. Speak with MonoSystems for more information.

COVER CLAMP INSTRUCTIONS:1.) Recommended for indoor applications only. For outdoor applications see wrap around cover clamps, P/N: XX-2094-XX2.) To install, make sure tray cover is centered about tray. Place cover clamps as shown and tighten bolt until snug.

WRAP-AROUND COVER HOLD DOWN INSTRUCTIONS:1.) Each provided with (2x) 3/8” hex bolts and (2X) 3/8” serrated flanged nuts for securing in place.2.) Recommended for outdoor applications. For tray length of 72” or less, or with horizontal elbows or vertical bends: (2) straps are recommended. For tray length of 120”, 144”, or with horizontal tees: (3) Straps are recommended.3.) To install, make sure tray cover is centered about tray. Place cover clamps as shown and tighten bolt until snug.

X0-X052-XX-XXX | FLAT COVERX0-X053-XX-XXX | PEAKED COVERX0-X054-XX-XXX | VENTED COVER

POWER TRAY

TRAYWIDTH

CABLE TRAY HEIGHT

X0-2055-HHOLD DOWN CLAMP

COVER

POWER TRAY

TRAY STYLE

STEEL AND

STYLEX0-2056-X

X0-2056-X

COVER CLAMP

XX-2094-XWRAP-AROUND COVER

TRAY WIDTH TRAY HEIGHT

ALUMINUM POWER TRAY

TRAYWIDTH

WALKABLE DIAMOND PLATE COVER INSTRUCTIONS:1.) Use to enclose cable tray and protect cable and wiring from damage or debris.2.) All mounting hardware (by others). MonoSystems recommends fastening cover to power tray fitting using 1/4” hardware. Feed screws thru hole in cover, mark and drill thru top siderail flange of tray and attach on other side with 1/4-20 nylon lock nut. Or install self tapping screws through holes in cover into tray. Be sure to completely align cover to tray before drilling and installing.

COVER CLAMP INSTRUCTIONS:1.) For indoor applications only. Ordered in pairs.2.) To install, align flush against edge of cover flange. Install 3/8”mounting hardware (by others) into mounting support (by others).

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

SPLICE PLATE INSTRUCTIONS:1.) For connecting two sections of power tray cable tray.2.) Includes two splice plates with tray connection hardware.3.) When installing, ensure flush contact between splice plate and power tray. Recommended torque for 3/8” fasteners: 35 ft-lbs [47.5 N-m]. Recommended torque for 1/4” fasteners: 12 ft-lbs [16.3 N-m].4.) One pair of splice connectors with hardware are supplied with each tray length ordered. For aluminum tray, carriage bolts are used, for steel tray, hex bolts are used.

WALL BRACKET INSTRUCTIONS:1.) Use to mount power tray to a wall or perpendicular surface.2.) 3/8” or 1/2” mounting hardware by others.3.) Fasten tray to wall mounted strut support (hardware by others).

EXPANSION SPLICE PLATE INSTRUCTIONS:1.) For connecting two sections of power tray.2.) Accommodates expansion or contraction of the tray.3.) Includes two expansion splice plates with tray connection hardware.4.) When installing, ensure flush contact between splice plate and power tray. When installing, torque 3/8” fasteners to 19 ft-lbs [21.7 Nm], torque 1/4” fasteners to 6 ft-lbs [8.1 Nm]. Then back off 1/4 turn.5.) Grounding straps (C0-X060-X) (ordered separately) must be used with expansion splice connectors.

AX-X001-PRALUMINUM SPLICE PLATES

ALUMINUM POWER TRAY

STEEL POWER TRAY

PX/G4-2001-PRSTEEL SPLICE PLATES

AX-X002-PRALUMINUM EXPANSION SPLICE PLATES

GROUND STRAP

ALUMINUM POWER TRAY

STEEL POWER TRAY

STEEL SPLICE PLATES

NYLON LOCK NUTS

GROUND STRAP

HOLD DOWN CLAMPS WITH HARDWARE

TRAYWIDTH

MS400-LSUP-XX

CSUP-XX

X0-2027-XX X0-B494-XX

LENGTH

X0-B409-XX

WHEN USEDTO SUPPORTPOWER TRAY

POWER TRAY

XX-B409-XX

HOLD DOWN CLAMPS WITH HARDWARE

LENGTH

MOUNTING SURFACE

X0-B297-XX

WALL MOUNTED SUPPORT SOLUTIONS:

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

TRAPEZE INSTRUCTIONS:1.) Use to mount power tray using a strut support beneath the tray.2.) 1/2” Mounting hardware by others.3.) Fasten tray to strut support (hardware ordered separately).

VERTICAL HANGER SPLICE INSTRUCTIONS:1.) Use to mount power tray vertically using threaded rods.2.) Ø 1/2” rods and mounting hardware by others.3.) 3/8” splice to tray hardware (provided)

CENTER HANGER SUPPORT INSTRUCTIONS:1.) Use to mount power tray using a strut support beneath the tray.2.) 1/2” Mounting hardware by others.3.) Fasten tray to strut support (hardware ordered separately). Instructions for solid bottom insert tray: (not shown)4.) Field drill Ø 1” hole in center of tray where center tray hanger pipe will be inserted.5.) Install spring nuts in strut portion of center hanger.6.) Field drill Ø 7/16” holes in solid bottom insert 1” from inside tray edge.7.) Install bolt thru solid bottom insert and thread into spring nut until snug.8.) Secure center hanger with 1/2” hardware as shown (by others).9.) Views for reference - do not scale.

OVERHEAD SUPPORT SOLUTIONS:

HOLD DOWN CLAMPS

MS400-12-XX-X0

MS400-12-XX-X0 TRAY WIDTH

TRAY WIDTH

SUGGESTED

HOLD DOWN CLAMPS

AND SPRING NUTS

NEOPRENE INSULATOR PAD PAIR

X0-MS52A-XX

POWER TRAY

HANGER CLIP

MOUNTING HARDWARE

THREADED ROD

XXX-021HANGER CLIPS

HANGER CLIP INSTRUCTIONS:1.) Use to mount single or multiple tiers of power tray (not containing a cover)2.) 1/2” Mounting hardware by others. 3/8” & 5/8” threaded rod clips also available.3.) Use washers and nuts as shown to clamp clips around side rails of tray. (hardware by others).

POWER TRAY

VERTICAL HANGING

AND HARDWARE

XX-2022VERTICAL HANGER

SPLICE

MOUNTING HARDWARE

FOR THREADED ROD

POWER TRAY

GUIDE CLAMP

WELDED PIPE

TRAY HEIGHT

TRAY WIDTH

XX-2030-XXCENTER HANGER

SUPPORT

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

ADJUSTABLE MULTI-TIER FLOOR SUPPORT INSTRUCTIONS:1.) Use to mount one to four tiers of power tray to a flat level mounting surface2.) Each support provided as (2x) vertical support posts to specified height and (1 - 4) horizontal shelf brackets provided to specified width. Shelf bracket to vertical support post hardware provided.3.) Mount assembly to floor using 3/8” hardware (by others).4.) Multi-tier system is universal and also suitable for trough tray, MonoRack, or MonoMesh products.

UNIVERSAL I-BEAM BRACKET INSTRUCTIONS:1.) To install, align clamps on existing I-beam (by others) and install 1/4” hex bolts. Capture on other end with 1/4” nylon lock nuts.2.) Apply loctite (by others) and tighten provided 1/4” set screws to secure bracket to I-beam.3.) Mount power tray (ordered separately) to clamp brackets using Z0-1208 or X0-2021 hold down clamps and 3/8” threaded hardware (ordered separately).

ELEVATED FLOOR BRACKET INSTRUCTIONS:1.) Use to mount power tray to a flat level mounting surface. To install: center tray about floor bracket and install hold down clamps using provided 3/8” hex bolts. Tighten clamps until tray is secured.2.) Brackets provide a floor mounted solution that is easier and faster than strut alone.3.) Brackets are available in a height to suit. Allows for clearance or path space below.

FLOOR MOUNTED SUPPORT SOLUTIONS:

ADDITIONAL MOUNTING SOLUTIONS:

SUP-XT-FLR-XXHXXW

FLOOR SUPPORT

ALUMINUM OR STEELPOWER TRAY

FIELD

HEIGHT

TRAYWIDTH

TRAY WIDTH

TRAY WIDTH

ELEVATIONHEIGHT

XX-EFBX-XXELEVATED FLOOR

ALUMINUM POWER TRAY

POWER TRAY

HOLD DOWN CLAMPSUIBBX-XX-XX-X

UNIVERSAL I-BEAM BRACKET

I-BEAMWIDTH

IBEAM MOUNTING FLANGE THICKNESS

INCLUDED

STEEL STRUT

FLANGE NUTS

MS409DB-XXI-BEAM DOUBLE-STRUT

CLAMP BRACKET

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

ADJUSTABLE MULTI-TIER FLOOR SUPPORT INSTRUCTIONS:1.) Used to securely hold tray in place.2.) Add NB-PR to end of part number for a pair with included hardware [3/8-16 x 3/4” hex bolt, 3/8-16” spring nut].3.) Mount wherever a tray flange is accessible.

HEAVY DUTY HOLD DOWN INSTRUCTIONS:1.) Used to securely hold tray in place.2.) 3/8” mounting hardware (by others).3.) Locate in place, mark and field-drill 3/8” mounting holes into tray side rail.

TRAY HOLD DOWN SOLUTIONS:

POWER TRAY

FIELD DRILL

HEAVY DUTYHOLD DOWN

X0-1241HOLD DOWN

STEEL STRUT

ALUMINUM POWER TRAY

HOLD DOWN CLAMP

HOLD DOWN CLAMP

SHOWN WITH ALUMINUM TRAY

HOLD DOWN CLAMP

STEEL STRUT

POWER TRAY

MOUNTING DETAIL:

GUIDE POSITION

MOUNTING DETAIL:

CLAMPING POSITION

INSULATOR PADOPTIONAL INSULATOR ORFRICTION REDUCER

SHOWN WITH HEAVY STEEL TRAYSHOWN WITH LIGHT STEEL TRAY

ALUMINUM POWER TRAY

STEEL POWER TRAY

HOLD DOWN

X0-2024HEAVY DUTY HOLD DOWN

STRUT

WHEN CLAMPING TRAY TO STRUTFLANGED HOLD DOWN CLAMP

ALUMINUM POWER TRAY

ALTERNATIVELOCATION

X0-1249HDFLANGED HOLD DOWN

(NO DRILLING REQUIRED)

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

VERTICAL PIVOT CONNECTOR INSTRUCTIONS:1.) Use to make vertical pivots using straight length trays.2.) Mount pivot plates using supplied 3/8” hardware as shown. Tray must be supported within 24” on both sides per NEMA VE 2. Supports by others. Recommended torque for 3/8” fasteners: 35 ft-lbs [47.5 N-m]

VERTICAL TRANSITION INSTRUCTIONS:1.) Use to make vertical transitions using straight length trays.2.) To install, align plates with tray and mark hole locations. Field drill Ø 3/8” clearance holes thru side rail. Bolt transition brackets to side rail using provided 3/8” hardware & ensure flush contact.

HORIZONTAL PIVOT CONNECTOR INSTRUCTIONS:1.) Used to accommodate changes in horizontal direction up to 6 . Mounting slots allow for movement when positioning desired angle.2.) Align horizontal pivot connector to mounting locations at end of tray. Install horizontal pivot connectors inside tray using supplied 3/8-16 hardware as shown. Tray must be supported within 24” on both sides per NEMA VE 2. Supports by others.

BRANCH PIVOT CONNECTOR INSTRUCTIONS:1.) Use to make tray to tray offset transitions.2.) Provided with hole for locking angle. Drill and install 3/8” hardware to lock angle in place.

HORIZONTAL EXTENDER PLATE INSTRUCTIONS:1.) These connectors are designed to accommodate minor horizontal directional changes between 6º and 14º . If angle exceeds 14º MonoSystems recommends using standard horizontal elbow fittings.2.) To install, align plates with tray, field bend, and mark hole locations. Field drill Ø 3/8” clearance holes thru side rail. Bolt plate to side rail using provided 3/8” hardware & ensure flush contact. Tray must be supported within 24” on both sides per NEMA VE 2. Supports by others.3.) Bonding jumpers such as C0-2060-600 (ordered separately) must be used.

TRAY PIVOT CONNECTORS:

POWER TRAY

XX-X010-PRVERTICAL PIVOT CONNECTORS

ORIENT AS DESIRED

XX-X010-PRVERTICAL PIVOT CONNECTORS

ALUMINUM POWER TRAY

VERTICAL TRANSITION PLATES

ALIGN CONNECTORAND FIELD DRILL

FLANGED NUTS

AX-X010-VT-PRVERTICAL TRANSITION PLATES

POWER TRAY

CONNECTORS

XX-2045BRANCH PIVOTCONNECTORS

ALUMINUM POWER TRAY

CONNECTORS

XX-X011-PRHORIZONTAL PIVOT

CONNECTORS

CONNECTORS

STEEL POWER TRAY

CUSTOMER TO TRIM AS NEEDED

AND CONNECT TO PIVOT

XX-X011-EHORIZONTAL EXTENDER PLATES

CUSTOMER TO

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

NO-RUNG CABLE DROP OUT INSTRUCTIONS:1.) Design allows for installation of dropout from below tray. No drilling required.2.) To install, position mounting bar with attached drop out centered in place below aluminum power tray.3.) With mounting bar flush against bottom of tray, feed (2x) 1/4-20 pan head bolts upward thru clearance holes in mounting bar and into threads of pem nuts within mounting clips.4.) Orient clamps in place such that they clamp against bottom outer side rail lip of tray (as shown). Tighten 1/4-20 pan head bolts allowing the clamps to pull against tray lip until snug.

BLIND END / END CAP INSTRUCTIONS:1.) Use to close off the end of a power tray run.2.) Mount blind end using supplied 3/8” hardware.

TRAY TO WALL CONNECTOR INSTRUCTIONS:1.) Use to mount end of tray to a flush flat surface.2.) Mount connectors to tray using supplied 3/8” hardware. Recommended torque for 3/8” fasteners: 35 ft-lbs [47.5 N-m]. Wall attachment hardware (by others).

TRAY TO BOX CONNECTOR INSTRUCTIONS:1.) Designed to attach the end of a power tray run to a distribution cabinet or control center to help reinforce the box at the point of entry.2.) Provided with tray attachment hardware.

CABLE DROP OUT INSTRUCTIONS:1.) Use to exit cables at end of power tray run.2.) Align dropout with end rung and snap over top.

CABLE DROPOUT SOLUTIONS:

TIGHTEN FROM

TRAYWIDTH

DROP OUT FITTINGPOWER TRAY

A0-2051-XX-BTD-V2NO-RUNG DROP OUT

DROP OUT FITTING

ATTACH AROUND RUNG AS SHOWN

XX-2051-XX CABLE DROP OUT

ALUMINUM POWER TRAY STEEL POWER TRAY

XX-2017-XXBLIND END

TRAY TO WALLCONNECTORS

XX-2015TRAY TO WALLCONNECTORS

POWER TRAY

POWER TRAY

CONNECTOR

XX-2016-XXTRAY TO BOX CONNECTOR

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

GROUNDING CLAMP LUG INSTRUCTIONS:1.) Suitable for use with copper or aluminum conductor.2.) Clear mounting surface & remove any paint or coating (if applicable).3.) Available in a variety of ampere ratings from 60A to 2000A.

INSTRUCTIONS:1.) Custom molded for a perfect fit to B4A, B5A, or B6A aluminum power tray.2.) To install, center about end of rail and slide on.3.) Material: black PVC. UL94 flame rated.

INSTRUCTIONS:1.) Use as a protective covering. Supplied in 50ft rolls.2.) To install, simply push onto edges of side rail. Edge trim contains a hot melt adhesive within trim.

INSTRUCTIONS:1.) Use as a protective covering and alignment.2.) To install, center about divider and snap onto edge.

GROUNDING JUMPER INSTRUCTIONS:1.) Mechanically attaches grounding cables to power tray. Mount on inside or outside of cable tray.2.) Field mount to tray.3.) Available in multiple configurations to accommodate a variety of cable sizes.

ADDITIONAL GROUNDING SOLUTIONS:

PROTECTIVE COVERINGS:

TORQUE TO 5ft-lbs

POWER TRAY POWER TRAY

ALUMINUM POWER TRAY

RAIL END PROTECTION CAPS

0800-BX-BLK

RIGHTLEFT

NOTCH AROUND

A0-16-RP

POWER TRAY

RAIL EDGE TRIM

X0-235X-X

GROUNDING CLAMPPOWER TRAY GROUNDING WIRE

FIELD DRILLAND ATTACH

ALIGNMENT CLIP DIV-CLIP-XX

POWER TRAY

C0-2060-XX

GROUNDING JUMPER INSTRUCTIONS:1.) Use to provide additional grounding connection. Required with expansion type connectors.2.) Field mount to tray by drilling Ø 3/8” holes and mount using provided 3/8” hardware.3.) Available in a variety of ampere ratings from 60A to 2000A.

L

4 International Drive Rye Brook, NY 10573

Toll Free: 1 888.764.7681Phone: 914.934.2075

Fax: 914.934.2190MonoSystems.com

04/19 DOCUMENT REF. NO. POWERTRAY-INSTALL

Manufactured by MonoSystems, Inc.PowerTray™ InstallINSTALLATION

Cable Tray / Ladder Tray

INSTALLATION INSTRUCTIONS

DIVIDER INSTRUCTIONS:1.) Use to create multiple compartments in power tray.2.) Align divider flush with end of power tray or as desired. Position divider to desired horz. location and clamp in place to rungs. Field install #8 tek screws thru divider and into rungs.3.) For horz. divider use P/N: XX-X058

WALL PENETRATION CONNECTOR:1.) Used to accommodate wall penetrations.2.) Includes: (1) 20” long base and cover section, cover tek screws and (2) trim plates.2.) Splice connection plates and mounting hardware ordered separately.3.) To install: feed sleeve thru wall or ceiling and secure in place (by others). Slide one trim plate over each end and position flush again penetrating surface. Mark and drill 3/8” holes and install 3/8” hardware to secure trim plate to sleeve.

CONDUIT ADAPTOR INSTRUCTIONS:1.) Use to securely attached a conduit or box hub.2.) Field mount to tray by drilling Ø 1/4” holes and mount using provided 1/4” hardware

DIVIDER INSTRUCTIONS:1.) Standard divider length 72”. Sold individually.2.) Includes divider, movable clips, and #8-32x3/8” PHIL. PAN. HD. screws.3.) Installation instructions:

• Align divider flush with end of power tray.• Position divider to desired horz. Location and clamp in place to rungs.• Insert movable divider clips into rung as shown.• Align #8-32 hole in clip and mark location on divider.• Field drill #8 clearance hole [ Ø 3/16”] thru divider and install pan head screw & flat washer (provided) thru drilled hole in divider and into tapped hole in clip. Fasten until divider is snug to rung. Do not over tighten!

4.) To move, simply loosen clip screws and slide divider section over.

TRAY DIVIDERS:

XX-X050-XXXSTRAIGHT DIVIDER STRIP

SELF DRILLING TEK SCREWS

HORIZONTAL FITTING DIVIDER

BEND TO CONFORM

ALUMINUM POWER TRAY

DIVIDER CLIPSHOWN IN THE INSERTIONPOSITION TO THE RUNG

PHILIPS PAN HEAD MACHINE SCREWS

OR

MOVABLE

MDS-M-H-2050-LMOVABLE DIVIDER

PHILIPS PAN HEAD MACHINE SCREWS

XX-2032-XXCONDUIT ADAPTORADAPTER

POWER TRAY

ADAPTER

SPECIAL ADAPTER

POWER TRAY THRU SECTION

WALLS OR CEILING

POWER TRAY

XX-2420-XXWALL PENETRATION SLEEVE