4
Integration Test Plan Module - Plant Maintenance Test Scenario Maintenance Cycle Patch/ Reference No BUSINESS PROCESS STEPS TRANS. CODE INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots) 1 Create Characterisitic Temeperature CT04 Name: Temperature. Description: Temperature in Deg C. Status:released. Data Type:Numeric format No. of characters:6 Decimal Places:2 Unit of measure: Deg C. Value Assignment: Single Value. DATA ACCEPTED ,. Maintenan ce plan category MM created. OK 2 Create Master Inspection Characteristic QS21 Name: TEMP; Description: Temperature in deg C Control data: Quantitative characteristic is selected; Status:released; Model: Reference DATA ACCEPTED Master inspectio n Character istics :V OLTS created. OK Comments : Tested By Test Date Approved By Approved Date K.Kiran Kumar 12/02/200 7

Calibration Cycle ECC 6

Embed Size (px)

Citation preview

Page 1: Calibration Cycle ECC 6

Integration Test Plan Module - Plant MaintenanceTest Scenario Maintenance Cycle Patch/

Reference

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

1 Create Characterisitic Temeperature

CT04 Name: Temperature.Description: Temperature in Deg C.Status:released.Data Type:Numeric formatNo. of characters:6Decimal Places:2Unit of measure: Deg C.Value Assignment: Single Value.

DATA ACCEPTED ,.

Maintenance plan category MM created.

OK

2 Create Master Inspection Characteristic

QS21 Name: TEMP;Description: Temperature in deg C Control data: Quantitative characteristic is selected; Status:released; Model: Reference Characteristic; Control indicators selected: Sampling procedure,Summery recording, Defects recording,Optional character,Fixed scope ,no.documentation,record measured values, No formula.

DATA ACCEPTED Master inspection Characteristics :VOLTS

created.

OK

Comments :

Tested By Test Date Approved By Approved Date K.Kiran Kumar 12/02/2007

Page 2: Calibration Cycle ECC 6

Integration Test Plan Module - Plant MaintenanceTest Scenario Maintenance Cycle Patch/

Reference

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

3 Create Measuring instrument

IE01

Name: MUMT-250; Category:Q; Description: temperature controller.Maint.plant:1000; Workcenter:ELE-MNT; company code:1000; costcenter:101010; task list usage: Maintenance(004); Business Area:

DATA ACCEPTED  

OK

4 Create Measuring point

IK01

Measuring point Object: Equipment (IEQ); Equipment: MUMT-250 Measuring point category: M(meas.general); charecteristic:TEMPERATURE.Decimal Places:2Unit of Measure: Deg C

DATA ACCEPTEDMeasuring point: 46 created.

OK

6 Create General Maintenance task list

IA05 Group:21 usage:Plantmaintenance(4); status:released(4); strategy: ; inspection type:300

DATA ACCEPTED Tsaklist with

Group:21 and

groupcounter:1

created.

OK

Comments :

Tested By Test Date Approved By Approved Date K.Kiran Kumar 12/02/2007

Page 3: Calibration Cycle ECC 6

Integration Test Plan Module - Plant MaintenanceTest Scenario Maintenance Cycle Patch/

Reference

No BUSINESS PROCESS STEPS TRANS. CODE

INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)

7 Create Inspection Method QS 31 Name:TEQUPDescription:Inspection Method for Test equipment.Staust: Being Created.Plant :1000Select Attach documentSelect document type:

Data Not accepted.

Comments :

Tested By Test Date Approved By Approved Date K.Kiran Kumar 12/02/2007