16
CAD PROJECT IN CALIFORNIA INVESTORS INTRODUCTION 2011

CALIS - Business Plan - CAD Project in Galt California

  • Upload
    erezd

  • View
    257

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CALIS - Business Plan - CAD Project in Galt California

CADPROJECTINCALIFORNIAINVESTORSINTRODUCTION2011

Page 2: CALIS - Business Plan - CAD Project in Galt California

Page 2 out of 16

CAD Project in California

AbstractCalis' main goal  is  to seek for high­growth opportunities  in  the renewable energy arena, primarily in the Anaerobic Digestion sector.

The company will develop Central Anaerobic Digestion projects (CAD, known also as  "central  biogas  projects")  in  California,  under  the  Renewable  Auction Mechanism (RAM) program, which was addopted  in  the state on December 17th, 2010,  and  will  manage  the  plants  during  the  20  years  period  of  the  Power Purchase Agreement (PPA).

The company is led by Erez Dolev. Being the founder and former CEO of Ledico Green as well as the former CFO of Ledico Bosch, Erez has a vast experience in renewable energy technologies and posesses a wide knowledge in finance.

The RAM programCalifornia Public Utilities Commission (CPUC) adopted on December 17th, 2010, a 

new program, named Renewable Auction Mechanism (RAM). The goal of the 

RAM program is to provide a simplified contracting mechanism that will enable 

smaller projects to compete in California's mandatory renewable energy market. 

Thus, the utilities will procure up to 1,000 MW of renewable system­side energy 

projects, up to 20 MW in size, that are eligible for the California Renewable 

Portfolio Standard (RPS) program. 

Important to know: 

The total capacity is allocated among the three utilities based on retail 

sales (SCE, PG&E, SDG&E).

There will be four auctions over a two year period.

Bids of Feed­in Tariff (FiT) are to be selected based on price, with the 

lowest price first, until the utility's minimum is reached for each auction.

In order to reduce transaction costs and streamline the approval process, 

the RAM requires the use of PPAs with non­negotiable standard terms 

and conditions.

Link to the RAM decision: http://docs.cpuc.ca.gov/word_pdf/FINAL_DECISION/128432.pdf

Page 3: CALIS - Business Plan - CAD Project in Galt California

Page 3 out of 16

Why CAD?Anaerobic Digestion projects (known also as biogas projects) produce energy from the Methane  that  can  be  extracted  out  of  organic waste. Moreover,  the  organic waste  convertion  procces  produces  also  other  stable  and  commercially  useful compounds. As a general rule, larger plants are more efficient. Therefore, Central Anaerobic Digestion projects  (CAD),  that  collect  different  types of  organic waste feedstocks,  from varied  sources  (e.g.  diaries, markets,  food manufacturers etc.), are higly profitable. A typical CAD process is depicted in the following diagram:

Source: www.rutherfordrenewables.co.uk

The main advantages of CAD over other renewable energy projects:

No need for subsidies – grid parity Produces energy 24 hours a day Not depands on one source of raw material High entry barriers – requires specific knowledge Several revenue sources (electricity, heat, gate fees, fertiliser) Favorable  by  green  organizations  and  state  authorities  due  to  high 

environmental benefits Greenhouse Gases reduction

Page 4: CALIS - Business Plan - CAD Project in Galt California

Page 4 out of 16

Business Plan

The ProjectsThe plants will be Central Anaerobic Digestion (CAD)  for production of electricity and  heat  from  biogas,  5MW  to  20MW  in  size  depands  on  the  availability  of feedstock.

The PPA will be signed with one of the following utilities: PG&E, SCE, SDG&E.

Calis will be responsible for all stages:

Business plan Strategic location (interconnection and feedstock supply) Permits and authorizations Feedstock supply agreements FiT auction and PPA Financial closing EPC negotiation Equipment procurement Project management Management and maintenance of the CAD plant for 20 years

Business PlanUsing  our  and  other  specialists'  knowledge  base,  we  built  a  very  accurate 

business plan with sensitivity tests taking in account each and every aspect of the 

CAD plant construction and opperation.

The business plan includes:

Gas Production from Feedstock mixture calculation Monthly Allocation of Feedstock and Gas Generation Fertiliser Value of Digestate Closed Periods (if needed) Revenues from the Biogas Capital Payment Schedule Overhead Costs Financial Summary Profit & Loss Source & Disposition of Funds Balance Sheet Technical Dash Board Sensitivity Tests Feedstock Values Calculation

In appendix A you may find some screenshots of the Business Plan

Page 5: CALIS - Business Plan - CAD Project in Galt California

Page 5 out of 16

Summary

In the following months we will  raise the funds for the first project. Receiving this document gives you the opportunity to take part in it and to invest in the following projects as well. We offer you to join other investors with part of the required equity in order to expose yourself and your company to the knowledge and experience of this amaizing project and to the future renewable energy oportunities this group of investors will be exposed to.

We  will  be  glad  to  elaborate  more  about  the  project  and  the  business  plan  in person.

Contact InformationErez Dolev

Mobile +972­50­8500647

Email [email protected]

Web www.calisgroup.com

Page 6: CALIS - Business Plan - CAD Project in Galt California

Page 6 out of 16

Appendix A – Business Plan Screenshots 

Gas Production from Feedstock Mixture

Page 7: CALIS - Business Plan - CAD Project in Galt California

Page 7 out of 16

Monthly Allocation of Feedstock and Gas Generation

Page 8: CALIS - Business Plan - CAD Project in Galt California

Page 8 out of 16

Fertiliser Value of Digestate

Page 9: CALIS - Business Plan - CAD Project in Galt California

Page 9 out of 16

Revenues from the Biogas

Page 10: CALIS - Business Plan - CAD Project in Galt California

Page 10 out of 16

Capital Payment Schedule

Page 11: CALIS - Business Plan - CAD Project in Galt California

Page 11 out of 16

Overhead Costs

Page 12: CALIS - Business Plan - CAD Project in Galt California

Page 12 out of 16

Financial Summary

Page 13: CALIS - Business Plan - CAD Project in Galt California

Page 13 out of 16

Financial Reports

Page 14: CALIS - Business Plan - CAD Project in Galt California

Page 14 out of 16

Technical Dash Board

Page 15: CALIS - Business Plan - CAD Project in Galt California

Page 15 out of 16

Sensitivity Tests

Page 16: CALIS - Business Plan - CAD Project in Galt California

Page 16 out of 16

Feedstock Values Calculation