Caltrain Grade Separation Feasibility Study Mary Avenue Railroad Crossing Community MeetingAugust 10, 2017
Agenda
2
• Meeting format review• Goals and context• Mary Avenue options Feedback
• Q and A• Next steps• Adjourn
Project Goals
4
Improve Safety (LUTE Policy 24, 36, 40,
41, 42, 46)
Reduce Traffic Delay(LUTE Policy 32, 42)
Enhance Ped/Bike Access
(LUTE Policy 24, 33, 36, 41)
20,000
30,000
40,000
50,000
60,000
Project Context
Aver
age
Dai
ly R
ider
ship
76 trains (2003)
92 trains (2016)
114 trains +80-106 HSR
(2040)
Caltrain Grade Separation – VTA Program Description
6
Sunnyvale has 2 of the 8 at grade crossingsVTA criteria include cost efficiency and Complete Streets
Screening Alternatives
7
Screening Alternatives
Impacts
Variants of Screening
Alternatives
• Establish rail and road criteria• Identify existing conditions• Develop cursory design of alternatives
• Identify impacts and constraints• Bring results to community
• Identify feasible alternatives• Develop variants to minimize impacts• Engage community for input
Design Criteria
Roadway RailroadGrades
4.75% 1.2% max
Design speed30 - 45 mph
Based on posted speed plus 5 mph
79 mph for shoofly (temp rail)
110 mph for final condition
Bridge depth 5’ Supporting roadway
6.75’ Supporting railroad
Vertical clearance Underpass
15.5’ over roadwayRoadway lowered 22’
Overpass
27’ over railroadRoadway 32’ above ground
13
Screening CriteriaScreening Considerations
SafetyAccessibility
Right of Way impactsUtility impacts
Traffic circulationVisual and character impactsEnvironmental compliance
Construction feasibilityEngineering feasibility
Cost Fundability
Community support14
Mary Ave elevated Evelyn Ave elevatedPotential acquisition of 12+ parcels Significant bridge costModifications to 7+ driveways No rail construction required
Mary Avenue OverpassC
AR
SO
N
DR
IVE
BID
WE
LL A
VE
CE
NT
RA
L
EX
PW
Y
Mary Avenue Overpass
19
MARY AVE
CA
RS
ON
D
RIV
E
CE
NT
RA
L
EX
PW
Y
BID
WE
LL A
VE
MA
GN
OLI
ALA
NE
SUN
NY
SID
E G
AR
DEN
S
MA
GN
OLI
ASQ
UA
RE
APA
RTM
ENTS
MARY MANOR
GROVE GARDEN APARTMENTS
EXPRESSIONS
BELMONT TERRACE
GEO
RG
E’S
AU
TO
LA MESA TERRACE
MU
RPH
YR
EDW
OO
DS
EVELYN SELF
STORAGE
J&L AUTO SERVICE
FAM
ILY
TO
WIN
G
CA
RS
ON
D
RIV
E
BID
WE
LL A
VE
CE
NT
RA
L
EX
PW
Y
MARY AVE
Mary Avenue Split Overpass
Mary Ave partially elevated Evelyn/Hendy partly elevated Railroad partially depressedPotential acquisition of 1+ parcels Mary/Evelyn intersection elevated Rail construction required
Modifications to 7+ driveways Significant rail cost
Mary Avenue Split Overpass
21
MARY AVE
CA
RS
ON
D
RIV
E
CE
NT
RA
L
EX
PW
Y
BID
WE
LL A
VE
MA
GN
OLI
ALA
NE
SUN
NY
SID
E G
AR
DEN
S
MA
GN
OLI
ASQ
UA
RE
APA
RTM
ENTS
MARY MANOR
GROVE GARDEN APARTMENTS
EXPRESSIONS
BELMONT TERRACE
LA MESA TERRACE
MU
RPH
YR
EDW
OO
DS
CA
RS
ON
D
RIV
E
BID
WE
LL A
VE
CE
NT
RA
L
EX
PW
Y
MARY AVE
Mary Avenue depressed Evelyn Avenue depressedSignificant impact to 3+ parcels No permanent rail impactReconst 8+ road accesses
Mary Ave depressed Evelyn Ave depressed
Potential acquisition of 3+ parcels No permanent rail impact
Modifications to 8+ driveways
Mary Avenue Underpass
Mary Avenue Underpass
23
MARY AVE
CA
RS
ON
D
RIV
E
BID
WE
LL A
VE
SUN
NY
SID
E G
AR
DEN
S
MA
GN
OLI
ALA
NE M
AG
NO
LIA
SQU
AR
E A
PAR
TMEN
TS
MARY MANOR
GROVE GARDEN APARTMENTS
EXPRESSIONS
BELMONT TERRACE
MU
RPH
YR
EDW
OO
DS
CA
RS
ON
D
RIV
E
BID
WE
LL A
VE
CE
NT
RA
L
EX
PW
Y
MARY AVE
Mary Ave partially depressed Rail partially elevatedPotential acquisition of 1+ parcels Significant rail costModifications to 3+ driveways
Mary Avenue Split Underpass
Mary Avenue Split Underpass
25
MARY AVE
CA
RS
ON
DR
IVE
BID
WE
LL A
VE
SUN
NY
SID
E G
AR
DEN
S
MA
GN
OLI
ASQ
UA
RE
APA
RTM
ENTS
MA
GN
OLI
ALA
NE MARY
MANORGROVE GARDEN APARTMENTS
EXPRESSIONS
BELMONT TERRACE
LA MESA TERRACE
CE
NT
RA
L
EX
PW
Y
MU
RPH
YR
EDW
OO
DS
• Excess R/W• Excess rail cost
CA
RS
ON
DR
IVE
BID
WE
LL A
VE
CE
NT
RA
L
EX
PW
Y
MARY AVE
Mary Ave depressed Evelyn Ave remains at-grade
Potential acquisition of 3+ parcels Relocate Mary/Evelyn intersection
Modifications to 1+ driveways No permanent rail impact
Mary Avenue Underpass with Jughandle
Mary Avenue Underpass with Jughandle
CA
RS
ON
D
RIV
E
BID
WE
LL A
VE
CE
NT
RA
L
EX
PW
Y
MARY AVE
SUN
NY
SID
E G
AR
DEN
S
MA
GN
OLI
ASQ
UA
RE
APA
RTM
ENTS
MA
GN
OLI
ALA
NE
MARY MANOR
GROVE GARDEN APARTMENTS
EXPRESSIONS
BELMONT TERRACE
LA MESA TERRACE
MU
RPH
YR
EDW
OO
DS
GEO
RG
E’S
AU
TOGOLDEN WEST
COLLISION CENTER
FAM
ILY
TOW
ING
CA
RS
ON
D
RIV
E
BID
WE
LLA
VE
MARY AVE
SUN
NY
SID
E G
AR
DEN
S
MA
GN
OLI
ASQ
UA
RE
\A
PAR
TMEN
TS
MA
GN
OLI
ALA
NE
MARY MANOR
EXPRESSIONS
BELMONT TERRACE
CA
RS
ON
D
RIV
E
BID
WE
LL A
VE
MARY AVE
SUN
NY
SID
E G
AR
DEN
S
MA
GN
OLI
ASQ
UA
RE
APA
RTM
ENTS
MA
GN
OLI
ALA
NE
MARY MANOR
EXPRESSIONS
BELMONT TERRACE
Mary Ave Underpass
On/Off-Ramp Connection
Mary Ave/Evelyn Ave Connection
Mary Avenue Underpass with Jughandle
MU
RPH
YR
EDW
OO
DS
MU
RPH
YR
EDW
OO
DS
FAM
ILY
TOW
ING
FAM
ILY
TOW
ING
GEO
RG
E’S
AU
TO
GEO
RG
E’S
AU
TO
GEO
RG
E’S
AU
TO
FAMILYTOWING
MU
RPH
YR
EDW
OO
DS
Mary Avenue Underpass with Jughandle – Traffic Counts
68 241 128
419 31482
2611170193
3139238
PMPEAK
56 412 260
153 15626
17934756
881028
28
AMPEAK
Schedule and Next Steps
Spring 2017 Summer Fall Winter Spring2018
Contract executed
Develop screening alternatives, high level impacts & variants
Evaluate shortlist of alternatives
Develop preferred alternative
Community meetings #3
Community meeting #2
Community meeting #1: 8/10, 8/24Sunnyvale Mary
BPAC session
8/17
Council session
Council meeting
Information
31
Website
Survey
Contact
Sunnyvale.ca.gov Search: Caltrain Grade Separation
https://www.peakdemocracy.com/5290
Ria Hutabarat Lo, PhDTransportation Manager
(408) [email protected]