CamCube Interim Review 2. ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida. Overview. Project Summary Resolved Issues Design Summary Current Issues to be Resolved Schedule Progress Budget Progress. Project Summary. Multi-year goal - PowerPoint PPT Presentation
Citation preview
CamCube Interim Review 2
ASEN 4028 – March 15, 2004Sam Baker
Tom FreestoneBrian MadgeBrian Roberts
Steve PfauJen Uchida
Overview
• Project Summary• Resolved Issues• Design Summary• Current Issues to
be Resolved• Schedule Progress• Budget Progress
Project Summary• Multi-year goal
– Design a pico-satellite around the CubeSat program guidelines. The satellite will be launched from the shuttle and orient itself in order to take pictures of the heat tiles with an onboard camera.
• Current year goal– Develop an attitude control system that
will orient the satellite and keep the on board camera steady for pictures.
Project Summary
• Reaction Wheel– Testing in a single axis– Possibility of testing in two axes
• Dual Disk testing apparatus– Applied torque from the reaction wheel
• 3-axis Gimbal– 2-axes will be locked for the single axis test– Measuring stability, slew rate, response to
applied forces
Resolved Issues
• Machining Time– Most parts
complete– 1 part left to
fabricate• Battery mounting
bracket
Design Summary – Cube
Design Summary – Cube
Design Summary – Dual Disk
Current Issues
• Load cell– Miscalculation of force from desired
torque numbers– Ordered new load cell (came in this
morning)– Each test only takes about 8 seconds
• Increase output voltage to the motion controller by 1mV every millisecond
Dual Disk Results
Dual Disk Results
• Wrong load cell• Noise
– ~5mV output– ~15 mV noise– Wobble in reaction wheel– Torque from wire
Current Issues• Wobble analysis
– Nutation angle, – Shaft displacement
from center of RW– Non-uniform mass
• Nutation– Number of
precessions per revolution
– Negative => retrograde
Budget Progress – Estimated Budget
System Est Price Price
Att Control $800.00 $667.79Att Determ $300.00 $294.00Electronics $50.00 $36.40
Misc $100.00 $14.97Structures $150.00 $124.91
Testing $2,000.00 $590.07Est Cost Actual Difference
$3,400.00 $1,728.14 $1,671.86
Budget Progress – Actual BudgetSystem Member Item Company Ordered Received Price
Att Control Tom 1.5-3 V DC Motor Radio Shack 11/12/03 11/12/03 $1.99 $4,000.00 CUStructures Sam 5052 H32 Aluminum 11/18/03 11/19/03 $9.04 $4,200.00 UROP
Testing Tom 3-Axis Gimbal Small Pts Cat 11/25/03 12/3/03 $27.95Att Determ Madge Rate Gyros/Eval Boards Analog Devices 11/30/03 12/3/03 $0.00Att Determ Madge Rate Gyros/Eval Boards Future Active Cat 12/1/03 $294.00
Final Report Jen Binding Report Kinko's 12/15/03 12/15/03 $14.97Att Control Madge A/D converter Future Active Cat 1/12/04 1/18/04 $93.00Att Control Steve Motors/Motion Controller Micro Mo Elect 1/16/04 1/20/04 $212.10 Structures Sam Bearing/Al Stock/Brass McMaster 1/22/04 1/28/04 $36.93Electronics Madge Static Mat Newark 1/28/04 2/26/04 $36.40Structures Sam Chucking Reamer McMaster 1/28/04 1/29/04 $10.96Att Control Steve Motors (5) Micro Mo Elect 2/22/04 2/25/04 $360.70Structures Sam Brass Online Metals 2/23/04 2/25/04 $24.83
Testing Roberts Load Cell Omega 2/23/04 2/25/04 $114.09Testing Roberts Batteries/Charger Eagle Pitcher 2/25/04
Structures Steve Screws/Aluminum Rod McGuckins 3/1/04 3/1/04 $21.14Structures Sam Chucking Reamer McMaster 3/3/04 3/4/04 $22.01
Testing Roberts Laser McGuckins 3/9/04 3/9/04 $12.13Testing Tom Camera Mike's Camera 3/10/04 3/10/04 $435.90
Spent $1,728.14 $6,471.86 Remain
Available Funds