Page 1: Capacity Enhancement Development Policy and Planning

Capacity Enhancement Development Policy and PlanningASIOACG/7 & INSPIRE/3

29th & 30th May 2013

Dubai, UAE

David Webb (Airservices) & Tomonori Tsuruzono (Emirates Airline)

Page 2: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Philosophy

The Work Program always considers Safety as the first priority;

Efficiency and Capacity works are prioritised based on the greatest common benefit, and priorities are agreed by the group;

The Safety and Efficiency balance is considered; and The work program is aligned with ICAO Policies and

Plans

Page 3: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Identify (Desired Operational Outcome) Analyze (Constraints or gaps that need to be overcome) Plan (Solution) Adapt (Monitor and Review)

Process

Page 4: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Identify

Identify desired operational outcome Problem on ATC and/or Operator Efficiency enhancement. Area in the region Timing in the day and/or year

Page 5: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Analyse

Determine the Constraints or gaps that need to be overcome

Determine root cause and related factors Determine Adaptable ASBU concept. Measure the required level. What item need to be considered for achieve ASBU

concept.

Page 6: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Plan

Adaptable technology and technique Evaluate requirement for ANSP and Airline Assign tasks to ANSP and Airline Schedule detail tasks. Agree priority

Page 7: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Adapt

Monitor the process and track the tasks Evaluate the result of works. Check further requirement of enhancement.

Page 8: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Policy Discussion

Include in ASIOACG Terms of Reference?

Page 9: Capacity Enhancement Development Policy and Planning

ASIOACG WG – Dubai – May 2013

Questions, Discussion & Agreement

Refer to Discussion Paper –Capacity Enhancement Development Policy and Planning