Capital Project FRONT FAÇADE CAST STONE RECONSTRUCTION
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Stamford Central School
District
1936 Construction
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
NYSED required Building Condition
Survey
March Associates “work list” (repairs)
Facilities Advisory Committee
Need for expedited emergency review
NYSED of cracking façade; front
doorway closed winter 2018 due to
falling debris.
Needs Assessment
Capital Project Front Façade Cast Stone
Reconstruction 2019-20
Emergency Construction Project
NYSED Mr. Bruce Jesiolowski
January 10, 2019
Mr. Bruce Jesiolowski, Project Manager State Education Department Bureau of Facilities Planning Room 1060 EBA 89 Washington Avenue Albany, NY 12210
Re: Stamford Central School District Emergency Work
MARCH No. 1702
Dear Bruce:
This is a follow up and recap of our conversation today.
The original 1936 Stamford CSD building is constructed on
the exterior with ornamental pre-cast concrete masonry panels that are failing. Pieces of this ornamental façade are failing from freeze-thaw cycles. The main front portico entrance has now been taken out of service and roped off to prevent further use.
The District intends to declare an emergency to mitigate
the hazards from falling debris, submit and LOI and authorize design to reconstruct all of the ornamental concrete masonry on the 1936 building for permanent remediation of this hazard.
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
The Work Includes:
Replacement of the front façade and
replacement of the failing precast concrete
masonry belt course
Related work on all three entrances of the
original structure
Mechanical work to disconnect and reconnect
fresh air inlets at classroom unit ventilators in
precast panels
Window and door removal and replacement at
the front façade
Asbestos abatement of caulk where necessary
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
The Work Includes:
The replacement of the precast concrete
masonry panels will replicate the existing
appearance of the building, given its historic
designation (ribbons, panels, window sills)
The design of the school is a community asset
and is an outstanding example of Art Deco
Architecture designed by the gifted Architect
Harold O. Fullerton
To receive a building permit the project needs
to be submitted to the New York State Historical
Preservation Office (SHPO) for review and
approval as a part of reconstruction building
approval.
*Requires restoration contractors and pre-cast
contractors.
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
BOE approval for a Formal Letter of
Intent (LOI) to NYSED for Capital
Project Approval to replace the Front
Façade.
Total Cost
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Standard Capital Project Construction
Cost Elements
Construction Bids
Construction Allowances (Asbestos monitoring,
air quality monitoring, etc.)
Design Contingency Costs
Reserve for Change Orders
Cost Escalation
Market Escalation
Standard Capital Project Incidental Costs Elements
Site Work
Project Administrative Costs (designs, blueprints,
postage, insurance during construction, etc.)
Architect
Legal Services, Bond Counsel (credit rating,
publications, notices)
Financial Services
Other non-brick and mortar
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Finance Plan for Project
A plan is in place to pay for the
project with no tax increase to cover
the cost of the project.
negate a tax impact
maximize state aid
curtail costs where possible
The district will utilize State Building Aid
(76.3%) and Capital Reserve funds
($770,000) to pay for the project.
***The project will require NO tax
increase for the community.
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Capital Project Front Façade Cast Stone Reconstruction 2019-20
FAQ
1. Why does this project need to be done?
The required Building Condition Survey identified buildings in the district that need repair. A
“work list” was generated to assist in planning and prioritizing repairs. A Facilities Advisory
Committee was established to receive input from the community on the “work list” and
repair priorities. This winter the front facade, which has a historical designation and was on
the “work list” to be repaired, began to have concrete material fall off creating a safety hazard. The front 1936 era façade (84 years old – a generation) and other original failing
precast building elements was moved to the top of the list for repair.
Capital Project Front Façade Cast Stone Reconstruction 2019-20
FAQ
2. How much will this work cost and how will it be paid for?
The total proposed capital project will cost $2.5 million dollars. Due to conservative fiscal
management and planning, there is already a plan in place to pay for this project with no
tax increase to cover the cost. The District will utilize State Building Aid and Capital Reserve
funds of $770,000 to pay for the project which will NOT require a tax increase.
Capital Project Front Façade Cast Stone Reconstruction 2019-20
FAQ
3. What is the timeline for the project?
The proposed Capital Project will be voted on by the community on May 21, 2019 during
the budget vote. Anticipated completion of the project is December 31, 2020.
Estimated Project Timeline
Task Date
March Associates Architects & Planners Project Review May 9, 2019 6:00 p.m.
Community Forum Project Review May 14, 2019 7:00 p.m.
Referendum Vote 05/21/2019
With voter approval – submit project to NYSED 06/03/2019
NYSED Review and Approval 06/03/19-08/02/2019 +/-
NYSED Approval 08/02/2019 +/-
Bid and Award Fall of 2019
Masonry restoration contractor and manufacturer build precast molds Winter 2019/2020
Construction Phase (8-10 months) April 2020
Estimated Completion 12/01/2020
Project Close-Out 12/31/2020
Capital Project Front Façade Cast Stone Reconstruction 2019-20
FAQ
4. Is this the last project that needs to be done at Stamford Central School?
The Building Condition Survey identified additional items that need repaired. However,
due to the condition of the front façade, and working with the New York State Department
of Education Division of Facilities planning, we are requesting an expedited review of the
project to have our building repaired and completed as soon as possible. The Facilities
Advisory Committee will be reconvened this fall to continue planning and prioritizing the “work list”.
Capital Project Front Façade Cast Stone Reconstruction 2019-20
March Associates will share a Capital Project presentation and review on May 9th at 6:00
p.m. during the scheduled board of education meeting.
A Capital Project Community Review is scheduled May 14th at 7:00 p.m.
We encourage all district residents to attend the informational meetings to learn more
about the specifics of this proposed Capital Project (Board meeting, Budget Hearing,
Community Capital Project Presentation, Rotary) .
The proposed Capital Project will be voted on by the community on May 21, 2019 during
the budget vote.
Anticipated completion of the project is December 31, 2020.
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Anticipated completion of the project is
December 31, 2020.
Estimated Project Timeline
Task Date
March Associates Architects & Planners Project Review May 9, 2019 6:00 p.m.
Community Forum Project Review May 14, 2019 7:00 p.m.
Referendum Vote 05/21/2019
With voter approval – submit project to NYSED 06/03/2019
NYSED Review and Approval 06/03/19-08/02/2019 +/-
NYSED Approval 08/02/2019 +/-
Bid and Award Fall of 2019
Masonry restoration contractor and manufacturer build precast molds Winter 2019/2020
Construction Phase (8-10 months) April 2020
Estimated Completion 12/01/2020
Project Close-Out 12/31/2020
Capital Project
Front Façade Cast Stone
Reconstruction 2019-20
Thank You