1
Carltons Wind Turbine Community Fund Exisng Grant Report / August 2019 Village Hall Refurbishment A grant was awarded in August 2018 with work carried out during autumn 2018 and the spring of 2019. The grant was for stage 2 and 3 of a major refurbishment with stage 1 being funded by the Village Hall Trustees. Highlights of stage 2 included: Upgrading to LED lighting, re-plastering walls followed by decorating and the laying of the new flooring to kitchen and bar area. Highlights of stage 3 included: The refurbishment of the cellar and bar area. The digging out the old floor and relaying new concrete into the cellar area, due to the old flooring being inadequate and dangerous to the bar staff. A more efficient and effective cooler was fitted into the chilled area of the cellar to reduce noise for the surrounding houses. There were also a fire and security alarm upgrades. The Trustees used locally sourced contractors to help reduce the carbon footprint and support the local economy. Music Festival A grant was awarded in July 2019 to support an ambitious mini-festival, which took place over the weekend of Saturday 3rd and Sunday 4th August 2019. The festival built on the long tradition of community events in the Carltons. The weather was kind and everyone had a really good time.

Carltons Wind Turbine Community Fund Existing Grant Report ...parishes.lincolnshire.gov.uk › Files › Parish › 791 › ... · Carltons Wind Turbine Community Fund Existing Grant

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Carltons Wind Turbine Community Fund Existing Grant Report ...parishes.lincolnshire.gov.uk › Files › Parish › 791 › ... · Carltons Wind Turbine Community Fund Existing Grant

Carltons Wind Turbine Community Fund Existing Grant Report / August 2019

Village Hall Refurbishment

A grant was awarded in August 2018 with work

carried out during autumn 2018 and the spring of

2019. The grant was for stage 2 and 3 of a major

refurbishment with stage 1 being funded by the

Village Hall Trustees.

Highlights of stage 2 included:

Upgrading to LED lighting, re-plastering walls

followed by decorating and the laying of the new

flooring to kitchen and bar area.

Highlights of stage 3 included:

The refurbishment of the cellar and bar area. The

digging out the old floor and relaying new concrete

into the cellar area, due to the old flooring being

inadequate and dangerous to the bar staff.

A more efficient and effective cooler was fitted into

the chilled area of the cellar to reduce noise for the

surrounding houses.

There were also a fire and security alarm upgrades.

The Trustees used locally sourced contractors to

help reduce the carbon footprint and support the

local economy.

Music Festival

A grant was awarded in July 2019 to support an

ambitious mini-festival, which took place over the

weekend of Saturday 3rd and Sunday 4th August

2019. The festival built on the long tradition of

community events in the Carltons. The weather

was kind and everyone had a really good time.