21
Carolina North Update Public Information Meeting January 19, 2012

Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Carolina North Update Public Information Meeting

January 19, 2012

Page 2: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Agenda

1) General Overview 2) Project Phasing 3) Current Projects: Utilities Ductbank Landfill Gas Project Greenway Research Building and Infrastructure Army COE Individual Permit 4) Development Agreement: Minor Modification Request – Improvements to ecological value and connectivity of Conservation Areas

1

Page 3: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Carolina North

2

Page 4: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

What is Carolina North? • 947 acres of land owned by the University

What will it be? • Mixed-use academic campus • Extension of the main campus

What does it mean to the University? • Provide space for necessary growth • Enable new activities and relationships • Enhance research mission

Carolina North

3

Page 5: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

50-year Development Plan

4

Page 6: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Carolina North Development Agreement Plan

5

Page 7: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Projected Development: First 800,000 square feet

Research Building One 225,000 sf Small Central Utility Plant 5,000 sf Law School 250,000 sf Research Building Two 120,000 sf Housing 200,000 sf

6

Page 8: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

2011-2012 Development Schedule: Ductbank (Electrical Infrastructure Additions)

Ductbank (Electrical Infrastructure Additions) Construction The ductbank will provide more reliable power to Giles Horney Building Complex and Administrative Office Building. Nationwide permit received from Army Corps of Engineers July 2011 Phase One construction Aug 2011-Aug 2012 Phase Two early site clearing Oct - Nov 2011 Phase Two construction Feb 2012 -Aug 2012

7

Page 9: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

2011-2012 Development Schedule: Landfill Gas Project Landfill Gas Pipe Construction Phasing

The pipe brings landfill gas from Eubanks Road to a generator located at Carolina North. The electricity generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually, heat will be recovered from the generator to be used to heat buildings at Carolina North. Phase One: collection system at Eubanks Rd. Sept. 2010 – Oct. 2011 Phase Two: pipe from Eubanks Rd. to Homestead Rd. Jan – April 2012 Phase Three: pipe from Homestead Rd. to generator (with ductbank) Feb 2012 – Aug 2012

Phase One

Phase Two

Phase Three

8

Page 10: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

2011-2012 Development Schedule: Carolina North Greenway Carolina North Greenway A paved greenway from Homestead Road to Municipal Drive, co-located with the ductbank, will be built when ductbank construction is complete. Greenway completion February 2013

9

Page 11: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

2011-2012 Development Schedule: Research Building & Infrastructure

Infrastructure Design commenced in June 2011

Research Building Design commenced in October 2011

10

Page 12: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

2011-2012 Development Schedule: Conservation Areas

11

Page 13: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Conservation Areas with 20 year Development Area

12

Page 14: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Carolina North Conservation Areas Report: Overview Map

13

Page 15: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Exhibit E-2012-1. Map: Conservation Areas

14

Area Crow Branch Conservation Area (Areas 1-2)

Bolin Creek East Conservation Area (Area 4)

Bolin Creek West Conservation Area (Areas 3-5-6A)

Bolin Creek 100-year Limited Development Area (Area 6B)

Acres 51 24 183 53

Approximate Acreage:

Page 16: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Crow Branch Conservation Area Changes Explained

1

1

2

2

3

3

Area 1 moved to create contiguous area along Crow Branch and to include mature forest. Area 2 reshaped to avoid landfill and to include additional wetlands and xeric forest. Area 3 moved due to existing landfill & groundwater treatment infrastructure.

15

Page 17: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Bolin Creek East Conservation Area Changes Explained Resolved conflict between Development

Area boundary & Conservation Area 4. Offset Conservation Area 100’ from Development Area boundary to account for fill slope from old runway. Included more streams, stream buffers, and wetlands. Created wildlife corridor that connects to west side.

1

1

2

2

3

3 3

16

Page 18: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Bolin Creek West Conservation Area & Bolin Creek 100-Year Limited Development Area (6B) Changes Explained

17

1

2

3

Extended Conservation Area to the property boundary. Created contiguous Conservation Area. Included more streams, stream buffers, and wetlands.

1 1

1

1

2

3 3

Page 19: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Exhibit E-2012-1. Map: Conservation Areas

18

Area Crow Branch Conservation Area (Areas 1-2)

Bolin Creek East Conservation Area (Area 4)

Bolin Creek West Conservation Area (Areas 3-5-6A)

Bolin Creek 100-year Limited Development Area (Area 6B)

Acres 51 24 183 53

Approximate Acreage:

Page 20: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Conservation Areas

•Use restrictive covenants as mechanism •Third-party monitoring •Protection identical to what is in Development Agreement •Conservation area total remains 311 acres

19

Page 21: Carolina North Update Public Information Meeting · 2016. 3. 21. · generated there will connect to the Duke Energy power grid at a point on Martin Luther King, Jr. Blvd. Eventually,

Carolina North: http://www.carolinanorth.unc.edu

Capital Improvement Projects: Landfill Gas Project Electrical Infrastructure Additions (ductbank) http://www.fpc.unc.edu

Project Permits: http://fpc.unc.edu/Projects/CurrentPermits.aspx

Carolina North Forest Website: http://www.fac.unc.edu/FacilitiesServicesHome/GroundsServices/CarolinaNorthForest.aspx

Carolina North Forest Facebook Page: http://tinyurl.com/4484tgz

For further information

20