IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany November 2012 Case Study Project Management and Project Planning Decommissioning Project Greifswald Axel Bäcker

Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

  • Upload
    trandan

  • View
    228

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Case Study

Project Management and Project Planning

Decommissioning Project Greifswald Axel Bäcker

Page 2: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Contents

project strategy/planning

project implementation

project management/controlling

Project management & planning

Page 3: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

project analysis

key decisions

licensing strategy/project planning

project planning/technical concept

Project strategy / planning (main issues)

Page 4: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

investigation of scenarios for the company strategy

timely sequence of main tasks

planning of the necessary personnel (qualification measures)

evalution of alternatives (technical, personnel)

ã definition of the company strategy (decommissioning main goals)

ã WBS creation (part projects definition)

Basic tasks and objectives

Project strategy / planning (main issues) – Project analysis

Page 5: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

à definition of the overall strategy

à technical strategy

à personnel development

à cost development

system analysis

detailed analysis for main issues

Steps

Project strategy / planning (main issues) – Project analysis

Page 6: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

• (fuel management)

• Material (waste) management & mass flow logistic

• dismantling strategy

• post operation

• personnel strategy

• site reuse options

define main dependencies between activities

define mile stones and overall project life time

prepare key decision plan (with arguments)

HOW to do it??

Main considerations

Project strategy / planning (main issues) – Project analysis

Page 7: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Basis

for the

decision making process

(system analysis)

DECISION TREE

Practical realisation

Project strategy / planning (main issues) – Project analysis

Page 8: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

1990

1991

1992

1993

1994

1995

1996

1997

1998

1990

1991

1992

1993

1994

1995

1996

1997

1998

ja9

nein

Ende

Ende Ende Ende

Ende

ja

ja

ja

ja ja

ja

nein

nein

nein ja

nein nein

no

nein

nein

nein

ja ja

yes

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja ja

ja ja

ja

ja

ja (EWN)

nein (§ 249 h)

ja

ja

jaja

nein

nein

nein

nein

nein

nein

nein

nein

nein

ja

ja

ja

nein

nein

neinnein

nein nein

nein

nein

neinnein

nein

nein

nein

ja

nein

nein

nein

nein

nein

nein

ZLN ZLNstationäreAnlage

Personal-ausstellung

Personaleinsatzaußerhalb EWN

Personal-ausstellung

Abbau mit Fremd-unternehmen

Personal-ausstellung Personal-

ausstellung

RealisierungInfrastrukturfür Investorprojekte

Personal-ausstellung

AnpassungInfrastrukturfür Investorprojekte

BeräumungunterirdischeWirtschaft

Personaltransferzu Stillegung und Abbau

Personaltransferzu Stillegung und Abbau

Personaltransferzu Stillegung und Abbau

Personalzuordnungzum StellenplanStillegung und Abbau

Umlagerung desPersonals beiAusgliederung

Ausgliederung nach§ 613 a BGB

Qualifikationvorhanden

Einsatz und AuswahlEWN-Stammpersonalfür Stillegung und Abbau

Entwicklung zumEnergie- undIndustriestandort

Industrie-brache

Rekulti-vierung

Erschließung derFlächen für Neuanlagen

Personalstrategie

Unternehmensentwicklungintegrierte

Standortentwicklung

Flächenrecycling undDemontage Altanlagen

Energiewerke Nord GmbH

Nachquali-fizierung

Ausgliederung von Betriebs-einheiten (Fernwärme, Schalt-anlage), Automatisierung vonBetriebseinheiten

AufbauStillegungs- und Standort-betreibergesellschaft

schrittweisePersonal-ausstellung

Privatisierung

Terminverzug1 : 1

Personalumsetzung möglichbis Bereitstellung Abbautechnik

8

77

6

11 14

15

19 24

20

21

22

31

30

25 26

28

29 35

36

39

38

37

27

32

33

34

18

23

Stillegungs-genehmigung

ModellprojektBlock 5-8Teilstillegungs-vorhaben

Personal-transfer zuStillegungund Abbau

Personal-ausstellung Rest-

betrieb

13

12

16

17

3

2

1

10

Castor Block 1-5bzw. Rheinsberg

EinlagerungZAB

Transport-technik fürEinlagerungverfügbar

EinlagerungMorsleben

Konditio-nierung ZLN

feste Abfälle

Konditionierungmobile Anlage

completedismantling

Unterstützung Region,aktive Öffentlichkeitsarbeit

sichererEinschluß

AR-Beschluß1990

UnternehmensentwicklungStillegung und Abbau

Stillegungskonzept-studie EWN, KAH, NIS

BereitstellungVERA + weitereLagerkapazität

Konfektio-nierungZAW

Konfektio-nierung vorOrt oder ZLN

Schmelzanlage/Verdampfer-anlage EWN

SchmelzanlageExtern/ Ver-dampferanlageZLN

ZustandsanalysekonformErwartungen

Abbautechnikenverfügbar

Ende

Ende

Ende

Ende

Ende Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

DirekteEndlagerung

Endlager EndlagerErhaltungReststruktur

BE-Wieder-aufarbeitung

EntwicklungTechnikCastor/Pollux

CastorZLN

UmlagerungCastor ZLN

Ende

Ende

KRB-MOX

nurHalle 7

aus Wirtschaft-lichkeitsbetrach-tungen aufgegeben keine

Rückstellungfür KGR, KKRGebäudeabriß

aus freien Marktgründennur teilweise realisiert

Block 5,KKR-MH geklärt abhängig von Realisierung TTC

und Privatisierungs-/Industrialisierungskonzepten

4ja nein

defekteBrennelemente

BRENN-ELEMENTE

BETRIEBS-ABFÄLLE

STILLEGUNGS-ABFÄLLE

ABBAU

NACHBETRIEBSTANDORT-BETRIEB

5ja

BereitstellungSonderbehälterund Handha-bungstechnik

nein

programm-, personal- und terminbestimmende Meilensteine

Referenzstrategie

Strategiealternativen

Ende

Energiewerke Nord GmbH

Decision tree dismantling

Project strategy / planning (main issues) – Project analysis

Page 9: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

1990

1991

1992

1993

1994

1995

1996

1997

1998

1990

1991

1992

1993

1994

1995

1996

1997

1998

ja9

nein

Ende

Ende Ende Ende

Ende

ja

ja

ja

ja ja

ja

nein

nein

nein ja

nein nein

nein

nein

nein

nein

ja ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja ja

ja ja

ja

ja

ja (EWN)

nein (§ 249 h)

ja

ja

jaja

nein

nein

nein

nein

nein

nein

nein

nein

nein

ja

ja

ja

nein

nein

neinnein

nein nein

nein

nein

neinnein

nein

nein

nein

yes

no

nein

nein

nein

nein

nein

ZLN ZLNstationäreAnlage

Personal-ausstellung

Personaleinsatzaußerhalb EWN

Personal-ausstellung

Abbau mit Fremd-unternehmen

Personal-ausstellung Personal-

ausstellung

RealisierungInfrastrukturfür Investorprojekte

Personal-ausstellung

AnpassungInfrastrukturfür Investorprojekte

BeräumungunterirdischeWirtschaft

Personaltransferzu Stillegung und Abbau

Personaltransferzu Stillegung und Abbau

Personaltransferzu Stillegung und Abbau

Personalzuordnungzum StellenplanStillegung und Abbau

Umlagerung desPersonals beiAusgliederung

Ausgliederung nach§ 613 a BGB

Qualifikationvorhanden

Einsatz und AuswahlEWN-Stammpersonalfür Stillegung und Abbau

Entwicklung zumEnergie- undIndustriestandort

Industrie-brache

Rekulti-vierung

Erschließung derFlächen für Neuanlagen

Personalstrategie

Unternehmensentwicklungintegrierte

Standortentwicklung

Flächenrecycling undDemontage Altanlagen

Energiewerke Nord GmbH

Nachquali-fizierung

Ausgliederung von Betriebs-einheiten (Fernwärme, Schalt-anlage), Automatisierung vonBetriebseinheiten

AufbauStillegungs- und Standort-betreibergesellschaft

schrittweisePersonal-ausstellung

Privatisierung

Terminverzug1 : 1

Personalumsetzung möglichbis Bereitstellung Abbautechnik

8

77

6

11 14

15

19 24

20

21

22

31

30

25 26

28

29 35

36

39

38

37

27

32

33

34

18

23

Stillegungs-genehmigung

ModellprojektBlock 5-8Teilstillegungs-vorhaben

Personal-transfer zuStillegungund Abbau

Personal-ausstellung Rest-

betrieb

13

12

16

17

3

2

1

10

Castor Block 1-5bzw. Rheinsberg

EinlagerungZAB

Transport-technik fürEinlagerungverfügbar

DisposalMorsleben

Konditio-nierung ZLN

feste Abfälle

Konditionierungmobile Anlage

kompletterRückbau

Unterstützung Region,aktive Öffentlichkeitsarbeit

sichererEinschluß

AR-Beschluß1990

UnternehmensentwicklungStillegung und Abbau

Stillegungskonzept-studie EWN, KAH, NIS

Additionalstorages

Konfektio-nierungZAW

Konfektio-nierung vorOrt oder ZLN

Schmelzanlage/Verdampfer-anlage EWN

SchmelzanlageExtern/ Ver-dampferanlageZLN

ZustandsanalysekonformErwartungen

Abbautechnikenverfügbar

Ende

stop

Ende

Ende

Ende Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

DirekteEndlagerung

Endlager EndlagerErhaltungReststruktur

BE-Wieder-aufarbeitung

EntwicklungTechnikCastor/Pollux

CastorZLN

UmlagerungCastor ZLN

Ende

Ende

KRB-MOX

nurHalle 7

aus Wirtschaft-lichkeitsbetrach-tungen aufgegeben keine

Rückstellungfür KGR, KKRGebäudeabriß

aus Rückstellungs-gründen nurteilweiserealisiert

aus freien Marktgründennur teilweise realisiert

Block 5,KKR-MH geklärt abhängig von Realisierung TTC

und Privatisierungs-/Industrialisierungskonzepten

4ja nein

defekteBrennelemente

BRENN-ELEMENTE

BETRIEBS-ABFÄLLE

STILLEGUNGS-ABFÄLLE

ABBAU

NACHBETRIEBSTANDORT-BETRIEB

5ja

BereitstellungSonderbehälterund Handha-bungstechnik

nein

programm-, personal- und terminbestimmende Meilensteine

Referenzstrategie

Strategiealternativen

Ende

Energiewerke Nord GmbH

Decision tree waste management

Project strategy / planning (main issues) – Project analysis

Page 10: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

1990

1991

1992

1993

1994

1995

1996

1997

1998

1990

1991

1992

1993

1994

1995

1996

1997

1998

ja9

nein

Ende

Ende Ende Ende

Ende

ja

ja

ja

ja ja

ja

nein

nein

nein ja

nein nein

nein

nein

nein

nein

ja ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja

ja ja

ja ja

ja

ja

ja (EWN)

nein (§ 249 h)

ja

ja

jaja

nein

nein

nein

nein

nein

nein

nein

nein

nein

ja

ja

ja

nein

nein

neinnein

nein nein

nein

nein

neinnein

nein

nein

nein

ja

nein

nein

nein

nein

nein

nein

ZLN ZLNstationäreAnlage

Personal-ausstellung

Personaleinsatzaußerhalb EWN

Personal-ausstellung

Abbau mit Fremd-unternehmen

Personal-ausstellung Personal-

ausstellung

RealisierungInfrastrukturfür Investorprojekte

Personal-ausstellung

AnpassungInfrastrukturfür Investorprojekte

BeräumungunterirdischeWirtschaft

Personaltransferzu Stillegung und Abbau

Personaltransferzu Stillegung und Abbau

Personaltransferzu Stillegung und Abbau

Personalzuordnungzum StellenplanStillegung und Abbau

Umlagerung desPersonals beiAusgliederung

Ausgliederung nach§ 613 a BGB

Qualifikationvorhanden

Einsatz und AuswahlEWN-Stammpersonalfür Stillegung und Abbau

Entwicklung zumEnergie- undIndustriestandort

Industrie-brache

Rekulti-vierung

Energiewerke Nord GmbH

Erschließung derFlächen für Neuanlagen

Personnel strategy

Flächenrecycling undDemontage Altanlagen

Nachquali-fizierung

Ausgliederung von Betriebs-einheiten (Fernwärme, Schalt-anlage), Automatisierung vonBetriebseinheiten

AufbauStillegungs- und Standort-betreibergesellschaft

schrittweisePersonal-ausstellung

Privatisierung

Terminverzug1 : 1

Personalumsetzung möglichbis Bereitstellung Abbautechnik

8

77

6

11 14

15

19 24

20

21

22

31

30

25 26

28

29 35

36

39

38

37

27

32

33

34

18

23

Stillegungs-genehmigung

ModellprojektBlock 5-8Teilstillegungs-vorhaben

Personal-transfer zuStillegungund Abbau

Personal-ausstellung Rest-

betrieb

13

12

16

17

3

2

1

10

Castor Block 1-5bzw. Rheinsberg

EinlagerungZAB

Transport-technik fürEinlagerungverfügbar

EinlagerungMorsleben

Konditio-nierung ZLN

feste Abfälle

Konditionierungmobile Anlage

kompletterRückbau

Unterstützung Region,aktive Öffentlichkeitsarbeit

sichererEinschluß

AR-Beschluß1990

UnternehmensentwicklungStillegung und Abbau

Stillegungskonzept-studie EWN, KAH, NIS

BereitstellungVERA + weitereLagerkapazität

Konfektio-nierungZAW

Konfektio-nierung vorOrt oder ZLN

Schmelzanlage/Verdampfer-anlage EWN

SchmelzanlageExtern/ Ver-dampferanlageZLN

ZustandsanalysekonformErwartungen

Abbautechnikenverfügbar

Ende

Ende

Ende

Ende

Ende Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

Ende

DirekteEndlagerung

Endlager EndlagerErhaltungReststruktur

BE-Wieder-aufarbeitung

EntwicklungTechnikCastor/Pollux

CastorZLN

UmlagerungCastor ZLN

Ende

Ende

KRB-MOX

nurHalle 7

aus Wirtschaft-lichkeitsbetrach-tungen aufgegeben keine

Rückstellungfür KGR, KKRGebäudeabriß

aus Rückstellungsgründennur teilweise realisiert

aus freien Marktgründennur teilweise realisiert

Block 5,KKR-MH geklärt abhängig von Realisierung TTC

und Privatisierungs-/Industrialisierungskonzepten

4ja nein

defekteBrennelemente

Fuel elements Operational waste Dismantlingmaterial

Dismantling Post operation STANDORT-BETRIEB

5ja

BereitstellungSonderbehälterund Handha-bungstechnik

nein

programm-, personal- und terminbestimmende Meilensteine

Referenzstrategie

Strategiealternativen

Ende

Site reuse

Overall decision tree EWN

Project strategy / planning (main issues) – Project analysis

Page 11: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

project analysis

key decisions

licensing strategy/project planning

project planning/technical concept

Project strategy / planning (main issues)

Page 12: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Direct dismantling no Safe Enclosure

Introduce project organization

Project realisation by own staff instead of contractors

Erect major interim store on-site for fuel, waste and treatment

Reuse of site for industrial and energetic uses

Project strategy / planning – EWN initial key decisions

Page 13: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

project analysis

key decisions

licensing strategy/project planning

project planning/technical concept

Project strategy / planning (main issues)

Page 14: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

basic documents for Explanatory reports on

dismantling project - fire protection

- dismantling p o - radiation protection a v - remote dismantling r e - waste management t r

a Operation manual

o l - procedures of operation systems f l - radiaton protection ordinance

license 1995 - decommissioning and dismantling ordinance

application for dismantling Technical planning:

license - which parts should be dismantled - which parts should be remained

issue of dismantling Authority of the country license Mecklenburg-Vorpommern

pre checking documents Authorised expert (technical control organisation, experts of fire protection, site safety )

VPU 0

VPU 1 VPU 2

Project strategy / planning (main issues) –

Licensing strategy/project planning

-step by step procedure

Page 15: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

project analysis

key decisions

licensing strategy/project planning

project planning/technical concept

Project strategy / planning (main issues)

Page 16: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

main decommissioning and dismantling steps

dismantling principles

operational waste management

categorisation of systems/buildings/areas by radiological classes

inventorisation

mass flow logistic (from dismantling)

main items of necessary plant adaptations

main items of investments (new equipment, new installations)

special dismantling and disposal concept for highly activated

components

safe post operation, evaluation of the residual life time of old equipment

possibilities to reduce costs (alternatives)

Project strategy / planning (main issues) –

Technical concept - contents

Page 17: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

dismantling planning on system basic, execution on room basis

start in unit 5; low contamination / radiation dose

from low to high contamination / radiation dose

use market equipment

in situ decontamination only for dose reduction

whole components / parts as possible for decay or treatment in

interim storage

Project strategy / planning (main issues) –

Technical concept – dismantling principles

Page 18: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

category I unrestricted material from the monitored

area which is not subject to the release

measurement procedure

category II suspected material (an eventual contamination cannot be

excluded) from the monitored area, mainly from the

turbine hall

category III contaminated material

Radiological classes

Project strategy / planning (main issues) –

Technical concept – material categorisation

Page 19: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

- inventory of buildings, rooms and equipment (only so deep as necessary!!)

- radiological classification of components, systems, buildings, areas

- dose rate situation in rooms

- waste inventory from operation

Planning tasks to be solved on this basis:

planning of

- working hours per room / dose estimation

- preliminary actions as decontamination for dose reduction before

dismantling

planning of possible mass flow intensity and of containers for storing of

dismantled material and waste

determination of material for further conditioning and treatment

determination of necessary buffer storages and treatment possibilities

Project strategy / planning (main issues) –

Technical concept – inventory issues

Page 20: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Project strategy / planning (main issues) –

Technical concept – inventory (mass flow)

Building

structure

~1 185 000 Mg

Plant parts

TH 1 - 6, CA 6

~ 50 000 Mg

Category 1

~ 1 235 000 Mg

Plant parts

TH 1 – 5, IH 1 - 5

~ 68 000 Mg

Category 2 and 3

~ 565 000 Mg

NPP Greifswald

1 800 000 Mg

Building

Structure and

concrete

~ 497 000 Mg

Plant parts

TH 1 – 5, IH 1 - 5

~ 68 000 Mg

Category 2 and 3

~ 565 000 Mg

Radioactive material

2/3

1/3

Page 21: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

project analysis

key decisions

licensing strategy/project planning

project planning/technical concept

Project strategy / planning (main issues)

Page 22: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Contents

project strategy/planning

project implementation

project management/controlling

Project management & planning

Page 23: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Project implementation – Main items

project definition (WBS)

project execution

registration of actual data

Page 24: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

decommissioning and dismantling of unit 1 – 6 KGR

decommissioning and dismantling of KKR-unit

refurbishments (plant adaptation and new facilities)

construction of the new interim storage

waste management

site reuse preparation

Definition of main projects – as basic for the WBS (example EWN)

all in all 6 Projects:

Project implementation – Project definition

Technical project structure

Page 25: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Project implementation – Project definition

Work breakdown structure EWN

Page 26: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Project implementation – Main items

project definition (WBS)

project execution

registration of actual data

Page 27: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

clarification of content

and scope of technical planning

documents (PCD 0,1&2)

execution planning

(pre-checking documents)

issuing of dismantling licence

licensin

g p

rocedure

Project implementation - Project execution

Detailed planning

Page 28: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

„Pre-checking document „ (PCD, German abbreviation VPU),

requirement of authority before starting of any decom. work

PCD‘s are to be submitted to the authorized experts

to check these documents regarding the licence and technical rules

PCD in connection with KGR decommissioning (VPU 0, VPU1, VPU2)

PCD in connection with storage of residual materials

PCD in connection with adaptation of systems,

refurbishment, new equipment, wall opening

Project implementation - Project execution

Detailed planning

Page 29: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

• Description of tasks

• List of systems to be decommissioned

• Catalogue of the mechanical, electrical and instrumentation

cutting points

• Adaptation of P&I flow sheets to show parts to be dismantled

• Preconditions (removal of media, cleaning, decontamination, removal

of hot spots)

• Step by step working plan

• Dismantling instruction to realize the cutting points

Project implementation - Project execution

Detailed planning

PCD 1 (content) – Execution of cutting points

between Systems to be dismantled and operation systems

Page 30: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

• List of systems to be dismantled

• List of remaining systems

• Kind of material,

• mass per system and room (inventory database)

• Preconditions for dismantling (wall opening, changing of

remaining systems, new airlocks)

• Step by step working plans

• Dismantling instructions

• Plan for dose assessment (>25 mSv)

Project implementation - Project execution

Detailed planning

PCD 2 (content) – Dismantling execution

Page 31: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

§7 facility- category IV

Free release through

authorized expert

VPU 1

Sign of cuttig

points

Emptying

cleaning

Realisation of

cutting points

VPU 2

Confirmation of

cutting points

Project implementation - Project execution

Detailed planning

Principle of decommissioning

Page 32: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

PCD 1 implementation example - Electrical cutting point

Project implementation - Project execution

Detailed planning

Page 33: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

PCD 1 implementation example - Cutting points of reactor

Project implementation - Project execution

Detailed planning

Page 34: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Project implementation – Main items

project definition (WBS)

project execution

registration of actual data

Page 35: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

claiming

of working

orders

registration of

dismantled

material

(mass flow

supervision)

invoice of

contractors

(services)

time

consumption

used

manpower

kg

direct

costs

schedule/

mile stones

checking period: bi-weekly / monthly

checking level: working package (activities)

OD

PM

Project implementation – Registration of actual data

Page 36: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

project definition (WBS)

project execution

registration of actual data

Project implementation – Main items

Page 37: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Contents

project strategy/planning

project implementation

project management/controlling

Project management & planning

Page 38: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Project management / controlling –

Controlling level working packages

Project controlling

Working package

Detailed project controlling

Project

Part project

Program

Activity

Action

Task

Basic time schedule

Detailed time schedule

Time Costs

Estimated costs

Nominal costs

top down

bottom up

Page 39: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Project management / controlling –

Basic time schedule

Page 40: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

• continuous inquiry of actual data and comparison with nominal data

(planned or calculated)

according to: - mass (kg)

- manpower (mh)

- costs (€)

- time consumption (d)

• calculation of actual cost specific factors and correction factor

time schedule planning by Project Engineers

supervision of realisation by Project Managers (Controlling)

• based on - mile stones and dependencies

- different project structure levels

- licensing conditions

- basic time schedule and budget

Project management / controlling –

Time schedule planning

Page 41: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

assessment of differences between actual and nominal data

adaptation of cost specific factors and correction factors

control of manpower capacity (mh) and dismantling productivity (kg/mh)

feedback of correlated factors into the planning tool of the DeManS

(decommissioning management system)

shifting of working packages outside the critical path on time

(smoothing of capacity peaks)

actual controlling by PM (controlling department)

Project management / controlling –

Actual controlling

Page 42: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

s t a

r t d

i s m

a n

t l i n

g

u n

i t 1

+ 2

u n

i t 3

+ 4

a n

d w

e t

f u e

l s t o

r a g

e

s t a

r t m

e s

s u

r e m

e n

t b

u i l d

i n g

a u

t h o

r i t y

c o

n t r

o l

e x

e m

p t i

o n

a u

t o m

i c

l a w

c o

n v

e n

t i o

n a

l b

u i l

d i n

g

d e

m o

l i t i

o n

Project management / controlling –

Actual controlling

Page 43: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

s t a

r t d

i s m

a n

t l i n

g

u n

i t 1

+ 2

u n

i t 3

+ 4

a n

d w

e t

f u e

l s

t o r a

g e

s t a

r t m

e s

s u

r e m

e n

t

b u

i l d

i n g

a u

t h o

r i t y

c o

n t r

o l

e x

e m

p t i

o n

a u

t o m

i c

l a w

c o

n v

e n

t i o

n a

l b

u i l

d i n

g

d e

m o

l i t i

o n

Project management / controlling –

Actual controlling

Page 44: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

reports on actual status of project performance

estimation of project performance (forecast)

preparation of management decisions in advance to the project revision

(to change the project strategy)

preparation / justification and issue of a new revision

of the project performance (each two years)

Project management / controlling –

Reporting and documentation

Page 45: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Optimisation of the whole decommissioning process

Practical results - dismantling of big components and decay storage reactors (part 1), SG, pressurizers:

• Shorten project time– ca. 3 a

• Decrease of overall cost – ca. 15% (apr. 250 Mill.€) by:

– shorter remaining operation phase

– optimisation of container costs

– minimisation of final storage volume

– easier treatment condition due decay time

– lower personnel costs

Decommissioning Costs KGR Mio. €

Concept planning 7.63

Licensing (ca. 4%) 65.83

Project controlling (ca. 1%) 14.54

Dismantling monitored area (ca. 3%) 43.45

Remote dismantling (ca. 7%) 113.11

Dismantling controlled area

overall dismantling (ca. 4%) 67.47

Refurbishing (ca. 7%) 121.12

Material (Waste) Management

(ca. 25%) 386.82

Remaining operation (ca. 50%) 833.00

1,653.0

0

Project management / controlling –

Actual controlling

Page 46: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Contents

project strategy/planning

project implementation

project management/controlling

Project management & planning

Page 47: Case Study Project Management and Project Planning ... · PDF fileProject Management and Project Planning Decommissioning Project Greifswald Axel Bäcker . IAEA Workshop on Decommissioning

IAEA Workshop on Decommissioning Planning and Licensing, Karlsruhe/Germany – November 2012

Thank you for your attention !