29

Castillian Corporate Presentation

Embed Size (px)

Citation preview

Page 1: Castillian Corporate Presentation
Page 2: Castillian Corporate Presentation

2

Page 3: Castillian Corporate Presentation

3

Page 4: Castillian Corporate Presentation

4 TSX-V: CT OTCQX: CTIIF Please refer to Page 2 for full disclosures on these result figures

Page 5: Castillian Corporate Presentation

5

*For full technical details please see press release dated January 17, 2013

Page 6: Castillian Corporate Presentation

6

Total Mineral Resource--Hope Brook Gold Project as of October 1, 2012*

Category Tonnes

(millions) Gold (g/t)

Gold (oz)

Indicated 12.3 1.48 590,000

Inferred 8.3 2.07 548,000

Page 7: Castillian Corporate Presentation

7

Drilling and geophysics have

identified a major fold structure

that closes below surface in the

Connector Zone. This explains

why the silicified horizon doesn’t

come to surface southwest of the

existing mine where historical

drilling failed to intersect the

mineralized silicified zone.

Page 8: Castillian Corporate Presentation

8

Page 9: Castillian Corporate Presentation

9

Page 10: Castillian Corporate Presentation

10

Page 11: Castillian Corporate Presentation

11

Page 12: Castillian Corporate Presentation

12

open

open

open 240 Zone

open

Mine Zone

Newly Identified Major Near

Surface Target Zone

Page 13: Castillian Corporate Presentation

13

Page 14: Castillian Corporate Presentation

Growing the Resource

14

Page 15: Castillian Corporate Presentation

15

Chetwynd

South

Chetwynd

Prospect

240 Zone

NW Zone

Mine Zone

Page 16: Castillian Corporate Presentation

16

Page 17: Castillian Corporate Presentation

17

Good Road Network

Air Strip

Wharf

Modern Winterized Camp

Ramp Portal

Page 18: Castillian Corporate Presentation

18

*Figures reflect a 5:1 share consolidation approved by

shareholders at the last AGM (May 9th, 2012). The

consolidation occurred on February 19th 2013.

$0.00

$0.05

$0.10

$0.15

$0.20

$0.25

$0.30

$0.35

$0.40

Page 19: Castillian Corporate Presentation

19

Page 20: Castillian Corporate Presentation

20

Page 21: Castillian Corporate Presentation

21 Member of Forbes & Manhattan Group of Companies

Page 22: Castillian Corporate Presentation

22

Page 23: Castillian Corporate Presentation

23

Page 24: Castillian Corporate Presentation

24

Former HB Mine

Major

Target

Zone

Extensive Resistivity Low Marks

Footwall Conductor (Blue)

Page 25: Castillian Corporate Presentation

25

Page 26: Castillian Corporate Presentation

26

0 50 100 150 200 250

4

5

6

7

8

9

10

11

12

13

0 1 2 3 4 5 6 7 8 9 10

AuGrade(ppm)forHB11-023Outlier

δ18O(‰

VSM

OW)

AuGrade(ppm)

AuGrade(ppm)Vs.δ18O(‰VSMOW)

HoleHB10-003

HoleHB11-013

HoleHB11-023

HoleHB11-029

HoleHB11-031

HoleHB11-033

HoleHB11-034

HoleHB11-060

HoleHB11-061

HoleHB11-023AuOutlier

Page 27: Castillian Corporate Presentation

27

1 2

3

1

2

3

Page 28: Castillian Corporate Presentation

28

Page 29: Castillian Corporate Presentation

29