City Council MeetingApril 27 2010April 27, 2010
20th Street and Cloverfield Boulevard20 Street and Cloverfield BoulevardStreetscape Improvement Project
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
20th Street and Cloverfield BoulevardPrevious comments have shaped the project - it has evolved over time
Improved bicycle and d t i ti itpedestrian connectivity
Further incorporated LUCELUCE Bike Network
Further incorporated LUCE concepts into streetscape enhancements
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
“Complete Streets”
They provide
Streets are for more than moving cars…
networks for moving pedestrians, bicycles, and transitThey provide open space for gathering and recreationThey are well designed and green to provide a quality environment for everyone
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
20th Street and Cloverfield Boulevard
“Peer Review” Process Components
• Pedestrian Experience • Balanced Use of right‐of‐wayUrban Design
• Traffic calmingT t ti Refined• Travel times
• System ImpactsTransportation
• Tree species recommendation• Additional Canopy
Urban ForestTask Force
Refined Streetscape Concepts
Task Force
Sustainable Practices
• Permeability • Carbon reduction• Heat reduction
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
Public Process3/15/10 Community Meeting
• Presentation of concept fi trefinements
• Discussion of bicycle enhancement options
• Tree selection and bio• Tree selection and bio-retention system
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
Peer Review Process: Bikes
Connectivity
LUCE Bike Network
– 20th Street north‐south connections
– Broadway, future Expo Bike Path and Michigan Avenue, and other east‐west connectionsconnections
Mic
hiM
ichi
gan
gan
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
Dedicated Bike Lane on 20th Streetbetween Pico Blvd & Michigan Avenue
Traffic Impact Trade‐OffsBenefit: Improved bicycling p y gexperience for short section
Impacts:• Requires elimination of one• Requires elimination of one
travel lane (northbound)• Results of Traffic Analysis
Increased vehicle travel timesShift of 800 peak hour vehicles to
parallel and neighborhood streets
Impacts would need to be addressed through CEQA
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
g Q
Recommended Bicycle and Pedestrian Treatments on 20th Street
Sharrow – “shared lane” markingAlerts drivers that bikes are permitted use of travel laneHelps cyclists ride outside of theHelps cyclists ride outside of the door zone
• Continuous north‐south connectivityconnectivity
• 20th Street is an appropriate location
New crosswalk at Michigan Avenue (incorporated with Signal Upgrade Project)
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
20th Street Concept Summary
Future new
Third tree species for larger canopyFuture new
crosswalk larger canopy
Pedestrian lightingLarger canopy trees g g
Sidewalk improvementsBicycle SharrowsNew crosswalk at
Sharrows
crosswalk at Michigan
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
Cloverfield Boulevard Concept
New Sidewalk Trees(
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
Silva Cell Bio-Retention System
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
Cloverfield Boulevard Concept Summary
Up to 32 new trees (threetrees (three species)
Bio-retention system
Pedestrian Li htiLighting
Sidewalk improvementsimprovements
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010
20th Street & Cloverfield ConceptsSummary of Refined 20th Street and Cloverfield Concepts
Improves pedestrian environment through shade lightingImproves pedestrian environment through shade, lighting, and additional crosswalk
Beautifies streetscape and enhances greenery by p g y yincreasing tree canopy
Increases permeability/reduce run‐off
Preserves on‐street parking
Connects bicyclists to larger network through “sharrow”
20th Street and Cloverfield Boulevard Streetscape Improvement Project| City Council| 4.27.2010