16
CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Embed Size (px)

Citation preview

Page 1: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

CDF Decommissioning StatusJonathan Lewis

Master Planning Meeting

9 November 2011

Page 2: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Overview

• PPD is implementing Phase 1 of the DOE-approved decommissioning plan Remove all hazards related to the

experimental program Put experimental areas on display to be

included in Fermilab’s educational visitor program

J. Lewis--CDF Decomminssioning Plan2

Page 3: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

J. Lewis--CDF Decomminssioning Plan3

Scope• All hazards related to CDF experimental program

mitigated • 2nd floor, collision hall and adjacent section of

Tevatron tunnel ready for tour groups of ≤49 people• West high bay cleared for iARC use• East high bay prepared for PPD detector

development and construction lab • Assembly pit prepared for joint PPD/iARC use• Office areas and 1st floor counting room cleaned and

ready as adjunct to PPD activities in high-bay• 3rd floor computer room for CDF analysis servers

Page 4: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

J. Lewis--CDF Decomminssioning Plan44

Counting Room Theatre

Stairs to parking lot

West Bay-- IARC:

Broom Clean

Mezzanine Removed

30’ Deep Pit:

Cable Bridge

Removed

East Bay--PPD:

Useful hardware recovered

Workspaces readied

Collision

Hall

Access to section

of Tevatron tunnel

Page 5: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

J. Lewis--CDF Decomminssioning Plan5

Schedule

• October-December Secure detector Recover electronics Cleanout highbays

Consolidate/remove cabinets Remove gas racks, motor-generators, etc.

• December Demolish mezzanines

• January IARC construction begins

No access to west door Recover PMTs, etc. from detector

Page 6: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Schedule, cont.

• March-April Remove cable bridge

• April IARC tie-in work on north side Begin collision hall work

• Ongoing Counting room clean-up Remove process systems Life safety improvements for tours IARC integration

J. Lewis--CDF Decomminssioning Plan6

Page 7: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Status

• Systems secured No flammable gas or HV All detector power off Solenoid warm

• Clean-up in full swing Priority to recover of items useful to other efforts Throwing away CDF-specific items as we encounter

them ~30 skids out the door in the past month

• New lab space for mu2e 2nd floor work room, main floor welding area Trying to make more space soon to meet demand

J. Lewis--CDF Decomminssioning Plan7

Page 8: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

J. Lewis--CDF Decomminssioning Plan8

Gas racks gone

Scrap

Mezzanine ready

for demolition

MGs and test magnet

ready for removal

!st floor CR being cleared

Page 9: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Coordination with IARC• Electrical

Freeing up experimental power substation Moving conduit for doorway

• Mechanical Coordinating moves of sprinkler and chilled water

pipes for interferences with interconnects, etc.

• Mezzanine removal• Planning (Dervin Allen)

Tours for A&E, contractors, etc. Locating utilities, electrical circuits Reduced generator needs during utility work Evaluating access, connections

Truck access CDF roof access etc. etc. etc

J. Lewis--CDF Decomminssioning Plan9

Page 10: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

CDF Building Improvements on D&D Budget

• Main Stairwell Remove abandoned chilled water pipes Relocate elevator pump

• 1st Floor Remove abandoned chillers, etc.

• 2nd floor Improve exits Isolate conference rooms and egress paths from

assembly area

• Collision hall Sprinklers Fire doors Exit lighting

J. Lewis--CDF Decomminssioning Plan10

Page 11: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Backup

J. Lewis--CDF Decomminssioning Plan11

Page 12: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Plans for Display

• Theatre Place for visitors to assemble

Meet scientist? Movie?

• Trigger room Electronics on display Other displays?

• Control room Flashing screens look almost like we are running

• Collision hall North and west sides blown open

Plastic covers, view of COT face, etc. South and east, closed up in running configuration

J. Lewis--CDF Decomminssioning Plan12

Page 13: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Display Effort• Working with Public Affairs and Education• Making posters to document our achievements

Mix of hardware and physics Ben Kiliminster coordinating

• Interactive activities geared mostly toward middle school Cosmic-ray test stand, etc.

• CDF people: Ben Kilminster, Anna Mazzacane, JDL

• Life safety improvements in tour areas Doors, walkways Remove obstructions Remove halon, sprinkler mods

J. Lewis--CDF Decomminssioning Plan13

Page 14: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

J. Lewis--CDF Decomminssioning Plan14

Planned Collision Hall Layout

Page 15: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

J. Lewis--CDF Decomminssioning Plan15

Storage of components that may have future use

• Detector Items They are safe in situ Not worth labor to pull down if no use identified

Phototubes, Radeka preamps, etc.

• Shelf Items Over the years CDF has collected lots of good stuff

What you want for a detector lab (fittings, valves, connectors) We will sort to keep what is most generally useful

Don’t want building to be a warehouse Plan for storage mezzanines in pit alcoves without crane

coverage Sufficient space for all lockers now in high-bay

Page 16: CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011

Alcove Plan

J. Lewis--CDF Decomminssioning Plan16

Stairs

N