25
COMPLETE ENGINEERING GROUP COMPLETE ENGINEERING GROUP, TRADING AS COMPLETE COOLING SOLUTIONS & COMPLETE MECHANICAL SOLUTIONS ATMOSPHERIC PRECISION COMPLETE MECHANICAL SOLUTIONS COMPLETE COOLING SOLUTIONS INTRODUCTION TO

CEG Presentation 26.05.2015

Embed Size (px)

Citation preview

Page 1: CEG Presentation 26.05.2015

COMPLETE ENGINEERING GROUP

COMPLETE ENGINEERING GROUP, TRADING AS COMPLETE COOLING SOLUTIONS & COMPLETE MECHANICAL SOLUTIONS

ATMOSPHERIC PRECISION

COMPLETE MECHANICAL SOLUTIONS

COMPLETE COOLING SOLUTIONS

INTRODUCTION TO

Page 2: CEG Presentation 26.05.2015

Complete Engineering Group, will manage maintain & develop a successful business offering mechanical services to our clients, exceeding their

expectations through our dedication to deliver the highest standards of professionalism & value

Adam Stevens

Chairman

Complete Engineering Group

Established 2004

COMPANY STATEMENT

Page 3: CEG Presentation 26.05.2015

COMPANY HISTORY

3

As we have evolved, so have our capabilities, Complete Cooling Solutions were formed in 2004, back then we were just a small design & build comfort cooling company. Moving forward ten years we now deliver each stage of the build process required to achieve ‘atmospheric precision’ . Our team of designers and project managers have taken hundreds of projects from conception to project completion which is then handed over to our after care maintenance team Complete Mechanical Solutions. Now Part of a £10.0m privately owned group with our headquarters located in London Clapham Junction and further regional offices in Slough, Complete Cooling Solutions & Complete Mechanical Solutions are leading companies specialising in design & build projects & maintenance for mechanical services, for both end users and main contractors.

Huawei new head office in Reading – Mechanical services fit out & design £1.2m Carried out by Complete Cooling Solutions part of The Complete Engineering Group

Page 4: CEG Presentation 26.05.2015

Complete Engineering Group Ltd Trading as: Complete Cooling Solutions Ltd, Complete Mechanical Solutions Ltd Trading since 2004

COMPANTY DETAILS

We are a privately owned company based in London Clapham Junction with regional offices in Slough

We offer design & build services for mechanical projects for both main contractors and end users and have the capability to deliver projects and maintain the equipment through its life cycle.

Group turnover last fiscal year (2013-2014) £10,000,000 Insurances Employers Liability Limit of indemnity : £10,000,000 Public/Products liability Limit of indemnity : £10,000,000 Professional indemnity Limit of indemnity : £2,000,000 Employers Liability Limit of indemnity : £10,000,000 Insurers:

Fusion Insurance Services Ltd & HCC International Insurance Company

Page 5: CEG Presentation 26.05.2015

COMPANY ORGANOGRAM

Page 6: CEG Presentation 26.05.2015

SERVICES WE OFFER

Mechanical Services (Design & Build) • Project values from £2k up to £4 million • Heating services • Chilled water systems • Plumbing and drainage • Gas • Medical gas services • Vacuum • Service and maintenance

Air Conditioning (Design & Build) • Project values from £2k up to £4 million • Comfort cooling • Close control rooms • Computer rooms and clean rooms • Chilled water systems • Process cooling • Package systems • Service and maintenance

Maintenance (Bespoke contracts) • Contract values from £500 to £1 million • Fully certified engineers • 24/7 helpdesk • Established supply chain • HVAC Systems • Water Treatment & monitoring • Emergency lighting • Security systems • Excellent Facilities management software • Established reputation • Security systems • Extended Warranties through our

suppliers

Ventilation (Design & Build) • Kitchen extract systems • Supply and extract systems • Fume cupboard installation • Laminar flow areas • Contaminant control • Fire and smoke control systems • Service and maintenance

Controls and Operation • Automatic controls systems • Noise and vibration control • Energy control systems

Remedial & Fast Track Project Works • Project values from £2k to £750,000 • Multi-service disciplines including mechanical, ventilation, air conditioning and controls • Rapid response to new enquiries nationally throughout the UK • Feasibility studies/front end design studies can be undertaken • Design and build projects managed through our specialised internal departments • Fast installation and commissioning of projects from a dedicated installation team • Services refurbishment and life cycle plant replacement undertaken

6

Page 7: CEG Presentation 26.05.2015

Highlighted areas showcase where CEG are operationally active or have completed project work this calendar year.

2014- 2015 CEG completed over 160 projects throughout the UK and retained a 91% repeat business.

GEOGRAPHICAL COVERAGE

Page 8: CEG Presentation 26.05.2015

OUR APPROACH TO THE DESIGN & BUILD Complete Engineering Group’s design & build department (Complete Cooling Solutions) offer a fast response, non contractual service to both end users and main contractors. We offer bespoke solutions driven by our in house experts, who between them have over 90 years experience. Our project managers deliver in excess of 160 projects throughout the UK each year and are highly experienced in delivering projects in time and budget without compromising the end result. Our diverse project portfolio includes office blocks, food preparation facilities, shop fitting, facility management services, plumbing, heating, chiller and air conditioning installations. By specialising in working with our customers within their occupied buildings, we enjoy a constant stream of repeat business. We are always available to visit your site and provide quotations and recommendations.

OUR APPROACH TO THE MAINTENANCE

Complete Engineering Group’s maintenance department (Complete mechanical Solutions) operates a 24 hour fast response call out service with a maintenance team that can provide all aspects of mechanical services on both a planned and response request basis. Our service also includes asset survey and condition reporting. We are always available to visit your site and provide you with service and maintenance recommendations. We provide the highest quality maintenance services through our dedicated maintenance business unit and many of the country’s top companies trust CMS to support their building services infrastructure. By taking the time to understand each customer’s unique requirements and business drivers and adopting an approach of partnership in everything we do, we tailor maintenance packages to suit each business’ individual and specific needs.

Satisfied client

Page 9: CEG Presentation 26.05.2015

COMPANY CERTIFICATIONS

Accreditations held by members of the Complete Engineering Group

Page 10: CEG Presentation 26.05.2015

‘ATMOSPHERIC PRECISION ACHIEVED’

We have selected a variety of completed projects & maintained projects executed by Complete Cooling Solutions & Complete Mechanical Solutions. Should you require third

party references, full details will be supplied upon request

Page 11: CEG Presentation 26.05.2015

HUAWEI Client Background Huawei is a leading global ICT solutions provider. Their products and solutions have been deployed in over 140 countries, serving more than one third of the world’s population. This Chinese multinational company is currently the largest telecommunications developer in the world. Systems Installed : Chilled water system & Close control system Ventilation Public Health/WC’s Gas fired boilers Tea Points Project value : Mechanical services £1,200,000 Design : Complete Cooling Solutions Programme : 20 weeks

Page 12: CEG Presentation 26.05.2015

NEDBANK Client Background Nedbank is part of Nedbank Group, one of the four largest banking groups in South Africa measured by assets, with a strong deposit franchise and over six million clients They offer a diverse range of products and services that can be tailored to Clients’ specific needs. Systems Installed : VAV system Public Health/WC’s Tea Points Project value : Mechanical services £140,000 Design : Complete Cooling Solutions Programme : 16 weeks Maintenance : Complete Mechanical Solutions

Page 13: CEG Presentation 26.05.2015

ZOOPLA Client background Zoopla.co.uk is the UK’s most comprehensive property website, focused on empowering users with the resources they need to make better-informed property decisions. Systems Installed : VRV air conditioning system Comms room air conditioning Leak detection system Ventilation Project value : Mechanical services £105,000 Design : Complete Cooling Solutions Programme : 7weeks Maintenance : Complete Mechanical Solutions

Page 14: CEG Presentation 26.05.2015

THE OFFICE GROUP Client Background The Office Group provides flexible offices and meeting rooms. They focus on building spaces that enable every way of working, for every sort of business. Systems maintained: VRV air conditioning systems including TM44 energy inspections Chilled water systems Comms room air conditioning Building management systems Boilers and associated plant Water treatment - including risk assessments Ventilation, Plumbing Sites : 17 offices from London to Leeds - 24/7 cover Carried out by : Complete Mechanical Solutions

Page 15: CEG Presentation 26.05.2015

FORESTERS Forester is a mutual organisation. They provide a range of straightforward financial solutions to help address life’s challenges for protection, saving, investing and pension planning. Their products are designed to meet today’s needs for flexible terms, low charges and clear and simple conditions. Systems Installed : VRV system Public Health/WC’s Tea Points Project value : Mechanical services £230,000 Design : Complete Cooling Solutions Programme : 16 weeks

Page 16: CEG Presentation 26.05.2015

AGE UK Client Background Age UK aims to improve Later Life for everyone through their information and advice, services, campaigns, products, training and research. The charity was formed from the amalgamation of Age Concern and Help the Aged Systems Installed : VRV system Public Health/WC’s Tea Points Project value : Mechanical services £300,000 Design : Complete Cooling Solutions Programme : 16 weeks Maintenance : Complete Mechanical Solutions

Page 17: CEG Presentation 26.05.2015

EDISON GROUP (LONDON OFFICE) Client Background Edison is an international investment research company. They write on more than 400 companies across every sector and works directly with corporates, fund managers, investment banks, brokers and other advisers. Edison’s research is read by institutional investors, alternative funds and wealth managers in more than 100 countries Systems maintained: VRV air conditioning systems Comms room air conditioning Tea Points Water leak detection systems Ventilation Site : 9,400 sq ft office - 24/7 cover Carried out by : Complete Mechanical Solutions

Page 18: CEG Presentation 26.05.2015

ALPARI (UK) LIMITED Client Background Alpari (UK) Limited is part of the association of Alpari companies worldwide with offices in over 20 countries. Combined, the companies look after over 170,000 active trading accounts, generating monthly trading volumes in excess of USD210 billion and employ over 630 people worldwide (May 2011). Systems Installed : Chilled water system Public Health/WC’s Close control system Tea Points Ventilation Project value : Mechanical services £350,000 Design : Complete Cooling Solutions Programme : 16 weeks Maintenance : Complete Mechanical Solutions

Page 19: CEG Presentation 26.05.2015

GATEHOUSE BANK Client Background Gatehouse Bank plc is a Wholesale Shariah Compliant Investment bank based in the city of London. Gatehouse Bank plc was founded in 2008 and has achieved full banking operations with divisions in Real-estate, Treasury, Wealth Management, and Shariah Advisory Systems Installed : VRV system Ventilation Comms Room Water Leak Detection System Tea Points Project value : Mechanical services £35,000 Design : Complete Cooling Solutions Programme : 8 weeks Maintenance : Complete Mechanical Solutions

Page 20: CEG Presentation 26.05.2015

ATG MEDIA Client Background ATG Media is a global pioneer of webcast and times online auction platforms. They are leaders in the fields of fine art and antiques, construction and farm equipment, classic cars, retail returns and machinery and business assets. ATG Media have outstanding brand recognition with over 20m bidders visits every year. Systems Installed : VRV air conditioning system Public Health/WC’s Leak detection Tea points Plumbing Ventilation Project value : Mechanical services £150,000 Design : Complete Cooling Solutions Programme : 10 weeks Maintenance : Complete Mechanical Solutions

Page 21: CEG Presentation 26.05.2015

IBERDROLA Client Background Iberdrola are the world leader in wind energy and one of the top five energy companies in the world The high quality office development at One Tudor Street, developed by Stockland UK comprises 70,000 sq ft across 6 floors Systems Installed : Chilled water system Public Health/WC’s Tea Points Ventilation Project value : Mechanical services £54,000 Design : Complete Cooling Solutions Programme : 12 weeks Maintenance : Complete Mechanical Solutions

Page 22: CEG Presentation 26.05.2015

RUTH MISKIN Client Background Ruth Miskin is one of the UK’s leading authorities on teaching children to read. She has many years experience as a head teacher, teacher trainer and consultant in phonics and literacy, working with primary and secondary schools throughout the UK. Systems Installed : VRV air conditioning system Public Health/WC’s Plumbing Tea Point Facilities Project value : Mechanical services £45,000 Design : Complete Cooling Solutions Programme : 6 weeks Maintenance : Complete Mechanical Solutions

Page 23: CEG Presentation 26.05.2015

EDMOND-DE-ROTHSCHILD Client Background The Edmond de Rothschild Group specialises in Private banking and asset management as well as private equity, institutional & fund services and corporate finance. Set up in 1953 by Baron Edmond de Rothschild and chaired today by his son Benjamin de Rothschild, the Group deploys its expertise in the leading international financial centres Systems maintained: VRV air conditioning systems Close control system Tea Points Ventilation Site : UK Head Office - 24/7 cover Carried out by : Complete Mechanical Solutions

Page 24: CEG Presentation 26.05.2015

WHY CHOOSE COMPLETE ENGINEERING GROUP?

• We are committed to carrying out project works on behalf of our clients with enthusiastic,

experienced and high quality project teams dedicated to achieving mutual targets and aspirations • We always strive to provide positive assistance in developing the design and installation of any

project, ensuring the client achieves the best researched and most beneficial result • We are an established favoured high performance partner of many end users and engineering

consultants and are proven to function effectively, honestly and co-operatively within a multi-company team

• We have an established reputation for fairness and cost consciousness. We are fair and open with our

pricing and provide lowest risk cost certainty. Our track record is one of consistent and competitive pricing

• We will make fastidious effort to achieve your desired end result within budgetary constraints using

our engineering excellence, backed up by careful product and technique application from a wealth of company experience, continuous investigation and testing programmes

• We are creative in our planning and offer innovative programming alternatives wherever possible • You will always be offered solutions to every problem and will find that we are enthusiastic and driven

to complete a project with your goals in mind • An individual approach to working relationships and excellent project delivery make Complete

Engineering Group distinct in the industry • Management team available 24 hours a day, 7 days a week • We aspire to deliver a high quality level of service for your maintenance contract or project, requiring

a combination of tried and tested procedures, a passion to get it right first time and pride in the finished product

• Established reputation and track record of achievement since 2004

24

Page 25: CEG Presentation 26.05.2015

GET IN TOUCH

Head Office:

95 St John’s Hill

London

SW11 1SY

Tel: 0207 233 9221

Email: [email protected]

Web: www.cegservices.co.uk

Southern Office:

Regal Court

42-44 High Street

Slough, Berkshire, SL1 1EL

Tel: 01753 247 702

Email: [email protected]

Web: www.cegservices.co.uk