19
Yokogawa System Solutions By UEC Pvt. Ltd. Lahore, Pakistan Copyright© UEC Pvt. Ltd. Lahore Pakistan Tuesday, March 29, 2022 UEC Pvt. Ltd. Page -1

Centum Presentation MOL

  • Upload
    numan

  • View
    247

  • Download
    49

Embed Size (px)

DESCRIPTION

Centum Presentation MOL

Citation preview

Yokogawa System Solutions

By

UEC Pvt. Ltd. Lahore, Pakistan

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -1

System Solutions

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -2

• Yokogawa Distributed Control System• Yokogawa Emergency Shutdown System• Network Security Solution• Systems Related Service• Instrument Construction and Services

Yokogawa Distributed Control System (DCS)

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -3

• CENTUM CS3000-R3• CENTUM-VP

Yokogawa Distributed Control System (DCS)

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -4

CENTUM CS3000-R3• Vnet and Vnet/IP (1Gbps) Network Speed• Microsoft Windows XP based• Flexible and Scalable• CENTUM CS/CS 3000 Availability

99.999 999 973% ; (Seven nines)• Powerful Engineering Functions

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -5

CENTUM CS3000-R3

Field Control Station (FCS)• FCS provides full scalability from a single node system to a super large DCS solution in the single architecture• Full application compatibility between Compact FCS and Standard FCS

Operation and Monitoring

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -6

CENTUM CS3000-R3

Secondary windows

System message window

Primary window

Tool box

Operation and Monitoring

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -7

CENTUM CS3000-R3

Real time trendingHistorical trending

Long-term trend data storage

CSV file export

Yokogawa Distributed Control System (DCS)

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -8

CENTUM-VP

• Vnet/IP 1Gbps Network Speed• Microsoft Windows XP & Windows Vista based

CENTUM VP HIS

FCS(Same as CENTUM

CS 3000 R3)

Control LAN (Vnet/IP or Vnet)

CENTUM VP HIS

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -9

CENTUM-VP

Page 9

The Container Window is capable of

combining and displaying more than

one screen.

System Message Banner compactly displays essential

information.Arranged in the plant

hierarchy, Browser Bar allows operators to

reach necessary information instantly.

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -10

CENTUM-VP

Page 10

Combination of each window can be changed freely by the operators.

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -11

CENTUM-VP

Page 11

Drag & Drop the pen to view on the

trend graph.

Up to 8 pens can be displayed on the same trend graph simultaneously.

New Trend Display

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -12

CENTUM-VP

Page 12

ShelvingPane

PlantPlantHierarchyHierarchy

All Alarms

Alarms in theSelected Area

Information of Individual alarm

Alarms and Events Display

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -13

Yokogawa Emergency Shutdown System

Page 13

• Prosafe-RS

• “ProSafe” is a mix word of “Professional” and “Safety”.• “RS” is a newly added abbreviation of “Responsive Solutions”.• SIL-3 Certified• ProSafe-RS is Yokogawa’s own product backed by field- proven CENTUM DCS technology.• Truly integrated system of DCS and SIS• Safety and high availability in a simple architecture

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -14

Page 14

Prosafe-RS

V net/IP

• “Pair & Spare” CPU • Redundant CPU module & I/O module• Redundant network from control highway to data bus in a module

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -15

Yokogawa System Architecture

Page 15Page 15

Standards for Wireless

equipment

Control network

Plant data network

Office LAN

HIS &ISS Client

CAMSuite ClientVP-Quantum/FDS Client

CAMSuiteVP-Quantum/FDS

Common Field network(s)

AP AP

Field networkgateway

VP-eXchange

Controller without I/O

Remote HIS

Business Planning

OperationalManagement

Monitoring& Control

I/O without Controller

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -16

Network Security Solution

Page 16

• Firewall Solution• Virus Protection Wall (Panda Gate Defender)• Antivirus Solution ( End Point Security)

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -17

Systems Related Services

Page 17

• Engineering• Installation• Maintenance

• Scheduled Visits• Emergency Visits

• Training (Local/Singapore)• Operation and Monitoring• Engineering• Maintenance

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -18

Instrument Construction & Services

Page 18

• Project Management•Installation, commissioning of instruments, DCS Csystems, ESD systems, PLC, analyzers, cables, cable trays, conduit, etc.•Design,supply, instsallation and Preparation of Control panels.•Assistance during pre commissioning an Comissioning of plant. •Trouble Shooting & Maintenance •After Sales Back-up services

Copyright© UEC Pvt. Ltd. Lahore PakistanThursday, April 20, 2023 UEC Pvt. Ltd.Page -19

Thank You Very Much

Page 19