Characterization presentationCharacterization presentationWinter 2009-10Winter 2009-10
Performed by:Performed by:Tomer Michaeli 052792769Tomer Michaeli 052792769Liav Cohen 301242509Liav Cohen 301242509
Supervisor: Shlomo Beer GingoldSupervisor: Shlomo Beer GingoldIn collaboration with:In collaboration with:
characterization of synchronizerscharacterization of synchronizers and metastabilityand metastability
Motivation In modern systems, there are several domains with
different frequencies.
To communicate between them synchronization is needed. Synchronization is achieved by means of a synchronizer’.
Designing and building synchronizers is one of the main priorities of the most leading companies in the world because
efficient synchronization system will enable significant power saving.
Project subject
Manual measurements of synchronization Circuits and comparison to results on chip.
Use the word direct instead of Manual
Direct measurments
Project goals
Learn the direct measurement method. Building and improving of a measurement
system for synchronization to characterize performance of synchronizers.
Blocks Diagramf1
f2
FFscope
FFscopef1
f2
FPGA
Extra generator
M.B
--Test chip
Required equipment An oscilloscope that can create histograms FPGA board DLP daughter board. Signal generator Voltage regulator Test chip board PC, including Xillinx ISE, Visual Studio.
Test Environment
Test Chip 65nm
FPGA board
Signal generator
DLP socket (PC) MUX socket
The test environment is composed by the FPGA board that generates control and data signals for the 65nm Synchronizer test chip.
Project Schedule
Task Duration
Learn the subject and build the measurement system
7 weeks
Get the results and compare to the results from the chip
4 weeks
Analize the results 3 weeks