Chartered Project Professional (ChPP)Application GuidanceHelping you to understand, decide and prepare for the Chartered Project Professional (ChPP) standard
32 The Chartered Project Professional Application Guidance
ContentsPage 3 Introduction
Page 4 Whybecomechartered?
Page 4 Areyoureadyforchartered?
Page 6 Theapplicationprocess
Page 9 Helpingyoutoprepare
Page 13 Theinterview
Page 15 Otherthingstonote
Page 17 Appendix1–Professionalpractice assessmentcriteria
Page 34 Appendix2–Technicalknowledge assessmentcriteria
BecomingaCharteredProjectProfessional(ChPP)willdemonstrateyourcommitmenttoprofessionalstandards,continuedprofessionaldevelopmentandethicalandprofessionalconduct.Itwillprovideassuranceforyouremployerandclientsandhelpraisetheprofileandvalueofprojectmanagementasaprofessionalpractice.
Thisguidancewillhelpyoutodecidewhenthetimeisrightforyoutoapplyandwillhelpyoutoprepareforanapplicationnoworatafuturedate.
IhopethatyouwilldecidetomakebecomingaChPPpartofyourcareerdevelopmentjourneyandwelookforwardtowelcomingyoutoanewcommunityofprojectprofessionals.
Debbie DoreChiefexecutiveofficer
32 Have a question? Need some help? Email [email protected]
IntroductionThisguidesetsouttohelpyoudothreethings:
Understandwhatbeingcharteredmeansforyouandtheprofession.
Decideifbecomingcharteredisrightforyounow,oratalaterdate.
Prepareyourapplication.
Ifyouaresuccessful,youwilljointheRegisterofCharteredProjectProfessionals.
Thecharteredstandardhasbeendesignedtobeaccessible,yetrigorouswithdifferentassessmentroutesaccordingtoqualifications,previousassessmentsandexperience.
54 The Chartered Project Professional Application Guidance
Why become chartered?
For APM and the profession it means For you it means For employers it means
Enhanced status of project management
Raised standards of practice
Improved project outcomes
Better public understanding and confidence in what we do
Assurance and confidence for customers of project management services
Opening the door to collaboration with other professions
Personal recognition from your peers in project management and other professions
Enhanced CV to stand out in the job market
A framework for the development of your career
International recognition
Assurance for clients of high standards and ethical practice
Use of the post nominal ChPP
Increased understanding, helping you to work more effectively
Proof of a high standard of practice and ethical standards
Attracting the best talent by actively supporting chartered
A competitive edge
A ready-made framework for developing your people
Motivated team committed to continued professional development and ethics
Increased status of project management in organisations/clients and the public
Are you ready for chartered? Youareprofessionallyactivewithaproventrackrecordofdeliveringprojects,
programmes,portfoliosorakeycontrolorenablingfunction.
Theseprojects,programmesorportfoliosexhibitcharacteristicsofcomplexity.
Youhavetherequiredbreadthofprojectexperiencetomeettherequirementsoftenmandatoryandtwoelectivecompetences.
Youhaveanadvancedtechnicalknowledgeandareabletoconfidentlyevaluateandanalysetheoryofcurrentpracticesandmethods.
Youarecommittedtocontinuingprofessionaldevelopmentandanethicalwayofworking.
Wherever you see ‘project management’,
this includes people working in project,
programme or portfolio management, or in a
key control or enabling function such as PMO.
54 Have a question? Need some help? Email [email protected]
Technical knowledge means: an advanced technical knowledge and understanding of how to deliver projects, programmes and portfolios. You could think about this as the theory.
Professional practice means: being able to provide evidence of applying the technical knowledge (theory) to practice. You could think about this as experience.
Are you eligible?
Youneedtobe‘professionallyactive’.Thismeans:
a) havingaproventrackrecorddeliveringprojects,programmes,portfoliosorakeycontrolorenablingfunction;and
b) havingup-to-dateknowledgeofcurrentpracticesandmethods;and
c) beingactivelyinvolvedintheprojectmanagementprofession.
Ifthemajorityofevidenceprovidedinyourapplicationismorethanfiveyearsold,youcanstillapply,youwilljustneedtoexplainhowyoucontinuetomeetpointsb)andc)above.
What is being assessed?
Theapplicationprocessisdesignedtoassessthefollowingareas,soconsiderwhetheryoucanprovideevidenceofthisnoworifyouneedsomemoreexperienceorlearningfirst.Thereismoredetaillateronintheseguidancenotesaboutthecompetencesthatsupporttheseareas.Youwillneedtoshow:
Technical knowledge:advancedtechnicalknowledgeandunderstandingofhowtodeliverprojects,programmesorportfoliostakingintoaccountmanyinteractingfactorsanddifferentapproachesthatcouldbetaken.
Professional practice:successfulapplicationofthisknowledgetodeliverprojects,programmesorportfoliosthatinvolved:
Uncertaintyorconflictingobjectives.
Highlevelsofunpredictabilityorrisk.
Multipleworkpackages,projectsorprogrammes.
Multipleinterdependentstakeholders,possiblywithcompetinginterests.
Youwillneedtocommittoprofessionalethicsandshowcontinuingprofessionaldevelopment(CPD).Youwillalsoneedtwoproposerswhosupportyourapplication.
Forthefulldetailsofcompetencesthatwillbeassessed,pleaseseeAppendices1and2.
Thenextsectiontellsyouhowtoprovidetheevidencerequired.
76 The Chartered Project Professional Application Guidance
The application process Theapplicationprocessisdesignedtobeasinclusiveaspossiblewithdifferentroutesaccordingtoyourqualifications,previousassessmentsandexperience.Thesamerequirementsfortechnicalknowledgeandprofessionalpracticeapplytoeveryonebuttheyaretestedindifferentways.
Therearethreeroutesandtheonlineapplicationprocesswillguideyouthroughaccordingtowhetheryouhavearecognisedassessmentandwhatitcovers.
Route 1:forthosewhohavearecognisedassessmentfortechnicalknowledge.
Route 2:forthosewhohavearecognisedassessmentfortechnicalknowledgeandprofessionalpractice.
Route 3:anexperientialrouteforthosewhodonothavearecognisedassessmentbutdomeettheeligibilitycriteria.
76 Have a question? Need some help? Email [email protected]
STAGE ONEDo you have a recognised assessment?
ROUTE 1 ROUTE 2 ROUTE 3
Yes, I have a recognised assessment for technical knowledge.
Yes, I have a recognised assessment for technical knowledge and professional practice.
No, I don’t have a recognised assessment but I meet the eligibility criteria and have the necessary experience.
Assessment of technical knowledge is via the recognised assessment that you hold.
Assessment of professional practice is via written submission and interview.
Assessment of technical knowledge and professional practice is via the recognised assessment that you hold.
Assessment of technical knowledge is via an extended interview.
Assessment of professional practice is via written submission and interview.
The next step is where you provide evidence of professional practice.
There are three steps to this part:
1 Decide which competences you are going to provide evidence for. The full list and more information is later on in these notes.
2 Give an overview (maximum 500 words) of up to four projects, programmes or portfolios that you will use to illustrate them.
3 Write up to 250 words for each competence, referring back to the project overviews.
The next step is where you provide evidence of professional practice.
There are three steps to this part:
1 Decide which competences you are going to provide evidence for. The full list and more information is later on in these notes.
2 Give an overview (maximum 500 words) of up to four projects, programmes or portfolios that you will use to illustrate them.
3 Write up to 250 words for each competence, referring back to the project overviews.
You will be asked to declare that you have kept up to date through CPD, give your proposers’ details and pay the application fee.
You will be asked to upload your CPD log (12 months), your proposers’ details and pay the application fee.
You will be asked to declare that you have kept up to date through CPD, give your proposers’ details and pay the application fee.
Your application will be assessed at this stage, and if successful you will be invited to interview.
98 The Chartered Project Professional Application Guidance
If you are applying without a recognised assessment
you will be tested on your technical knowledge at
interview. Make sure that you have prepared for this.
A recognised assessment is one that has been reviewed and approved by APM, and meets the requirements of the chartered standard:
is at least at the required level for technical knowledge or professional practice;
is externally regulated by an approved body (such as Ofqual), or aligns to the quality requirements of ISO17024; and
covers a minimum number of mandatory and elective competences.
You can find the current list of recognised assessments here: apm.org.uk/chpp. You will need to upload your certificate when you apply.
*Can’tseeyourassessmentlisted?Don’tworry,youcanstillapplythroughtheexperientialrouteandprovideevidencethroughthewrittensubmissionandinterview.*
FindoutmoreaboutAPM’srecognisedassessmentschemeontheAPMwebsite.
STAGE TWOInterview
ROUTE 1 ROUTE 2 ROUTE 3
Up to one hour face-to-face interview (two assessors)*
Professional practice: validates your written submission.
Ethics.
A phone interview (one assessor) of up to 30 minutes.
CPD: discussion of competences related to
CPD.
Ethics.
Up to two hour face-to-face interview (two assessors)*
Professional practice: validates your written submission.
Technical knowledge: technical questioning to assess your breadth of knowledge.
Ethics.
A panel meets periodically to confirm results and award chartered status.
*ItmaybepossibletoarrangeaSkypeinterviewifyouareunabletoattendinperson.
98 Have a question? Need some help? Email [email protected]
Helping you to prepareAPMhascommissionedarangeofsupportservicesthatareavailabletomembersandnon-members.Findoutmorebyvisitingapm.org.uk/chpp.
Completing the form
YourapplicationwillbeonlineunlessyourequestaPDFformfromthecharteredteamintheAPMServiceDeliveryteam(contactinformationatthebottomofthispage).
Geteverythingtohandbeforeyoustart.Onceyoustarttheonlineapplicationyoucansaveitandcomebacksoyoudon’tneedtodoitallatonce.Thereisalsoan‘exporttoPDF’optionsoyoucanpulloffacopyforyourrecords.
Checklist Ifneeded:
Certificatesfromanyrecognisedassessments Projectoverviews
Twoproposers:nameandcontactinformationonly Evidenceofcompetences
Methodofpayment YourCPDrecord
IfyouarealreadyregisteredontheAPMwebsiteyouwillneedtologintobegin.Ifyouaren’talreadyregistered,itisquickandeasytodoso.Youwillbeaskedtoprovidesomebasicinformationtocompletetheregistrationprocess.
Theformhashelpavailableasyougobutifthisdoesn’tansweryourquestion,youcancontactthecharteredDeliveryteam.
Personal information
Youareaskedtoprovidesomebasicpersonalinformationsuchasanyprofessionalmembershipsandyouremployer(ifapplicable).Werespectyourinformationandwillonlyuseitinaccordancewithdataprotectionrulesandourprivacypolicy;thisisavailableonrequestandviatheonlinelinkwhenyouregister.
Recognised assessments
Selectanyrecognisedassessmentsfromthedrop-downlist.Thiswilldeterminethenextstepsoftheapplicationprocess.Youwillbedirectedautomaticallytothepartsyouneedtofillinnext.Ifyoudon’thavearecognisedassessmentyouwillgotothewrittensubmissionstageandtechnicalknowledgewillbetestedatinterview.
Bereadytouploadanyrelevantcertificates.
Thecurrentlistofrecognisedassessmentscanbefoundhere:apm.org.uk/recognisedassessment.
If you have an assessment that covers both technical knowledge and professional practice, you can skip the next section and go straight to the section on continuing professional development.
If your most recent assessment is more than five years old you will need to provide a statement showing how you have kept up to date with current practice and methods and been actively involved in the project management profession.
Once you start the online application you can save it and come back so you don’t need to do it all at once.
1110 The Chartered Project Professional Application Guidance
Project experience
Unlessyouhavearecognisedassessmentthatincludesprofessionalpractice,youwillneedtoprovideoverviewsofuptofourprojects,programmesorportfoliosthatgivethecontextualevidenceforyourprofessionalpracticeassessment.Youwillrefertoonlyoneofthesewhenyoucompletethecompetencesection,soitisimportanttodescribeaprojectthatwillgiveyouthebestchanceofmeetingtherelevantassessmentcriteria.Ifyouthinkyoucanmeetthemallfromoneproject,that’sfine,justgiveasmanyoverviewsasyouthinkyouneed,uptofour.
Thesewillbereferredtoasyourprojectexperienceasyourprojectexperiencethroughoutyourapplication.Showhowtheproject,programmeorportfoliodemonstratedthefollowingcharacteristics:
uncertaintyorconflictingobjectives;
highlevelsofunpredictabilityorrisk;
multipleworkpackages,projectsorprogrammes;
multipleinterdependentstakeholders,possiblywithcompetinginterests.
Youwillbeexpectedtowriteupto500wordsforeachprojectoverview.
If your most recent project, programme or portfolio is
more than five years old you will need to provide
a statement showing how you have kept up to date with current practice and
methods and been actively involved in the project
management profession.
1110 Have a question? Need some help? Email [email protected]
Competence selection and assessment
Inthissectionyouwillshowhowyoumeetthecompetences.Mostaremandatorybuttherearealsosomechoices.Youwillneedtospendsometimethinkingabouttheevidenceyouwillneed–don’trushit.
Theelectiveselectionprovidestheopportunityforthoseinspecialistrolestodemonstratehowtheymeetthecharteredstandard.
Mandatory Nine competences
Plus your choice of either budgeting and cost control OR financial management
Elective Your choice of two from a list of 15
Total 12 competences
Foreachcompetenceassessed,youwillneedtocoveraminimumoffourprofessionalpracticeassessmentcriteriaacrossthecompetence.Statewhichproject,programmeorportfoliooverviewtheevidenceisfrom.ThecompetencesandassessmentcriteriacanbefoundinAppendix1.
Write up your project overviews and competence statements offline so that you can spell check, word count and edit them easily. Then simply cut and paste them into the application system.
Write your answers in the first person. “I did….”
Avoid jargon and company acronyms – remember the assessors won’t know your organisation so explain things as clearly as you can using plain English.
Proofread your application. It may help to go back to it the next day with a fresh pair of eyes before submitting.
Make sure your proposers are happy and know that they may be contacted.
Avoid theoretical answers or repeating the competence statements and assessment criteria.
IMPORTANT NOTE:Eachcompetencestatementmustrelatetooneproject,programmeorportfoliodetailedintheprojectexperiencesection.Youcan’trefertomorethanoneprojectexperiencewithinasinglecompetence.
Assessorswillbelookingforevidenceofhowyouhaveattainedanddemonstratedthecompetence,nothowyouhavemanagedotherstodoitsoyoushouldusethefirstperson,‘I’,inyourresponses.Allcompetencesmustberelatedtoyourownexperiencesoavoidmakingstatementsaboutanyteamorcorporateachievementswhichwerenotyourown,anyrestatementoftheassessmentcriteria,orcoverageofknowledgeandtheory.
Eachofyouranswerscanbeupto250words.
1312 The Chartered Project Professional Application Guidance
Continuing Professional Development (CPD)
Yourdevelopmentasaprojectprofessionalwillcontinuethroughoutyourcareerandyoumustmakeacommitmenttokeepinguptodate.
Youwillneedtohavecompleted35hoursofCPDinthe12monthsuptoyourapplicationandconfirmthatyouwillmaintainthiseveryyear.AllCPDmustmeettherequirementsofAPM’sCPDschemewhichcanbefoundhere:apm.org.uk/cpd.
YoucanusetheAPMCPDlog,butthisisnotmandatoryprovidedyoumeetthenecessaryrequirements.Thisincludesastatementontheareasyouwouldliketodevelopfurtheroverthenext12months.
Your proposers
Youmustprovidecontactdetailsfortwoproposerswhocansupportyourapplication.Proposerscouldbeanotherprojectprofessionaloryourlinemanagerbutcan’tbeafamilymember.
YourproposersshouldbelieveyouaresuitableforconsiderationforChPPandbehappytoconfirmthisifcontactedbyAPM.
Code of Professional Conduct and online directory
Inthissectionyouwillbeaskedtoconfirmthatyouhaveread,understoodandwillabidebyAPM’sCodeofProfessionalConduct:apm.org.uk/codeofconduct.Thiswilldemonstrateyourcommitmenttotheprofessionandethicalbehaviour,andyourwillingnesstosupportothers.
Youwillalsobeaskedif,subjecttoyourapplicationbeingsuccessful,youwouldlikeyournametobepublishedontheAPMwebsite.
CPD: Things you might want to consider could
include: work-based learning; distance learning;
special work projects, writing technical papers;
mentoring; voluntary work; association activities or
committee work; promoting project management to
young people; seminar/conference presentations;
any relevant course or private study.
CPD
Youwilleitherhavetouploadyourrecordorself-declare(seesectionaboveontheapplicationprocess)
APMwilldoanannualauditofasampleofChPPCPDrecords.
1312 Have a question? Need some help? Email [email protected]
The interviewIfyourfirststageapplicationissuccessful,youmaybeinvitedtointerview.
Theinterviewisamandatorypartoftheassessmentprocessforallapplicants.Itisbasedontheinformationyouprovideinyourapplicationandwillvalidateandexploreyourresponses.Seetheearlierstep-throughoftheapplicationprocessonpageeighttocheckwhatyourinterviewwillcover.
Interviewsmayberecordedorobservedforqualityassurancepurposeswiththeapplicant’spermission.
Theinterviewerswillmaketheirjudgementsbasedsolelyontheinformationinyourapplicationandyourperformanceduringtheinterview.
InterviewersareexperiencedassessorsandunderstandtherequirementsandcriteriaforChPP.Youwilleachbetoldoneanother’snameinadvanceoftheinterviewtoidentifyandpreventanyconflictsofinterest.Theywon’tnecessarilybematchedtoyourmarketsectororareaofexpertise,butwillgiveaverybriefintroductionofthemselvesforyourbenefitbeforetheinterview.
Interview format
Theinterviewformatwilltaketheformofadiscussion.Therearenotrickquestionsandyoushouldstructureyourresponsestoquestionsusing‘I’not‘we’or‘theteam’.Theinterviewerswillbeseekingtounderstandyourevidence.Appendix2summarisesthetechnicalknowledgeassessmentcriteriainterviewerscanselectfrom.
Route 1 interviews
Yourinterviewwillbeconductedbytwoassessorsandthepurposeoftheinterviewistoexploreandvalidateyourwrittensubmission.Youareexpectedtoprovidedetailedandspecificanswersaboutactualeventsrelatingtoevidenceinyourapplication.Youwillbeasked:
clarificationquestionsonyourprojectoverviews(ifapplicable);
clarificationquestionsonyourprofessionallyactivestatement(ifapplicable);
questionsonsixcompetenceareasfromyourwrittensubmission(theseareasarechosenbytheassessors);
questionsonethics;
finally,ifyouhaveanyadditionalevidenceyouwouldliketoaddtosupportyourapplication–youhaveuptofiveminutestoprovidethis.
Keep a copy of your application for your records and to review before the interview stage. There is an ‘export to PDF’ link on each page of the online application form.
You can find the technical knowledge assessment criteria in Appendix 2.
1514 The Chartered Project Professional Application Guidance
Route 2 interviews
Yourinterviewwillbeconductedbyoneassessorand,asyoualreadyholdarecognisedassessmentfortechnicalknowledgeandprofessionalpracticethepurposeoftheinterviewistoexplorecurrency,ethicsandCPD.Youwillbeasked:
clarificationquestionsonyourprofessionallyactivestatement(ifapplicable);
clarificationquestionsonyourCPDsubmission(ifapplicable);
questionsonhowtheCPDyouhaveundertakenrelatestoaselectionofmandatorycompetencesand/orexamples,withinthepastfiveyears,whereyouhaveusedaselectionofmandatorycompetenceswithinyourprojectmanagementrelatedactivity;
questionsonethics;
finally,ifyouhaveanyadditionalevidenceyouwouldliketoaddtosupportyourapplication–youhaveuptofiveminutestoprovidethis.
Route 3 interviews
Yourinterviewwillbeconductedbytwoassessorsandthepurposeoftheinterviewistoexploreandvalidateyourwrittensubmissionaswellasassesstechnicalknowledge.Youareexpectedtoprovidedetailedandspecificanswersaboutactualeventsrelatingtoevidenceinyourapplicationwithregardstoprofessionalpractice.Thetechnicalknowledgequestionsaredesignedtoassessyourbreadthofknowledgeagainstthecriteriaandanswerstothesequestionsdonotspecificallyhavetorelatetoyourownexperience.Youwillbeasked:
clarificationquestionsonyourprojectoverviews(ifapplicable);
clarificationquestionsonyourprofessionallyactivestatement(ifapplicable);
questionsonsixcompetenceareasfromyourwrittensubmissioninrelationtoprofessionalpractice(theseareasarechosenbytheassessors);
questionsonfourcompetenceareasfromyourwrittensubmissioninrelationtotechnicalknowledge(theseareasarechosenbytheassessors);
questionsonethics;
finally,ifyouhaveanyadditionalevidenceyouwouldliketoaddtosupportyourapplication–youhaveuptofiveminutestoprovidethis.
1514 Have a question? Need some help? Email [email protected]
What happens next?
Yourassessorswillmakearecommendationwhichwillthenbereferredtoapanelforapproval.Youwillthenbeinformedoftheoutcome.
Ifyouaresuccessful,youwillreceivealetterandacertificatefromAPMconfirmingyourachievementwithineightweeksfromthedateofinterview.YournamewillbeincludedontheRegisterofCharteredProjectProfessionals.
YournamewillbepublishedontheAPMwebsiteifyouhavegivenpermissionforustodoso.
Ifyourapplicationisnotsuccessful,wewillwritetoyouandexplainthereasonforthedecision.Youwillbegivenfeedbackandguidancetohelpyoutoresubmit.
Ifunsuccessfulatinterviewyouwillhavetostarttheapplicationprocessagain,includingyourwrittensubmission.
Other things to note
Confidentiality
APManticipatesthatyoushouldbeabletoprovidethisinformationatalevelofdetailthatdoesnotbreachanynecessaryconfidentiality.However,pleasenotethatallassessorshavesignedconfidentialityagreements.
Register and directory
APMwillmaintainaregistercontainingdetailsofallthosewhoholdtheCharteredProjectProfessionaldesignation.ThiswillbemanagedbyAPMforthepurposesofmeetingtherequirementsoftheRoyalCharterandthiswillnotbepubliclyavailable.Thoseontheregisteralsohavetheoptiontohavetheirnamesonapublicdirectory.Youcanoptinoroutofhavingyournamedisplayedonthedirectory.
Special arrangements
Medical and mobility
APMiscommittedtopromotingapositiveattitudetowardspeoplewithspeciallearningandadditionalneeds.Ithasagreatdealofexperienceinfacilitatingindividualrequirementsandtailoringadjustmentswiththeaimofremovinganyunfairdisadvantagethatanindividualmayencounterasaconsequenceoftheirmedicalcondition.
1716 The Chartered Project Professional Application Guidance
Accesstothefacilitiesorarrangementsdescribedherecanbegrantedtoapplicantswithdisabilities/learningdifficultieswhoapplytothecharteredDeliveryteam.Adispensationmaybeallowedforapplicantswithamedicalorphysicalconditionthatpreventsthemfromcompletingtheassessmentwithinthenormalregulations.
Other aids/equipment available
Largeprintpapersmaybeproducedwhererequiredwithpriorarrangementwiththecharteredteam.
Forassistancewithanyoftheabove,orforanyotherrequirements,[email protected].
Assessment Results Enquiries/Appeals
byattendingtheinterviewcandidatesareconfirmingthattheyarefittodoso:noappealswillbeheardconcerningacandidate’swellbeingduringtheinterview.Forfurtherinformationvisitusatapm.org.uk/apm-feedback-and-complaints-process/assessment-results-enquiry-process/
FAQs
Foralistoffrequentlyaskedquestions,pleasevisittheAPMwebsiteat:apm.org.uk/chpp.
1716 Have a question? Need some help? Email [email protected]
Appendix 1:
Professional practice assessment criteria for written submission
Note:Ifyouarecurrentlyansweringthewrittensubmissiononprofessionalpracticethesearetheassessmentcriteria.
1918 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
1a Budgetingandcostcontrol
Youneedtodemonstrateaminimum of four of the following assessment criteria toshowthatyoucan:
PP1.1 establishestimatesfordifferentcostsassociatedwithaproject
PP1.2 establishandagreeanoverallbudgetforaproject
PP1.3 applymetricstoestablishcosttrendswithinaproject
PP1.4 updateandrefinebudgetallocationsbasedonacostanalysisthroughthechangecontrolprocess
PP2.1 setupfundingdrawdownarrangementsbasedonanappropriatelyandaccuratelyinformedcashflowforecast
PP2.2 producefinancialreportsforstakeholdersbasedoneffectivefinancialperformancemonitoring
PP2.3 ensurethecompletionofallfinancialtransactionsbeforetheclosureofaprojectandproducefinalfinancialreportsonthefinancialperformanceofaprojectfordistributiontoallstakeholders
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouestablishedestimatesfordifferentcostsassociatedwiththeproject,appliedmetricstoestablishcosttrends,producedfinancialreportsbasedoneffectivefinancialperformancemonitoring,andensuredthecompletionofallfinancialtransactionsbeforetheclosureofaprojectandproducedfinalfinancialreportsonthefinancialperformanceoftheproject.
1bFinancialmanagement
Youneedtodemonstrateaminimum of four of the following assessment criteria toshowthatyoucan:
PP1.1 adoptaconsistentapproachtotheinvestmentappraisalofaprogrammeorportfolioinlinewithorganisationalpractice
PP1.2 ensureaconsistentapproachtoestimatingisusedacrosstheprogrammeorportfolio
PP1.3 establishcontrollimitsforthereportingandapprovalofbudgetvariances
PP1.4 establisharrangementsforthereleaseoffundsatappropriatestagesinaprogrammeorportfolio
PP2.1 determinecapitalandrevenueexpenditureforaprogrammeorportfolioensuringalignmentwiththeorganisation’sfinancialplan
PP2.2 establishfinancialreportingmilestonesandreviewsforaprogrammeorportfolio
PP2.3 producefinancialprogressreportsbasedonthefinancialinformationrelatedtoaprogrammeorportfolio
PP2.4 adjustafinancialplanbasedontheprogressofachangeinitiativeandassociatedfinancialreviews
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprogrammesorportfolioswithinyourprojectexperience,andexplainhowyouensuredaconsistentapproachtoestimatingacrosstheprogrammeorportfolio,establishedcontrollimitsforthereportingandapprovalofbudgetvariances,establishedfinancialreportingmilestonesandreviews,andadjustedthefinancialplanbasedontheprogressofachangeinitiativeandassociatedfinancialreviews.
Mandatory competences Youmustcompletestatementsagainstthemandatorycompetences,andselecteither1aBudgetingandcostcontrol,OR 1bFinancialmanagement.
1918 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
2 Changecontrol Youneedtodemonstrateaminimum of four of the following assessment criteria toshowthatyoucan:
PP1.1 establish,implementandmaintainanappropriatechangecontrolprocess
PP1.2 captureandrecordproposedchangestotheagreedscopeandobjectivesoftheproject
PP1.3 determinethehigh-levelimpactofproposedchangestothescopeandobjectivesofaprojectincludingreferencetorelevantsources
PP1.4 useatrendanalysistoimprovethefutureperformanceofprojects
PP2.1 reachjustifiedrecommendationsontheapproval,rejectionordeferralofproposedchangestoaproject
PP2.2 updateplansandschedulestoreflectapprovedchangestoaprojectensuringconfigurationmanagementisused
PP2.3 communicateimplementedchangestorelevantstakeholders
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouestablished,implementedandmaintainedthechangecontrolprocess,undertookanimpactanalysiswithinputfromothers,developedrecommendationsonhowtoaddressthechangesandgainedapprovalforthese,andcommunicatedthese.
3 Conflictmanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 takeaproactiveapproachtoidentifyandaddresspotentialconflictsituationswhichmayimpactonaproject
PP1.2 takeanimpartialapproachtoinvestigatingthecauseofconflict
PP1.3 evaluateandimplementconflictmanagementmeasuresincludingtheroleofcolleaguesandspecialists
PP1.4 monitortheextenttowhichconflictmanagementmeasuresaresuccessful
PP2.1 supportotherstoresolveconflict
PP2.2 respondappropriatelyandpromptlytoconflictsituationswhereinterventionisrequired
PP2.3 resolveconflictgivingduerespecttotheviews,opinionsandconcernsofallparties
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoutookaproactiveapproachtoidentifyandaddresspotentialconflictsituationswithmayhaveimpactedonyourproject,evaluatedandimplementedconflictmanagementmeasuresincludingtheroleofcolleaguesandspecialists,supportedotherstoresolveconflict,andresolvedconflictgivingduerespecttotheviews,opinionsandconcernsofallparties.
Mandatory competences
2120 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
4 Consolidatedplanning
Youcanevidencethisacrossanumberofassessmentcriteria.Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 complywithorganisationalpracticewhenestablishingthestructureandformatofaneffectiveconsolidatedplan
PP1.2 considerconstraints,assumptions,dependenciesandgovernancearrangementswhencreatingaconsolidatedplan
PP1.3 includeorrefertootherrelevantplansanddocumentation
PP1.4 createaconsolidatedplanwhichbalancesthefundamentalcomponentsofthatplantomeettherequirementsofaprojectandensureformalacceptance
PP2.1 applyconfigurationmanagementtoaplanonceithasbeenformallyaccepted
PP2.2 continuallymonitortheprogressofachangeinitiativeagainsttheconsolidatedplan
PP2.3 adjusttheconsolidatedplanutilisingachangecontrolprocess
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouconsideredconstraints,assumptions,dependenciesandgovernancearrangementswhencreatingaconsolidatedplan,includedorreferredtootherrelevantplansanddocumentation,appliedconfigurationmanagementtotheplanonceithadbeenaccepted,andadjustedtheplanmakinguseofchangecontrol.
5 Governancearrangements
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 definereporting,decision-makinghierarchiesandlevelsofauthorityforaproject
PP1.2 establishtherelationshipbetweenaproject’sgovernanceandorganisation’sgovernancestructures
PP1.3 designtheprojectgovernancestructuretakingintoaccountcontext,complexityandpotentialimpact
PP2.1 ensureclarityofownershipandlevelsofauthoritybyagreeingtheresponsibilitiesandaccountabilitieswithrelevantindividuals
PP2.2 ensureeffectivereportinganddecisionmakingthroughmaintainedgovernancestructures,staffingandmaintenanceofapprovedreportinganddecisionmaking
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoudefinedreporting,decision-makinghierarchiesandlevelsofauthorityfortheproject,designedtheprojectgovernancestructuretakingintoaccountcontext,complexityandpotentialimpact,ensuredclarityofownershipandlevelsofauthoritybyagreeingtheresponsibilitiesandaccountabilitieswithrelevantindividuals,andensuredeffectivereportinganddecisionmakingthrough
Mandatory competences
2120 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
6 Leadership Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 selectanappropriateleadershipstylebasedonthesituationand/orcontext
PP1.2 collaboratewithotherstomaintainthemomentumofaproject
PP1.3 encourageotherstoadoptbehaviourswhichbuildtrust,confidenceandcollaborationwithinandbetweenteams
PP1.4 establishenvironmentswhichpresentopportunitiesforempoweredandautonomousworking
PP2.1 maintainateam’sunderstandingof,andcommitmenttothevision,valuesandobjectivesofaprojectthrougheffectiveandopencommunication
PP2.2 facilitateopendiscussiontosupporttheidentificationofpotentialorrealdifficultiesandchallengestodeliveringasuccessfulproject
PP2.3 addressdifficultiesandchallengeseffectivelyandinatimelymanner
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouselectedanappropriateleadershipstylebasedonthesituationand/orcontext,encouragedotherstoadoptbehaviourswhichbuilttrust,confidenceandcollaboration,maintainedtheteam’sunderstandingof,andcommitmenttothevision,valuesandobjectivesoftheprojectthrougheffectiveandopencommunication,andaddresseddifficultiesandchallengeseffectivelyandinatimelymanner.
7 Reviews Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 considerfactorswhichneedtobeevaluatedduringareview
PP1.2 establishandimplementascheduleofreviewsincorporatingkeymilestonesduringandafteraproject
PP1.3 obtainappropriateinformationfromvalidsourcestoinformthereview
PP2.1 maintainrecordsofanydeviationsfromplanstoincludereasonsforandresponsestothedeviations
PP2.2 communicatetheoutcomesofreviewstorelevantstakeholders
PP2.3 confirmstakeholderunderstandingandacceptanceofproposedactions
PP2.4 implementagreedactionsandupdatelessonslearnedlog
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouconsideredfactorswhichneededtobeevaluatedduringareview,obtainedappropriateinformationfromvalidsourcestoinformthereview,communicatedtheoutcomesofreviewstorelevantstakeholders,andimplementedagreedactionsandupdatedthelessonslearnedlog.
Mandatory competences
2322 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
8 Riskandissuemanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 continuallyidentifyrisksandissueswithinaproject
PP1.2 createariskmanagementplanincludingpotentialimpactandsuitableresponses
PP1.3 recordsissues,howtheywereresolved,andtheirimplicationstoinformplanningforfutureprojects
PP1.4 transfer,acceptoravoidunresolvedrisksattheendofaproject
PP2.1 Assesstheprobabilitiesandimpactsoftheriskswithinaprojectandplantheirresponses
PP2.2 Assessandplanresponsestoissues
PP2.3 implementresponsestorisksandissues,addressinganyimplicationsforthefutureincludingescalation
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoucontinuallyidentifiedrisksandissueswithintheproject,createdariskmanagementplanincludingpotentialimpactandsuitableresponses,assessedtheprobabilitiesandimpactsoftherisksandplannedtheirresponses,implementedresponsestorisksandissues,addressinganyimplicationsforthefutureincludingescalation.
9 Stakeholderandcommunicationsmanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 determinestakeholderinterests,requirementsandlevelsofinfluenceforaproject
PP1.2 producestakeholdermanagementandcommunicationplans
PP1.3 monitortheeffectivenessofstakeholdermanagementandcommunicationplans
PP1.4 adjuststakeholdermanagementandcommunicationplanstorespondtoanychangingneedsoftheproject
PP2.1 employrelevantcommunicationmethodsandmediatomeetstakeholderrequirementsandexpectations
PP2.2 disseminateclear,timelyandrelevantinformationtostakeholders
PP2.3 obtain,andrespondto,feedbackfromstakeholderswhichmayhaveanimpactonaproject
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoudeterminedstakeholderinterests,requirementsandlevelsofinfluenceforaproject,monitoredtheeffectivenessofstakeholdermanagementandcommunicationplans,employedrelevantcommunicationmethodsandmediatomeetstakeholderrequirementsandexpectationsanddisseminatedclear,timelyandrelevantinformationtostakeholders.
Mandatory competences
2322 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
10 Teammanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 agreeteamobjectivesandwaysofworkingtoachievethevisionandgoalsofaproject
PP1.2 acknowledgeslevelsofperformancethroughconstructivefeedbacktoindividualsandteams
PP1.3 adoptaproactiveapproachtocommunicationtoestablishnetworksofsupportandfacilitateeffectivedelegation
PP2.1 meetthedemandsofaprojectthroughbalancingindividualandteamneeds
PP2.2 provideopportunitiesforcoachingandmentoringtomembersofateam
PP2.3 addressperformanceissueslikelytonegativelyimpactonthesuccessofaproject
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouagreedteamobjectivesandwaysofworkingtoachievethevisionandgoalsoftheproject,adoptedaproactiveapproachtocommunicationtoestablishnetworksofsupportandfacilitatedeffectivedelegation,metthedemandsoftheprojectthroughbalancingindividualandteamneeds,andaddressedperformanceissuesthatwerelikelytonegativelyimpactonthesuccessoftheproject.
Mandatory competences
2524 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
11 Assetallocation Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 Determinechangesrequiredbytheorganisation’sstrategicobjectives
PP1.2 categoriserelatedprojectsandprogrammesinrelationtoanorganisation’sstrategicobjectives
PP1.3 maptheintendedoutputs,outcomesandbenefitsofrelatedprojectsandprogrammestoanorganisation’sstrategicobjectives
PP1.4 determinegapswhichmayexistinthealignmentofrelatedprojectsandprogrammes,eithercurrentorproposed,tostrategicobjectives
PP1.5 establishappropriatemeasurestocomparethelikelyvalueof,bothcurrentandproposed,relatedprojectsandprogrammestoanorganisation’sstrategicobjectives
PP2.1 useappropriatemeasurestoprioritiserelatedcurrentandproposedprojectsandprogrammes
PP2.2 considertheavailabilityoffinanceandotherresourceswhenapplythesemeasures
PP2.3 recommendwhetherprojectsandprogrammesshouldbeinitiated,maintainedorclosedtomaintainabalancedportfolio
PP2.4 communicateappropriatelyandeffectivelytostakeholdersanyrecommendationssodecisionmakingisadequatelyinformed
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprogrammesorportfolioswithinyourprojectexperience,andexplainhowyoudeterminedchangesrequiredbytheorganisation’sstrategicobjectives,mappedtheintendedoutputs,outcomesandbenefitsofrelatedprojectsandprogrammestoanorganisation’sstrategicobjectives,establishedappropriatemeasurestocomparethelikelyvalueof,bothcurrentandproposed,relatedprojectsandprogrammestotheorganisation’sstrategicobjectives,andconsideredtheavailabilityoffinanceandotherresourceswhenapplyingthesemeasures.
Elective competences
2524 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
12Benefitsmanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 demonstratehowtheintendedbenefitsrelatetostrategicobjectives
PP1.2 establishmeasurablebenefitswhicharemeaningfultostakeholders
PP1.3 prioritiseachievementofbenefitsbasedontheirlevelofcontributiontostrategicobjectives
PP1.4 confirmdependenciesbetweenintendedbenefitsandtheoutputs,outcomesandrelatedbusinesschanges
PP2.1 createabenefitsmanagementstrategywhichconsiderspriorities,timescalesandresponsibilities,andmonitoringmethods
PP2.2 createabenefitsrealisationplanwhichconsidersfundingoptions,keyindicators,milestonesandreportingschedules
PP2.3 carryouteffectivemonitoringagainstthebenefitsrealisationplan
PP2.4 basedonmonitoringoutcomes,takeactiontohighlightrecommendedadjustmentstomaximisebenefitsrealisation
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprogrammesorportfolioswithinyourprojectexperience,andexplainhowyoudemonstratedhowtheintendedbenefitsrelatedtostrategicobjectives,prioritisedachievementofbenefitsbasedontheirlevelofcontributiontostrategicobjectives,createdabenefitsmanagementstrategywhichconsideredpriorities,timescalesandresponsibilities,andmonitoringmethods,carriedouteffectivemonitoringagainstthebenefitsrealisationplan,andtookactiontohighlightrecommendedadjustmentstomaximisebenefitsrealisationbasedonthemonitoringoutcomes.
Elective competences
2726 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
13Businesscase Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 determinetherelevantfactorswhichcouldinfluencethedevelopmentofaconvincingbusinesscase
PP1.2 supportapersuasiveargumentthrougheffectiveanalysisofrelevantfactors
PP1.3 establishabenefitsframeworkforabusinesscase
PP1.4 documentabusinesscaseinarelevantformat
PP2.1 gaininitialandongoingformalacceptanceofabusinesscase
PP2.2 monitorandrefineabusinesscaseascircumstancesandfactorschange
PP2.3 implementachangecontrolprocessandconfigurationmanagementsystemwhenupdatingabusinesscase
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyousupportedapersuasiveargumentthrougheffectiveanalysisofrelevantfactors,documentedabusinesscaseinarelevantformat,gainedinitialandongoingformalacceptanceofthebusinesscase,andimplementedachangecontrolprocessandconfigurationmanagementsystemwhenupdatingthebusinesscase.
14Capabilitydevelopment
Youneedtodemonstratea minimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 conductaskillsanalysisonindividualswithinanorganisationtoidentifygapsincompetencesrequiredtodeliverasuccessfulchangeinitiative
PP1.2 developatraininganddevelopmentstrategyinrelationtoprojectmanagement
PP1.3 implementatraininganddevelopmentstrategyinrelationtoprojectmanagement
PP2.1 usetoolsandtechniquestodetermineanorganisation’scapabilitytosupportchangeinitiatives
PP2.2 applyrelevantcompetencymodelstoanorganisation’sworkforceinrelationtoprojectmanagement
PP2.3 monitorandevaluateorganisationallearningagainstobjectives
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprogrammesorportfolioswithinyourprojectexperience,andexplainhowyouconductedaskillsanalysisonindividualswithintheorganisationtoidentifygapsincompetencesrequiredtodeliverasuccessfulchangeinitiative,implementedatraininganddevelopmentstrategyinrelationtoprojectmanagement,appliedrelevantcompetencymodelstotheorganisation’sworkforceinrelationtoprojectmanagement,andmonitoredandevaluatedorganisationallearningagainstobjectives.
Elective competences
2726 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
15Contractmanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 effectivelymonitorsupplierperformanceagainstagreedcontractualobligations
PP1.2 ensuretheorganisationmeetsitscontractualobligationsthrougheffectivemonitoring
PP2.1 respondappropriatelytoensureallpartiescomplywiththetermsofacontract
PP2.2 managecontractvariancespromptlytoresolveanycontractualproblems
PP2.3 effectivelymanagesupplierrelationships
PP2.4 effectivelycloseacontractonceallcontractualobligationshavebeenmet
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoueffectivelymonitoredsupplierperformanceagainstagreedcontractualobligations,respondedappropriatelytoensureallpartiescompliedwiththetermsofthecontract,effectivelymanagedsupplierrelationships,andeffectivelyclosedthecontractonceallcontractualobligationshadbeenmet.
16Frameworksandmethodologies
Youneedtodemonstrateaminimum of four of the following assessment criteria toshowthatyoucan:
PP1.1 analysepotentialframeworks/methodologiesforthemanagementofprojects
PP1.2 determineinternalandexternalcontextswhichcouldaffecttheuseofaframework/methodology
PP1.3 identifytheunderlyingframework/methodologyprinciplesthatwillsuitthemanagementofprojectswithintheorganisation
PP2.1 definetheprocesses,standardsandguidelinestoimplementtheframeworkand/ormethodologyoverthelifecycleofprojects,adoptingthesefromexistingsources,ordevelopingthemasrequired.
PP2.2 reflectonthestrengthsandlimitationsofaframework/methodologymakingrefinementsasrequiredbasedonexperience
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouanalysedpotentialframeworks/methodologiesforthemanagementoftheproject,determinedtheinternalandexternalcontextswhichcouldaffecttheuseofaframework/methodology,definedtheprocesses,standardsandguidelinestoimplementtheframeworkand/ormethodologyoverthelifecycleofprojects,adoptingthesefromexistingsources,ordevelopingthemasrequired,andreflectedonthestrengthsandlimitationsofaframework/methodology
Elective competences
2928 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
17Independentassurance
Youneedtodemonstratea minimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 effectivelyresourceindependentassuranceactivities
PP1.2 agreethescopeofandresponsibilitiesformanageableindependentassuranceactivities
PP1.3 prioritiseindependentassuranceactivitiesbasedonariskassessmentoftheprojects
PP2.1 conductindependentassuranceactivitiesmakingrecommendationsforcorrectiveactionwhererequired
PP2.2 maintaineffectivetwo-waycommunicationwithallstakeholderssuchthatcorrectiveactionisreportedandconcernsareaddressedpromptly
PP2.3 provideeffectiveadvice,guidanceandsupporttotheimplementationofrecommendations
PP2.4 analysepatternsofchangewhichcouldinformthefutureperformanceofprojects
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoueffectivelyresourcedindependentassuranceactivities,agreedthescopeofandresponsibilitiesformanageableindependentassuranceactivities,conductedindependentassuranceactivitiesmakingrecommendationsforcorrectiveactionwhererequired,andanalysedpatternsofchangewhichcouldinformhefutureperformanceofprojects.
18Procurement Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 establishthetype,qualityandquantityoftheresourcerequirement
PP1.2 developdetailedspecificationsfortheprocurementofresourcesforaproject
PP1.3 evaluatetechnicalandcommercialoptionsforfulfillingtherequirements
PP1.4 agreeaprocurementplanwithrelevantstakeholders
PP2.1 negotiateandsecureinternalresourcestoeffectivelydeliveraproject
PP2.2 complywithorganisationalprocedureswhenselectingandnegotiatingwithsuppliersbasedonarigoroustenderingprocess
PP2.3 agreesviablecontractsandstatementsofworkinlinewithorganisationalrequirements
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouestablishedthetype,qualityandquantityoftheresourcerequirement,developeddetailedspecificationsfortheprocurementofresourcesfortheproject,agreedaprocurementplanwithrelevantstakeholders,andagreedviablecontractsandstatementsofworkinlinewithorganisationalrequirements.
Elective competences
2928 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
19Qualitymanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 establishagreedqualityindicatorsfortheprocessesandoutputsoftheprojectreferringtothebusinesscase
PP1.2 preparethequalitymanagementplanforaprojectthroughliaisonwithrelevantstakeholdersandinaccordancewiththeprocesses,cultureandvaluesoftheorganisation
PP1.3 createaqualityregisterforaproject
PP2.1 managetheprocessofqualityassuranceforaproject,toconfirmtheconsistentapplicationoftheproceduresandstandardsdefinedinthequalitymanagementplan.
PP2.2 managetheprocessofqualitycontrolforaprojecttodeterminewhethersuccesscriteriaaremet.
PP2.3 capturelessonslearnedduringaprojecttocontributetocontinualimprovement.
PP2.4 actionoutcomesfromthequalitymanagementprocess,implementingthechangecontrolprocesswhererequired.
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouestablishedagreedqualityindicatorsfortheprocessesandoutputsoftheprojectreferringtothebusinesscase,createdaqualityregisterfortheproject,managedtheprocessofqualitycontrolfortheprojecttodeterminewhethersuccesscriteriahadbeenmet,andactionedoutcomesfromthequalitymanagementprocess,implementingthechangecontrolprocesswhererequired.
Elective competences
3130 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
20Requirementsmanagement
Youneedtodemonstratea minimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 conductananalysisofstakeholderwantsandneedstoinformascheduleofrequirements
PP1.2 prioritisestakeholderwantsandneedsbasedoneffectiveresearch
PP1.3 througheffectiveresearch,determinedependenciesandconstraintswithinaprojectwhichmayinfluencetheapproachto,andoutcomesof,thatproject
PP1.4 confirmtheoutcomesofallresearchthroughinternaland/orexternalexperts
PP2.1 produceafinalscheduleofrequirementsbasedoneffectivenegotiationwithstakeholders
PP2.2 clearlydocumenttherequirementsagreedwithinthescheduleofrequirements
PP2.3 adjustthescheduleofrequirementsduringtheprojectifrequiredusingthechangecontrolprocess
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouconductedananalysisofstakeholderwantsandneedstoinformascheduleofrequirements,confirmedtheoutcomesofallresearchthroughinternaland/orexternalexperts,producedafinalscheduleofrequirementsbasedoneffectivenegotiationwithstakeholders,andclearlydocumentedtherequirementsagreedwithinthescheduleofrequirements.
Elective competences
3130 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
21Resourcecapacityplanning
Youneedtodemonstratea minimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 establishresourcerequirementsforeachproject
PP1.2 determinewhererelatedprojectshavedependenciesandsimilardeadlines,takingaccountofthescheduleforrealisationofbenefits
PP1.3 assessthetotalresourcecapacityforthedurationofallrelatedprojects
PP1.4 phasetherelatedprojectstofullyoptimiseresourceusagetakingaccountofopportunitiesforsharedinfrastructuresand/orprocurement
PP1.5 buildcontingenciesintorelevantresourceplans
PP2.1 establishreportingrequirementsandschedulesforrelevantprojectmanagers
PP2.2 informthedirectionofprojectactivitiesthrougheffectiveschedulingofphases,milestonesandreviewpoints
PP2.3 prepareanddeliveroverallprogressreportstorelevantstakeholders
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprogrammesorportfolioswithinyourprojectexperience,andexplainhowyouestablishedresourcerequirementsforeachproject,assessedthetotalresourcecapacityforthedurationofallrelatedprojects,builtcontingenciesintorelevantresourceplans,andpreparedanddeliveredoverallprogressreportstorelevantstakeholders.
Elective competences
3332 The Chartered Project Professional Application Guidance
Competence Professional practice assessment criteria Additional guidance
22Resourcemanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 establishresourcerequirementforallactivitiesandeventswithinaproject
PP1.2 determineinternalandexternalresourceswhichareavailabletosupportthedeliveryofaprojectandanydependenciesbetweenthoseavailabilities
PP1.3 prepareascheduleforresourceuse,reconcilingresourcelimitsandtimeconstraintsbyapplyingresourcesmoothingand/orlevelling
PP2.1 monitorresourceuseagainstthescheduleduringtheprojectandidentifyvariancesthatrequireaction
PP2.2 refinearesourcescheduleusingthechangecontrolprocess
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouestablishedtheresourcerequirementsforallactivitiesandeventswithintheproject,determinedinternalandexternalresourceswherewereavailabletosupportthedeliveryoftheprojectandanydependenciesbetweenthoseavailabilities,monitoredresourceuseagainstthescheduleduringtheprojectandidentifiedvariancesthatrequiredaction,andrefinedtheresourcescheduleusingthechangecontrolprocess.
23Schedulemanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 define,inappropriatedetail,activitiesandeventstobecompletedduringaproject
PP1.2 determinerelationshipsanddependenciesbetweenactivitiesandevents,andtheirimplicationstotheorganisation
PP1.3 developdurationestimatesandcriticaldatesforeachactivityandevent
PP2.1 accuratelydocumentascheduleofphases,milestonesandreviewpointsforaproject,sufficienttoinformthedirectionofworkandthemonitoringofprogress
PP2.2 refinesascheduleofactivitiesbasedoneffectivemonitoring,implementingthechangecontrolprocesswhenrequired
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoudefined,inappropriatedetail,activitiesandeventstobecompletedduringtheproject,developeddurationestimatesandcriticaldatesforeachactivityandevent,accuratelydocumentedascheduleofphases,milestonesandreviewpointsfortheproject,sufficienttoinformthedirectionofworkandthemonitoringofprogress,andrefinedthescheduleofactivitiesbasedoneffectivemonitoring,implementingthechangecontrolprocesswhererequired.
Elective competences
3332 Have a question? Need some help? Email [email protected]
Competence Professional practice assessment criteria Additional guidance
24Solutionsdevelopment
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 useappropriatetoolsandtechniquestoidentifyoptionstodelivertherequirementsforaproject
PP1.2 useappropriatetoolsandtechniquestoevaluateandselectoptionstodelivertherequirementsforaproject
PP1.3 documenttherequirementsandselectionoptionfordeliveryoftheproject
PP2.1 implementaneffectivemonitoringprocess
PP2.2 refinedeliveryoptionsasrequiredandimplementthechangecontrolprocessupdatingtheconfigurationmanagementsystemasandwhenrequired
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyouusedappropriatetoolsandtechniquestoidentifyoptionstodelivertherequirementsfortheproject,documentedtherequirementsandselectionoptionfordeliveryoftheproject,implementedaneffectivemonitoringprocess,andrefineddeliveryoptionsasrequiredandimplementedthechangecontrolprocessupdatingtheconfigurationmanagementsystemasandwhenrequired.
25Transitionmanagement
Youneedtodemonstrateaminimum of four of the following assessment criteriatoshowthatyoucan:
PP1.1 determinekeystaffrequiredtosupportatransitionprocess
PP1.2 establishthelogisticrequirementstosupportatransitionprocess
PP1.3 determinetheknowledgetransferrequirementsforatransitionprocess
PP1.4 createatransitionplanwherepriorities,potentialdisruptionandoutputownershiparekeyconsiderations
PP2.1 negotiatewithstakeholderstogainagreementonthetransitionprocessplan
PP2.2 negotiatewithstakeholderstogainagreementonstaffingsolutions,logisticsandknowledgetransferrequirements
PP2.3 establishabenefitreviewprocesstomonitorbenefitsrealisationwhichmeetstherequirementsofrelevantstakeholders
Tomeettheminimumfourassessmentcriteriainthisinstance,youcould,forexample,provideexamplesfromoneoftheprojectswithinyourprojectexperience,andexplainhowyoudeterminedkeystaffrequiredtosupportthetransitionprocess,establishedthelogisticrequirementstosupportthetransitionprocess,createdatransitionplanwherepriorities,potentialdisruptionandoutputownershipwerekeyconsiderations,andnegotiatedwithstakeholderstogainagreementonstaffingsolutions,logisticsandknowledgetransferrequirements.
Elective competences
3534 The Chartered Project Professional Application Guidance
Appendix 2:
Technical knowledge assessment criteria for interview (if required)
Note:Ifyouarecurrentlypreparingforyourroutethreeinterviewincludingtechnicalknowledgethesearetheassessmentcriteria.
3534 Have a question? Need some help? Email [email protected]
Competence Technical knowledge assessment criteria Additional guidance
1aBudgetingandcostcontrol
Youneedtoshowthatyoucan:
TK1.1 evaluatecosttrackingtoolsandtechniques
TK1.2 evaluatethelimitationsofcostestimationinthecontextofaproject
TK1.3 discussthevalueofcostanalysistoaproject
TK2.1 evaluatetheimportanceofcashflowandcashflowforecastsinthecontextofaproject
TK2.2 suggestwhythemonitoringofthefinancialperformanceofaprojectisimportanttoprojectobjectives
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingwhyacertainmodelcouldbeusedoveranother,demonstratingevaluationofcosttrackingtoolsandtechniques.
1bFinancialmanagement
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatemethodsforproducinganeffectiveinvestmentappraisaltoaprogrammeorportfolio
TK1.2 evaluatetheimportanceofdifferinglevelsoffinancialaccountabilityinaprogrammeorportfolio
TK1.3 analysesourcesandimpactofestimationbias
TK2.1 evaluatetheimportanceofaligningthefinancialplanofaprogrammeorportfoliotoanoverallfinancialplan
TK2.2 analysetheextenttowhichadjustingafinancialplanwouldbebeneficialtoaprogrammeorportfolioandthesourcesrequiredtodothis
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingwhyacertainmethodcouldbeusedoveranother,demonstratingcriticalevaluationofmethodsforproducinganeffectiveinvestmentappraisal.
Mandatory competences
3736 The Chartered Project Professional Application Guidance
Competence Technical knowledge assessment criteria Additional guidance
2 Changecontrol Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatethefeaturesandbenefitsofusingachangecontrolprocess
TK1.2 analysewaysinwhichtocollateandrecordinformationfromstakeholders
TK1.3 evaluatetheextenttowhichtrendanalysisaddsvaluetothemanagementofchangewithinaproject
TK2.1 criticallyevaluatemethodsofimpactassessmentandoptionsanalysisinrelationtochangewithinaproject
TK2.2 evaluatetheimportanceofrespondingappropriatelytorecommendationsrelatingtothescopeandobjectivesofproject
TK2.3 analysetheimportanceofmanagingapprovedchangewithinaconfigurationmanagementsystem
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingandevaluatingthefeaturesandbenefitsofusingachangecontrolprocess.
3 Conflictmanagement
Youneedtoshowthatyoucan:
TK1.1 evaluatepositiveandnegativeconflictinthecontextofaproject
TK1.2 criticallyevaluatethecausesofconflict
TK1.3 analysewaysinwhichtoeffectivelymanageconflictinthecontextofaproject
TK1.4 evaluatetheextenttowhichconflictcouldbeatooltoimproveperformance
TK2.1 evaluatethemethodsandtechniqueswhichcouldbeusedtomanageandresolveconflictincludingmonitoringtheireffectiveness
TK2.2 evaluatetheimportanceofobjectivityandimpartialitywhenresolvingconflict
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthethirdcriterion,thiscouldtaketheformofexplainingwaysthatyoucouldeffectivelymanagedconflictandwhyyoumightchosethoseapproachesoveralternatives,demonstratinganalysisofwaysinwhichtoeffectivelymanageconflict.
Mandatory competences
3736 Have a question? Need some help? Email [email protected]
Competence Technical knowledge assessment criteria Additional guidance
4 Consolidatedplanning
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatethepurposeofaconsolidatedplan
TK1.2 analysedifferentformatsforconsolidatedplans
TK2.1 evaluatetheimportanceofmonitoringtherelationshipbetweenaconsolidatedplanandtheprogressofaproject
TK2.2 analysesituations,potentialorreal,whereaconsolidatedplanmayhavetobeadjustedinthecontextofaproject
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthesecondcriterion,thiscouldtaketheformofexplainingthedifferenttypesofplanthatyoucouldemploywithinaproject,andhowyoucouldusethemtomeetdifferentneedsandpurpose,analysisofdifferentformatsforconsolidatedplans.
5 Governancearrangements
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheconceptsofhierarchiesandorganisationalstructureinthecontextofaproject
TK1.2 analysetypesoforganisationalstructure
TK1.3 evaluatetheimportanceofestablishingandmaintainingtimelyreportinganddecision-makinghierarchiesforaproject
TK2.1 evaluatetheimportanceofestablishinggovernancestructures,rolesandresponsibilitieswithinaproject
TK2.2 evaluatetheimportanceofestablishingclearlevelsofauthoritywithinaproject
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingthehierarchiesandstructuresthatyoucouldemploywithinaprojectandwhythosemightbechosenoveralternatives,demonstratingcriticalevaluationoftheconceptsofhierarchiesandorganisationalstructureinthecontextofaproject.
Mandatory competences
3938 The Chartered Project Professional Application Guidance
Competence Technical knowledge assessment criteria Additional guidance
6 Leadership Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetherangeofleadershipstylesandwhentoadopttheminaprojectcontext
TK1.2 evaluatethetoolsandtechniques,andbehaviours,forgainingandmaintainingtrust,confidenceandcollaborationofothers
TK1.3 evaluatetheenvironmentstoencourageempoweredandhigh-performingteams
TK2.1 analysewaysinwhichleaderscaneffectivelycommunicatethevisionandvaluesoftheprojectwithteammembersandstakeholders
TK2.2 evaluatemethodsforaddressingdifficultiesandchallenge,includingescalation
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingtheleadershipstylesthatyoucouldadoptinprojectwork,andwhytheymightbeappropriateatdifferenttimes,demonstratingcriticalevaluationoftherangeofleadershipstylesandwhentoadopttheminthecontextofaproject.
7 Reviews Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetherangeoffactorsduringreviews,andhowthesevarythroughthestagesofaproject
TK1.2 criticallyevaluatetheimportanceofaligningreviewswithorganisational,legalandregulatoryrequirements
TK1.3 evaluatethevalidityofvarioussourcesofinformation
TK2.1 analysesituations,potentialorreal,wheredeviationstoaplanmayoccurinthecontextofaprojectandhowtodeterminesuitablesolutions
TK2.2 criticallyevaluatetheimportanceofstakeholderengagementwhenimplementingtheoutcomesofreviews
TK2.3 analysetheimportanceofmanagingupdatestodocumentationimpactedbyreviews
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingtherangeofwhatyoucouldconsiderduringreviews,andhowyoumightapproachthemacrossthedifferentstagesoftheproject,demonstratingcriticalevaluationoftherangeoffactorsduringreviews,andhowthesevarythroughthestagesofaproject.
Mandatory competences
3938 Have a question? Need some help? Email [email protected]
Competence Technical knowledge assessment criteria Additional guidance
8 Riskandissuemanagement
Youneedtoshowthatyoucan:
TK1.1 evaluatethefunctionofariskandissuemanagementplansandregistersinthecontextofaproject
TK1.2 analyseapproachestoriskidentification
TK1.3 analysequalitativeandquantitativemethodstoassessriskinthecontextofaproject
TK2.1 evaluatetheimportanceofriskandissueimpactassessmentswithinthecontextofaproject
TK2.2 criticallyevaluateapproachestoimpactassessmentsandresponseplanning
TK2.3 evaluatethefunctionofachangecontrolprocessinthemanagementofrisksandissues
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthesecondcriterion,thiscouldtaketheformofexplaininghowyoucouldapproachriskidentificationandwhenandwhytheseapproachesmightbeappropriate,demonstratinganalysisofapproachestoriskidentification
9 Stakeholderandcommunicationsmanagement
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheimportanceofstakeholdermanagementandcommunicationinthecontextofaproject
TK1.2 criticallyanalysethemethodstoidentifystakeholdersandanalysetheirinterests,requirementsandlevelsofinfluence
TK1.3 analysewaysinwhichtoeffectivelyengagewithstakeholders
TK2.1 evaluatemethodsandmediausedtocommunicatewithstakeholders
TK2.2 evaluatetheimportanceofstakeholderfeedbackinthecontextofaproject
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthesecondcriterion,thiscouldtaketheformofexplaininghowyoucouldapproachstakeholderidentificationandanalysisandwhenandwhythesemethodswouldbeappropriate,demonstratinganalysisofmethodstoidentifystakeholdersandtheirinterests,requirementsandlevelsofinfluence
Mandatory competences
4140 The Chartered Project Professional Application Guidance
Competence Technical knowledge assessment criteria Additional guidance
10Teammanagement
Youneedtoshowthatyoucan:
TK1.1 analysetoolsandtechniquestodevelopandmaintainaneffectiveteam
TK1.2 evaluatetherelationshipbetweenateamdevelopmentcycleandmotivatedandco-ordinatedteams
TK1.3 evaluatetheroleofperformancefeedbackasatool
TK1.4 criticallyevaluatestylesofcommunicationandtheiradaptationduringaproject
TK2.1 analysewaysinwhichindividualsandteamscanbesupportedduringaproject
TK2.2 evaluatecoachingandmentoringasdevelopmenttechniques
TK2.3 criticallyevaluatetherelationshipbetweenperformancemanagementandthesuccessofaproject
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingtoolsandtechniquestodevelopandmaintainaneffectiveteam,andwhyandwhenyoumightusethoseoveralternatives,demonstratinganalysisoftoolsandtechniquestodevelopandmaintainaneffectiveteam.
Mandatory competences
4140 Have a question? Need some help? Email [email protected]
Competence Technical knowledge assessment criteria Additional guidance
11Assetallocation Youneedtoshowthatyoucan:
TK1.1 criticallyevaluateapproachestoaligningchangeinitiativestostrategicobjectives
TK1.2 analysemeasureswhichcouldbeusedtocomparethelikelyvalueof,bothcurrentandproposed,relatedprojectsandprogrammestoanorganisation’sstrategicobjectives
TK1.3 criticallyevaluatedifferentcategoriesorriskandhowthesemightbeappraised
TK2.1 evaluatetheimportanceofabalancedportfoliototheachievementofstrategicobjectives
TK2.2 analyseapproachestomaintainingabalancedportfolio
TK2.3 Evaluatemethodsofrepresentingbalancedportfolios
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplaininghowyouapproachedconfirmingandcategorisingbenefitsagainststrategicobjectives,andwhyyouchosetheseapproachesoveralternatives,demonstratingcriticalevaluationofapproachestoconfirmingandcategorisingbenefitsagainststrategicobjectives.
12Benefitsmanagement
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluateapproachestoconfirmingandcategorisingbenefitsagainststrategicobjectives
TK1.2 criticallyevaluateapproachestoestablishingmeasuresforbenefits
TK1.3 criticallyevaluateapproachestoidentifyingandrecordingdependenciesbetweenbenefits
TK2.1 evaluatethesignificanceofabenefitsmanagementstrategyandabenefitsrealisationplan
TK2.2 analyseapproachestomonitoringtheprogressofabenefitsrealisationplan
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplaininghowyouapproachedconfirmingandcategorisingbenefitsagainststrategicobjectives,andwhyyouchosetheseapproachesoveralternatives,demonstratingcriticalevaluationofapproachestoconfirmingandcategorisingbenefitsagainststrategicobjectives.
Elective competences
4342 The Chartered Project Professional Application Guidance
Competence Technical knowledge assessment criteria Additional guidance
13Businesscase Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheimportanceofunderstandingorganisationalstrategiesandconstraintswhendevelopingabusinesscase
TK1.2 analysemethodsofestablishingabenefitsframeworks
TK1.3 criticallyevaluatetheimportanceofidentifyingoptimismbiasandestablishingconfidencelimits
TK2.1 analysedifferentformatsofabusinesscasethatcouldbeusedtoengagewithstakeholderstosecuresupport
TK2.2 evaluatetheimportanceofmonitoringandrefiningthebusinesscaseduringtheproject
responsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplaininghowyouaccommodatedorganisationalstrategiesandconstraintswhendevelopingyourbusiness,whythiswasimportantandhowitimpactedyourwork,demonstratingcriticalevaluationoftheimportanceofunderstandingorganisationalstrategiesandconstraintswhendevelopingabusinesscase.
14Capabilitydevelopment
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheimportanceofconductingaskillsanalysisonindividualswhowillbedeployedonprojects
TK1.2 evaluatetheimportanceofaneffectivelearninganddevelopmentstrategytothecreationofacompetentworkforceemployedonprojects
TK1.3 analyseapproachestoimplementingalearninganddevelopmentstrategy
TK2.1 analysetoolsandtechniqueswhichcouldbeusedtodetermineanorganisation’scapabilitytosupportprojects
TK2.2 evaluatetheimportanceofapplyingrelevantcompetencemodelstoanorganisation
TK2.3 criticallyevaluateapproachestomonitoringandevaluatingorganisationallearninginrelationtoprojectmanagement
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingwhyconductingaskillsanalysiswasimportantandhowitimpactedyourwork,demonstratingcriticalevaluationoftheimportanceofconductingaskillsanalysisonindividualswhowillbedeployedonprojects
Elective competences
4342 Have a question? Need some help? Email [email protected]
Competence Technical knowledge assessment criteria Additional guidance
15Contractmanagement
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheimportanceofensuringbothpartiestoacontractmeettheirobligationstothatcontract
TK1.2 criticallyevaluatemethodsandindicatorsforidentifyingsupplierperformanceproblems
TK2.1 analyseapproachesforeffectivecontractmanagementinthecontextofaproject
TK2.2 criticallyevaluatewaysofestablishingandmaintainingproductiverelationshipswithsuppliers
TK2.3 criticallyevaluateapproachestotheresolutionofcontractproblemsincludingcontractvariances
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingwhyitisimportantthatbothpartiestoacontractmeettheirobligations,andhowitcouldimpactaprojectifthisisnotdone,demonstratingcriticalevaluationoftheimportanceofensuringbothpartiestoacontractmeettheirobligationstothatcontract.
16 Frameworksandmethodologies
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatecharacteristicsandlimitationsofdifferentframeworksandmethodologieswhichcouldbeusedforaproject
TK1.2 evaluateapproachestotailoringframeworksandmethodologies
TK2.1 criticallyevaluatethesourcesofinformationwhichcouldinformtheselectionofanappropriateframeworkand/ormethodology
TK2.2 analysethebenefitsandcostsofprescribingframeworksandmethodologiestodifferentaspectsofprojects
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingframeworksandmethodologiesthatyoucoulduseforaproject,andwhatcharacteristicsandlimitationsthesehavewhenimplemented,demonstratingcriticalevaluationofcharacteristicsandlimitationsofdifferentframeworksandmethodologieswhichcouldbeusedforaproject.
Elective competences
4544 The Chartered Project Professional Application Guidance
Competence Technical knowledge assessment criteria Additional guidance
17Independentassurance
Youneedtoshowthatyoucan:
TK1.1 analyseapproachestoindependentassurancetoensurethattheseactivitiesaddvalue
TK1.2 criticallyevaluatetherelationshipbetweenriskassessmentandindependentassuranceactivities
TK2.1 evaluatemethodsofcommunicatingtheoutcomesofindependentassuranceactivitiestorelevantstakeholders,andmaintainingopencommunicationaboutthese
TK2.2 criticallyevaluatetheimportanceofreinforcingrecommendationswithadvice,guidanceandsupport
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingapproachesthatyoucoulduseforindependentassurance,whythesemightbechosenoveralternatives,andhowyouensuredthattheseactivitiesaddedvalue,demonstratinganalysisofapproachestoindependentassurancetoensurethattheseactivitiesaddedvalue.
18Procurement Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheimplicationofdifferentprocurementoptions
TK1.2 evaluatethefunctionofprocurementspecificationsinaproject
TK1.3 analyseapproachestoidentifyingresourcesrequired
TK2.1 criticallyevaluateapproachestonegotiateinternalandexternalresource
TK2.2 analyseapproachestoselectingsuppliers
TK2.3 criticallyevaluatethenatureandimplicationsofdifferentformsofcontract
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingapproachesthatyoucoulduseforprocurement,whythesewerechosenoveralternatives,andtheimplicationofthese,demonstratingcriticalevaluationoftheimplicationofdifferentprocurementoptions.
Elective competences
4544 Have a question? Need some help? Email [email protected]
Competence Technical knowledge assessment criteria Additional guidance
19Qualitymanagement
Youneedtoshowthatyoucan:
TK1.1 analysethecharacteristicsofeffectivequalitymanagementprocesses
TK1.2 evaluatetheimportanceandpotentialsourcesofeffectivequalityindicators
TK1.3 criticallyanalyseapproachesfordevelopingqualitymanagementplans
TK2.1 analysetheimportanceofconfigurationmanagementtoaproject
TK2.2 evaluateprinciplesandpracticalimplicationsofcontinualimprovement
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingkeycharacteristicsofqualitymanagementprocessesthatyouhaveused,andthoseofothersthatyoucoulduseandwhythesewouldorwouldnotbeeffective,demonstratinganalysisofthecharacteristicsofeffectivequalitymanagementprocesses.
20Requirementsmanagement
Youneedtoshowthatyoucan:
TK1.1 evaluatemethodsandapproachestoinvestigateandselectdifferentpossiblerequirements
TK1.2 evaluatetheimportanceofengagingwithstakeholderstoinformrequirementsandconfirmtheoutcomesofresearch
TK2.1 criticallyevaluatetheroleofnegotiationinconfirmingrequirements
TK2.2 analysethecharacteristicsofwell-specifiedrequirements
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingwhatmethodsandapproachesyoucouldtoinvestigateandselectdifferentpossiblerequirements,andwhytheseweremethodsandapproachesmightbechosenoveralternatives,demonstratingevaluationofmethodsandapproachestoinvestigateandselectdifferentpossiblerequirements.
Elective competences
4746 The Chartered Project Professional Application Guidance
Competence Technical knowledge assessment criteria Additional guidance
21Resourcecapacityplanning
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheroleofresourcecapacityplanninginthecontextofmultipleprojects
TK1.2 analysetoolsandmethodswhichcouldbeusedtosupporteffectiveresourcecapacityplanning
TK2.1 evaluatetheimportanceofeffectiveco-operationwithprojectmanagerswhenschedulingresourcesdeployedwithinrelatedprojects
TK2.2 evaluatetheroleofmilestonesandreviewswhenmanagingrelatedprojects
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingtherolethatresourcecapacityplanninghashadinthecontextofyourmultipleprojects,andhowyoucoulduseittomeetdifferentneeds,demonstratingevaluationofmethodsandapproachestoinvestigateandselectdifferentpossiblerequirements.
22Resourcemanagement
Youneedtoshowthatyoucan:
TK1.1 analysedifferentcharacteristicsofresources
TK1.2 evaluatetheroleofassumptionsinresourceplanning
TK1.3 analysemethodswhichcouldbeusedtomanageresourcesusedwithinaproject
TK2.1 criticallyevaluatethebenefitstoaprojectofconstantlymonitoringandrefiningaresourceschedule
TK2.2 analysethetechniquestoguidethechoice,captureandanalysisofrelevantdatatoeffectivelymonitorresources
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingdifferentresourcesthatyoucoulduseinprojectsandhowtheyvary,andhowyoucouldusethemtomeetdifferentneeds,demonstratinganalysisofdifferentcharacteristicsofresources.
Elective competences
4746 Have a question? Need some help? Email [email protected]
Competence Technical knowledge assessment criteria Additional guidance
23Schedulemanagement
Youneedtoshowthatyoucan:
TK1.1 evaluatetheimportanceofconsideringtheapproachestakenandoutcomesofotherprojectswhenschedulingworkactivities
TK1.2 criticallyanalysenetworkanalysismethods
TK1.3 analysemethodswhichcouldbeusedtoestablishdependencies,estimatesandconfidencelimits
TK2.1 evaluateappropriatetoolsandtechniqueswhichcouldbeusedtoscheduleandmonitorphases,milestonesandreviewpointswithinaproject
TK2.2 evaluateapproachestocapturingandanalysingrelevantdatatomonitorandrefineaschedule
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingwhyitisimportanttoconsiderapproachestoschedulingworkincludingtheoutcomesofotherprojects,andthepossibleimpactofnotdoingthis,demonstratingevaluationoftheimportanceofconsideringtheapproachestakenandoutcomesofotherprojectswhenschedulingworkactivities.
24Solutionsdevelopment
Youneedtoshowthatyoucan:
TK1.1 evaluatepossibletoolsandtechniqueswhichcouldbeusedtoidentifyoptionstodelivertherequirementsforaproject
TK1.2 evaluatetoolsandtechniqueswhichcouldbeusedtoanalyseandselectoptionstodelivertherequirementsforachangeinitiative
TK2.1 criticallyevaluatetheimportanceofmodelling,prototypingandtesting
TK2.1 evaluatetheimportanceofmonitoringandrefiningdeliveryrequirementsandoptionswithinaproject
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingtoolsandtechniquesthatcouldbeusedtoidentifyoptions,andwhythesemightbechosenoveralternatives,demonstratingevaluationofpossibletoolsandtechniqueswhichcouldbeusedtoidentifyoptionstodelivertherequirementsforaproject.
Elective competences
4948 The Chartered Project Professional Application Guidance
Competence Technical knowledge assessment criteria Additional guidance
25Transitionmanagement
Youneedtoshowthatyoucan:
TK1.1 criticallyevaluatetheimportanceofassessingbusinessreadinessintransitionmanagement
TK1.2 analysetheuseofchangemanagementmodelsintransitionmanagement
TK2.1 criticallyevaluatethebenefitstoatransitionprocessofeffectivestakeholderengagement
TK2.2 criticallyevaluatetheextenttowhichabenefitsrealisationplanaddsvaluetoaproject
Theinterviewisyouropportunitytodemonstrateevidenceofyourknowledgeinresponsetoquestionsfromtheassessoraboutyourunderstandingofprojectmanagementprinciples.Forexample,forthefirstcriterion,thiscouldtaketheformofexplainingtheimportanceofassessingbusinessreadinessandtheimpactofnotdoingso,demonstratingevaluationoftheimportanceofassessingbusinessreadinessintransitionmanagement
Elective competences
4948 Have a question? Need some help? Email [email protected]
5150 The Chartered Project Professional Application Guidance
5150 Have a question? Need some help? Email [email protected]
Ibis House, Regent Park,Summerleys Road,Princes Risborough,Buckinghamshire HP27 9LE
Tel (UK) 0845 458 1944Tel (Int) +44 1844 271 640Email [email protected] apm.org.uk
Association for Project Management
BRO V2.0 11/18