9
CAC Meeting #3 Summary June 9, 2011 Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study June 9, 2011 PWD CAC Mtg 3 Summary 29JUN11 V2.docx 1 Citizen Advisory Committee Meeting # 3 Meeting Summary June 9, 2011 6:008:30pm; ARAMARK Tower 1101 Market St. 15 th Floor The third meeting of the Philadelphia Water Department’s Stormwater Citizen Advisory Committee (CAC) commenced at 6:30pm with a brief review of the previous meeting’s topics and outcomes. Review of Charge to the CAC The meeting began with a review of the Charge to CAC: “To provide advisory opinions to PWD on topics related to rate structure, stormwater credits and incentives, and special ratepayer situations to be considered as a part of the PWD’s 2012 rates case.” The committee was reminded that “we don’t have to agree on ideas and desires, we only have to agree to have a mutually informative friendly discussion.” Housekeeping The CAC was asked if the next meeting, which is currently scheduled for June 30 th , would work for everyone given that the July 4 th Holiday falls on the following Monday. The committee agreed to hold the meeting as schedule and those who are unable to attend will send an alternate. PWD provided an update on the proposed DPermits bill. DPermits (or Discontinuance Permits), as described in Handout #3, allow property owners to obtain a permit under existing City Code which allows them to permanently disconnect from water service and to stop being charged by PWD for water and sewer service. The proposed bill would revise the existing code to allow PWD to charge these properties for stormwater fees. The bill has moved out of committee. PWD will continue to inform the CAC of any upcoming policy developments. Green City, Clean Waters Update The CAC was provided with an update on Philadelphia’s Green City, Clean Waters LongTerm Control Plan (LTCP) for which PWD signed a consent agreement on June 1 with the Pennsylvania Department of Environmental Protection (PaDEP). The final plan is a $2 billion 25year plan, rather than the $1.6 billion 20year plan referenced in Handout #6 and in the September 1, 2009 Summary Report provided to the CAC. It was noted that along with the ancillary benefits provided only a green approach could meet the City’s financial constraints, be implemented systemwide, reduce overflows in all watersheds and have an immediate impact on PWD’s system. CAC members asked how the plan would be funded and if the affordability was reviewed. PWD stated that the plan will be paid for via the customer revenues. In addition, the U.S. Environmental Protection Agency (USEPA) defined affordability and that bills could not increase more than a 2.5% on an annual basis in costs related to support plan implementation. Review of Stormwater Costs At the previous meetings, several CAC members asked for additional information on the programs and services which account for PWD’s stormwater costs. As discussed in Handout #7, PWD will increasingly invest in

Citizen Advisory Committee Meeting 3 - phillywatersheds.org CAC Mtg 3 Summary... · Stormwater Utility and Rate Consultation – Credits Analysis and ... The committee agreed to hold

Embed Size (px)

Citation preview

 

 

CAC Meeting #3 Summary June 9, 2011  

Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study      June 9, 2011  PWD CAC Mtg 3 Summary 29JUN11 V2.docx      1 

Citizen Advisory Committee Meeting # 3  Meeting Summary  June 9, 2011 6:00‐8:30pm; ARAMARK Tower 1101 Market St. 15th Floor  The  third  meeting  of  the  Philadelphia  Water  Department’s  Stormwater  Citizen  Advisory  Committee  (CAC) commenced at 6:30pm with a brief review of the previous meeting’s topics and outcomes.  

Review of Charge to the CAC The meeting began with a review of the Charge to CAC:  “To provide advisory opinions to PWD on topics related to rate structure, stormwater credits and  incentives, and special ratepayer situations to be considered as a part of the PWD’s 2012 rates case.”  The committee was reminded that “we don’t have to agree on ideas and desires, we only have to agree to have a mutually informative friendly discussion.”   

Housekeeping The CAC was asked if the next meeting, which is currently scheduled for June 30th, would work for everyone given that the July 4th Holiday falls on the following Monday.   The committee agreed to hold the meeting as schedule and those who are unable to attend will send an alternate.   PWD provided an update on the proposed D‐Permits bill.  D‐Permits (or Discontinuance Permits), as described in Handout  #3,    allow  property  owners  to  obtain  a  permit  under  existing  City  Code  which  allows  them  to permanently disconnect from water service and to stop being charged by PWD for water and sewer service.  The proposed bill would revise the existing code to allow PWD to charge these properties for stormwater fees.   The bill has moved out of committee.   PWD will continue to inform the CAC of any upcoming policy developments.   Green City, Clean Waters Update The CAC was provided with an update on Philadelphia’s Green City, Clean Waters Long‐Term Control Plan (LTCP) for which  PWD  signed  a  consent  agreement  on  June  1 with  the  Pennsylvania  Department  of  Environmental Protection (PaDEP).   The final plan is a $2 billion 25‐year plan, rather than the $1.6 billion 20‐year plan referenced in Handout #6 and in the September 1, 2009 Summary Report provided to the CAC.   It was noted that along with the ancillary benefits provided only a green approach could meet the City’s financial constraints, be implemented system‐wide, reduce overflows in all watersheds and have an immediate impact on PWD’s system.   CAC members asked how the plan would be funded and  if the affordability was reviewed.   PWD stated that the plan will be paid for via the customer revenues.    In addition, the U.S. Environmental Protection Agency (USEPA) defined affordability and  that bills  could not  increase more  than a 2.5% on an annual basis  in costs  related  to support plan implementation.   Review of Stormwater Costs  At the previous meetings, several CAC members asked  for additional  information on the programs and services which  account  for  PWD’s  stormwater  costs.    As  discussed  in  Handout  #7,  PWD  will  increasingly  invest  in 

 

 StoJun

winrestpr A anprreaccore TThcupopr 

 A th 

ormwater Utilitye 9, 2011 

waterways pronfrastructure,equired via futream  withinresented.  

CAC  membnticipated byrograms  andequirements ccounts for costs associateequired detai

he Path Fohe CAC was ustomers’ conossible so tharocess.   The 

member of they thought t

y and Rate ConsuPWD

otection and  stormwater uture stormwn  Philadelphia

er  asked  hoy the original d  services  waborne  by  PWustomer costed with admil on the custo

rward provided witncerns with tat the range oproposed pat

the CAC askethe original ch

ultation – Credit CAC Mtg 3 Sum

restoration, spermit requ

water permits a.    A  breakd

w  stormwatCAC were $7as  largely  drWD.   Additionts (billing, colinistration, finomer costs.   T

th a  review othe stormwatof the opinionth forward wi

ed  if residentharge to CAC 

 

ts Analysis and mmary 29JUN11 V

storm flood rirements andto take owndown  of  cur

er  costs  wen75M  (excludiriven  by  the nally,  the  remlections, and nance,  legal, This subject w

of why we arter fee.  The ins the CAC mill look at the

ial propertieswas for non‐

RecommendatioV2.docx

relief, green id addressing ership of all prrent  program

nt  from  $11ng customer evolving  stomainder  of  tcustomer seand so forthwas added to

re here, whicinformation p

might have can following “K

s should be bresidential pr

ons Study 

nfrastructureoverflows.    Iprivate pipesms  and  cost

1M  last  yeacosts) and t

ormwater  prothe  differenceervice includin) apportioned the “parking

ch  is namely presented win be capturednobs”:   

better represeroperties.  

e, renewal ant was also no that directlyts  attributab

r  to  $124M he  increase  iogram  and  ce  between  tng an allocatid to the storg lot.”  

finding waysll be made asd and conside

ented  in the 

CAC MeSummaJune 9, 

  

d replacemenoted that PWy discharge tole  to  stormw

this  year.   n costs  for thchanges  in  the  $111M  aon of relatedmwater fees

s  to potentias clear and asered in the ra

committee n

eeting #3 ary  2011 

nt of aging WD may be o a river or water  was 

The  costs he current he  permit nd  $124M d overhead .   The CAC 

lly  resolve s simple as ate making 

 

noting that 

 

 StoJun

FaThtom Thfo 

 Thrareinco AInPWbabetr          AAmalre

ormwater Utilitye 9, 2011 

airness Conhe CAC was to a  series of maintain and e

he CAC was tollowing as ad

1. Econo2. Appro3. Known

should4. Rate C

he CAC also ather  than  loecognized  thancreases  in feourts would l

Allocation Mn  the previouWD’s stormwased  chargesetween whatransition and 

Allocation Fs further disc

might be adjullocation  opteallocation w

• Optionstormwstormw

y and Rate ConsuPWD

ncepts then presentelegal  tests.   easy to explai

then asked “wdditional cons

mic viability ‐priate Noticen and measurd not go too fCaps – a cap s

noted  that mooking  at  theat  there mayees.   A CAC mikely view thi

Methods Ovus meeting,  twater  rate strs.    This was  dt would be  cthe final posi

actors cussed in Hansted.   The prtions  are  curere analyzed n 1, which  rewater  to  sanwater revenu

ultation – Credit CAC Mtg 3 Sum

ed with the coAdditionally, in to custome

what else  is siderations fo

‐ Economicalle ‐ Rate payerrable costs ‐ Car into the fuhould be plac

most rate paye  overall  cony be  some  yemember askes as anything

verview he CAC was ructure wouldiscussed  viaonsidered mition of parce

dout #9, the roposed costsrrently  beingand presentesults in $14.5itary  sewer  tues 

ts Analysis and mmary 29JUN11 V

oncept of fai  it  is generalers.   

important toor evaluating 

y viable for ths should be gCosts should uture ced to help m

yers will  judgncepts  and  coears which md what the tg that could b

presented wd  transition  ta  the  “teetereter based  “el‐based “win

CAC was pres allocation o  reviewed  bed to the CAC5M cost realloto  60/40  and

RecommendatioV2.docx

rness as addrlly preferred 

 them when the fairness o

he rate payergiven approprbe known an

manage the po

e “fairness” osts  that  themay  require mhreshold for e considered

with current cto a combinar  totter”  exam“winners,”  thners.”      

sented with toptions sharedy  PWD’s  RaC: ocation by mod making  cus

ons Study 

ressed in Hanthat a  rate  s

they think oof the rate str

rs riate notice ofd measurable

otential negat

by comparinge  CAC  is  beinmitigation  in “confiscatory a taking.  

cost allocatioation of 50% mple, which e  relatively n

the current cod were notedtes  Consulta

oving the constomer  cost p

ndout #8.  A rstructure be 

f fairness?”   ructure:   

f any upcomie and any fut

tive impact to

g  the currentng  presentedorder  to may” would be. 

n methodolometer basedessentially  dneutral positi

ost allocationd to be purelynt.      The  fo

nveyance pipeproportional 

CAC MeSummaJune 9, 

  

rate structuresimple  to de

The CAC  ide

ng changes ture looking p

o property ow

t  fees  to  last d with.      Theanage  the  im  It was note

ogy.   As of  Jud and 50% padescribes  the ion of  the  cu

n factors and y hypotheticaollowing  2  o

e allocation fto  sanitary  s

eeting #3 ary  2011 

e is subject evelop and 

ntified the 

projections 

wners 

year’s bill e  CAC  also mpact  from ed that the 

uly 1, 2011 arcel‐ area transition 

urrent 50% 

how these al as these options  for 

rom 70/30 sewer  and 

 

 

CAC Meeting #3 Summary June 9, 2011  

Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study      June 9, 2011  PWD CAC Mtg 3 Summary 29JUN11 V2.docx      4 

• Option 2, which results in $29.0M cost reallocation by moving the conveyance pipe allocation from 70/30 stormwater  to  sanitary  sewer  to  50/50,  making  customer  cost  proportional  to  sanitary  sewer  and stormwater revenues and adjusting the strength factors  

 The CAC raised the following question/concerns regarding the proposed reallocation methodology following  

• Changes  in  the Strength Factor / TSS/ BOD might adversely  impact  industry.  It was noted  that strength value is different for residential sanitary and stormwater volumes are taken into account. 

• Revenue and cost are used interchangeably.  Cost should be the driver vs. how revenue is captured.  Goal should be to bring in enough revenue to cover stormwater costs.  

• PWD  needs  to  charge  based  on  actual  costs  for  stormwater  and  that  the  “people  that  cause  the problems” pay their fair share.   The flexibility to modify the allocation factors appears to undermine the validity of the $124M cost allocation presented in Handout #5.  

• It may be difficult to achieve fairness in any category.  A CAC member provided an example of an existing property with  systems already  in place and  that  some  rate payers may  feel  they didn’t have  complete information on  their anticipated costs, which may have  informed  their property development decisions (e.g. purchasing a property).  

 Reallocation Basics The CAC then discussed the “reallocation basics” as presented in Handout #9.  The following basics were noted:  

• Any proposed reallocation will result in a “Zero Sum Game”   • Every proposed change affects most ratepayers  • Under any change some rate payers will be happy with the results while others will not be • Each rate payer will have a preference 

 Summary of Reallocation Analysis  The CAC then reviewed the results of the reallocation analysis presented in Handout #9.   It was noted that within the  construct of  zero  sum game –  there are a  lot of potential options  for  reallocation and  the  impacts  largely depend on how the reallocation is made.   Under the two options studied: the fees don't change much for most properties; most  properties  facing  large  parcel  area  based  charges would  see  their  charges  decrease  under  a reallocation; for a few, who are  large sewer customers, the fees  increase, particularly  if they have small parcel‐based charges with significant water consumption;  these customers can be  identified and  the degree of  impact quantified.    Table 1 as provided in Handout # 9 was reviewed. This table presents the categories of rate payers, preferred rate structure and average monthly fees. It was noted that averages presented can’t tell the whole tale and there may be customers in here that pay 1000% more than under the meter based stormwater charges.  A member of the CAC noted that these averages were not representative of their properties and felt that a sub‐category was potentially needed under warehouses to represent large and small facilities.   Table  2  as  provided  in  Handout  #9  was  reviewed.  This  table  presents  the  range  of  average  monthly  fees attributable  to  each  category  for  the  historical meter  based  charge,  the  current  charges  as  of    July  1,  2011 (FY2012), an all parcel‐based charge, reallocation option 1, reallocation option 2, and the theoretical all sewage based  charge.    It  was  noted  that  when  looking  at  the  reallocation  proposed  under  option  2,  most  of  the categories’ average fees are similar to their current fees as of July 1, 2011.    

 

 

CAC Meeting #3 Summary June 9, 2011  

Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study      June 9, 2011  PWD CAC Mtg 3 Summary 29JUN11 V2.docx      5 

Table 3 as provided  in Handout #9 was  then  reviewed.   This  table presents  the “Dow  Jones”  list of properties, further discussed in Handout #9, and the impacts of any proposed rate change on the actual monthly fee for these actual properties across the range of rate bases and reallocation options.  The impacts were discussed, noting that properties that utilize large amounts of water may see a large increase due to cost reallocation.   It was noted that the average monthly fees presented account for the change in sanitary costs for each property category.  The CAC asked that the additional increase in sanitary sewer charges be presented separately and the full costs to the customer be presented in a separate table.  The CAC also requested copies of the current tables and  any  future  table  in  excel  format  so  that  they  can  review  and  analyze  the data on  their own prior  to  the meeting.   Additionally, the CAC was presented with the following table, which presents the properties which would be most burdened by the $29M reallocation option.   

Property Category  Total Parcels Parcels Impacted Under a 10% and $100 Threshold 

Parcels Impacted Under a 20% and $200 Threshold 

Parcels Impacted Under a 30% and $300 Threshold 

Residential ‐ Row  349,808 n/a n/a n/aResidential ‐ Twin  70,451 n/a n/a n/aResidential ‐ Single  27,921 n/a n/a n/aAirport/Transit/Utility  464 70 36 22Apartments  17,489 180 102 61Auto Dealer  171 24 18 8Condominium  1,495 41 16 13Education  1,132 109 55 32Fast Food  292 11 3 2Government  18,224 415 247 172Healthcare  475 34 20 15Hotel  118 20 16 12Industrial Factory/Shop  1,710 215 127 82Industrial Warehouse  2,408 322 166 93Light Manufacturing  534 114 56 32Office Building  885 54 29 20Parking  4,473 58 20 11Religious/Charity  2,783 86 30 9Restaurant  694 9 1 0Shopping Center  86 45 25 17Small Business  14,137 259 139 74

Vacant  30,512 122 46 28

Total  546,262 2,188 1,152 703

 

 

CAC Meeting #3 Summary June 9, 2011  

Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study      June 9, 2011  PWD CAC Mtg 3 Summary 29JUN11 V2.docx      6 

The Properties Most Burdened by Reallocation Based on  the  available data  and depending on what  is deemed  a measure of  “significant  impact”  all of  these potential options and  their  impacts are calculable.    In  short, many property owners do better  if  there  is  some reallocation of stormwater costs back to sanitary costs.   But you will have some who go up – such as those that use a  lot of water.   Overall  the  reallocation would  reduce  the universe of properties  that are hugely  impacted compared to the path to full parcel area based charges.    A member of the CAC suggested that if the number of big “losers” is relatively minor, that the reallocation funds might be better used  to help the  impacted parcels and do the retrofits; noting the need  to consider  the bigger picture and that at the moment we are considering shifting costs around to alleviate those most impacted.  Thoughts – O’ – Meter The CAC was then polled along the “Thoughts‐O’‐Meter” on the range of reallocation options and asked to weigh in based on their own situations and their sense of fairness.  The options and results of the poll are summarized in the table below:  

“Is relocation a good step toward overall fairness and should it be pursued?” Number   Option   Votes   

1  No Reallocation   2 

2  Support $14M Reallocation (Option 1)  3 

3  Support $29M Reallocation (Option 2)  1 

4  Support Reallocation Higher than $29M  0 

5  Other    5 

 The CAC members were encouraged to provide their thoughts and opinions on the options for which they voted.   Those members, who voted for the “Other” option, were asked to provide an explanation as to why they voted for this option and what type of reallocation they would support.  They were as follows:  

• Establish the actual costs, set the rate, help outliers, extend out the phase‐in.  Focus income from the fee on real expenses.  

• Support  for $29M  reallocation or beyond while providing help  to  the outliers  in  the various categories, providing  time  based  help/phase‐in  coupled  with  significant  incentives.    People  contributing  sewage should pay more and help should be provided to the other groups impacted.  

• Go beyond the $29M reallocation option, cap increases, make costs to implement retrofits economically viable with a quick return on investment for property owners ROI.  

• More information is needed on the reallocation and how the constituency represented would be affected before a reallocation could be voted upon.  

• Base the change in reallocation on reasonable science not just on helping those that may be aggrieved.    The CAC asked if the reallocation options were supportable in the next rate making process and it was noted that  $29M  appears  to be  the upper  limit  for  reallocation based on preliminary  analysis. The CAC  also  asked  if  this exercise was  undertaken  because  PWD  felt  that  something was  done wrong  in  the  past  or  if  it was  just  an adjustment to the methodology.  PWD stated that they felt this was a tweak that may be justifiable as a result of 

 

 

CAC Meeting #3 Summary June 9, 2011  

Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study      June 9, 2011  PWD CAC Mtg 3 Summary 29JUN11 V2.docx      7 

the shifting of stormwater  to a parcel based charge and expressed  their desire  to address  the properties being impacted  the most.    It was  noted  that  any  change  undertaken  by  the  rate  case must  be  defensible  and  not arbitrary.   The CAC requested that the same analysis be performed and provided to show the  impact on the overall sewer bill for a given customer class.    CAC Members who voted for other options provided the following commentary:  

• Option  1  ‐  Going  back  to  first  principles  –  allocation  based  on  peak  flow  seems  to  be  a  reasonable allocation and therefore supported the existing allocation  

• Option 3 – Support for $29M reallocation but wants to take care of outliers as well.  

Revised Meeting Topics and Schedule Based upon the previous CAC meeting, the Revised Meeting Topics are as follows:  

Date   Topic  

April 28   Introduction 

May 19   Stormwater Program and Costs  

June 9   Program Cost Reallocation 

June 30   IA/GA Split, Residential Charges Rate Relief Topics 

July 21   Special Issues: Direct Dischargers 

August 11   Incentives 1 – Review of Current and Possible Incentives 

September 1   Incentives 2 – Incentives and Credits Integration 

September 22   Credits 1 – GA, IA and NPDES Credits 

October 13   Credits 2 –Residential and Other Credits 

November 3   Final Meeting 

          

 

 

CAC Meeting #3 Summary June 9, 2011  

Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study      June 9, 2011  PWD CAC Mtg 3 Summary 29JUN11 V2.docx      8 

Parking Lot The following questions were raised.  As part of the CAC Meeting process, these questions will be answered and addressed either as part of the next CAC Meeting scheduled for June 30th if time permits or under separate cover.  

Parking Lot

Details on billing, collection and other administrative costs.

Forward key tables presented in handouts and meeting as spreadsheets. Send any future tables prior to meetings.

Send all parcel area based use allocations version of tables presented.

How delta in charge spilt between stormwater and sanitary sewer as presented in Handout 9 – Tables 2 and 3 was determined and impact on full sewer bills.  

Attendees List CAC Committee Members and Alternates 

First Name  Last Name  Affiliation 

Robert W. Ballenger Esq. Community Legal Services Thomas Becker Philadelphia University Paul Bonasch Perfecseal Philadelphia Jack Bonner Residential Property Owner Vincent Dougherty City of Philadelphia – Commerce Wesley Firkin UBOAP‐WTARF‐TCR; Thackray Crane Brian Franey Manko Gold Katcher & Fox (alternate for Joe Manko) Arthur Friedman Archdiocese of Philadelphia Brian Glass PennFuture Donald S Haas Brandywine Realty Trust Maia Jachimowicz City of Philadelphia – Finance Shelby Linton-Keddie Esq. McNees, Wallace & Nurick Sheilah M. Louis Esq. Philadelphia City Council – Legal Bob Martin Brandywine Realty Trust Richard McClure Kennedy Wilson Properties Anthony Tigano Chapman Auto Group David Wolf Wolf Investment Corporation  

Other Attendees First Name  Last Name  Affiliation 

Glen Abrams Philadelphia Water Department Joseph Clare Philadelphia Water Department Andre Dasent Philadelphia Water Department Joanne Dahme Philadelphia Water Department

 

 

CAC Meeting #3 Summary June 9, 2011  

Stormwater Utility and Rate Consultation – Credits Analysis and Recommendations Study      June 9, 2011  PWD CAC Mtg 3 Summary 29JUN11 V2.docx      9 

Other Attendees Dave Jagt Black and Veatch Prabha Kumar Black and Veatch Gerald Leatherman Philadelphia Water Department Anna Lepchuck Philadelphia Water Department Amanda Lieberman Simon Public Relations Henrietta Locklear AMEC Earth and Environmental Brian Merritt AMEC Earth and Environmental Howard Neukrug Philadelphia Water Department Pat Perhosky Philadelphia Water Department Keith Readling AMEC Earth and Environmental Andy Reese AMEC Earth and Environmental Lisa Simon Simon Public Relations Casey Thomas Philadelphia Water Department Erin Williams Philadelphia Water Department Sydina Williams Simon Public Relations Jeffrey Wolf Wolf Investments