19
TENERIFFE NEWSTEAD NEW FARM PRECINCT TRAFFIC AND PARKING STUDY FINAL REPORT April 2018 Prepared for Transport Network Operations Transport Planning & Strategy Branch Brisbane Infrastructure Prepared by Transport Engineering Studies Group Transport Planning & Strategy Branch Brisbane Infrastructure

City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

TENERIFFE NEWSTEAD NEW FARM PRECINCT TRAFFIC AND PARKING

STUDY

FINAL REPORT

April 2018

Prepared for

Transport Network Operations

Transport Planning & Strategy Branch

Brisbane Infrastructure

Prepared by

Transport Engineering Studies Group

Transport Planning & Strategy Branch

Brisbane Infrastructure

Page 2: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

14 Saturn Analysis – 2031

Assessment of future traffic operation on the road network was undertaken using updated versions of the BSTM-MM and the BCASM-NFT as described in Section Error: Reference source not found. Future trip demands used in the SATURN Model were identified for the 2031 design horizon from the BSTM-MM which was updated to incorporate the proposed increase in population and employment in the future year models. Model results for the proposed future transport network scenarios are outlined in the following sections.

14.1 Base Case2031 Base Case includes scheduled upgrades to the wider network as listed in Section Error: Reference source not found which was reflected in the future year demand matrices and may have an impact on traffic travelling through the study area. The base case scenario does not include any geometrical change the existing network in the NFT area.

14.1.1 2031 AM Peak – Base Case

The resulting 2031 network base case scenario with all scheduled wider network improvements in place is forecast to operate in congested conditions with over capacity movements along a number of major corridors and many intersections based on the estimated increase in travel demand outside the NFT area. This has been illustrated in Figure 14-1.

In addition, several other intersections along Ann Street and Brunswick Street are predicted to operate at or over capacity. Table 14-1 lists the intersections within the study area that are predicted to operate with over capacity turning movements.

Generally street sections within the study area are operating below capacity.

Table 14-1: 2031 AM Peak Hour (Base Case) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements

Max V/C%

342 Ann St / Church St 1 131.85335 Access/Egress to 1058-1062 Ann St 1 106.46340 Ann St / Chester St 1 102.70360 Ann St / Breakfast Creek Rd / Skyring Tce 8 102.231057 Ann St / Brunswick St 1 100.67398 Story Bridge / Kemp Pl 2 98.241059 Ann St / Commercial Rd 1 97.74393 Bowen Tce / Martin St 1 97.341237 Brunswick St / Berwick St 3 96.35397 Brunswick St / Robertson St 1 90.91

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

Final 2

Page 3: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

Figure 14-1: Summary of Modelled Road Network Operation – 2031 AM (Base Case)

Final 3

Page 4: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

14.1.2 2031 PM Peak – Base Case

The resulting 2031 network base case scenario with all scheduled wider network improvements in place is forecast to operate in congested conditions with over capacity movements along a number of major corridors and many intersections based on the estimated increase in travel demand. This has been illustrated in Figure 13.3.

In addition, several other intersections along Ann Street and Brunswick Street are predicted to operate at or over capacity. Table 14-2 lists the intersections within the study area that are predicted to operate with over capacity turning movements.

Generally street sections within the study area are operating below capacity. Only a small section of Doggett Street is forecast to operate close to capacity.

Table 14-2: 2031 PM Peak Hour (Base Case) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements

Max V/C%

1237 Brunswick St / Berwick St 3 121.48342 Ann St / Church St 1 107.66393 Bowen Tce / Martin St 1 100.97360 Ann St / Breakfast Creek Rd / Skyring Tce 4 100.47392 Bowen Tce / Ivory St 2 100.411057 Ann St / Brunswick St 2 100.211059 Ann St / Commercial Rd 1 99.24

394 State Route 15 (Mid-Block between Martin St and Ivory St) 1 96.42

395 Story Bridge / Bowen Tce (Merge) 1 96.42430 Ann St / Longland St 1 92.66

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

Final 4

Page 5: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

Figure 14-2: Summary of Modelled Road Network Operation – 2031 PM (Base Case)

Final 5

Page 6: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

14.2 Option 1Option 1 was developed to introduce restrictions to the road network and predominantly involves restricting movements to streets and reducing posted speed on selected roads as described in Section Error: Reference source not found.

14.2.1 2031 AM Peak – Option 1

The intersections with over capacity movements in this option are summarised in Table 14-3.

Table 14-3: 2031 AM Peak Hour (Option 1) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements

Max V/C%

342 Ann St / Church St 1 131.85335 Access/Egress to 1058-1062 Ann St 1 114.64340 Ann St / Chester St 1 103.23360 Ann St / Breakfast Creek Rd / Skyring Tce 9 101.851057 Ann St / Brunswick St 1 100.681059 Ann St / Commercial Rd 1 98.44398 Story Bridge / Kemp Pl 2 98.271237 Brunswick St / Berwick St 3 98.12393 Bowen Tce / Martin St 1 97.26397 Brunswick St / Robertson St 1 91.06

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

The network performance results for this option are illustrated in Figure 14-3. Generally street sections within the study area are operating below capacity.

14.2.2 2031 PM Peak – Option 1

The intersections with over capacity movements in this option are summarised in Table 14-4.

Table 14-4: 2031 PM Peak Hour (Option 1) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements

Max V/C%

1237 Brunswick St / Berwick St 3 122.60342 Ann St / Church St 1 107.72393 Bowen Tce / Martin St 1 102.72392 Bowen Tce / Ivory St 2 101.411057 Ann St / Brunswick St 2 100.39360 Ann St / Breakfast Creek Rd / Skyring Tce 5 100.361059 Ann St / Commercial Rd 1 99.02

394 State Route 15 (Mid-Block between Martin St and Ivory St) 1 96.31

395 Story Bridge / Bowen Tce (Merge) 1 96.31430 Ann St / Longland St 1 93.48

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

Final 6

Page 7: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

The network performance results for this option are illustrated in Figure 14-4. Generally street sections within the study area are operating below capacity.

Figure 14-3: Summary of Modelled Road Network Operation – 2031 AM (Option 1)

Final 7

Page 8: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

Figure 14-4: Summary of Modelled Road Network Operation – 2031 PM (Option 1)

Final 8

Page 9: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

14.3 Option 2Option 2 was developed to improve accessibility of the network and involves minor upgrades to a number of intersections as described in Section Error: Reference source not found.

14.3.1 2031 AM Peak – Option 2

The intersections with over capacity movements in this option are summarised in Table 14-5.

Table 14-5: 2031 AM Peak Hour (Option 2) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements Max V/C%

342 Ann St / Church St 1 131.86335 Access/Egress to 1058-1062 Ann St 1 105.14340 Ann St / Chester St 1 103.17360 Ann St / Breakfast Creek Rd / Skyring Tce 9 102.08

1057 Ann St / Brunswick St 1 102.061059 Ann St / Commercial Rd 2 100.70398 Story Bridge / Kemp Pl 2 98.22393 Bowen Tce / Martin St 1 97.47

1237 Brunswick St / Berwick St 3 97.09400 Kemp Pl / Boundary St 1 93.64

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

The network performance results for this option are illustrated in Figure 14-5. Generally street sections within the study area are operating below capacity.

14.3.2 2031 PM Peak – Option 2

The intersections with over capacity movements in this option are summarised in Table 14-6.

Table 14-6: 2031 PM Peak Hour (Option 2) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements

Max V/C%

342 Ann St / Church St 1 107.42392 Bowen Tce / Ivory St 2 103.04393 Bowen Tce / Martin St 1 102.701057 Ann St / Brunswick St 2 102.61360 Ann St / Breakfast Creek Rd / Skyring Tce 5 101.961059 Ann St / Commercial Rd 1 100.28430 Ann St / Longland St 1 96.75394 State Route 15 (Mid-Block between Martin

St and Ivory St)1 96.47

395 Story Bridge / Bowen Tce (Merge) 1 96.47340 Ann St / Chester St 1 93.67

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

The network performance results for this option are illustrated in Figure 14-6. Generally street sections within the study area are operating below capacity.

Final 9

Page 10: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

Figure 14-5: Summary of Modelled Road Network Operation – 2031 AM (Option 2)

Final 10

Page 11: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

Figure 14-6: Summary of Modelled Road Network Operation – 2031 PM (Option 2)

Final 11

Page 12: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

14.4 Option 3Option 3 was developed to improve accessibility of the network and involves major upgrades to a number of corridors as described in Section Error: Reference source not found.

14.4.1 2031 AM Peak – Option 3

The intersections with over capacity movements in this option are summarised in Table 14-7.

Table 14-7: 2031 AM Peak Hour (Option 3) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements

Max V/C%

342 Ann St / Church St 1 131.861237 Brunswick St / Berwick St 3 123.90335 Access/Egress to 1058-1062 Ann St 1 105.43340 Ann St / Chester St 1 103.24360 Ann St / Breakfast Creek Rd / Skyring Tce 9 102.181057 Ann St / Brunswick St 1 102.111059 Ann St / Commercial Rd 2 100.66398 Story Bridge / Kemp Pl 2 98.24393 Bowen Tce / Martin St 1 97.63400 Kemp Pl / Boundary St 1 93.15430 Ann St / Longland St 1 90.42

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

The network performance results for this option are illustrated in Figure 14-7. Generally street sections within the study area are operating below capacity.

14.4.2 2031 PM Peak – Option 3

The intersections with over capacity movements in this option are summarised in Table 14-8.

Table 14-8: 2031 PM Peak Hour (Option 3) – Intersections with Over Capacity Turning Movements

Node Description No. of Over Capacity Movements

Max V/C%

342 Ann St / Church St 1 107.11393 Bowen Tce / Martin St 1 103.04392 Bowen Tce / Ivory St 2 102.691057 Ann St / Brunswick St 2 102.69360 Ann St / Breakfast Creek Rd / Skyring Tce 5 102.061059 Ann St / Commercial Rd 1 100.51430 Ann St / Longland St 1 96.81

394 State Route 15 (Mid-Block between Martin St and Ivory St) 1 96.37

395 Story Bridge / Bowen Tce (Merge) 1 96.37340 Ann St / Chester St 1 93.81

Note: Thresholds for exceeding practical capacity – Traffic Signals >=90%, Roundabouts >=0.85% Priority Control >=80%

Final 12

Page 13: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

The network performance results for this option are illustrated in Figure 14-8. Generally street sections within the study area are operating below capacity.

Figure 14-7: Summary of Modelled Road Network Operation – 2031 AM (Option 3)Final 13

Page 14: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

Figure 14-8: Summary of Modelled Road Network Operation – 2031 PM (Option 3)

Final 14

Page 15: City of Brisbane - Teneriffe Newstead New Farm … · Web viewTeneriffe Newstead New Farm Precinct Traffic and Parking Study Final Report April 2018 Prepared for Transport Network

Teneriffe Newstead New Farm Precinct Traffic and Parking Study Transport Engineering Studies

14.5 SATURN Modelling Summary – 2031Statistics extracted from the 2031 BCASM-NFT base case and options have been summarised in Table 14-9 The table shows marginal differences between the options.

Of the options assessed, Options 2 and Option 3 were predicted to increase the average speed during the afternoon peak hour period, the difference however is marginal. Option 2 has achieved a higher travel time during both the morning and afternoon peak periods.

Table 14-9: SATURN Summary Table (2031)

2031 AM PeakSATURN Measure Base Option 1 Option 2 Option 3

Total Travel Time (PCU-hours) 19,565.5 19,561.7 19,527.6 19,532.9

Total Travel Distance (PCU-kms)

446,920.8 447,004.8 447,087.5 447,088.0

Average Speed (kph) 22.8 22.9 22.9 22.92031 PM Peak

SATURN Measure Base Option 1 Option 2 Option 3Total Travel Time (PCU-

hours) 21,446.2 22,003.2 21,485.1 21,505.0

Total Travel Distance (PCU-kms)

449,488.2 449,463.4 449,530.4 449,481.2

Average Speed (kph) 21.0 20.4 20.9 20.9Definitions:

Total Travel Time is the total travel time travelled by each individual vehicle in the model.

Travel Distance is the total distance travelled by each individual vehicle in the model.

Average Speed is the average speed calculated after considering the total travel time and travel distance travelled by each vehicle.