City of Johannesburg
2012/16 Integrated Development Plan:
2014/15 Review
2
Vision:
“Johannesburg – a World Class African City of the Future – a vibrant,
equitable African city, strengthened through its diversity; a city that
provides real quality of life; a city that provides sustainability for all its
citizens; a resilient and adaptive society.”
Joburg. My City – Our Future!
Mission:
The City of Johannesburg commits itself to pro-active delivery and the
creation of a city environment in 2040 that is resilient, sustainable and
liveable. It aims to achieve this through long-term 2040 plans, targeted
programmes, services and enabling support that drives economic growth,
optimal management of natural resources and the environment, the
development of society and the individuals within it, and the practice and
encouragement of sound governance, in all the City does.
3
Contents
1. Introduction .......................................................................................................... 5
2. The City of Johannesburg .................................................................................. 11
3. Governance and institutional framework ............................................................ 21
4. Delivering on Joburg 2040 Strategy ................................................................... 33
5. Spatial Development Framework ....................................................................... 59
6. Basic Service Delivery ....................................................................................... 67
7. 2014/16 Priority Implementation Plans ............................................................ 709
8. Intergovernmental planning and partnerships .................................................. 167
9. Community Based Planning and Stakeholder consultation ........................... 1884
10. Medium Term Budget ................................................................................. 1984
11. 2013/14 Capital Investment Framework ..................................................... 2040
12. Monitoring and evaluation .......................................................................... 3227
13. Disaster and risk management ..................................................................... 330
4
Abbreviations
Abbreviation Explanation
Comm Dev Community Development
CIF Capital Investment Framework
CIPA Capital Investment Priority Area
CRUM Citizen Relations and Urban Management
DED Department of Economic Development
DP Development Planning
DWA Department of Water Affairs
EISD Environment, Infrastructure Services Department
EMS Emergency Management Services
FMMU Facilities Maintenance and Management Unit
GAC Group Audit Committee
GDS Growth and Development Strategy
GCSS Group Corporate and Shared Services
GRMC Group Risk Management Committee
GSPCR Group Strategy, Policy Coordination and Relations
IDP Integrated Development Plan
JDA Johannesburg Development Agency
JM Joburg Market
JMPD Johannesburg Metro Police Department
JOSHCO Johannesburg Social Housing Company
JPC Johannesburg Property Company
JRA Johannesburg Roads Agency
JTC Johannesburg Theatre Company
ME Municipal Entity
MTC Metro Trading Company
NMT Non- Motorised Transport
PAIL Public Access to Internet in Libraries
SAF Strategic Area Framework
SALGA South African Local Government Association
SAPS South African Police Service
SHSUP Sustainable Human Settlement Urbanisation Plan
TARSC Technical Advisory Resource Centre
TIR Transport Information Register
TOD Transit Oriented Development
UDF Urban Development Framework
UDZ Urban Development Zone
UFW Unaccounted for Water
5
1. Introduction
The 2014/15 review of the City of Johannesburg’s Integrated Development Plan (IDP) is the
fourth IDP revision of the 2011-2016 term of office, and serves as a review of the IDP adopted
at the start of this term. This is in line with legislation, specifically the Municipal Systems Act
(2000) which requires that each elected council should develop and adopt an Integrated
Development Plan (IDP) at the start of its term of office. A municipal IDP defines the
development and plans of the municipality for the electoral term and includes an assessment of
the City’s level of development, its developmental priorities, key performance indicators and
targets, and operational strategies for the five year term.
The City’s Strategic Planning Framework is detailed in the figure below.
Figure: CoJ Strategic Planning Framework
This City’s long term Joburg 2040 Strategy identifies four key outcomes, and a number of
related outputs, that intend to realise the City’s long term vision. The City’s five-year IDPs then
translate these desired outcomes into medium-term programmes for implementation in that term
of office. On an annual basis, the IDP is reviewed and business plans are developed, detailing
Joburg 2040 Strategy
• Outlines the City’s programmes for current term of office linked to
its priorities
Business Plans / SDBIP
• Detailed business plans and SDBIPs for departments and municipal
entities
5-Year IDP
• Identifies the city’s
future trends and long term strategy
• Outlines the City’s vision and mission to
2040
MEDIUM TERM FINANCIAL
PLAN
ANNUAL BUDGET AND
SDBIP
LONG TERM FINANCIAL
PERSPECTIVE
6
short term operational plans. These are linked to annual budgets and the City’s annual Service
Delivery and Budget Implementation Plan (SDBIP).
The review process
As required by the Municipal Systems Act, the City revises its IDP on an annual basis, to ensure
that it remains relevant to its specific operating environment including political, socio-economic
or other changes that may occur. This annual review also enables the City to update its IDP,
based on its overall performance.
2011/12 IDP
In 2011, the City developed and adopted a 2011/12 IDP. This IDP was linked to the City’s
Municipal Turnaround Strategy, developed to address some of the concerns raised by national
government regarding the performance of municipalities. The 2011/12 IDP also stated the City’s
commitment to addressing essential issues. At the start of the mayoral term, the Executive
Mayor committed to an intensive programme of accelerated service delivery as identified in the
City’s Municipal Turnaround Strategy. An Extended Joint Operations Committee monitored and
ensured coordination in the resolution of basic service delivery issues.
Growth and Development
Strategy
Integrated Development
Plan
Business Plans
and SDBIPs
National and provincial agenda
Long-term strategy for the City (informed by government planning, emerging trends and other development issues)
5-year plan linked to long-term goals i.e. breaking down the City’s long-term objectives into 5-year strategic planning Semi-operational Annual IDP then outlines an overview of planning for a specific year against high-level strategic plans
outlined in the 5-year IDP and reports on progress against those high-level goals on an annual basis
Annual planning by departments and municipal entities linked to achieving objectives outlined in 5-
year IDP.
Government priorities and focus areas are set at both a national and provincial level
7
2012/13 review
Following the process to revise and update the City’s long term strategy (Joburg 2040 GDS),
which was approved on 20 October 2011, a substantial review of the City’s IDP was necessary
to ensure alignment to the revised strategic focus. As a result, in 2012, a revised 2012/16 IDP
which was informed by the Joburg 2040 Strategy was adopted by Council. The 2012/16 IDP
“Committing to a promising future” detailed the City’s implementation plans for the full term of
office based on the six principles outlined in the Joburg 2040 GDS.
2013/14 review
In June 2012, the City embarked on a review process of its IDP in terms of legislation that
requires municipalities to revise their IDPs on an annual basis. Key to the review of the City’s
IDP was the development of the Joburg 2040 GDS Roadmap in 2012/13 to define what the
City’s plans will be for the next three decades in order to achieve its long-term vision:
“Johannesburg - a World Class African City of the future – a vibrant, equitable African
city, strengthened through its diversity; a city that provides real quality of life; a city that
provides sustainability for all its citizens; a resilient and adaptive society. Joburg. My
City – Our Future”
The GDS Roadmap process allowed the City to review and finalise its priorities for decade 1 as
well as the remainder of the current term of office, building on the flagship and master
programmes detailed in previous IDPs. These priorities include:
Financial Sustainability and Resilience;
Agriculture and Food Security;
Sustainable Human Settlements;
SMME and Entrepreneurial Support;
Engaged Active Citizenry;
Resource Sustainability;
Smart City;
Investment Attraction, Retention and Expansion;
Green Economy; and
Safer Cities.
8
2014/15 review
The 2014/15 review is informed by the City’s performance to date as well as external
assessments such as those of credit rating agencies, Auditor General reports and other critical
reviews. The continued rollout of Community Based Planning forms part of the review, as does
various City strategies and plans that were further developed in 2013/14. These include
initiatives such as the City’s Corridors of Freedom, and a focus on Developmental Service
Delivery.
The 2014/15 IDP builds on the work that has been started in the current term of office and
ensures that, while the City continues to deliver services, it is also focused on responding to
residents’ concerns and maintaining a long term development perspective.
The City of Johannesburg is committed to the empowerment of its residents. Therefore all
revised plans are communicated with its communities through a thorough consultation process.
Structure of the 2014/15 Integrated Development Plan
Chapter 1: Introduction
The chapter provides an overview of the document’s structure and content inclusive of:
City vision and mission
Rationale behind the review, process of identifying the ten city priorities
Chapter outline of the 2014/15 IDP document
Chapter 2: The City of Johannesburg
This chapter gives an overview of Johannesburg and the context within which the municipality
operates. Factors influential to planning such as demographics, information for social and
human development, economic growth and development, sustainable services and governance
are elaborated in this chapter.
Chapter 3: Governance and institutional framework
Chapter 3 provides an overview of the governance and institutional framework of the City.
Chapter 4: Delivering on Joburg 2040 Strategy
9
This chapter provides further details of the GDS Roadmap as well as the linkages to the IDP
including:
An outline of the City’s GDS Roadmap
An outline of the City’s priorities for the remainder of the term
Chapter 5: Spatial Development Framework
Chapter 5 provides detail on spatial framework within which the City intends to give effect to its
Joburg 2040 Strategy.
Chapter 6: Basic Service Delivery
This chapter provides a high level overview of the City’s operational plan i.e. key operations
across the City.
Chapter 7: 2014/15 Priority Implementation Plans
Chapter 7 details the City’s ten Priority Implementation Plans including targets, indicators and
delivery agendas for the remainder of the term of office.
Chapter 8: Intergovernmental planning and partnerships
This chapter includes details on the City’s intergovernmental planning and partnerships.
Chapter 9: Community Based Planning and Stakeholder consultation
Chapter 9 focuses on the rollout of community based planning in the 2013/14 financial year and
highlights the implementation of the pilot project implemented in Region E. In addition, it
provides an overview of the City’s 2014 IDP and Budget outreach process.
Chapter 10: Medium Term Budget
The medium term budget gives a high level overview of the City’s three-year budget.
Chapter 11: 2014/15 Capital Investment Framework
This chapter gives details on the City’s 10-year capital investment planning (Capital Investment
Framework).
Chapter 12: Monitoring and evaluation
10
Chapter 12 provides an overview of the City’s performance management framework as well as
its processes for monitoring and evaluation of programmes.
Chapter 13: Disaster and risk management
The final chapter of the document provides an overview of the strategic risks and mitigation
measures as well as the City’s disaster management plan.
11
2. The City of Johannesburg
In order to contextualise the City’s Integrated Development Plan, and the detailed programmes
and projects outlined herein, it is important to provide an overview of key data and statistics
related to the City. This ensures that an overview of development within the City is provided at
the start of this review of the IDP.
CoJ regions
The City has instituted a system of urban management that operates at a regional scale. A
map, indicating the seven regions of Johannesburg is included below.
Map: Johannesburg’s seven regions
Total Population
12
The city of Johannesburg had a population of 3,225,307 in 2001 and 4,434,827 in 2011. This
implies a population growth rate of 37.5% between 2001 and 2011, while average population
growth for Metro Municipalities in South Africa over the same period was 21.4%. The population
of the City is currently projected to be 4,676,731 (see figure below) based on 3.1% growth rate
per annum since 2011. Population density in the city of Johannesburg (number of people per
km²) is 2 639.37 – which is relatively low compared to other cities such as Mumbai, Sao Paulo,
Lagos etc.
Figure: City of Johannesburg Population: 2001 -2013
Source: Constructed from Statistics South Africa Data, May 2013
The dependency ratio, which is a calculation of the total proportion of the population that is
either too young or too old to work, i.e. people younger than 20 and older than 64, is 37.2%.
This is below the average of 39.8% for Metro Municipalities in South Africa. The Sex Ratio
(Males per 100 females) is 100.7 implying that there are more males than females in City of
Johannesburg which is typical of a migrant City as more men come from various origins looking
for economic opportunities.
Age Distribution
The city’s population is predominantly young, concentrated in the working age group between
20 years and 39 years. This is also a migration phenomenon as people move from other parts
Estimate
13
of the country; particularly the young that are seeking employment. There is a greater
propensity for people to migrate to the City of Johannesburg as it is considered an economic
hub – the first choice of destination by job seekers across the country and region.
Figure 2: City of Johannesburg Population Pyramid
4.8%
3.6%
3.1%
3.6%
5.6%
6.2%
5.0%
4.0%
3.2%
2.7%
2.3%
1.8%
1.3%
0.8%
0.6%
0.4%
0.3%
0.2%
0.0%2.0%4.0%6.0%8.0%
Female
4.9%
3.6%
3.1%
3.5%
5.7%
6.7%
5.7%
4.5%
3.4%
2.6%
2.1%
1.6%
1.1%
0.7%
0.5%
0.3%
0.2%
0.1%
0.0% 2.0% 4.0% 6.0% 8.0%
00 - 04
05 - 09
10 - 14
15 - 19
20 - 24
25 - 29
30 - 34
35 - 39
40 - 44
45 - 49
50 - 54
55 - 59
60 - 64
65 - 69
70 - 74
75 - 79
80 - 84
85+ Male
Source: Constructed from Statistics South Africa Data, May 2013
Household Dynamics
The city had a total number of households of 1,006,910 in 2001 and 1,434,856 in 2011 (an
increase of 42.5% between 2001 and 2011). Due to the household’s growth rate of
approximately 3.7%, the total households in Johannesburg are projected to be currently
1,487,946. The average households’ size is approximately 2.8 in 2011 down from 3 in 2001 and
there are an estimated 36.2% female headed households.
City’s Socioeconomic Development
Johannesburg is the economic powerhouse of South Africa and generates 17% of the country's
gross domestic product, mostly through the manufacturing, retail and service industry sectors.
With all the major banks and Africa's largest stock exchange (the Johannesburg Stock
14
Exchange in Sandton) it is considered to be the seat of the financial sector in South Africa.
According to the global ranking of “Most Expensive Cities of the World” of 2013 (by Mercer, the
Swiss Bank UBS, the ECA International and the Intelligence Unit), City of Johannesburg is
ranked number 154 making it relatively least expensive out of a total of 209 cities surveyed. As
a result, it is a favourite destination for retailers from Sub-Saharan countries, particularly those
from South Africa's neighbours.
In Johannesburg the challenges of overcoming service and infrastructure backlogs, meeting
developmental goals and encouraging economic growth mean that new and creative
mechanisms are urgently required. As seen over the years, the city has experienced a rapid
growth in population from around 3 million in 2001 to an estimated 4.6 million today. Despite
notable progress in the City’s human development over the past ten years, high levels of
inequality are still a concern. This together with the high poverty rate (currently 24.7%) needs to
be tackled urgently through fast tracking transformation in the various development initiatives
undertaken by the City. While reduction of unemployment from 37% in 2001 is impressive,
unemployment is still very high at 25%. Of particular concern is youth unemployment which is
estimated at 32%. On the positive side, Johannesburg has seen good progress in education.
The proportion of the population with at least a matric has improved from 29% to 35% over the
ten year period and this is accompanied by a huge reduction of those with no schooling from
7.3% to 2.9%. There has been good progress towards achieving the Millennium Development
Goals (MDGs) in access to services, and the combined access to all four main services (water,
electricity, refuse collection and sanitation) is now 95%.
Income
The city’s income can be categorized as an upper-middle income economy in 2013. World Bank
defines upper-middle-income economies as those with average incomes of R39, 000 to R121,
000. Johannesburg’s GDP per capita at current prices is currently at R114, 000 (figures
converted as at 13 October 2013, courtesy of Panoramic Software, 2013). Johannesburg’s
category as an upper-middle income is recognition of economic achievements in the past
decade in which GDP per capita has almost doubled, while strides towards reducing poverty are
being made.
15
Economic outlook
The city of Johannesburg has a friendly business environment and has been successful in
attracting investments. De-concentrating the economy has however remained a challenge. The
dominance of trade and finance in Johannesburg arises from the central location in South
Africa’s geography, amongst other factors. This advantage can be contrasted to the lower
concentration in agriculture and mining which is largely driven by the lack of natural resources.
Thus, Johannesburg needs to continue boosting manufacturing production, in terms of higher
value-added production as well as expansion into new emerging neighbouring markets. In the
last decade, Johannesburg economy was one of the country's fastest growing regions at an
average rate of 6% per year. The GDP growth rebounded from the negative 1.7% in 2008 and is
forecasted to continue growing at an average of 3-5% in the short to medium term.
For Johannesburg to sustain its growth and avoid the middle income trap, it needs to pay
attention to de-concentrating the economy while raising the productivity of not only
manufacturing, but also the already strong services sector. Higher levels of education and skills
as well as creativity, innovation, and competition are necessary. These would not only promote
higher growth but also inclusive growth, which will help reduce the persistent high income
inequality in Johannesburg.
Employment outlook
Johannesburg also continues to fight unemployment, which is one of the major problems facing
South Africa as a whole. Overall, unemployment in the city is around 25% based on a narrow
definition. If the expanded definition is taken into account, unemployment in the City rises to
approximately 40%. Youth unemployment is of particular concern and is estimated to be around
32% (official definition). The finance sector is the biggest employer in the City accounting for
26.6% of total employment, followed by the trade sector which employs 21.1% of the formal
sector workers. The agricultural sector employs the smallest share of the formal sector workers
with only 0.4% (Global Insight, 2013).
16
Development indicators
Despite facing a number of economic challenges, Johannesburg has made great progress in
social and economic issues. As such, Johannesburg has been one of the great economic
development success stories, with sustained strong growth and impressive poverty reduction
over the past 10 years. Despite this, high levels of poverty are still a concern in the City, as
indicated by the latest statistics that 24.7% of people are still living below the poverty line. The
number of people living below the poverty line has gone down by 16.2% in the last decade.
The benefits of the city’s economic success have not been shared equally. Johannesburg has
had the highest level of inequality relative to other metros. The Gini coefficient, a measurement
of income inequality in Johannesburg is currently 0.63. This is however an improvement of 4%
over the last decade. What explains high inequality in Johannesburg? The city is regarded as
the economic engine of the country; it attracts people from different classes - people who have
high education levels, unskilled or uneducated persons seeking low income jobs, as well as
students who normally work part-time jobs for sustenance during their years of studying. Much
of the inequalities are inter-regional with Region F and Region A lagging behind other regions.
On the human development side, Johannesburg has done considerably well. Over the last
decade, the city experienced an 8.2% increase in the level of human development (currently
rated 0.74), and this can be attributed to improvements in living standards. This implies that as
people relocate to Johannesburg for better economic opportunities, they often start with low-
paying jobs and then develop themselves through education and skills development. Over time,
they will therefore experience higher levels of human development.
Towards the Millennium Development Goals (MDGs)
Johannesburg also continues to make progress towards meeting the Millennium Development
Goals (MDGs) and is likely to meet most of them on aggregate. To date, the number of
households with access to refuse collection increased by 4.5% since 2001 to 96.9%;
households that have access to piped water within at least a distance less than 200m from
dwelling is currently 96.7 % up from 91.2% in 2001; access to flush toilet facility increased by
4.8% since 2001; access to electricity for lighting is now 90.8% up from 85% in 2001 and the
17
combined aaverage access to all 4 main basic services is currently standing at 95%. The
challenge in delivering basic services has been high population growth in the city as well as high
unemployment which has a negative impact on people’s ability to pay for services provided.
Johannesburg has also made some strides towards eradicating informal settlements. Overall,
there was a notable reduction in the proportion living in informal dwellings by 2% since 2001.
This has been accompanied by an increase of 4.5% over the ten year period in the households
living in house or brick/concrete block structure on a separate stand or yard. Rental
accommodation is also increasingly becoming important in the city with rented accommodation
having increased by 9.5% since 2001.
Towards Joburg 2040
The City now has a strategy that charts the overarching direction to achieving higher
socioeconomic development. The strategy hinges upon collaboration with all stakeholders in
Johannesburg. The following endeavours will, as embedded in the strategy, lead the city
towards a sustainably high quality of life.
The City will focus on driving a caring, responsive, efficient and progressive developmental
approach, to enable it to reach full potential as integrated and vibrant spaces.
The City envisages a future that presents significantly improved human and social
development realities, through a targeted focus on poverty reduction and food security
development initiatives that enable self-sustainability, improved health and life expectancy,
and real social inclusivity. By 2040, the City aims to achieve substantially enhanced quality
of life for all.
The City plans to lead in the establishment of sustainable and eco-efficient infrastructure
solutions (e.g. housing, transport, energy, water, waste, sanitation and information and
communications technology), to create a landscape that is liveable, environmentally
resilient, sustainable, and supportive of low carbon economy initiatives
The City will focus on supporting the creation of an even-more competitive, ‘smart’ and
resilient economy, when measured in relation to national, continent and global performance.
The City will promote economic growth and sustainability through the meaningful
mobilisation of all who work and live here, and through collaborating with others to build job-
intensive long-term growth and prosperity, from which all can benefit
18
Overall satisfaction with service delivery
Satisfaction1 Survey undertaken
Subject
Matter of
survey
Survey method Survey
date
Sample
size
Survey
results
Comment
Overall satisfaction with
Municipalit
y
Quality of Life survey
using multi-stage
PPS sampling
approach
Aug –
Dec 2011
5826
respondent
s
6.32 The CoJ Quality of Life
(municipal satisfaction) of 6.32
was above the Gauteng City
Region (GCR) average of 6, 25.
GCR was in the midst of the
global economic crisis in 2009
but has weathered the storm
well, with overall (average) QoL
rising from 6.24 to 6.25
Municipal
Service
delivery
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.2 The household composite index
remained constant at 62 for
2011 and 2013. This reflects a
fairly high level of satisfaction
with overall service delivery
Satisfaction2 with:
Electricity Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.94 87.4% expressed satisfaction
with electricity. Overall, the
satisfaction levels regarding the
provision of electricity increased
from 6.61 in 2011 to 6.94 in
2013.
Refuse
collection
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.95 88.1% expressed satisfaction
with refuse collection. The
satisfaction levels for refuse
collection increased marginally
in 2011 to 7.70 and dropped to
6.95 in 2013. However
satisfaction is still very high
1 The service assessment model was designed to measure satisfaction ratings on a 10-point scale with 1 = extremely
low and 10 = extremely high.
19
Neighbour
hood
roads
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.46 82.1 % expressed satisfaction
with neighbourhood roads.
Results show a satisfaction
mean score of 6.46 for
neighbourhood roads in 2013 –
higher than the 2011 score of
5.93 in 2011. Satisfaction levels
increased across five of the CoJ
regions.
Sanitation
and waste
water
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.92 89% expressed satisfaction with
sanitation. Satisfaction is very
high in 2013. Sanitation and
waste water received a mean
score of 6.92 in 2013 – slightly
down from 6.97 in 2011.
Stormwat
er
drainage
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.71 85.9% expressed satisfaction
with stormwater. The
satisfaction level for stormwater
is still very high. The satisfaction
increased marginally to 6.71 in
2013.
Street/pub
lic lights
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.18 75.4% expressed satisfaction
with streetlights. Satisfaction
with street lights received a
mean score of 6.18 in 2013 – up
from 5.93 in 2011.
Water
provision
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
7.45 95.4% expressed satisfaction
with water provision. Results
reflects that satisfaction with
water provision showed the
highest satisfaction level of all
basic service types measured
(7.45) in 2013 with a slight
decrease from 7.49 measured in
2011.
Communi
cation
efficiency
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.70 Since 2007, CoJ communication
efficiency has shown an upward
trend remaining fairly constant
during the 2011 to 2013 period.
Billing
and
Representative
sample approach
February
2013
5000
households
7.10 Satisfaction with billing and
payment remained on a
20
payment whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
relatively high level – above 70.
Efficiency of dealing with
incorrect accounts recorded a
substantial increase from a
score of 43 in 2011 to 65 in
2013.
Communit
y services
Representative
sample approach
whereby the sample
sizes are allotted to
each ward in
proportion to
population numbers
February
2013
5000
households
6.40 Satisfaction levels with
community services remained
fairly constant around 64 for the
whole period.
21
3. Governance and institutional framework
The City’s Governance Model separates the Legislature from the Executive and is used as a
mechanism for oversight and scrutiny at a municipal level. The establishment of Council as a
“Local Council”, performing the function of a legislative assembly, has been critical for the
successful implementation of this model, as the ultimate authority to hold the Executive and the
Administration to account.
The Legislature
The core mandate of the Legislative Arm of Council is focused on five themes:
Accountability, Oversight and Scrutiny;
Strengthen capacity of the Legislative Arm of Council;
Public Participation to safeguard local democratic processes;
Monitoring and Evaluation; and
Sound Financial Management.
Legislative functions also include the approval of by-laws, policies, budgets, the Integrated
Development Plan, tariffs, rates and service charges. Council further considers reports received
from the Executive Mayor, focuses on public participation related to Council matters through
discussions, stimulates debate in multi-party portfolio committees, and ensures community and
stakeholder participation as well as playing an oversight role on the Executive.
An Oversight and Scrutiny Framework guides committees in terms of the oversight role they
play within the Legislature. Councillors also visit sites in person where projects, especially
service delivery projects are implemented, to perform their oversight function.
Oversight reports are submitted to Council on a quarterly basis for further processing. Other
measures include the use of questions by individual Councillors to hold the Executive to
account, as well as motions to ensure debate on Council issues.
22
Figure: The Structure of Council
The Speaker of Council
The Speaker, Councillor Constance (Conny) Bapela, is the Head of the Legislative Arm of
Council and plays a coordination and management role in relation to the Section 79 Standing
Committees. Other responsibilities of the Speaker, as legislated, include:
Presiding at meetings of the Council;
Performing the duties and exercising the powers delegated to the Speaker;
Ensuring that the Council meets at least quarterly;
Maintaining order during meetings;
Executive
Members of the Mayoral
Committee (MMCs)
Executive Mayor
Departments and entities
Leader of Executive Business
Speaker
Chairperson of Committees Chief Whip
Portfolio Committees 13
Standing Committees
Whips
Finance
Community Development
Economic Development
Dev Planning & Urban
Management
Housing
Health & Human Dev
Environment Infrastructure and Services
Transport
Public Safety
Corporate Services &
Administration
Rules Petitions and Public
Participation
Ethics Disciplinary
Municipal Public Accounts
Programming
13 Political Parties
GEYODI OCOL Governance
Legislative
23
Ensuring compliance with the Code of Conduct by Councillors; and
Ensuring that Council meetings are conducted in accordance with the rules and orders
of the Council.
The Secretary to Council
The Secretary to Council is the administrative head of the Office of the Speaker and reports
functionally to the Speaker of Council and administratively to the City Manager. The Secretary
to Council is responsible for leading and coordinating all functions relating to the Office of the
Speaker, Office of the Chief Whip of Council, Office of the Chair of Chairpersons, Office of the
Opposition and Office of Minority Parties.
Chairpersons of Section 79 Portfolio Committees
Section 79 Portfolio Committees perform an oversight role by monitoring the delivery and
outputs of the Executive. These committees do not have any delegated decision-making
powers. Functions include:
Reviewing, monitoring and evaluating departmental policies;
Reviewing and monitoring of city plans and budgets;
Considering quarterly and annual departmental reports;
Examining the links between the strategy, plans and budgets of the City; and
Holding the political Executive accountable for performance against policies and City
priorities.
Table: Chairpersons of Section 79 Portfolio Committees
Committee Chairperson
Chair of Chairs Clr Solly Mogase
Rules Committee Clr Jeanette Putsoa
Ethics/Disciplinary Committee Clr Zodwa Nxumalo
Housing Committee Clr Jacqui Lekgetho
Petitions and Public Participation Committee Clr Lebohang Tshabalala
Corporate and Shared Services Committee Clr Cathy Seefort
Environment, Infrastructure and Services Committee Clr Ursula Lichaba
Finance Committee Clr Boyce Gcabashe
24
Committee Chairperson
Transport Committee Clr Bafana Sithole
Economic Development Committee Clr Willie van der Schyf
Community Development Committee Clr Zerina Motala
Municipal Public Account Clr Sol Cowan
Heath and Social Development Committee Clr Gabriel Matlou
Public Safety Committee Clr Oupa Tolo
Development Planning Committee Clr Salphina Mulauzi
Governance Committee Clr Rosemary Thobejane-Ndoqo
Programming Committee Clr Conny Bapela
Gender, Youth and People with Disabilities Clr Francina Mashao
Oversight Committee on Legislature Clr Justice Ngalonkulu
The Standing Committees
Standing Committees have been established to deal with Council-related matters. These
committees have decision-making powers and are chaired by Councillors, with the exception of
the Audit Committee which is chaired by an independent person. This is in line with the
prescriptions of the Municipal Finance Management Act (MFMA)
The Chief Whip of Council
The Chief Whip, Councillor Prema Naidoo, plays a pivotal role in the overall system of
governance to sustain cohesiveness within the governing party and maintain relationships with
other political parties. The Chief Whip is required to:
Ensure proper representation of all political parties in the various committees;
Maintain sound relations with the various political parties represented in Council; and
Attend to disputes between political parties and build consensus.
The Executive
The Executive is made up of the Executive Mayor, Councillor Mpho Parks Tau, the Mayoral
Committee and the Leader of Executive Business.
25
The Executive Mayor, assisted by the Members of the Mayoral Committee, heads the Executive
arm of the City. The Mayor presides at meetings of the executive committee, performs
ceremonial functions, and exercises the powers delegated to the Mayor by the municipal council
or the executive committee. The Executive Mayor is also accountable for the strategic direction
of the City.
Each Member of the Mayoral Committee, as listed in the table below, is responsible for a
specific portfolio and is directly accountable to the Executive Mayor.
Table: Members of the Mayoral Committee
Portfolio Member of the Mayoral Committee
The Executive Mayor (Governance) Clr Mpho Parks Tau
Community Development Clr Chris Vondo
Health and Social Development Clr Nonceba Molwele
Corporate and Shared Services Clr Mally Mokoena
Environment, Infrastructure and Services Clr Matshidiso Mfikoe
Housing Clr Dan Bovu
Development Planning Clr Ross Greeff
Finance Clr Geoffrey Makhubo
Public Safety Clr Sello Lemao
Economic Development Clr Ruby Mathang
Transport Clr Christine Walters
The Leader of Executive Business
Councillor Geoffrey Makhubo is the Leader of Executive Business and provides the interface
between the executive and the legislative branches of the City. The roles and responsibilities of
the Leader of Executive Business are to:
Represent the executive branch on of Council matters and serve as a link between the
executive branch and the legislative branch;
Ensure that the executive business is effectively delegated to Council, via the
Programming Committee;
Consult with the Speaker when the Speaker intends calling a special meeting of Council,
outside the scheduled Council meetings;
26
Consult with the Speaker for purposes of allocating time for discussion of matters of
public importance on the Council Agenda; and
Determine which matters are referred to the Speaker and thereafter to Section 79
Portfolio Committees and Council.
The clusters
The cluster approach adopted by the City in the previous financial year aims to coordinate the
City’s programmes around the four outcomes outlined in the Joburg 2040 Strategy. The
Clusters for Human and Social Development, Economic Growth, Sustainable Services and
Governance, are chaired by Members of the Mayoral Committee and provide political
leadership, guidance and oversight in the implementation of the City’s Priority Implementation
Plans.
The Clusters are configured as such:
Cluster Department and Entity
Sustainable services Environment and infrastructure services department
Joburg Water
City Power
PIKITUP
Housing department
JOSHCO
Economic growth Economic Development department
Johannesburg Property Company
Joburg Market
Transportation department
Johannesburg Roads Agency
Metrobus
Development Planning department
Johannesburg Development Agency
Human and social
development
Social development department
Community development department
27
City Parks and Zoo
Joburg City Theatres
Health department
Public Safety
Governance Group Corporate and Shared Services
Office of the Speaker: Legislature
Office of the Mayor/City Manager
Group Finance
Institutional Review
The Institutional Review process of a municipality is guided by the Municipal Systems Act, the
Municipal Structures Act and well as the Municipal Finance Management Act. The frameworks
provided by these Acts clearly define the roles and responsibilities of the City Manager and how
to appoint and manage Section 57 employees.
The Institutional Review in the City of Johannesburg began in 2011 and primarily focused on the
development and operationalization of the high-level design of the City aligned to the Joburg
2040 Strategy. This initiated a restructuring process in some entities and departments. The final
phase focused on the organisational structures for levels 5 to 11.
Finally, amendments to the Municipal Systems Act that came into effect on 1 July 2012 have
prompted the City to end the Fixed Term Contract Employment regime on all levels except
Section 57 positions and some positions in Political Offices.
Employment Equity (EE)
The City has adopted the Statistics South Africa (StatsSA) targets for the Economically Active
Population (EAP) of Gauteng: 78% for Africans, 4% for Coloureds, 2% for Indians and 16% for
28
Whites. The gender split target is 50:50 and the target for People with Disabilities (PWDs) is
2%. The City has developed an Employment Equity Plan for the period 2011 to 2016 which
includes these numerical targets.
Talent Management
Talent management has been identified as a key area of focus for the City. The draft Talent
Management Framework has been developed and will serve as a guide in the implementation of
talent management in the City. The implementation of talent management forms the basis of
succession planning and the City’s retention strategy.
Retention of Staff
The City utilises various mechanisms to retain employees such as flexible working hour
arrangements, access to training and development programmes, subsidised education
programmes, fair and transparent human resources policies and employee representation.
These mechanisms are described in the Training and Development Policy, Succession Planning
Framework, Employment Equity Policy, Disability Management Policy, Career Development
Policy and Flexitime Policy.
Recruitment and Filling of Critical Positions
The filling of any vacancies is preceded by an assessment process executed by the “Staffing
Vacancy Task Team”. The task team was established to manage and control the employee
numbers in response to the City’s requirement to reduce employee cost amid the City’s re-
organisation and the ex-Fixed Term Contract (ex-FTC) placement processes.
Furthermore the City has made R30 million available for the filling of strategic and critical
positions. For this purpose a high level Strategic Staffing Panel has been established to
evaluate the need and allocate the funds accordingly.
Structure of CoJ
29
The Administration
The City Manager
Mr Trevor Fowler is the City Manager appointed by the Council in terms of Section 82 of the
Municipal Structures Act, and is designated as the Accounting Officer and the Administrative
Head of the City. He is also the Chief Information Officer of the City and is responsible for the
management of the Promotion of Access to Information Act (PAIA) requirements.
The responsibilities of the City Manager include managing financial affairs and service delivery
in the municipality. The City Manager is assisted by the Chief Operations Officer and the various
30
Group Executive Directors and Group Heads as well as the Heads of the core city
Departments.
The Chief Operations Officer
The Chief Operations Officer, Mr Gerald Dumas, reports directly to the City Manager. The
primary role of the Chief Operations Officer is to ensure services are delivered to the customers
and residents of the City. This must be done in a customer centric, transformative, sustainable
and resilient manner so as to ensure improvement in the quality of life of the residents of the
City. The Chief Operations Officer (COO) manages all the operational, or core, departments of
the City through the City’s Delegations of Power. The COO is also responsible for the City’s
Engineering Centre of Excellence and is one of the Deputy Chief Information Officers (CIO).
The Chief Executive Officers and Managing Directors of the 11 Municipal Entities also form a
key part of the City’s management.
The Group functions
31
The role of the Group functions is to ensure alignment and consistency in the strategic approach
and implementation of the respective discipline across the entire CoJ group, both core
departments and municipal entities. However, this is done in a manner which provides the
required flexibility within the system to meet the specific needs of the municipal entities. The
CoJ Group functions are:
Group Strategy, Policy Coordination and Relations
Group Finance
Group Corporate and Shared Services
Group Communications and Tourism
Group Legal and Contracts
Group Governance
Group Risk Assurance Services
Group Audit
Citizen Relationship and Urban Management
32
The Line functions
The role of the line functions in the City is to ensure that the operations of the City are executed.
The CoJ Line functions are:
Health
Social Development
Community Development
Public Safety (JMPD and EMS)
Housing
Transportation
Environment and Infrastructure Services
Economic Development
Development Planning
33
4. Delivering on Joburg 2040 Strategy
GDS ROADMAP
The Roadmap in the Context of the GDS
The role of city strategies is to build continuity amidst uncertainty. While challenges emerge so to do
opportunities, however, to achieve sustainability cities must mediate the tensions between economic
growth, human development and natural resource security. Economic growth must be inclusive and not
generate jobless growth, able to absorb a range of skills levels and absorb migrants into the economy of
cities. Economic growth must be decoupled from natural resource use as cities move towards low
carbon economies. Human development-improving the health and well-being of people must not
impact negatively on the natural environment. These basic sustainability outcomes are the focus of most
city strategies. Working towards a sustainable growth path is in the interests of all cities, but the
sustainable outcomes; economic growth, human development and natural resource security create
tensions that have to be mediated. Cities must use available know how- building intergovernmental
partnerships, deepening participation in communities, legislation and regulation are needed to mediate
these tensions.
The City’s approved 2011 Joburg 2040 Growth and Development Strategy aims to respond to
unpredictability by setting a clear pathway towards implementation. But dealing with unpredictability,
change and continuity is not simply a technical process. Understanding change is also about a social
dialogue. Social dynamics are nuanced, quick changing and complex and can only be understood
through on-going and regular dialogue. Public dialogue, getting closer to communities builds intelligence
from the bottom up and is an important part of the city strategy process. Joburg 2040 has been an
important tool to begin this social dialogue - considering the things that matter most to citizens.
This GDS Roadmap responds to its time, keeping with the tradition of previous strategies developed in
the City. This is to say that we are keeping with the practice of updating and responding to rapid change
and shifts in the global, national and local contexts and building it into a long-term thinking model that is
incrementally shaped over time. The GDS has elevated the ‘concept’ of sustainability in the context of
jobless growth, natural resource scarcity and improving the quality of our citizens citizens and good
governance. The role of this roadmap is to deepen our understanding of multiple challenges facing the
city in particular the challenge for sustainable growth.
The role of this Joburg 2040 GDS Roadmap is to enhance the set of sustainability outcomes that give
meaning and implementation force to the vision contained, and to solidify and crystallize action around
the best approach to executing delivery on this strategy.
The purpose of the roadmap
34
The GDS Roadmap is a management tool that illustrates the critical steps to guide the implementation of
the City’s Growth and Development Strategy. It allows for strategic choices to be made with a pre-
determined route in place. The Roadmap intends to make implementation of the GDS flexible and
scalable, reflecting the degree of urgency, complexity, innovation and sensitivity associated with long-
term policy measures expressed in the GDS.
It is important because it allows for two important aspects:
1. Allows for anticipation of challenges
a. Critical steps detailed in advance
2. Common understanding among staff
a. Regardless of level of involvement or development, everyone understands the intention of
the strategy
b. Identify and resolve difficulties before they become costly/unmanageable
The roadmapping process tends towards a cross-functional planning team to fully examine potential
competitive strategies and ways to implement those strategies as seen in the diagram below.
-
Objectives of the GDS Roadmap
To align decisions with national and provincial government, including an agreed methodology
for business case development and other assessment tools for infrastructure and other
investment
To find better solutions of achieving shared outcomes with delivery partners
To provide more efficient delivery of actions under the direct influence of the City of Joburg
35
To facilitate investments occurring around current city transformation and other legacy projects
which accommodate growth and facilitate redevelopment
To provide a range of mechanisms to achieve urban re/development in line with the GDS
To allows decision making on new funding and investment tools to deliver the GDS
To develop new policies approaches anthat seek to use existing tools more efficiently,
particularly in the early years/ Term of Office period
To allow for better approaches to share information with delivery partners.
Towards achieving our Outcomes
To achieve these outcomes every decade will define the emphasis. Preparatory work and detailed
planning and implementation have already taken place since the launch of Joburg 2040 GDS. The
proposed GDS Roadmap Framework is indicated below:
36
In decade 1 the 2040 process will be initiated. We begin by building on the solid foundation of previous
administration which created considerable political stability and oversight and ensured that the City was
managed effectively and maintained adequate levels of services. But in this decade the organisation
gears itself for thinking and conceptualising a very different role and function for itself. The first year
term of office will OPTIMISE ‘getting the basics right’ improving overall service delivery excellence and
working to improve budgeting for infrastructure planning and operations. The infrastructure network
would be improved and maintained ensuring high levels of service.
However the city will embark of key plans for transformation. This would involve defining a new role for
the city in terms of waste management away from management and processing toward business
recycling and growing its recycling economy. The city would conceptualise its role away from passive
distributor of electricity to active co-partner in generation and energy efficiency. Water resources will be
DECADE 1 10 Priorities Optimise service delivery 5 Fundamental Rights to the City Economic Transformation Restructuring the Apartheid City
DECADE 3 Sustainable City Resilience City Liveable City
DECADE 2 Established next generation of energy infrastructure Diversified and accessible economy Scale up innovation, mobility & integration
2040 Decade 1 Decade 2 Decade 3
fundamentals
10yr review 5yr IDP review
5yr IDP
GDS 5YR TRENDS & INDICATOR TRACK
2011
GDS OUTCOMES & OUTPUTS
2016 (IDP)
37
conserved making use of technology and behavioural change strategies to optimise the current water
management system. The city will develop plans and change existing business models moving the city
from the role of passive distributor and manager to active producer, co-manager and coordinator of
generation and conservation. This decade begins with planning for a new energy future and defining a
new energy mix for the city.
We will also lay the foundation for a smart city, using technology and systems to improve service
efficiencies and optimise management of scarce resources. This will entail and internal assessment of
the City’s current ‘smartness’ and develop simple innovation systems and technologies to improve
functioning and overall efficiencies of the institution. Smartness will not be defined only in terms of
technology, the city will embark on recruiting a ‘smart workforce’ building important strategic capacities
and strong work ethnic required to the transform the City.
We begin consolidating spatial plans for the city in 2040. The long term spatial plan will be developed in
an integrated manner. These plans will define the future of the city and articulate a precise, mechanistic
and actionable plan for transforming the Apartheid city into an integrated and spatially just city.
We will achieve financial sustainability- diversifying the revenue base, minimising funding gaps, building
considerable internal reserves. Redefining the city’s role regarding energy production and consumption
would be a central feature of achieving sustainability.
We will also carve a role in the education sector focusing on life long learning and support to schools
from Early Childhood Development through to university education and professional development.
Libraries are defined as key strategic assets for building a culture of social learning and supporting
school based curriculum’s. Related to workforce development the city will become an active enabler of
economic development by; linking skills with demand, building significant research intelligence and
growing networks between business, training colleges, academic institutions and civil society
organisations. The city will get closer to the second economy and support existing entrepreneurs in this
economy. The city will define its role in the green economy and support important creative economy
sectors.
The city will scale up infrastructure development during a decade of sound financial management. The
next generation of energy efficient infrastructure will be built and the city will make considerable
investment in ‘green infrastructure’. The green economy at this stage will be scaled up and the
workforce would be engaged and fully participative in this economy.
We will work continuously to build financial sustainability and create opportunities for financial
innovation further diversifying our revenue base and scaling up investments with positive returns. The
City’s financial position will allow greater investments in infrastructure for economic growth.
The city will scale up its transportation investments according to the Integrated Transport Plan,
introduce and develop new routes and make considerable investments in its multi-modal transport
system. More than half of the city will be integrated through a series a spatial reconfiguration projects
developed and conceptualised as part of the 2040 Spatial Plan.
38
A well developed and productive workforce committed to public service and supported by a host of
higher education institutions that supply necessary skills to the demands of firms and employers. The
City will have workable and on going partnerships with chambers of business and key role players in the
economy. City-wide our society will be made up of a highly developed and productive workforce,
working closely with all partners; labour, academic institutions, colleges, schools to ensure that the best
talent is recruited and that everyone contributes to building a productive CoJ workforce.
After the first decade the city will show considerable progress towards transforming the Apartheid City
into an integrated and spatially just city with public space use to integrate communities across racial and
class lines.
At the end of three decades we realise and consolidate important work undertaken. This involves a
comprehensive assessment of progress against key targets and milestones. On-going progress tracking
will ensure that the city realises its targets. The long term goals will be achieved and the next phase of
long term strategy planning will commence. The goals of a more sustainable city would have been
achieved, fully integrated and function and the City will be financially resilient. Importantly we would
have made considerable progress in realising the 2040 Vision.
Providing Context to the City’s Roadmap and Prioritization (Alignment)
The City developed its long-term strategy, the Joburg 2040 GDS, with due consideration of other plans
and priorities identified within the South African context. These include, amongst others, the National
Planning Commission’s (NPC’s) National Development Plan (NDP) – launched in November 2011 and
revised in August 2012. The NDP sets out a vision for South Africa for 2030. The Gauteng Provincial
Government (GPG) has also embarked on a planning process relating to ‘Gauteng 2055’ – a vision for
2055 for the wider Gauteng City-Region (GCR). The Gauteng 2055 plan will be finalised in 2014, and will
build on a preliminary discussion document, published in May 2012.
In addition, the CoJ’s sister metropolitan municipalities, Ekurhuleni and Tshwane, have completed and
are currently undertaking long-term planning that focuses on 2055, with both of these long-term GDS
documents to be released shortly. It is useful to note that in each case, a logic has been proposed in
terms of the planning period (e.g. 2030, 2040 and 2055). Instead of being overly concerned about the
end dates of each plan, emphasis should be placed on issues of ‘idea alignment’ across the spheres of
government, alongside the need to acknowledge the specificities of each unique space.
The revised NDP launched in August 2012 draws on the insights of the Diagnostic and subsequent
engagement, identifying two overarching objectives for 2030: eliminating income poverty, and reducing
inequality. Six priorities are identified:
Uniting all South Africans around a common programme to achieve prosperity and equity;
Promoting active citizenry to strengthen development, democracy and accountability;
Bringing about faster economic growth, higher investment and greater labour absorption;
39
Focusing on key capabilities of people and the state;
Building a capable and developmental state; and
Encouraging strong leadership throughout society to work together to solve problems.
The figure below provides a graphic depiction of the NDP’s ‘cycle of development’ – depicting the key
considerations viewed as critical in taking South Africa towards a more inclusive, equitable and
prosperous 2030.
Figure xx: The NDP’s envisaged ‘cycle of development’
In addition to national planning processes underway, GPG has established some preliminary views on
the ‘strategic pathways’ to 2055 – depicting an acknowledgment of the status quo within the GCR, and
the envisaged future, within the context of four central ideals: equitable growth, social inclusivity and
cohesion, sustainable development and infrastructure, and good governance. These are depicted in the
figure below. The process for refinement and further planning in this respect is one in which all
municipalities, including the City, will be part.
40
Figure 2: Overview of Gauteng 2055 Vision – in the context of the 2014 National Outcomes (source:
Draft Gauteng Vision 2055, 24 February 2014)
The above serve as inputs into the City’s prioritisation process, as it plans for the period ahead. In
addition to the above, a critical input when identifying priorities and commitments for Decade Three,
Decade One and the current Term of Office is the CoJ’s GDS itself. This has served as the foundation for
the cluster system, with the GDS paradigm, as reflected below, setting out the foundation of the City’s
thinking – and the alignment of priorities with an envisaged future Johannesburg that is liveable,
resilient and sustainable.
In addition to focusing on alignment with an array of plans, as outlined above, the the importance of
ensuring application of the outcomes approach, as defined by the Department of Performance
Monitoring and Evaluation (DPME) has been emphasised. The City has chosen to adopt the outcomes
approach (i.e. the methodology that involves the cascading impacts, outcomes, outputs, activities and
inputs, driving alignment in planning and M&E). The City’s thinking in respect of long-term and medium-
term priorities, and the identification of commitments associated with the current Term of Office, is
therefore aligned with this approach. As such, there is a need for all clusters to ensure rigour in
cascading outcomes, when identifying the Decade Three, Two and Decade One priorities, and the set of
commitments for the current period. The figure below provides an overview of the outcomes approach,
and the respective levels of delivery.
41
Figure 3: The outcomes approach to planning, monitoring and evaluation
It is acknowledged by the City that focus during the development of the first IDP has largely been placed
on the current five-year Term of Office, and attempts to address the long-term perspective, and
ensuring alignment through each successive period of planning – down to the current term.
Linking the Roadmap to the Priorities
Priority setting as a process has to be done in stages to give consideration to the ‘building blocks’ that
will be used as long term implementation is realised. Priority setting, therefore, from a complex set of
interrelated groups of decisions, all aimed at identifying:
What are the areas/issues to focus on?
What are the needs and priorities of each particular service, outcome or condition?
What is the next investment/disinvestment decisions that should be made?
In order to prioritize, 4 principles come to mind:
1. Impact
2. Significance
3. Risk
4. Resources
42
While the priorities span across a range of City activities, they provide a sense of focus and urgency. The priority
areas give a focus for direction of effort in the early years of implementation, but do not preclude planning and
investment in other areas; it will continue, provided it is in keeping with the Growth and Development Strategy.
They were identified through a rigorous process of assignment and allotment of resources, taking into account
the previous attempts at developing a Roadmap. This meant that a number of gaps became evident in the
choice of Priorities i.e. limited emphasis is placed on social issues and issues affecting quality of life. Emphasis
has now been placed on refining the direction for all priorities, in the context of the current financial year, and
the remaining periods leading to the end of the term of office.
Intentions of the City’s Priorities
1. Financial sustainability and resilience: The intention is to ensure that finances are at all times
sustained so that the city has the resilience to recover easily and immediately from unexpected,
unfavourable occurrences that may have a severe impact on the city's operations
2. Agriculture and food security: The aim is to address poverty and income inequality by focussing
on poor and vulnerable groups in society.
43
3. Sustainable human settlements: The key objective is to address spatial inequality and create
the material conditions for economic growth with an emphasis on strengthening the inclusive
nature of entrepreneurial, middle, working class and marginalised economic activity.
4. SMME and entrepreneurial support: The goal is to address poverty and facilitating
interventions which will optimise the development of the entrepreneurial and middle classes.
5. Engaged active citizenry: The intention is to ensure that citizens of Johannesburg take an active
role in the communities and participate as involved members of society.
6. Resource sustainability: Economic growth is inter-related with the demand for water,
electricity, liquid fuel and mining. Managing limited natural resources as well as the
consequences of using these natural resources is important.
7. Smart city: Building a smart city will result in economic development and job creation, providing
a great place to live and work and using digital technologies for better connectivity and
improved service delivery.
8. Investment attraction, retention and expansion: The aim is to recruit investment into the city
and promoting Joburg as a world class business destination of choice.
9. Green economy: The goal is to create economic opportunities from more sustainable and green
services such as producing bio-ethanol, manufacturing sola geysers and provision of public
transport.
10. Safer cities: The intention is to create a safe and secure city that builds and empowers
communities.
44
GDS Roadmap Annexure:
Decades 1-3 and Term of Office Deliverables
OUTCOME 1: IMPROVED QUALITY OF LIFE AND DEVELOPMENT-DRIVEN RESILIENCE FOR ALL
OUTPUT 1: Reduce poverty and dependency
OUTPUT 2: Food security that is both improved and safeguarded (PRIORITY)
OUTPUT 3: Increased literacy, skills and lifelong learning amongst all our citizens
OUTPUT 4: Substantially reduced HIV prevalence and non-communicable diseases – and a
society characterised by healthy living for all
OUTPUT 5: A safe and secure city (PRIORITY)
OUTPUT 6: A city characterised by social inclusivity and enhanced social cohesion
GDS Indicator
Baseline (2010)
Targets
2020 2030 2040
Human & Social Development
HDI 0,66 (medium) 0,70 – 0,79 (high) >0,8 (very high) >0,9 (very high)
Poverty rate 20,9% <15% <10% <5%
Gini-coefficient 0,62 <0,60 <0,50 <0,40
HIV/AIDS prevalence
HIV antenatal women
29,6
10%
5%
<5%
Food security
Severely inadequate
access
Inadequate access
Adequate access
4,7%
12,9%
82,4%
0%
<5%
>95%
0%
0%
100%
0%
0%
100%
45
Public Safety Perception Index 56 70 >80 >80
Public Safety Index To be determined To be determined To be determined To be
determined
OUTCOME 1: IMPROVED QUALITY OF LIFE AND DEVELOPMENT-DRIVEN RESILIENCE FOR ALL
OUTPUT 1: Reduce poverty and dependency
DECADE 1 – OUTCOMES - BY 2020 • Create systems for citizens to address
their own development and self-
sustainability e.g. DSDM
• 100 % coverage and delivery of all basic
infrastructure
• Single window services – increase
registration rate & sustainable job
placements under exit strategy
• Integrated social support database (all
spheres of government)
• Proactive increased investment in
deprived wards/ areas in city
• Eliminate social, economic and cultural
barriers to integration
TERM OF OFFICE DELIVERABLES - BY 2016: • 200 000 beneficiaries receiving social support
(ESP) & 50% placed in sustainable jobs –
social support impact report
• Transformative and proactive ESP strategy for
long term with Outcomes aimed at reduced
dependency on City services
• Integrated human development approach
coordinated across all spheres of government
prioritization of resources and programmatic
effort,.
• Transform and uplift all areas identified as
falling within the most deprived 50 % of the
City
• DSDM implementation of key strategic
projects/ programmes
• Cooperatives empowered to provide goods
and services to the CoJ linked to DSDM
OUTPUT 2: Food security that is both improved and safeguarded
DECADE 1 – OUTCOMES - BY 2020
• Increased subsidies and improved distribution of
food support to vulnerable beneficiaries
• Eliminate child hunger linked to ECD approach
• Facilitate alternative markets e.g. bringing farmers
directly to sell to consumers – eliminate the
middlemen value chain
• Facilitate household food production & food
gardens (water harvesting/recycled water)
• Fully functional Agri-Resource Centres citywide,
with Agri-Apprenticeship programmes supporting
communities, schools, and micro-farmers at all
levels
• 80% compliance with minimum standards in retail
TERM OF OFFICE DELIVERABLES - BY 2016: • Food security implementation strategy with
impact of implementation
• Increased food security access for at least 20
% of the estimated food insecure individuals
in the most deprived wards – 50 901
individuals in 17 551 households
• Facilitate urban agriculture to support access
and affordability to food
• Rating, classification and regulation of all
food outlets
• Support and educate targeted households in
own food production
• Facilitate and mobilize NGO sector to be
active in food security and safety networks
• Agri-resource centres and processing hubs
46
OUTPUT 3: Increased literacy, skills and lifelong learning amongst all our citizens
DECADE 1 – OUTCOMES - BY 2020 • Universal access for all children to registered
ECD facilities (Grade 0 & R)
• PAIL at all libraries with strategic emphasis
on learning and literacy
• Facilitate smart e-learning linked to academic
institutions at most vulnerable schools
(secondary)
• Facilitate greater access to e-learning
opportunities across all sectors
• Facilitate STEM related programmes at
vulnerable education institutions
• Achieve 100 % internet access in schools
• Promote and enhance City/business spend on
R&D with Outcomes linked to GDS
• Support research initiatives of local
universities
TERM OF OFFICE DELIVERABLES - BY 2016: • Implement skills development plan and
improve labour market access, especially youth
• Number of community members trained on
basic IT/information literacy through the
implementation of the eLearning strategy
• Number of people accessing eWorld through
implementing the eLearning Strategy
• Develop community communication portals
for information, jobs and career opportunitie
• PAIL at all public libraries
• Target e-learning at vulnerable schools
• Internet access at all vulnerable schools
• Maths/Science programmes at all vulnerable
schools
• Strategic utilisation of social infrastructure to
educate and develop community capacity
• Use catalytic projects to mobilise communities
and promote volunteerism
• R&D index – public sector spend per capita
(check international benchmarks i.e. 1% of CoJ
budget spend on relevant training and
education of staff)
OUTPUT 4: Substantially reduced HIV prevalence and non-communicable diseases – and a society
characterised by healthy living for all
DECADE 1 – OUTCOMES - BY 2020 • HIV prevalence rate (antenatal women) –
10%; Increase no of HIV positive people
(including children) on ART
• Eliminate mother-to-child transmission
of HIV
• No patients with MDR-TB
• Reduce infant & child mortality rate
through healthy lifestyles, nutrition and
food security
• Mass-education approaches to prevention
of HIV, Aids, TB
• Increase psychosocial support services
• 100% immunization coverage
• Integrated intergovernmental health
systems
• Free access to public fitness/activity
facilities
• Aggressively address alcohol and
TERM OF OFFICE DELIVERABLES - BY 2016: • Focus on PHC including health posts and teams
at ward level / contribute to Province’s Health
turn-around strategy (TAS) – prioritise – TAS
linked to 10-point plan; also includes quality
improvement plans
• HIV prevalence rate (antenatal women) – 20%
• No vector control hotspots
• Substance abuse & high risk lifestyle
programmes at all schools – stimulate
behavioural change
• 100% of clinics provide comprehensive PHC
package & ART
• COPC sites in all wards
• Healthy Lifestyles programme & Preventative
Health Impact Assessment linked to food
security initiatives
• Smart Health Strategy & Implementation Plan
• Establish CoJ Substance Abuse Treatment Centre
47
OUTPUT 5: A Safe and secure city
DECADE 1 – OUTCOMES - BY 2020
• Maintain and advance integrated command
centre and ensure multidisciplinary
approaches to crime prevention
• Community mobilisation and organisation re
community safety
• Work in partnership to address determinants
of crime i.e. youth unemployment, alcohol
abuse, drug abuse - Social cohesion strategy
linked to youth mobilization (addressing
youth unemployment)
• Strategic public/Private safety partnerships
• Reduced incidence of social crime
• Reduce sexual and physical violence against
men and women
• Extend substance abuse campaign and
combat the use the drugs, alcohol and
reckless behaviour
• Build community capacity to build safe
communities
• Maintain integrated and multidisciplinary
Safer cities approach
TERM OF OFFICE DELIVERABLES - BY 2016: • Roll out of the consolidated city safety
strategy and implementation plan, as a
multidiciplinary approach to city safety
• Establish an integrated command centre,
taking advantage of the City’s own
infrastructure
• Re-orientate crime prevention to take into
account urban design, policing and
community partnerships
• Implement a community based crime
prevention approach, inclusive of community
structures – with full roll out of the Joburg 10
Plus Programme to its logical conclusion.
• Support to youth and children in conflict with
the law (diversion programmes, secure care
centres, home-based supervision)
• Establish safe places/shelters for abused
women
• Modernize approaches to urban management
and its linkage to crime prevention (design out
crime)
• Secure and protected public space
environments after hours
• Build moderninzed and capacitated police
force
OUTPUT 6: A city characterised by social inclusivity and enhanced social cohesion
DECADE 1 – OUTCOMES - BY 2020
• Enhance nation building and citizen identity
through creating mechanisms for
acceptance and tolerance
• Establish roots for new social compact
between citizens and society through
DSDM and other linked activities
• Anti-xenophobia strategy realized outcomes
• Diversity awareness & tolerance created
and realized spatially through monuments,
museums, heritage, place names, special
days
• Promote citizen participation, involvement
& volunteerism
• Using sport, recreation, arts and culture to
enhance greater social cohesion
• Dialogue opportunities in deprived
communities
• Create value based system and advance
knowledge through building community
TERM OF OFFICE DELIVERABLES - BY 2016: • Number of sport, recreation, arts and culture
events/programmes to promote social cohesion
• Develop and create public spaces for social
cohesion linked to long-term spatial approach
• Upscale Anti xenophobia and citizenship
education, awareness and initiatives
• Develop and support emerging artists - Number
of artists developed and supported
• Number of communities supported in Film
Development/related value chain careers
• Number of arts programmes/projects offered
through partners
• Maintain ongoing social dialogue forums in
communities
• Develop volunteerism and active citizen
programmes
• Develop nation building and citizen identity
programmes
48
OUTCOME 2: PROVIDE A RESILIENT, LIVEABLE, SUSTAINABLE URBAN ENVIRONMENT – UNDERPINNED BY INFRASTRUCTURE SUPPORTIVE OF A LOW-CARBON ECONOMY OUTPUT 1: Sustainable and integrated delivery of water, sanitation, energy and waste
OUTPUT 2: Eco Mobility
OUTPUT 3: Sustainable Human Settlements (SPATIAL and HOUSING)
OUTPUT 4: Climate change resilience and environmental protection
GDS Indicator
Baseline (2010)
Targets
2020 2030 2040
Sustainable Services
Ecological footprint None – To be
established
Annual update of State
of Environment
To be determined
Annual update of
State of
Environment
To be determined
Annual update of State
of Environment
To be determined
% share of clean energy
utilized in the city
None – To be
established
Annual update of State
of Energy Report
% clean energy to be
determined
% coal and firewood
usage (HHs)
Annual update of
State of Energy
Report
% clean energy to be
determined
% coal and firewood
usage (HHs)
Annual update of State
of Energy Report
% clean energy to be
determined
% coal and firewood
usage (HHs)
% unaccounted for
water
38% <20% International benchmark International
benchmark
% water reclaimed None To be determined To be determined To be determined
% waste to landfill as a
proportion of waste
generated
1 035 457 tonnes
waste to landfill
Reduce by more than
50%
Zero waste to landfill Zero waste to landfill
% of energy share
utilized from waste
None To be determined To be determined To be determined
Revenue from waste
generated
None To be determined To be determined To be determined
Urban Decay Index 41.57 (transitional) Fixed (– )or better Fixed (– )or better Fixed (– )or better
Modal shift from private
(car driver/ passenger)
to public (train, bus)
transport
57% private: 53%
public (ITP 2008)
40% private: 60% public 35% private : 65% public 30% private : 70%
public
49
OUTCOME 2: PROVIDE A RESILIENT, LIVEABLE, SUSTAINABLE URBAN ENVIRONMENT – UNDERPINNED BY INFRASTRUCTURE SUPPORTIVE OF A LOW-CARBON ECONOMY
OUTPUT 1: Sustainable and integrated delivery of water, sanitation, energy and waste (WASTE)
DECADE 1 – OUTCOMES - BY 2020
• Zero waste to landfills by:
• Increase waste recycling rate
• Maintaining separation at source
and reducing waste disposal
• Optimise Rand value generated
from waste aligned to job creation
and urban management practices
(link to DSDM)
• Enforce new waste management practices
• Continue to generate energy from waste
to landfill sites through increased
production
TERM OF OFFICE DELIVERABLES - BY 2016: • Achieve city-wide separation at source
(households, firms, business) – plastics; paper;
glass; organics; metals
• Education and awareness programmes targeted to
stimulate behavioral change
• Regulate Waste pickers system linked to informal
economy and DSDM approaches
• Redevelop operating model and SLAs with
paper/glass recyclers and create a new revenue
source operational from these waste streams
• Operationalise energy from waste at 2 landfill
sites and report on % energy generated
• Establish and implement new waste by-laws
• Implement and reduce new fleet and technological
requirements
• A reduction in waste to landfill by 70%
OUTPUT 1: Sustainable and integrated delivery of water, sanitation, energy and waste (WATER)
DECADE 1 – OUTCOMES -BY 2020 • 100% access to water
• Blue drop status maintained
• Optimal utilization of acid mine water
• Reduce universal free access to water
• 50% new developments to be water harvesting
compliant
• Reduce unaccounted for water to below 15%
• Enhance the scope for water recycling
• Demand side management balanced with
secure water supply
TERM OF OFFICE DELIVERABLES - BY 2016 • 100 % access to water at household level
• The reduction of unaccounted for water
to less than 25% requires refurbishment
of infrastructure and introduction of
smart metering
• Maintain the blue drop status
• Utilization of acid mine drainage as an
alternative potable source of water – in
conjunction with IGR partners
• Regional integrated water management
with MOUs to be established and
operationalized
• Initiate new approaches to water security
e.g. 25% new developments to be water
harvesting compliant requires by-law
revisions etc.
• Stimulate behavioural change and
awareness through creating a culture of a
water-wise and water efficient society
50
OUTPUT 1: Sustainable and integrated delivery of water, sanitation, energy and waste (SANITATION)
DECADE 1 – OUTCOMES • Maintain green drop status
• 50% of new developments to make provisions
for grey water usage
• Increase access to sanitation in households
100%
• Increase water recycling to above 20%
• Bucket system eradicated
TERM OF OFFICE DELIVERABLES 2016 • Eradicate bucket system completely
• Maintain/improve green drop status
• Increasing access to sanitation in
households to above 90%
• Increasing water recycling to 10%
• Consider innovative approach/provisions
for grey water use/re-use/reticulation
OUTPUT 1: Sustainable and integrated delivery of water, sanitation, energy and waste (ENERGY)
DECADE 1 – OUTCOMES • 10 % mix of renewables - Growing diversity in
the mix of energy services
• Introduction of smart approaches to energy
systems
• Optimize the production of natural gas
• Electricity pricing and access decisions made in
favour of the poor
• Demand Side Management to yield benefits in
terms of energy security and minimal losses
• Create a greater role for local green
manufacturing
• Link to green economy:
• Established solar panel and components
industry
• Functional bio-mass plant
• Solar farms on mine dumps
• Functional bio-fuel plant
TERM OF OFFICE DELIVERABLES 2016 • % energy mix - Renewables – solar
systems/gas
• % Energy generated from from waste
• Smart, energy efficient metering/public
lighting/solar traffic signals
• 100 % access to energy
• Coordinated planning and investment linked to
broader housing/spatial plans
• Progress to energy-wise solutions through
innovative consumer education practices
• Solar water geysers in all poor households
OUTPUT 2: Eco-mobility
DECADE 1 – OUTCOMES • Modal split: 60% private/40% public
• Link land use to support shorter trips and sustainable
transportation choices
• Manage the road network efficiently to improve safety
and support a gradual reduction in car dependence.
Make it easier to drive less. Accelerate the shift to low-
carbon vehicles
• Regional transport authority established
• Re-fleeting of City’s fleet with green buses
• Upgrading of public spaces along rivers for walking,
cycling and other recreational activities
• Regional transport network(regional integrated BRT
system)- high speed passenger rail connected to major
TERM OF OFFICE DELIVERABLES 2016
• Continue rollout and operational
sustainability of BRT 1C
• Implement non-motorised transport plans
in four suburbs
• Implement complete streets approach in
suburbs
• Good quality road infrastructure across the
city (% improvement)
• Introduction of programmes to promote
behavioural change towards road safety and
public transport usage
51
OUTPUT 3: Sustainable Human Settlements (Spatial)
DECADE 1 – OUTCOMES • A series of catalytic spatial
transformation projects that is
changing the face of the city
• A 2040 spatial with clear investment
targets
• Fully capacitated integrated and
coordinated intergovernmental spatial
approach in place
• Integrated state investment into the
property market
• Ensure linkage with IUDF and targets
• Established City Spatial Development
Finance Fund
• Ongoing development along corridors
– ensure that patterns of growth and
managed sufficiently
• Strategic approach to residential
densification in place
TERM OF OFFICE DELIVERABLES 2016
• Consolidated Zoning Scheme - tools and policies
in support of spatially integrated
growth/investment in place such as the
• Land assembly for priority corridors
• Priority corridors implemented including:
Portland Perth/Empire and Louis
Botha/Alexandra corridors.
• Regional investment opportunities linked to
economic strategy
• Public housing areas at desired densities
• Emphasis on spatial integration to facilitate
economic development and increase GVA and the
construction and operations of BRT
• Sustainable Human Settlements Urbanisation Plan
– alternative rental stock.
• Inner City – public transport, affordable housing,
informal trade
• Deprivation alleviation – off grid energy solutions
OUTPUT 3: Sustainable Human Settlements (Housing)
DECADE 1 – OUTCOMES • Eliminate informal settlements
• Recognize and give regional funding priority
to transportation facilities, infrastructure, and
services that
• explicitly advance the development of housing
in designated regional growth centers.
• % increase in rental stock
• % increase in high rise/multi story public
housing
• % increase in student/temporary
accommodation
• Inclusion of penalty and exit clauses in
contractual agreements for poor workmanship
by contractors
• Number of formalised settlements with access
to above minimum service levels (% of total)
• People’s Housing Process (PHP) as acceptable
mode of SHS delivery in appropriately
identified areas.
TERM OF OFFICE DELIVERABLES 2016 • Implement Housing Accreditation Plan
• Acquire, manage and develop identified land
parcels for high rise public housing
developments --
• Formalization (legalization) of all well located
settlements
• Sustainable Human Settlements Urbanisation
Plan (SHSUP) in place
• Penalty and exit clauses in contractual
agreements for poor workmanship
• Support households to access debt finance to
buy houses (including as rental stock)
• Activating greater renatla market intervention
• % increase in rental stock
• % increase in high rise/multi story public
housing
• % increase in student/temporary
accommodation
• % implementation of “Better Buildings” Plan
• % of formalized settlements with access to
above minimum service levels
• Backyard shack enablement programme
(legalizing to help in the densification process)
• Land assembly for priority corridors
52
OUTPUT 4: Climate change resilience and environmental protection
DECADE 1 – OUTCOMES • Strong enforcement of environmental
standards
• 50% of all citywide buildings to be
retrofitted
• Effective disaster preparedness systems in
place
• Green economy practices to be entrenched
• Maintain biodiversity and ecological
protection areas
• Build a network for Independent Renewable
Energy Producers and look to future
generation
• Build intelligent infrastructure by investing
in net metering systems
• Retain, conserve, expand and protect
environmental assets including greening
• Conserve and preserve sensitive habitats and
biodiversity
• Improve water quality and integrity of
watercourses, wetlands
TERM OF OFFICE DELIVERABLES 2016 • Establish “green scorpions” to enforce
environmental standards
• 10 % reduction in greenhouse gas emissions
• Number of rivers and streams protected and
rehabilitated
• All new buildings to be energy efficient
• Adaptation solutions i.e. municipal buildings
to be retrofitted (%) and green economy
practices through green manufacturing ion
place
• Promote a network of open spaces and water
courses
• Environmental education and awareness of
environmental risks to stimulayte behavioural
change
• Proactive early warning system to improve
capacity to identify vulnerable settlements/
communities in place
53
GDS Indicator
Baseline (2010)
Targets
2020 2030 2040
Human & Social Development
GVA growth rates 2,69% 50% above
national
average
50% above
national
average
50% above
national
average
Unemployment 23,1% <15% <10% <10%
GDP : Jobs None Narrow the
gap
1:1 1:1
Gini-coefficient 0,62 <0,60 <0,50 <0,40
City Competitiveness
Rankings
None To be
determined
To be
determined
To be
determined
Entrepreneurship growth
(formal and informal)
None To be
determined
To be
determined
To be
determined
OUTCOME 3: AN INCLUSIVE, JOB-INTENSIVE, RESILIENT AND COMPETITIVE ECONOMY THAT HARNESSES THE POTENTIAL OF CITIZENS
OUTPUT 1: Job intensive economic growth
OUTPUT 2: Promotion and support to small business (PRIORITY)
OUTPUT 3: Increased competitiveness of the economy
OUTPUT 4: A smart city of Johannesburg, that is able to deliver quality services (PRIORITY)
54
OUTCOME 3: AN INCLUSIVE, JOB-INTENSIVE, RESILIENT AND COMPETITIVE ECONOMY THAT HARNESSES THE POTENTIAL OF CITIZENS
OUTPUT 1: Job intensive economic growth
DECADE 1 – OUTCOMES - BY 2020
• Unemployment < 15 % (linked to NDP
targets) minimum 400 000 jobs
• Facilitate the creation of new industries to
create jobs
• Bridge skills gap through partnerships with
institutions of higher learning
• Support employment creation through public
investment in infrastructure with linkage to
DSDM
• Promote labour absorption practices to
stimulate growth
• Strategic procurement of public services from
organisations in entrepreneurial economy
• City-wide internship programme
• Continually promote an active tourism market
• Youth Employment Programme – subsidise
and incentivize the hiring of younger workers
TERM OF OFFICE DELIVERABLES - BY 2016: • Number of sustainable jobs created
• % reduction in unemployment (currently
600 000 people unemployed in Joburg)
• CoJ Public Works programme focusing on
infrastructure including DSDM approach
• City-wide internship programme
• % Strategic procurement from
organisations in social economy
• Create new employment opportunities in
tourism sector
• Facilitate small business development to
create jobs
• Youth Employment Programme with
implementation (impact on job’s created)
• Business and specialised services tourism
programme
• Support job creation opportunities in waste
recycling, retro-fitting, agri-businesses
OUTPUT 2: Promotion and support to small business
DECADE 1 – OUTCOMES - BY 2020 • Incentivize innovation and new practice
by creating an enabling environment for
new entrepreneurs
• Partnership arrangements to benefit small
and start-up enterprises
• Regulate competition amongst small
business
• Create and support flourishing economic
activities through linear markets, bazaars
etc as a function of spatial-economic
planning
• Small business training programmes
contributing to high-end growth
• Cooperatives and partnership support
programme for skills development
• Strategic procurement to support
emerging and small business entrenched
TERM OF OFFICE DELIVERABLES - BY 2016: • Provide incentives and support for small
business – number of greenfield small
businesses/startups created
• Maintain economic infrastructure supportive of
small business
• Small business training centre and support
linked to green economy objectives
• SMME Procurement Policy implemented that
actively utilises City procurement and leverages
city spend to:
• SMME funding and financial support
• SMME business support in marginalised
areas
• SMME and informal trader education
and skills development
• Improved public-private and public-public
collaboration in the Johannesburg small
business support environment
• Leverage CoJ procurement to support emerging
businesses, BBBEE, women, youth, etc
• Mentorship programme to facilitate support and
development of entrepreneurs
• Nr of SMMEs contributing to GVA growth in
55
OUTPUT 3: Increased competitiveness of the economy
DECADE 1 – OUTCOMES - BY 2020: • Technologically ready to compete with
relevant skills and innovative practices
• An attractive environment for skilled and
educated labour
• Supportive infrastructure for financial and
business services employment
• Lowered costs of infrastructure and cost of
doing business through spatial-economic
linkages
• Domestic market capitalisation
• Attracting FDI: Number of greenfield
projects and bonds maturing
• Attracting FDI: Capital investment linked
ton improvement in the purchasing power
of residents
• Strategic FDI attraction determined by
International relations strategy
(metro/provincial)
• Integrated regional tourism services
TERM OF OFFICE DELIVERABLES - BY 2016: • Establish packages for investment for long term
competiveness (greenfield / capital investment)
• Technological fundamentals and economic
infrastructure in place i.e. % broadband
implementation
• Attractor of talent and skills and advanced
learner ships for the youth number of
learnerships yielding outputs
• Reduce risk climate by exploring global
scenarios for opportune economic growth
• CoJ Trade and Investment Week linked to
outcomes bearing greater investment incentives
– number of new investment projects
• Rand-value trade deals secured through in-
bound/out-bound missions to Africa, BRICs
cities, Northern Cities
OUTPUT 4: A smart city of Johannesburg, that is able to deliver quality services
DECADE 1 – OUTCOMES - BY 2020
• Become technologically competent through the
rollout of supportive smart infrastructure
• Build on three key Smart areas of focus
• E-learning
• Smart Safety
• Smart Services
• Become a Smart institution to enhance
efficiency and productivity
• Centralized, coordinated platforms and smart
grids improve insight and decision making
• Access to quality information and ICT
• Enhance capacity, ability and competency to
embrace Smart approaches
• Sustain 100 % coverage of broadband
throughout the City
• Use the cloud, shared services, and wi-
fi to enable:
• Teleworking, Smarter education, E-
health, Connection
• with remote communities
TERM OF OFFICE DELIVERABLES - BY 2016: • Approved Smart City Strategy and
Implementation plan - % of plan
implemented
• Province-wide data centre - an
integrated ICT platform to support
smart practices and technologies
• Links Smart City Strategy to broader
sectors of service delivery, education,
safety and broadband
• Pilot smarter classroom technology to
kickstart learning approaches
• Engage with citizens using apps and
social media – empowering them to
improve the system
• 90 % Broadband coverage operating at
scale
• Smart services strategy – relating to
billing, health, transport, water,
electricity and other services in place
56
GDS Indicator
Baseline (2010)
Targets
2020 2030 2040
Governance
Participation Index None To be determined To be determined To be determined
Customer
Satisfaction Index
65 70 >70 >80
Quality of Life None To be determined To be determined To be determined
Transparency Index 81,2 Ranking : 3
Compliance: 90%
Nr of corruption
cases
Ranking: 2
Compliance: >90%
Nr of corruption
cases
Ranking: 1
Compliance: >95%
Zero corruption
Current ratio 0,8 1 1 1
Debt : Revenue 46,6% 45% 45% 45%
Remuneration :
Expenditure
35,2% 30% 30% 30%
Maintenance :
Expenditure
2,7% 7% 10% 10%
Interest :
Expenditure
5,7% 7% 7% 7%
Net Operating
Margin
8,0% 15% 15% 15%
Capex: Total
Operating
Expenditure
12% 20% 20% 20%
Cash Cover 10,7 days 30 days 45 days 60 days
OUTCOME 4: A HIGH-PERFORMING METROPOLITAN GOVERNMENT THAT PROACTIVELY CONTRIBUTES TO AND BUILDS A SUSTAINABLE, SOCIALLY INCLUSIVE, LOCALLY INTEGRATED AND GLOBALLY COMPETITIVE GAUTENG CITY REGION (GCR)
OUTPUT 1: An active and effective citizen focused GCR
OUTPUT 2: A responsive, accountable, efficient and productive metropolitan government
OUTPUT 3: A Financially and administratively sustainable and resilient city (PRIORITY)
OUTPUT 4: Meaningful citizen participation and empowerment (PRIORITY)
OUTPUT 5: Guaranteed customer and citizen care and service
57
OUTCOME 4: A HIGH-PERFORMING METROPOLITAN GOVERNMENT THAT PROACTIVELY CONTRIBUTES TO AND BUILDS A SUSTAINABLE, SOCIALLY INCLUSIVE, LOCALLY INTEGRATED AND
GLOBALLY COMPETITIVE GAUTENG CITY REGION (GCR) OUTPUT 1: An active and effective citizen focused GCR
DECADE 1 – OUTCOMES - BY 2020 • CoJ contributing to regional governance
governance model
• Continue to drive implementation of NDP
and Gauteng 2055 with alignment of
Metropolitan and Provincial plans
• Strengthen intergovernmental cooperation
• Strategic coordination and shifting scale of
planning and delivery beyond local and
provincial boundaries
• Ensure that there is a coherent set of powers
for metro governance i.ee control over built
environment, housing etc
• Build a shared vision for the GCR
• Provincial and metropolitan international
relations objectives aligned
TERM OF OFFICE DELIVERABLES - BY 2016: • Active participation in the development of the
NDP, Gauteng 2055 and Implementation Plan
• Alignment of Metropolitan, Regional and
National Plans reflected in City of Joburg IDP
• Establish cross border forums on critical issues
such as transportation, social support, social
cohesion, commercial institutionalisation, etc
• Approved and implementable
Intergovernmental Relations Strategy for the
City of Joburg
• Participate in regional social cohesion activities
and promote Joburg in the context of the region
through strategic events
OUTPUT 2: A responsive, accountable, efficient and productive metropolitan government
DECADE 1 – OUTCOMES - BY 2020
• Effective capacitation and response of front
line service functions (waste, revenue etc)
• Set up local government public prosecutor
(independent)
• Establish Joburg Ombudsman for public
management
• Creating inspiring working environment –
multi-skilled workforce
• Recruiting and growing leadership that live
the core values of the City
• Empowering employees to develop and use
their talents
• Use of assessment tools in recruitment
• Resilient workforce responsive to the needs
of the community
• e-Government and virtual offices
• Strategy-led governance practices and
funding
TERM OF OFFICE DELIVERABLES - BY 2016: • Capacitated front line services able to
engage with customers proactively
• Enhanced Administrative accountability
through institutional structures
• Oprationalise Joburg Ombusdman
• Workforce skills and productivity audit
report
• Develop customized CoJ Productivity Index
• e-Government implementation and
utilisation approach linked to smart city
• Facility rationalisation, green facilities and
board rooms supporting city administration
• Institute strategy-led governance
mechanisms and budgeting (J2040, IDP,
SDBIP) systems
• Performance monitoring and evaluation
system with impact reporting enabling
decision making
58
DECADE 1 – OUTCOMES - BY 2020
• 96% bill collection rate to maximise City
revenue
• Disciplined expenditure management –
efficient management of resources
• Data verified and streamlined - high levels of
confidence in the City by private sector
partners and citizens, through accurate billing
and reliable ratios
• Number of PPPs supporting funding streams
and capital implementation
• Clean audit year on year
• Internationally competitive credit rating
• Achieve international benchmark for
operations and capital expenditure benchmark
• Improve cash reserves according to
Presidency requirements
• Stakeholder confidence in city finances and
financial situation – maintain competitive
edge
• Moderate municipal debt levels
• Smart procurement systems linked to revised
economic approach
TERM OF OFFICE DELIVERABLES - BY 2016: • Financial situation stabilised and
turned around – effective billing and
revenue systems in place
• Complete eradication of the billing
problem and 96 % collection by the
City to maximize revenue
• Clean audits for remainder of term
• Improved credit rating
• Accurate data and biling information
sustained
• Number of PPPs to support capital
implementation and revenue sources
• Improvement in customer/ stakeholder
satisfaction index (close to 70%)
• Long-term capital investment executed
according to plan
OUTPUT 4: Meaningful citizen participation and empowerment
DECADE 1 – OUTCOMES - BY 2020
• Community Based Planning based on
participatory governance entrenched
• Community based model for urban management
established and making impact i.e. DSDM
• Metropolitan government contributing to a
transformed and capable state (link to GCR
Output)
• New social compact between government and
citizens in place
• Utilising new media and new communication
techniques to enhance participative practices
• Informed citizenry who know, accept and
exercise their rights and responsibilities –
stimulated through education, awareness and
behavioral change
TERM OF OFFICE DELIVERABLES - BY 2016: • DSDM model implemented and
customized for future action
• Community based planning,
budgeting and oversight as part of
CBP
• Communication strategy yielding
outputs with correct focus on city
achievements and progress - Impact
report on the utilisation of new media
and e-participation techniques
• Strengthening public participation and
access to government information
• Strengthen ward committees and
support to ward councillors
• Cross-cutting approach to stimulate
behavioual change across all
outcomes of the GDS
59
5.
6.
7.
OUTPUT 3: A Financially and administratively sustainable and resilient city
OUTPUT 5: Guaranteed customer and citizen care and service
DECADE 1 – OUTCOMES - BY 2020
• Creating customer-centric culture within the
institution by building relevant institutional
structures
• Make e-services the back bone of service
delivery – ensure back room capacity
• Values and customer charter the norm for
engaging with customers
• De-centralise revenue and customer care
services to streamlined, effective and productive
regional centres
• Create one centre for business clients
TERM OF OFFICE DELIVERABLES - BY 2016: • Focus should be on immediate to short
term with targets aimed at quick wins
with lasting solutions
• Customer-centric satisfaction index
with impacts and outputs
• e-Government implementation and
utilization linked to Smart City and
Broadband
• Capacitated and capable call centre able
to resolve and route queries correctly
• Globally competitive customer
satisfaction index
• Customer charter implementation
across all Regions
60
8. Spatial Development Framework
The City’s Spatial Development Framework (SDF)3, through its development strategies and
policy guidelines, continues to restructure the historically fragmented urban form of the City.
The SDF is tasked with integrating processes and agendas into a single, coherent spatial plan
with associated strategies. The most significant influencing factor on the SDF is the Joburg
2040 Growth and Development Strategy (GDS) of the City.
The table below outlines the key development principles of the SDF and the anticipated
outcomes as well as critical implementation interventions.
Table: Desired outcomes through the application of SDF principles
Principles Outcomes Key to implementation
Sustainability Responsible use of the City’s natural and heritage resources (water, open spaces, ridges, rivers etc.);
A sustainable rates base and financial model;
Safe and secure urban environments promoted through safety and design principles;
Affordable energy supply and consumption patterns;
Low emissions and pollution levels;
Promotion of food security within the city and province;
Protection and conservation of the City’s cultural heritage; and
Sustainable economic growth and job creation.
Demand management and resource protection;
Protection and management of environmental systems;
Quality of infrastructure and service delivery (engineering and social) – the role technology can play in future delivery modes and management; and
Sustainable human settlements – affordable, sustainable, housing solutions.
Efficiency An efficient and robust urban form and structure that facilitates:
Appropriate and functional service delivery;
Affordability of business and living costs;
Managed growth within the constraints of future plans relating to infrastructure provision; and
A connected and effective movement system (in terms of time and cost).
High-density, compact, mixed-use urban systems;
An efficient and affordable public transportation system;
Pedestrian friendly cities and neighbourhoods; and
Quality of infrastructure and service delivery.
Accessibility Facilitating physical access to opportunities for all communities and citizens;
An economy that caters for a full spectrum of skills and experience for job seekers;
Diversity of opportunities, e.g. economic,
Efficient and affordable public transportation system;
Pedestrian friendly cities and neighbourhoods; and
Avoid large enclaves of poverty
3 Full document and Annexures available via:
http://www.joburg.org.za/index.php?option=com_content&view=article&id=5941
61
social and institutional, afforded by the City;
All modes of transport supporting good access to opportunities; and
A range of housing typologies and tenure models that allow residents to live with dignity and quality of life.
Economic growth.
Map: CoJ Consolidated Spatial Development Framework
SDF review
A revision of the SDF is currently underway to address the following developmental issues,
which include:
• Significant and underestimated population and household growth;
• Changing landscape due to changes in infrastructure and property markets;
• Rapid urbanisation and the need for sustainable accommodation;
62
• Natural resource scarcity and the multi-dimensional impacts of climate change;
• New or revised policy, legislation and planning tools; and
• The need to address gaps relating to guidelines and proposals relating to job creation
and effective City transformation; whilst acknowledging and incorporating informality
amongst other challenges.
The key themes and directives associated with the SDF remain Strategic Densification and
compaction of the urban form, maintaining the Urban Development Boundary, an emphasis on
public transport as a key lever towards spatial transformation and inclusive access to the City.
The SDF has a series of components to support and guide development, including:
Seven fundamental Development Strategies to accelerate the delivery of developments
that support a desired urban form and support medium- to long-term objectives include;
o Supporting an Efficient Movement System;
o Ensuring Strong Viable Nodes;
o Supporting Sustainable Environmental Management;
o Initiating and Implementing Corridor Development;
o Managing Urban Growth and Delineating an Urban Development Boundary;
o Increased Densification of Strategic Locations; and
o Facilitating Sustainable Housing Environments in Appropriate Locations.
A Growth Management Strategy (GMS) and priority areas;
Regional Spatial Development Frameworks (RSDFs) and associated urban development
frameworks and precinct plans;
A Capital Investment Framework (CIF) that determines priority capital; and
Supporting annexures and assessment tools including Nodal Assessments and Profiles,
and the Sustainable Human Settlement Development Indices assessment tool to
evaluate the sustainability of development proposals and applications.
Reflections on the inherent strengths and weaknesses of the document and identifying existing
gaps will be a critical part of the review to effectively incorporate and align the tenets of the
Joburg 2040 Strategy. There is also a realisation that the City will need to undertake an
extensive public participation outreach process of the draft document in 2014/15.
63
Whilst the SDF fundamentals are unlikely to change substantively in the review, the detail of
future public transport routes and supportive land use guidelines and design codes to support
these themes may well change from current depictions.
New policy and legislation have been noted as one of the developmental issues influencing the
SDF review. Chapter 4 Sec 12 (6) of the Spatial Planning and Land Use Management Act
(SPLUMA), 16 of 2013 notes that: “(municipal) spatial development frameworks must outline
specific arrangements for prioritising, mobilising, sequencing and implementing public and
private infrastructural and land development investment in the priority spatial structuring areas
identified in the spatial development frameworks”.
It is for this reason that a key amendment in this review will be in relation to the demarcation of
the Growth Management Strategy Priority Areas that have guided the City’s capital investment
and developmental priorities since 2008. To avoid confusion with the similarly named Growth
and Development Strategy, the SDF will, in future, refer to Capital Investment Priority Areas
(CIPAS) to reflect these priorities.
The primary objectives of the CIPAs are premised on:
• Spatial locations best placed to deliver the outcomes of the City’s GDS 2040 Vision
• Defining investment profiles for each CIPA indicative of localised development objectives
and targets in relation to the Economy, Housing, Transportation, Social Amenities,
Social Inclusion, Resource Efficiency and Revenue.
• Prioritising City capital funding in CIPA locations via projects and programmes and
developing responsive, developer and investor-friendly land use and financial policies to
ensure that the overall developmental vision and specific targets are not constrained by
infrastructure deficits or planning policy.
It is important to note that the spatial extent of these CIPAs will also undergo a revision given
the more recent consideration of the future alignment of the Rea Vaya Bus Rapid Transit
system and an increased emphasis on facilitating economic growth within emerging and future
development corridors.
Sustainable Human Settlements Urbanisation Plan
64
The unprecedented scale and speed of rapid urbanisation has a profound impact on our planets
resources and living conditions within human settlements. The City’s Sustainable Human
Settlements Urbanisation Plan (SHSUP) has acknowledged that a response to rapid
urbanisation needs to consider the provision of sustainable accommodation. In the forthcoming
review, an increased emphasis will be placed on targets and approaches to meet
accommodation needs and demands, both presently and in the future. It is estimated that by
2030 the City would need to accommodate more than one million households based on current
backlogs and future demographic projections. By drawing on available resources and
accommodation typologies (both formal and informal) the Urbanisation Plan has developed a
framework that begins to address these accommodation needs and associated social facilities,
bulk infrastructure requirements and institutional aspects. Strategic Development Areas,
primarily linked to emerging and future corridors, form the spatial basis of the SHSUP and will
be incorporated into the revised SDF. The SHSUP advocates for a new way of planning and
designing our living environments for long-term sustainability. Sustainable development is far
more than the provision of infrastructure or preserving the environment. It is about putting the
community at the centre of development and creating a sense of identity through well designed
built form that promotes a mix of uses, walkability and cycling facilities.
Mass Transit Corridors/ Corridors of Freedom
The Corridors illustrate the new spatial vision for the City using corridor Transit-oriented
Development as a catalyst for growth. The corridors aim to spatially transform the City by linking
people to jobs through placing development along public transport corridors, in particular, Rea
Vaya. This will be used as the backbone of spatial transformation to enable fast, safe and
affordable mobility along corridors. The corridors will be linked to mixed-use development nodes
with high density accommodation, supported by office buildings, retail development and
opportunities for leisure and recreation. This will give rise to a people-centred City where the
needs of communities, their safety, comfort and economic well-being are placed at the core of
planning and delivery processes.
The City has identified three corridors for the current term of office i.e. the Empire-Perth; Louis
Botha and Turffontein Strategic Area Frameworks. Extensive public participation processes with
key and relevant stakeholders to test and verify status quo information is currently underway.
The Strategic Area Frameworks for the Corridors of Freedom are examples of the detailed plans
65
to be initiated to outline the land, infrastructure and urban design elements that support the
implementation of the SHSUP and deliver on future accommodation targets in well located
areas.
Accessibility
Whilst economic growth and the provision of residential accommodation is an important
component of the City’s vision, addressing the capacity and backlogs in relation to current and
projected demands on social amenities remains a key concern to the successful implementation
of the City’s spatial plan and associated development objectives. The City recently completed a
study on the accessibility of residents to selected municipal facilities in Johannesburg. The
study was conducted by the Council for Scientific and Industrial Research (CSIR) in 2011/12
and forms part of the geographic accessibility study in the two metropolitan municipalities of
eThekwini and Johannesburg.
Non-renewable resources
66
Rising population growth and urbanisation in the City is putting increasing pressure on our non-
renewable resources. This means that our city is becoming more and more vulnerable to the
impacts and effects of climate change.
The hosting of the C40 Cities Climate Leadership Group (C40), a network of the world’s
megacities taking action to reduce greenhouse gas emissions, in Johannesburg during
February 2014 demonstrates the realisation and commitment of the City towards a global
initiative focussed on the effective management of environmental resources. The City
recognises that for real long-term sustainability, development must be socially, economically
and environmentally sustainable in order to ensure the responsible use of environmental
resources and the promotion of environmental best practices.
The review will focus on the issue of resource efficiency guidelines and identify critical mitigation
measures such as enhancing our drainage systems, increasing the resilience of our water
supply, and protecting our natural bio-diversity. The City’s Bio-Regional Diversity Plan is one
such intervention, which explores spatial possibilities and constraints within the City and
reinforces the City’s Urban Development Boundary. Planning guidelines on the Urban
Development Boundary will also form part of the review and will provide a perspective on land
management and environmental protection in a more coherent and pro-active fashion with land
being classified into divisions of Critical Bio-Diversity Areas and Ecological Support Areas.
Poverty and inequality
Whilst urbanisation has resulted in the enhancement of human welfare through improvements to
mortality, literacy and even income levels; it has also been accompanied by the growth of
poverty. Cities have become both the engines of growth as well as significant foci of poverty and
deprivation. Other enhancements in the review will therefore include the refinement of the SDF’s
presentation and understanding of the “marginal” nature of communities given a range of
indicators including employment and income levels, health, education and living conditions.
These have been consolidated and spatially represented into a Deprivation Index within the
City.
67
Over the years, the SDF’s historic representation of the “Marginalised Areas” of the City
(typically Alexandra, Diepsloot, Ivory Park, Orange Farm and Soweto) has transformed. Areas
such as Zandspruit / Cosmo City located to the north-west, the Inner City and extensions east
towards Ekurhuleni are also displaying high levels of deprivation and need. Conversely, Soweto
shows more complex and differentiated deprivation levels extending across the range of the
scoring scale (highest to lowest). Not unsurprisingly, these highly Deprived Areas also host the
highest densities in the City and the highest prevalence of informal residential accommodation
via informal settlements, backyard shacks or invaded buildings. The consideration of safety and
security in the urban environment is therefore critical in terms of amongst other aspects design
of the public and private space, managing the urban environment to address urban decay
issues, addressing security of tenure as well as planning for and preparing for natural and man-
made disasters, in particular those resulting from climate change impacts.
Additionally, themes or aspects that have been less prominent or absent from the SDF are
receiving attention in the revision. Working groups are presently considering policy approaches
to:
Resource Efficiency - a framework in response to the issues of resource efficiency and
impacts relating to climate change;
Density Provisions and Guidelines;
Transit-Oriented Development Guidelines - highlights 10 key development and design
principles and demonstrates the practical application; and
Urban Development Boundary Guidelines – provides a rationale for the development
and the prioritisation of land through principles and land use guidelines and procedures
68
9. Basic Service Delivery
The South African constitution clearly articulates that municipalities have a responsibility of
ensuring all citizens are provided with basic services. In fulfilling its mandate the City of
Johannesburg has made significant strides on efforts to improve its services making it more
client-focused. Furthermore, commits itself to excellent proactive delivery of services to all
residents, creating an environment that is resilient, sustainable and liveable. It aims to achieve
this through long term plans, targeted programmes, provision of services and enabling support
that drive economic growth, optimal management of natural resources and the environment, the
development of society and the individuals within it, and the practice and encouragement of
sound governance.
The primary mandate of the City is to deliver services to its customers and residents. Thus
Service delivery must be executed in a customer-centric, transformative, sustainable and
resilient manner ensuring an improvement in the quality of life of all the residents of the City.
Cognisant of the historical trend, that service delivery protests have been rife throughout South
African municipalities in the previous year’s, which has resulted in remonstrations. In curbing
this trend the city remains committed to on- going consultation and engagements with
communities. It continues to improve consultation sessions to be effective and meaningful
through community engagement/ outreach sessions. Service delivery therefore is defined in a
manner that articulates the strategic intent of the City in relation to its customers.
Consequently every aspect of service delivery seeks to satisfy and meet customer needs and
expectations. The critical elements of service delivery are:
Infrastructure development and management;
ICT infrastructure development and management;
Human capital development and management;
Financial resources;
Result-oriented management;
Integrated, coordinated and outcome-based operational planning and management;
Sustainable human settlement and urban management.
69
Service delivery is directly aligned with Outcome 2 of the Joburg 2040 Strategy i.e. to “Provide a
resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of
a low carbon economy”.
In order to achieve and maintain high quality services the City developed service standards and
the below structures to monitor service performance and take action to improve service s when
issues are identified. These include:
Steering and oversight Structure (Central Visible Service Delivery Forum)
This structure will ensure a stronger tie between the City’s leadership and communities
in order to improve integration across all service delivery sectors within the City.
Customer Service Charter and Service Level Agreements
The City is currently developing implementation plans for the Customer Service Charter
and Service Level Standards.
Integrated ward-based service delivery structure
The City has established a ward-based service delivery structure to assist with prompt
service delivery across the City. The City is in the process of developing city-wide
service delivery maps and profiles that will outline the service delivery backlogs and
baselines as well as an assessment and confirmation of customer and citizen needs.
This will culminate in well-integrated, coordinated and outcome-based operational plans
to address ward profiles, service delivery backlogs and baselines and customer needs.
Service Delivery Monitoring Programme
The City is busy with street by street audits in order to update its monthly Service
Delivery baselines. This will form the knowledge base of information on the state of
service delivery in the City. Tracking and monitoring of service delivery performance
and reporting will also commence and quarterly reports will be released on the state of
service delivery in each region. The desired outcome of this programme is to reduce
service delivery backlogs and address service delivery gaps during the current term of
office.
Call centre - 0860 JOBURG or 0860 56 28 74
The CoJ call centre operates on a 24-hour basis (excluding those services which operate during
office hours, e.g. Metro Bus). Customers may contact the call centre to:
Request information on the City’s processes and procedures;
Request information on the City’s various service offerings;
Log a service request;
70
Log a municipal account query;
Enquire on the status or progress of an existing query;
Register a complaint; and
Record a compliment.
Customer Service Centres
The City has 47 full service centres and 10 pay-points across the City. Customers may visit any
of these to, amongst others, make payments, log account and billing related queries, request
meter reading investigations and refunds, apply for ESP/Pensioner rebates, clearances and
new connections etc.
CoJ website (www.joburg.org.za)
e-Services is an initiative by the City to provide online access to a range of services for both
individuals and business in the Greater Johannesburg area. Specific service offerings include:
Log a query or problem;
Online statements;
Once registered, customers can update their billing address online;
Submit meter readings online;
Track the progress of building plans submitted;
Fill in the online valuations form to assist the City in evaluating properties correctly; and
Access GIS mapping services.
71
10. 2014/16 Priority Implementation Plans
Chapter 7 details the City’s ten Priority Implementation Plans including targets, indicators and
delivery agendas for the remainder of the term of office.
PRIORITY 1: FINANCIAL SUSTAINABILITY AND RESILIANCE
Group Finance Department is the custodian of financial management in the City and
champion the Financial Sustainability and Resilience Priority. Financial sustainability
and resilience are foundations that support the short and long-term vision of the City to
ensure the City’s continued ability to fund the planned intensive capital investment
program that will result in a spatial transformation of Johannesburg.
Despite the prevailing macroeconomic conditions, the City of Johannesburg is
financially in good shape, is delivering on its promises, and is continuing to record
significant achievements. In the past financial years the City has achieved surpluses is
in line with the City’s Growth and Development Strategy objective of achieving financial
sustainability and resilience. Such surpluses will be augmented with contributions from
private investors, national and provincial government towards a target of spending R100
billion on infrastructure over the next decade.
In developing the SDBIP and IDP, the department remains mindful of developments
locally and globally, particularly the economic factors that influence the budget
assumptions incorporated in the Financial Development Plan (FDP). The FDP
incorporates 15 key focus areas that intend to strengthen the City’s ability to generate
internal surpluses and cash reserves that allow the City to shift in its approach from
consumption to investment. The key focus areas include completeness of revenue;
strategic supply chain management incorporating economic transformation; expenditure
management that eliminates unnecessary expenditure through zero-based budgeting;
and attainment of a clean audit.
72
These efforts are underpinned by the following principles:
• Changing the course by changing the way the City optimally utilises its resources;
• Increasing productivity by doing more with less and managing human resources
efficiently;
• Customer eccentric approach; and
• Stabilizing the revenue base of the City
In pursuing financial sustainability, the City of Johannesburg needs to generate and
collect sufficient resources to pay for its activities on an on-going basis. It is envisaged
that expanding the investment in infrastructure will protect the City’s revenue base and
change the face of the City and ensure a better Johannesburg for future generations.
The financial sustainability of the municipality is crucially dependent on key factors:
(a) A vibrant and inclusive economy;
(b) Efficient and appropriate service delivery;
(c) Rooting out of fraud and corruption;
(d) The ability to levy and collect taxes and services charges fairly and efficiently in
order to pay for the service it provides.
A. Expected Outcomes
Financial stabilization and long term financial sustainability – sound financial
management environment that is resilient and able to meet the changing
needs of the City evolving towards Joburg 2040;
96 % Revenue collection rate by the City to maximize revenue;
Clean audit reports for the remainder of term;
73
Achievement of specified profitability and liquidity ratios;
Improved credit rating or maintained at AA+;
Accurate data and billing information sustained;
Diversified funding programmes to support capital projects implementation
and secure alternative revenue sources;
Spend in excess of R30 billion on infrastructure expenditure throughout the
City;
Reduction of the debtors’ book;
Smart procurement systems linked to principles of economic transformation.
B. Intergovernmental Engagements
The department engages with Provincial and National Treasury to ensure
alignment with priorities and for reporting purposes as prescribed by legislation.
Financial Sustainability and Resilience Priority
Group Finance is the custodian of financial management in the City and champions the
Financial Sustainability and Resilience Priority. This is the foundation that supports the
short and long term vision of the City to ensure its ability to fund the intensive capital
investment program planned that will result in a spatial transformation of Johannesburg.
Financial Development Plan
In order to continuously meet yearly obligations the department developed a Financial
Development Plan which has a city wide reach and ensures the attainment of financial
sustainability and resilience objectives throughout the City. Although Group Finance
remains the overall champion various champions have been allocated responsibility to
ensure that set targets are achieved satisfactorily on time and to ensure accountability.
74
Below are key strategic aspects of this plan:
Strategic Outcome Specific Objective Key Role-player
Project Champion
Target date for achievement
1: Billing Accuracy
Improved and accurate rates and service billings
100% accuracy in respect of service billings
Group Revenue and Shared Services
Lungelwa Sonqishe
June 2015 – 94% June 2016 – 96% June 2017 – 96%
2: Debtor Collections
Improved cash collections of rates and service debtor outstanding amounts
96.1%% collection of debtors In respect of service billings
Group Revenue and Shared Services
Lungelwa Sonqishe
June2015 – 96% June2016 – 96% June2017 – 97%
3: Personnel Remuneration
Reduction in the quantum of personnel remuneration
Reduction of personnel remuneration as a % of operating costs to 30%
Group Corporate Shared Services
Vuyo Mlokoti June2015 – Below 36% June 2016 – Below 35% June 2017 – Below 34%
4: Unnecessary Expenditure
Elimination of unnecessary expenditure
Eliminate all unnecessary expenditure
Economic Development cluster
Charity Chisadza
Initially – July 2014, thereafter on an ongoing basis
5: New revenue sources
Identification and implementation of new revenue sources
Identify new revenue streams for the City
All Departments
Reggie Boqo Ongoing
6: Ratio achievement
Achievement of specified profitability and liquidity ratios
Achievement of selected profitability and liquidity ratios
Group Finance and Revenue
Khomotso Letsatsi
Benchmark Targets: Current ratio –1:1 Solvency ratio Above 2:1 Debt to Revenue ratio – Below 45% Interest to Expenditure ratio – Below 7% Net operating margin above 15% Cash coverage – Above 45 days Investment reserve – R3.15 billion Days in debtors – 45 days
7(a) : 10 year capital expenditure programme – City Infrastructure
Ten-year capital expenditure plan for engineering infrastructure
To achieve R107 billion infrastructure expenditure throughout the City
All Departments and MOE’s
Tiaan Ehlers
06/2015 – R11 bn 06/2016 – R11.5 bn 06/2017 – R10 bn
Improved repairs and maintenance plan relating thereto
To achieve a level of at least 7% of operating expenditure on planned and routine
All Departments and MOE’s
Tian Ehlers
06/2014 – 5.0% 06/2015 – 5.3% 06/2016 – 5.2%
75
Strategic Outcome Specific Objective Key Role-player
Project Champion
Target date for achievement
maintenance
7(b) : 10 year capital expenditure programme – City assets
Ten-year capital expenditure plan for City-owned land, buildings and other facilities
As per Package 11(a)
All Departments and MOE’s
Helen Botes
As per Package 7(a)
Improved repairs and maintenance plan relating thereto
As per Package 11(a)
All Departments and MOE’s
Helen Botes
As per Package 7(a)
8: Supply Chain Management
Improvement in the supply chain approval and monitoring
Improvement in the efficiency and performance of the supply chain processes in the City
Group Finance and Revenue
Thembisa Peele
Ongoing
9: Ongoing clean audits
Achievement of ongoing clean and unqualified audits
No qualifications or matters of emphasis in either the City or its MOE’s
Group Finance and Revenue / All ED’s / All MD’s of MOE’s
Ishwar Ramdas
Ongoing clean audit
Within Group Finance the focus of the Financial Sustainability and Resilience priority
centres on the following critical areas:
Revenue Optimization
Expansion of revenue base (2014/15 and 2015/6) by recouping revenue tied up in
historically unbilled areas;
Revenue protection (increased billing, increased collections, reduced impairments)
Encourage and increase payment levels e.g. installation of pre-paid/smart meters
etc.
Enhanced campaigns to inculcate a payment culture;
Completeness of revenue and billing accuracy - ensuring that all properties in the
City of Johannesburg are on Land Information System (LIS) and are billed for all
five services;
76
Enhanced strategy to intensify actions to collect outstanding funds and curtailing
the growth of the debtors book;
Cash inflows to be directed to capital programs;
Consolidation of Revenue Step Change benefit realization;
Expenditure Management
Implement cost containment measures in line with National Government;
Funds to be channelled towards City’s priorities and eliminate unnecessary
expenditure;
Zero-based budgeting shifting from consumption to investment;
Gearing departments and entities towards massive infrastructure spending over
the years.
Clean Audit
Having achieved an unqualified audit opinion in the financial year ending 30 June 2013,
the City is committed to double its efforts towards attainment of a clean audit going
forward with specific focus on:
Promote and ensure compliance with best practice in financial management and
accounting standards, regulatory requirements, governance practices and audit
requirements;
Continued review and enhancement of internal controls;
Continuous training for uniformity in reporting thereby improving the quality of
reporting;
Resolving and addressing of all previous issues raised by the Auditor General
77
Supply Chain Management
Implementation of strategic supply chain principles citywide ensuring all entities
and departments adhere to group policies
Full compliance to SCM Regulations, policy, guidelines and procedures to
eliminate issues of irregular expenditure;
Periodic review and audit of SCM processes;
Implementation of SCM policy to provide a change in course towards economic
mainstreaming and encouragement of participation by SSME’s in the local
economy;
Supplier performance monitoring;
Strategic procurement initiatives to promote attainment of value for money.
Treasury
Optimize City’s funding model and redemption strategy and diversify funding
options to support capital investment programs;
Improvement of credit rating;
Managing cost of funding
78
1.
2014/15: Implementation and Performance Overview
Long term impact (Joburg 2040 related output)
IDP program
me
Key Performan
ce Indicator (2013/16)
Target (2013/16)
Target 2016/17
Projects / intervention
s
Lead Department
Baseline Input and Output targets
2014/15 2015/16 2016/17
Financially and administratively sustainable and resilient city
Revenue Completeness and accuracy
Revenue collection ratio
97% collection of debtors in respect of service billings 4
98.1% Collection of debtors in respect of service billings
Debtor Collection: Improved cash collections of rates and services debtor outstanding amounts
Group Finance
93.80% Input: % reduction on the debtors books (>30 days ) Output 96% collection of debtors in respect of service billings
Input: % reduction on the debtors books (>30 days ) Output: 96% collection of debtors in respect of service billings
Input: % reduction on the debtors books (>30 days ) Output: 97% collection of debtors in respect of service billings
Bill Completeness
100% Accuracy in respect of service billings
100% Accuracy in respect of service billings
Billing Accuracy: Improved and accurate rates and service billings
Input: 50% Reduction in the number of bills returned as a result of incorrect/ incomplete customer information Output: 100% accuracy in respect of service billings
Input: 50% Reduction in the number of bills returned as a result of incorrect/ incomplete customer information Output: 100% accuracy in respect of service billings %
Input: 50% Reduction in the number of bills returned as a result of incorrect/ incomplete customer information Output: 100% accuracy in respect of service billings %
Financially and administratively sustainable and resilient city
Capital Project Management
To achieve R30.07 billion expenditure for engineering and infrastructure throughout
06/2014 – R 7. 59 billion infrastructure expenditure 06/2015 – R11 billion
R13.5 billion Infrastructure expenditure by 06/2017 – R14.2 billion Infrastructure expenditure by 06/2017 –
10 year capital expenditure programme for engineering and infrastructure
All Departments and MEs
R4.5bn Input: Implementation through project management office New revenue sources Increased revenue collection Output: R11 billion
Input: Implementation through project management office New revenue sources Increased revenue collection Output: R11.48 billion
Input: Implementation through project management office New revenue sources Increased revenue collection Output: R10 billion
4 Calculations excluding LTA, ESP Deceased Estates and estimations longer than 6 months
79
Long term impact (Joburg 2040 related output)
IDP program
me
Key Performan
ce Indicator (2013/16)
Target (2013/16)
Target 2016/17
Projects / intervention
s
Lead Department
Baseline Input and Output targets
2014/15 2015/16 2016/17
the City 06/2016 – R11.48 billion
infrastructure expenditure
infrastructure expenditure
infrastructure expenditure
% of operating expenditure on planned and routine maintenance
5.1% Total of 7% of the operating expenditure spent on repairs and maintenance
Repairs and maintenance plan
Departments and MEs
3.5% Input: Review and implement repairs and maintenance plan % Compliance to the maintenance plan Output: Total of 5.0% of the operating expenditure spent on repairs and maintenance
Input: Review and implement repairs and maintenance plan % Compliance to the maintenance plan Output: Total of 5.3% of the operating expenditure spent on repairs and maintenance
Input: Review and implement repairs and maintenance plan % Compliance to the maintenance plan Output: Total of 5.2% of the operating expenditure spent on repairs and maintenance
Achievement of selected profitability and liquidity ratios
June 2016
Current ratio –1:1 Solvency ratio Above 2:1 Debt to Revenue ratio – Below 45% Remuneration to Expenditure ratio – Below 30% Maintenance to Expenditure ratio – Below 7% Interest to Expenditure ratio – Below 7% Net operating margin above 15% Cash cover –
Financial Development Plan – 6 & 12
Group finance
Current Ratio: 1:1 Solvency Ratio: 2.:1 Debt to Revenue: 49.7.% Remuneration to Expenditure 36.6% Maintenance to Expenditure 3.6.6% Interest to Expenditure: 5% Net Operating Margin: 10% Cash
Current Ratio: 1:1 Solvency Ratio: 2.1:1 Debt to Revenue: Below 45% Remuneration to Expenditure below 36% Maintenance to Expenditure 5.0% Interest to Expenditure 5% Net Operating Margin 12% Cash coverage (days) 58 days
Current Ratio: 1:1 Solvency Ratio: 2.2:1 Debt to Revenue: Below 45% Remuneration to Expenditure below 35% Maintenance to Expenditure 5.3% Interest to Expenditure 5% Net Operating Margin 13% Cash coverage (days) 50 days
Current Ratio: 1:1 Solvency Ratio: 2.3:1 Debt to Revenue: 45% Remuneration to Expenditure below 34% Maintenance to Expenditure 5.2% Interest to Expenditure 6% Net Operating Margin 13% Cash coverage (days) 46 days
80
Long term impact (Joburg 2040 related output)
IDP program
me
Key Performan
ce Indicator (2013/16)
Target (2013/16)
Target 2016/17
Projects / intervention
s
Lead Department
Baseline Input and Output targets
2014/15 2015/16 2016/17
Above 45 days Investment reserve – R3.15 billion Days in debtors – 32.9 days
coverage (days): 74.1 days
Financially and administratively sustainable and resilient city
Smart and efficient procurement processes
Improvement in the efficiency and performance of the supply chain processes in the City
90% Adherence to Citywide procurement plan
100% Adherence to Citywide procurement plan
Review of SCM Procedure Manual Establish a single entry point for all requests for initiation of the procurement process Periodic audit of processes and procedures
Group Finance
SCM Policy 2009 SCM Procedure Manual 2008 SSME Policy 2009
Input: Review of SCM processes and procedures Review of SCM policy Output: 50% Improvement in the efficiency and performance
Input: Review of SCM processes and procedures Review of SCM policy Output: 70% Improvement in the efficiency and performance
Input: Review of SCM processes and procedures Review of SCM policy Output: 85% Improvement in the efficiency and performance
Financially and administratively sustainable and resilient city
On-going clean audits
Clean audit report
Clean audit report
Clean audit report
Training Initiatives to control weaknesses within the system
Group Finance
Qualification
Input: Clear all prior year audit issues Identify and mitigate additional areas of audit risk and clear Respond to all current year’s audit and accuracy Improvement on internal controls Output Clean audit report
Input: Clear all prior year audit issues Identify and mitigate additional areas of audit risk and clear Respond to all current year’s audit and accuracy Improvement on internal controls Output Clean audit report
Input: Clear all prior year audit issues Identify and mitigate additional areas of audit risk and clear Respond to all current year’s audit and accuracy Improvement on internal controls Output Clean audit report
81
PRIORITY 2: AGRICULTURE AND FOOD SECURITY
2014/15 Priority Implementation Plan: Agriculture and Food
Security
Annexure A: Draft 2014/15 Priority Implementation Plan
JOBURG 2040 OUTCOME: IMPROVED QUALITY OF LIFE AND
DEVELOPMENT-DRIVEN RESILIENCE FOR ALL
City Priority: Agriculture and Food Security
The right to food is enshrined in international and national laws. Article 25.1 of the United
Nations Declaration on Human Rights states that “everyone has a right to a standard of living
adequate for the health and wellbeing of himself and of his family, including food…” The South
African Bill of Rights reaffirms in section 26 and 27 that everyone has the right to sufficient food.
The Integrated Food Security Strategy (IFSS) aims to eradicate malnutrition, food insecurity and
hunger in South Africa through increasing domestic food production and trading; improving the
generation of income and job creation in agriculture; and improving food safety and nutrition.
The policies in place to facilitate the implementation of this initiative includes the Integrated
Food Security Strategy (2002); the Zero Hunger Strategy (2009) and the Gauteng 20 Year Food
Security Strategy that the city is drawing upon in the design and implementation of its
intervention strategy.
The securing of food is critical to development and poverty alleviation as without food people
cannot carry out activities that will pull them out of poverty. Conversely poverty fuels food
insecurity creating a destructive cycle of impoverishment. The City’s Agriculture and Food
Security Priority Implementation Plan is one of the key strategic interventions identified to break
the intergenerational cycle of poverty through generating employment and sustainable
livelihoods and enhancing food security. The focus is on a multi-pronged approach which will
include actively supporting and providing incentives for small-scale growers to provide a steady
support of fresh produce from the urban food system, improve access to markets and ensuring
that the City has various strategies and policies in place to realise the right to food.
82
Johannesburg faces a number of challenges with regard to hunger and under-nutrition among
the urban poor. Food insecurity among the urban poor in the most deprived areas is standing at
42% (Urban Food Security Baseline Survey: 2008). This challenge is exacerbated by the fact that
the majority of poor people live far from the city centre and income is spent on transport and
food. Linked to rapid urbanisation are the diseases of lifestyle which are the fastest growing
causes of death among both the poor and middle class.
In order to operationalise the efforts within the City the COJ Food Resilience Framework was
established in 2012 and provides for the structure of three levels of intervention, as follows:
A range of instruments to be used to tackle individual hunger on a day-by-day basis
including food vouchers, food parcels, backyard gardens and programmes connecting
citizens to income generating activity which will enable them to buy food;
The informal food supply sector to be supported with local resource coordination to
assist growers with access to basic supplies, finance and farming advice. Growers will be
linked to properly constituted local trading spaces / linear markets, which largely do not
yet exist in the most deprived portions of the City; and
Urban agriculture at the area level is to be supported where feasible through the
packaging of land, and the establishment of hub-and-spoke infrastructure to connect
networks of local producers to cold-chains, packing houses and wider distribution
networks.
Economic Landscape: The Agriculture and Food Security PIP is positioned to have both a social
and an economic impact primarily on the lives of poor citizens of Joburg. It holds potential in
contributing to addressing the problem of unemployment among young people in particular
through investment in the opportunities brought about by the agricultural value chain. The
economic potential needs to be harnessed through the various actions packaged by the city in
this Priority Implementation Plan.
Developmental Service Delivery Model: The Priority enables communities to partner with the
city in addressing the challenge of hunger, under nutrition, over- nutrition and unemployment.
It enables communities to take personal action and responsibility to grow food to leverage their
food reserves and also to partner with other community members through cooperatives to
enhance their ability to produce additional food they can sell to the public to improve their
83
income. In order to grow the market the city would explore the implementation of the
structured demand approach that involve direct purchase of small farmers’ produce by the city
for its social development programmes to stimulate the growth of the business and generate
employment potential and enable entry into the formal markets.
The hub-and-spoke system will directly enable the DSDM approach through the following
channels/ interventions:
a) Budget spend on agri-resource centres and hub-and-spoke sites will directly support,
sustain and enable local micro value chains in farm production, transport, agro-
processing, linear markets, warehousing and retail- all serviced by co-operatives and
new micro-enterprises drawing entrepreneurial providers and labour from highly
deprived areas
b) Micro-farms organised into co-operatives drawn from the deprived areas are the key
users of the hub-and-spoke system, which allows several small micro-farms to
collaborate and supply the market as if they were one large farm. These hubs can
directly supply city bulk purchase needs for food parcels, catering purposes and be
linked directly with restaurants aligned with the City through healthy lifestyle
partnerships.
Inner city: The initiative seeks to contribute to the inner-city through growing the potential of
rooftop gardens including the use of the abandoned buildings for hydroponic farming, working
with young inner-city farmers to provide inner-city with fresh food.
Corridors of Freedom: The Corridors of Freedom provides an opportunity to the sustainability of
the food security aspect of the program through the creation of markets for micro-farmers and
working with the informal food traders to become ambassadors of promoting healthy diets. The
healthy lifestyle would benefit through promotion of the greenbelt, tree planting, landscaping
the corridors, outdoor gyms and also through an accessible health facility in the corridor
(upgrade or build)
• Agri-Resource centres and satellite sites will serve all 3 of the primary corridors: Louis
Botha served by Alex and Betrams satellite sites, with planned additional satellite site in
Orange Grove.
84
• Significant opportunity for local food markets attached to transit precincts/ Rea Vaya
stations : Transit precincts are ideal sites for linear farmers markets selling micro-farm
produce sourced through Agri-Resource Centre networks & Hub-and-Spoke systems
• Agro-processing opportunities can be pursued as part of the light-industrial mix along all
3 corridors: Factory spaces appropriate for agro-processing (some already under public
ownership) exist in Turfontein, the South-East of the Empire-Perth corridor (east of Eldorado
Park) and in Alex.
• As the Food Resilience & Urban Agriculture Programme matures, People’s restaurant
locations can be sited along the corridors
• Illegal dumpsites along the corridors can be reclaimed as communal/ homestead
gardens aligned to planned green-scaping by City parks.
The key objectives of the city’s interventions are:
To promote access to food in the necessary quantity, quality and regularity for people who
are facing nutritional and food insecurity, under the human right to adequate and healthy
food perspective and work towards the reduction of severe food insecurity within areas that
are identified as highly food insecure by 60% by end of 2016;
To promote and enhance biodiversity and the organic and agro ecological food production,
and strengthen city region healthy eating habits;
To provide support for people interested in farming through small scale agricultural
activities and linking small farm produce to markets / communities and encourage the
consumption and promotion of the food produced by cooperatives and small farmers;
To take advantage of the agricultural value chain to stimulate local economic
development in deprived areas through incentives and setting up sustainable local supply
network through small farmers in local areas;
To facilitate entry into formal markets through removal of barriers to entry for small
farmers, infrastructure development (storage, processing, cold storage facilities and
transportation) and capacity building to meet quality and safety requirements;
To consolidate and enhance partnerships with retailers which provide opportunities for
small farmers and enforce affordable food pricing; and
To create an enabling environment that promotes healthy lifestyles and undertaking
reasonable steps to ensure legal compliance (access to food, food safety).
85
Key Focus Areas
Access to Food Programme
The primary aim of this programme is to promote access to safe and affordable food at
household level. The programme component seeks to respond to immediate needs of
beneficiaries for food and aims to ensure that all of the identified households at the highest
risk of food insecurity are assisted through one of the initiatives (e.g. Food Bank; Food for
Waste; Home based Food Gardens of all types etc).
Urban Agriculture Support Programme
This focus area is aimed at providing a sustainable model for empowering communities to grow
their own food, stimulating local economic development and facilitating access to the markets.
A number of initiatives will be used:
Agri-resource Centers: set up in all regions of the City, these are community based
support systems for agricultural activity at an individual/household and communal level.
Small Scale Initiatives Targeting Specific Areas (Hub and Spoke – Located at the Agri-
Resource Centre): The City will support initiatives in small-scale crop farming and small-
scale intensive animal farming through cooperatives and small enterprises.
Large Scale Initiatives – Food Empowerment Zone: The development of Food
Empowerment Zones in available large pieces of land zoned agriculture. These would
involve farms ranging from one hectare to over 100 hectares set to be harvested to sell
to food retail giants.
o Supporting Emerging Farmers – division of land into various pieces for a cluster
of SMMEs and or cooperatives. This cluster of entrepreneurs which may be up
to 50 farmers involved in diverse farming activities would have share through
being part of a tertiary or secondary cooperative a common slaughter houses,
common cold chain and common distribution point and system.
o Private Sector investment – A large portion of land within the farm where the
emerging farmers would be operating would be leased out to a private sector
partner on condition that they commit to a mentorship programme for the
emerging farmers to reach industry standards.
o Capacity to Transform Into Manufactured Food – Within the empowerment
zones efforts will be made to capacitate the farming enterprises to build
capacity to transform food into manufactured food. In this regard the City will
partner with various stakeholders primarily the Small Enterprise Development
86
Agency (SEDA) through GDED (GEP) on incubator on food processing /Agro-
processing.
o Market Access – The key initiative is to physically bring markets closer to
communities either through setting them up or providing mobile facilities, or by
enabling the local producers to supply to large retailers.
Promoting healthier eating and healthy lifestyles programme
The city like many other urban areas in the world is facing an increase in non-communicable
diseases predominantly brought on by how people lead their lives and treat their bodies
through what they eat. In addition, lack of nutritious food (under-nutrition)5 for the poor is a
reality. This programme targets all residents of the city of Johannesburg and is premised on the
notion that it will be delivered through partnership with the civil society, private sector and
other spheres of government to ensure nutrition security within the city. Levers of the
intervention include:
Community Programmes primarily facilitated by the City in partnership with various
stakeholders that would enable communities to actively participate in activities at local level
(e.g. Street Alive, Outdoor Gyms, Senior Citizens Club Activities, School programmes, fun
walks, support groups etc).
Corporate Focus: City in partnership with the private sector to set up an Excellence Award
for Best Practice in promoting healthy lifestyle within companies.
Educational and Awareness Campaigns via multimedia platforms would be undertaken on
continual basis to raise the knowledge levels of the residents to assist them in making the
necessary decisions to promote healthy living.
The National Health Insurance model also places greater emphasis on population based health
and outcomes. This new strategy entails establishment of ward based primary health care
outreach teams that will offer an integrated health service at community, household and
individual level. They will provide the link with the community to provide an enabling
environment for the communities to take responsibility for their health.
Key outcomes:
5 Under-nutrition refers to lack of sufficient micro-nutrients- such as vitamins, iron and zinc. In children, a
severe and/or chronic lack of adequate nutrition can manifest in underweight and stunting
87
Create an enabling environment for high value food commodities e.g. vegetables, fruit &
animal products to be sold locally linking small farmers in their own areas
Agribusiness Ventures and Farm Enterprises providing fresh, locally grown food for
growing urban population and viable food procurement and distribution systems
Work with large food retailers, distributors and manufactures to create localized system
through which to ensure food security
Sustained visible multimedia and programmatic intervention in collaboration with multi
stakeholders working towards a prosperous, healthy, productive citizenry (Joburg brand
associated with healthy living)
88
National outcome: Vibrant, equitable and sustainable rural communities with food security for all
Joburg 2040 outcome: Improved quality of life and development-driven resilience for all
Long term
impact
(Joburg 2040
related output)
IDP
programme
Key
Performance
Indicator
(2013/16)
Target (2013/16) Projects /
interventions
Baseline
(2006/11)
Target 2013/14
financial year
2014/15 Budget
(per programme)
2015/16 target
Capex Opex
Food security
that is both
improved and
safeguarded
Access to
Food
%6 reduction in
food insecurity
15% reduction in the
severe malnutrition
incidence
Child Health: Growth Monitoring & nutritional support
5% reduction in the
severe malnutrition
incidence
0 X 5% reduction in the
severe malnutrition
incidence
60% reduction in
food insecurity in 60%
of most deprived
areas identified by
food insecurity index7
Food vouchers, food parcels, backyard gardens and programmes connecting citizens to income generating &
affordable nutritious food
42%
households
food insecure
in current
research in
most deprived
areas
20% reduction in
food insecurity in
20% of most
deprived areas
identified by food
insecurity index
0 7494 20% reduction in
food insecurity in
20% of most
deprived areas
identified by food
insecurity index
Number of Neighbourhood
8 and
small scale food
2 Neighbourhood
Food Gardens
established
Applied
through
CIMS
Opex
budget
should
20 Neighbourhood Food Gardens established
6 The % reduction will be against the actual achieved for the 2013/14 financial year. This will become the baseline from 2014/15 year and the 5% reduction will be against this baseline.
7 39 of the City’s Wards are ranked as most deprived areas (rank 8-10 on the City’s poverty index) with a total population of 1 556 744 citizens (1 127 533 working age): 72% of each ward on average under age of 35. 23 of these wards (selected according to highest levels of deprivation and highest population) account for the 60 % most deprived areas to be targeted over remainder of mayoral term. The total population living in these 60 % targeted wards is 897 577, of this population 146 398 households made up of 441 191 individuals are estimated to be food insecure. 60 % of this food insecure target group is 87 839 food insecure households made up of 264 714 individuals, and this is the target to be assisted over the remainder of the mayoral term, in 3 equal annual tranches of 29 280 households per year, made up of 88 238 individuals. 8 A neighbourhood food garden- normally school based gardens and small gardens within park. The objectives at small scale add on existing produce for schools, to supply at minimal scale produce to communities,
mostly elderly). JCPZ inputs on education, Schools, develop and manage the gardens. JCPZ develops a garden and train users, beneficiaries, they manage the garden. Number of gardens developed in schools
(normally through partnerships) JCPZ measure how many schools are benefiting. For park gardens, its number of households benefitted
89
National outcome: Vibrant, equitable and sustainable rural communities with food security for all
Joburg 2040 outcome: Improved quality of life and development-driven resilience for all
Long term
impact
(Joburg 2040
related output)
IDP
programme
Key
Performance
Indicator
(2013/16)
Target (2013/16) Projects /
interventions
Baseline
(2006/11)
Target 2013/14
financial year
2014/15 Budget
(per programme)
2015/16 target
Capex Opex
gardens
and
subject
for
approv
al is
R10,000
,000.00
be 10%
of the
Capex
budget
applied
through
CIMS – R
1 000
(City Parks)
Food Bank initiative: Tonnes of food made available to support identified families in deprived areas facing hunger
450 tonnes
5000 as per
the 2012/13
target house
100% of food
insecure
households in CoJ
ESP database
challenge
addressed through
accessing nutritious
food package
0 R2m 100% of food
insecure households
in CoJ ESP database
challenge addressed
through accessing
nutritious food
package via Food
Bank initiative
(JFPM)
600 Homestead and
Communal Food
Gardens
Food Gardens (schools, cooperatives, individuals, communal )
160 Food
gardens
385 0 9367 600
426 households benefiting from the programme (142 per annum)
Exchanging waste for food in targeted areas
New 142 households
benefiting from
exchanging waste
for food parcels in
targeted areas
Nil R2
million
250 households benefiting from exchanging waste for food parcels in targeted areas (PIKITUP)
% of small-scale
agriculture
60% of small-scale
agriculture projects (in
Priority areas identification and/or
3000
opportunities
20% of identified
household being
X X
90
National outcome: Vibrant, equitable and sustainable rural communities with food security for all
Joburg 2040 outcome: Improved quality of life and development-driven resilience for all
Long term
impact
(Joburg 2040
related output)
IDP
programme
Key
Performance
Indicator
(2013/16)
Target (2013/16) Projects /
interventions
Baseline
(2006/11)
Target 2013/14
financial year
2014/15 Budget
(per programme)
2015/16 target
Capex Opex
projects (in a
mixed housing
developments)
developed and
sustained to
increase food
security to
households
a 34000 mixed
housing opportunities)
developed and
sustained to increase
food security to
households
densification Land assembly for
housing development
facilitated
With provision
in the
settlement
design for
food gardens
food secured as per
COJ Food
Insecurity Index
Job-intensive
economic
growth
Urban Farmer
Support
% Growth in
market share of
emerging
producers
5% Market share
acquired by emerging
producers
Programs
New
2% Market share at
JM
X X 5 % Market share at JM (JFPM)
Hub and Spoke
services
expanded to
increase farming
skills to facilitate
coordination of
transportation,
storage and
marketing to be
competitive
Local packaging
houses &
processing
facilities roll out
(hub & spoke
Diversified farming activities involving 240 emerging farmers supported through the functional Hubs and establishment of local market
Hubs Providing common space local farmers to maximise their access to markets
2 hub-and-
spoke support
centres
Establishment of
local market
serviced by the
Hubs in the three
Regions (A,C,G)
70 farmers
1000 3928 Diversified farming activities involving 91 emerging farmers supported through the functional Hubs and establishment of local market (social development)
91
National outcome: Vibrant, equitable and sustainable rural communities with food security for all
Joburg 2040 outcome: Improved quality of life and development-driven resilience for all
Long term
impact
(Joburg 2040
related output)
IDP
programme
Key
Performance
Indicator
(2013/16)
Target (2013/16) Projects /
interventions
Baseline
(2006/11)
Target 2013/14
financial year
2014/15 Budget
(per programme)
2015/16 target
Capex Opex
principle)
Number of food
empowerment
zones (large scale
farming )
established
4 Food empowerment
zones incorporating
emerging farmers &
private sector within
one farm fully
operational providing
animal & crop framing
Diversified activities
including manufactured
food
Large farm establishment to supply large retailers
New Establishment of 1
(one) Food
Empowerment Zone
South of
Johannesburg
supplying to large
retailers
1 000 2357 Establishment of one Food Empowerment Zone South of Johannesburg operational (Social Development)
Food security
that is both
improved and
safeguarded
Healthy
Lifestyle
Increased
knowledge on
Food Production
27 000 learners
exposed to the
programme
Education on food production programme
New 9000 learners
educated
0 2141 9000 learners educated City Parks
% compliance to
food safety
legislation by food
premises
inspected9
100% compliance to
food safety legislation
by food premises
inspected
(City of Joburg
recognition awards
initiated targeting
work places and
eating establishment )
Citywide Recognition of eating establishments promoting healthy eating and best company practice promoting healthy lifestyle in the work place
New 100% compliance to
food safety
legislation by food
premises inspected
(and recognition
awards given)
x X 100% compliance to food safety legislation by food premises inspected (and recognition awards given)
(Health)
9 Database on the number of premises will be determined at the beginning of financial year
92
National outcome: Vibrant, equitable and sustainable rural communities with food security for all
Joburg 2040 outcome: Improved quality of life and development-driven resilience for all
Long term
impact
(Joburg 2040
related output)
IDP
programme
Key
Performance
Indicator
(2013/16)
Target (2013/16) Projects /
interventions
Baseline
(2006/11)
Target 2013/14
financial year
2014/15 Budget
(per programme)
2015/16 target
Capex Opex
Long and healthy life for all
% of hypertensive patients controlled
50% of hypertensive patients controlled
10
x New 50% of hypertensive patients controlled
0 X 50% of
hypertensive
patients controlled
(Health)
% reduction in the incidence of pneumonia cases in children less than 5 years
15% reduction in the incidence of pneumonia cases in children less than 5 years
x New
10% reduction in the incidence of pneumonia cases in children less than 5 years
0 X 5% reduction in the
incidence of
pneumonia cases
in children less
than 5 years
(Health)
% HIV positive babies born to HIV positive mothers.(LG facilities)
Less than 2% HIV exposed babies born HIV positive
11
3.8% (July 2010 – June 2011)
Less than 2% HIV exposed babies born HIV positive
0 X Less than 2% HIV
exposed babies
born HIV
(Health)
10
A survey conducted in 2012/13 for COJ Health Services determined that 35% of hypertensive patients were controlled
11 National target for HIV exposed babies born HIV positive is less than 2%
93
PRIORITY 3: SUSTAINABLE HUMAN SETTLEMENTS
National Spatial
Outcomes12
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair
allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to
environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social
facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040
Outcome
Provide a resilient, liveable, sustainable urban environment – underpinned by
infrastructure supportive of a low-carbon economy
City Priority Sustainable Human Settlements
Champion
Department Development Planning
We live on a planet of cities.
It is widely reported that the largest increases in population over the next 50 years will
occur in ‘developing’ cities such as Johannesburg, signalling that the City will continue to
face an increasingly complex array of challenges in the decades to come. These
challenges will require not only a change in our approach to urban development, but a
fundamental change to our urban way of life.
The economic and other forces that drive both state and non-state actors to want growth
and prosperity are likely to be unstoppable; the key to becoming a resilient, sustainable
and liveable City is in the way we choose to define and drive that prosperity. Making our
City efficient and habitable in the face of rising urbanisation requires innovative and
coordinated urban design, planning and governance which transcend cognitive and
behavioural constraints to social transformation.
To realize the agreed-to national programme of building a non-racial, non-sexist, socially
and economically inclusive South Africa, the City is using mass public transit corridors to
reorganise the current form of the City, and transform it into a sustainable human
settlement. Corridors of Freedom are the antithesis to the apartheid spatial form and
will, over time, birth a fundamentally different society to the one we inherited in 1994.
Corridors of Freedom are therefore an urban revolution which seeks to build a new City
along and around mass transit movement lines to create housing, economic and social
opportunities in proximity to each other. They will be achieved through the application of
a variety of public instruments and incentives which seek to create, increase and capture
value. The primary output of the Corridors of Freedom is to reorganise space in the City
to increase overall economic efficiency and productivity by bringing social facilities, jobs
12 Adapted from Chapter 8 of the National Development Plan.
94
and housing closer to each other. The overarching principles of spatial development
outlined in Section 8 of the National Development Plan (NDP) are key determinants of
the sustainable human settlements outcomes that the City needs to work toward. These
outcomes are as follows:
Accessibility - ease with which people, goods and information move around the
urban system.
Integrated living spaces - which respond to as many aspects of living (work,
play, learn) as possible. Ensure integration across uses and income levels. This
requires a more intense and efficient use of space.
Economic opportunities - provide for a range of employment opportunities to
get as many people working as possible. Understand the different roles of the
City in this regard - enabler, facilitator, regulator, sponsor.
Range of housing options – choice in terms of sizes, configuration and tenure
options. Housing provision to be understood beyond the affordable housing
scope to transcend failures/trends in market led housing solutions.
Social and open space amenities - emphasise investment in humans. Social
amenities provide spaces which also foster social cohesion.
Social cohesion - emphasis on an urban environment and system which
consciously nurtures the evolution of a more cohesive society. This will manifest
in some of the investment choices made - i.e. city sponsored public
transportation system, well located and maintained social amenities, participatory
approach to planning and development.
These outcomes in turn inform the programmes that need to be achieved by the City’s
collective institutional machinery, to incrementally transform Johannesburg into a
resilient, liveable and sustainable human settlement. The plans, mechanisms and
strategies that will aid the implementation of the SHS priority are inter alia as follows:
National Development Plan;
Gauteng 2055;
Strategic Area Frameworks;
CoJ Municipal Rates Policy;
CoJ Financial Development Plan;
Urban Development Zones;13
Capital Investment Plan (CIP) and Capital Investment Priority Areas (CIPAs);
Inner City Road Map Implementation Plan;
Special Economic Zones;
Social Restructuring Zones;
SHS indices and design guidelines;
Strategic Integrated Transport Plan Framework;
Complete Streets Policy and Guidelines.
13
Currently applicable in the CBD, but City to explore extension of the UDZ along the Corridors of Freedom.
95
96
PROGRAMME MASS PUBLIC TRANSIT CORRIDORS
PROJECT 1 IMPLEMENTATION OF INTERVENTIONS IN CORRIDORS
LEAD DEPARTMENT/ME Development Planning
PROBLEM STATEMENT
Inefficient spatial form
Lack of socio-economic transformation
Low quality living environments with poor access to social facilities + economic opportunities
KPI (2013/16) % implementation of interventions in identified corridors and TOD Nodes per R250 million capital works programme
BASELINE Strategic Area Frameworks (SAFs) for Louis Botha, Empire-Perth and Turffontein
OUTCOMES
Integrated living spaces
Engineering, economic, social infrastructure
Social cohesion
14 Adapted from Chapter 8 of the National Development Plan.
15 This 2014/15 review of the IDP reflects the revision of Key Performance Indicators from the input-based indicators that were reflected in the 2012/13 IDP to output-based indicators. The output-based indicators are implementation oriented,
to be consistent with the City’s outcomes-based performance monitoring and evaluation framework.
16 The SAFs for each corridor are complemented by other projects that are designed to enable the implementation of these plans. These projects include a land use tool, an infrastructure investment plan and an economic infrastructure
analysis for each corridor. In some cases, these projects will be done for specific precincts within each corridor. The infrastructure investment plan and economic infrastructure analysis are led by EISD and Economic Development
respectively. These projects are done as part of the Departments’ daily workload.
National Spatial Outcomes14
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance Indicator (2013/16)
Projects / interventions15
Target (2013/16) Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year 2014/15 Budget (‘000) 2015/16 target
Capex Opex
% Implementation of Strategic Area Frameworks for Corridors and TOD Nodes16
Corridor Partnership Programme
5 000 -
Westbury Precinct Development
100% New Designs Phase 1 of construction (public environment upgrades including NMT and community
11 000 - Phase 2 of construction
97
17 Westbury Clinic Upgrade, new Noordgesig Clinic, new Esselen Street Clinic, Orchards Clinic.
gardens)
Non-motorised transport infrastructure
15 km of cycle lanes implemented along the UJ/Wits corridor
Designs 10km of Cycle lanes implemented along the UJ/Wits / Melville to Park Station route
Projects 100% completed 80000
NMT facilities along Rea Vaya routes
NMT facilities along Rea Vaya routes
Rea Vaya Phase 1B infrastructure completed
Improvements along the Rea Vaya routes
Identified NMT projects completed
75600
% completion of strategic land acquisition in seven (7) priority development corridors
Strategic land acquired for seven (7) priority development corridors
New indicator Acquisition instructions issued to JPC for land in: Empire-Perth Louis Botha Turffontein
Purchase of 6 portions of land in Auckland Park Purchase of identified land in corridors
2 360 - Acquisition instructions issued to JPC for land in: Diepsloot-Randburg
Engineering Infrastructure: City Power
100% expenditure of allocated capital budget
New indicator 100% expenditure of allocated capital budget
100% expenditure of allocated capital budget
19400 - 100% expenditure of allocated capital budget
Engineering Infrastructure: City Power
100% expenditure of allocated capital budget
New indicator 100% expenditure of allocated capital budget
100% expenditure of allocated capital budget
19400 - 100% expenditure of allocated capital budget
Social Infrastructure: Community Development (Libraries, Stadia, Recreation Centres and Sports Facilities
100% expenditure of allocated capital budget
New indicator 100% expenditure of allocated capital budget
100% expenditure of allocated capital budget
12640 - 100% expenditure of allocated capital budget
City Parks 100% expenditure of allocated capital budget
New indicator 100% expenditure of allocated capital budget
100% expenditure of allocated capital budget
5 000 - 100% expenditure of allocated capital budget
Health17 100% expenditure of allocated capital budget
New indicator 100% expenditure of allocated capital budget
100% expenditure of allocated capital budget
59000 - 100% expenditure of allocated capital budget
98
PROGRAMME MASS PUBLIC TRANSIT CORRIDORS
PROJECT 2 REA VAYA PHASE 1C INFRASTRUCTURE
LEAD DEPARTMENT/ME Transport and JDA (implementation)
PROBLEM STATEMENT
Inefficient spatial form
Lack of socio-economic transformation
Poor urban mobility
KPI (2013/16) Implementation of phase 1C infrastructure (8km of roadways, 5 stations and Alex / Wynberg depot 40% completed towards public transport expansion and services to
residents)
BASELINE Designs completed
OUTCOMES Safe, affordable + efficient public transport
Increased accessibility to and within the Corridor
National Spatial Outcomes18
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance Indicator (2013/16)
Projects / interventions
Target (2013/16) Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year
2014/15 Budget (‘000) 2015/16 target
Capex Opex
Rea Vaya: Implementation of phase 1C infrastructure (including 8 km of roadways and 5 stations)
Rea Vaya Phase 1C (Louis Botha corridor)
Phase 1C implemented
Designs completed
75% of designs completed and road construction commenced and in progress
R536 - Phase 1C maintenance plans in place Additional stations constructed
18 Adapted from Chapter 8 of the National Development Plan.
99
PROGRAMME MASS PUBLIC TRANSIT CORRIDORS
PROJECT 3 REA VAYA BRT RIDERSHIP
LEAD DEPARTMENT/ME Transportation
PROBLEM STATEMENT Increase Rea Vaya BRT share of public transport mode
KPI (2013/16) TBC
BASELINE 45 000 passenger trips per day
OUTCOMES Safe, affordable + efficient public transport
Decrease in greenhouse gas emissions
National Spatial Outcomes19
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance Indicator (2013/16)
Projects / interventions
Target (2013/16)
Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year
2014/15 Budget (‘000) 2015/16 target
Capex Opex
Increase Rea Vaya BRT share of public transport mode
Number of passenger trips per day commuted through Rea Vaya (Phase 1A and 1B)
60 000 passenger trips per day through Rea Vaya
30 000 passenger trips per day
30 000 passenger trips per day
50 000 passenger trips per day
- 377
60 000 passenger trips per day through the Rea Vaya
19 Adapted from Chapter 8 of the National Development Plan.
100
PROGRAMME TRANSIT ORIENTED DEVELOPMENT
PROJECT 1 TOD ROLL OUT IN PRIORITISED NODES
LEAD DEPARTMENT/ME Development Planning and Transport
PROBLEM STATEMENT Poly-nucleic City Form
Undefined hierarchy of nodes and uncoordinated investment and interventions
KPI (2013/16) New indicator
BASELINE SDF and DED Nodal assessment
OUTCOMES Integrated living spaces Engineering, economic, social infrastructure Social cohesion
National Spatial Outcomes
20:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance Indicator (2013/16)
Projects / interventions
Target (2013/16)
Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year 2014/15 Budget (‘000) 2015/16 target
Capex Opex
New indicator Jabulani: Second phase of construction to upgrade public environment and create new transit precinct. Interventions include stormwater infrastructure, and
100% SDF and DED Nodal Assessment
tbd 100% expenditure of allocated budget
% of 350 000 - 100% expenditure of allocated budget
20 Adapted from Chapter 8 of the National Development Plan.
101
National Spatial Outcomes20
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance Indicator (2013/16)
Projects / interventions
Target (2013/16)
Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year 2014/15 Budget (‘000) 2015/16 target
Capex Opex
a section of the station link.
New indicator Kliptown: Kliptown Walter Sisulu Square Upgrade
100% SDF and DED Nodal Assessment
tbd 100% expenditure of allocated budget
2 000 - 100% expenditure of allocated budget for Walter Sisulu Square upgrade
New indicator Randburg: Selkirk Infrastructure installation
100% SDF and DED Nodal Assessment
tbd 100% 20 000 - 200 units
Catalytic public investment in Randburg Civic Precinct and CBD
Randburg: Public environment upgrading in Randburg CBD and civic precinct property development
100% SDF and DED Nodal Assessment
100% 100% % of 350 000 - 100% expenditure of allocated budget
102
PROGRAMMES PRIORITY AREA IMPLEMENTATION + GRAVEL ROADS
PROJECT 1 IMPLEMENTATION OF PRIORITY AREA PROGRAMME
LEAD DEPARTMENT/ME Development Planning, DED, Housing, JOSHCO, JPC, JDA
PROBLEM STATEMENT Lack of catalytic investment in identified Priority Areas (previously marginalised areas)
KPI (2013/16) Catalytic public investment in Priority Areas: Gravel roads, public environment upgrades
BASELINE 100% of capital works program complete
OUTCOMES Upgrading and improvement of historically marginalised areas of the City
Integrated public investment in focus areas to lever private investment for local economic development and job creation
National Spatial Outcomes21
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance Indicator (2013/16)
Projects / interventions
Target (2013/16) Baseline (2006/11)
Actual 2013/14 financial
year
Target 2014/15 financial year
2014/15 Budget (‘000) 2015/16 target
Capex Opex
Catalytic public investment in Priority Areas
Diepsloot: Ngonyama Road upgrade and new park development
100% implementation of Priority Area Programme for financial years
100% of Capital Works Programme Complete
100% implementation of Priority Area Programme for financial year
100% - - 100% implementation of Priority Area Programme for financial year
Kilometres of gravel roads upgraded to surfaced roads according to Complete Streets standards
Upgrading of gravel roads to surfaced roads in 7 marginalised areas
7 marginalised areas of focus
16.99km 32.2km tbd tbd tbd 32.2km
21 Adapted from Chapter 8 of the National Development Plan.
103
PROGRAMME INNER CITY REGENERATION
PROJECTS
TEMPORARY HOUSING (JOSHCO)
STATE-LED HOUSING (HOUSING AND JOSHCO)
LINEAR MARKETS (ECONOMIC DEVELOPMENT)
IMPROVED MOBILITY (JOBURG ROADS AGENCY)
INVESTMENT ATTRACTION (ECONOMIC DEVELOPMENT)
LEAD DEPARTMENT/ME Citizen Relations and Urban Management
Development Planning
PROBLEM STATEMENT Degenerating CBD
KPI (2013/16) 18 linear markets developed or upgraded 2175 affordable rental stock and temporary/ emergency shelter in the Inner City Improved Inner City mobility
BASELINE Inner City Roadmap
OUTCOMES
Economic growth and investment
Vibrant 24/7 Inner City
Social cohesion
Range of affordable housing
National Spatial Outcomes
22:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance
Indicator (2013/16)
Projects / interventions
Target (2013/16)
Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year
2014/15 Budget (‘000) 2015/16 target
Capex Opex
Informal Trading Work-stream:
Roll out of informal trade
18 linear markets
Inner City Road Map
Refurbishment of Noord Street market.
5 linear markets upgraded or developed24
22 Adapted from Chapter 8 of the National Development Plan.
104
National Spatial Outcomes22
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance
Indicator (2013/16)
Projects / interventions
Target (2013/16)
Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year
2014/15 Budget (‘000) 2015/16 target
Capex Opex
Number of linear markets upgraded or developed
facilities in designated areas
developed or upgraded
7 linear markets upgraded or developed23
Investigation towards permanent closure of 8 short streets identified in the Inner city towards enhance mobility
Closure of 8 short streets for pedestrianisation and informal trading
Walking promoted as a mode of choice
New Temporary closure of 8 identified short streets for informal trading
- 2 000 Implementation of recommendations of the study
Housing Work-stream: Number of affordable rental stock and temporary/ emergency shelter in the Inner City
Provision of affordable rental stock and temporary/ emergency shelter in the Inner City
2175 affordable rental stock and temporary/ emergency shelter in the Inner City
Inner City Road Map Implementation Plan
AA House - 245 affordable stock (remaining 30) Europa – 168 Affordable stock (161) Affordable City Deep 136 family units (216) Selby 172 family units
Europa House 1 000 - Project complete
Nederburg Rental Housing
15000 - Project complete
11 Eloff Street Building
18000 - Project complete
195 Commissioner Street Building
22000 - Project complete
Inner City M1 – motorway 100% New Resurfacing, drainage and 100% resurfacing,
24 (1) Metro Mall informal trade stalls, (2) Faraday Market upgrading, (3) Hoek Street Linear Market, (4) Jeppe Street Linear Market, (5) Westgate Linear Markets. 23 (1) Eloff Street Linear Market, (2) Twist Street Linear Market, (3) Jeppe Market, (4) Yeoville Market (upgrading), (5) Metro Mall (market repairs), (6) Quartz Street Linear Market, (7) Faraday Market (additional trading stalls).
105
National Spatial Outcomes22
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance
Indicator (2013/16)
Projects / interventions
Target (2013/16)
Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year
2014/15 Budget (‘000) 2015/16 target
Capex Opex
Mobility: Lane kilometres of road upgraded
upgrading Resurfacing, drainage and miscellaneous bridge upgrade
miscellaneous bridge upgrade
drainage and miscellaneous bridge works
M2 – motorway upgrading
100% Resurfacing, drainage and miscellaneous bridge upgrade
New Resurfacing, drainage and miscellaneous bridge upgrade
100% resurfacing, drainage and miscellaneous bridge works
Inner City Mobility: Improved Mobility within the Inner City
Rehabilitation of the Robinson Canal
100% of planned work completed per schedule to improve mobility within the Inner City
New Phase 1A complete Phase 1B complete
Integrated Traffic Signalling
100% of planned work completed per schedule to improve mobility within the Inner City
New Upgraded compliant signalised traffic intersections
PROGRAMMES ALTERNATIVE RENTAL STOCK
HOUSING DELIVERY IN INTEGRATED AND SUSTAINABLE HUMAN SETTLEMENTS
106
PROJECT 1 NEW HOUSING ALTERNATIVE TO BACKYARD SHACKS
MIXED25 HOUSING OPPORTUNITIES IN THE CITY
LEAD DEPARTMENT/ME Housing
PROBLEM STATEMENT
Slow housing delivery
Unsustainable housing location and typologies
‘Informal and illegal’ housing market
KPI (2013/16) Mixed housing opportunities created
New housing standard developed
BASELINE SHSUP (base document)
OUTCOMES
Range of affordable housing opportunities in the City Safe + healthy rental accommodation Locally based support mechanism that empowers owners to improve their accommodation + rental income Supportive engineering infrastructure + billing of services
National Spatial Outcomes26
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance
Indicator (2013/16)
Projects / interventions
Target (2013/16) Baseline (2006/11)
Actual 2013/14 financial
year
Target 2014/15 financial year
2014/15 Budget (‘000) 2015/16 target
Capex Opex
Mixed housing opportunities created
Mixed housing opportunities
34 000 mixed housing opportunities
3000 units delivered 3200 units delivered
New housing standard
Sample houses for rent and Technical
Four sample houses and
Better House Programme
Sample house and Technical Support
Construction of sample houses and
- 653 Sample houses and Technical Support Centres completed for four
25 Mixed housing means a mix in typology, income group and tenure.
26 Adapted from Chapter 8 of the National Development Plan.
107
developed
Support Centres to assist construction and access to finance
Technical Support Centres completed
Centre completed in one focus area (Braamfischerville)
establishment of Technical Support Centres in two focus areas.
(4) focus areas
PROGRAMME ALLEVIATION OF LIVING ENVIRONMENT DEPRIVATION
PROJECT 1 NUMBER OF INFORMAL SETTLEMENTS BENEFITTING FROM OFF-GRID BASIC SERVICE PACKAGE
FACILITATION OF LOCAL MICRO-ENTERPRISES TO MAINTAIN OFF-GRID SERVICES
LEAD DEPARTMENT/ME EISD, Health and Social Development, Economic Development, City Power, Joburg Water, Pikitup
PROBLEM STATEMENT Inadequate access and cost of services in deprived areas.
KPI (2013/16) 50 informal settlements benefiting from off-grid basic services package
BASELINE New indicator
OUTCOMES Co-production in the delivery of basic services Poverty alleviation
National Spatial Outcomes
27:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance
Indicator (2013/16)
Projects / interventions
Target (2013/16) Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year 2014/15 Budget (‘000) 2015/16 target
Capex Opex
Number of informal settlements benefiting from off-grid basic
Technical specification of basic services package28
100% completion of off-grid service solution in 50 informal settlements
New Concept document and action plan for 1 highly deprived area (Slovo Park informal settlement)
100% completion of Phase 1 – Report on an integrated off-rid solution for Slovo Park
- 108000 Reduced living environment deprivation , as measured by improved access to sanitation in 50 informal settlements serviced
27 Adapted from Chapter 8 of the National Development Plan.
28 a) off-grid energy, b) off-grid sanitation, c) waste management to compost and/or reuse recyclables as energy, d) temporary shelter built from smart materials replacing traditional shack, e) microcredit for installation costs of (a) , (b) and maintenance applied through charges for services at zero or close to zero interest.
108
National Spatial Outcomes27
:
Spatial Justice: Spatial reconfiguration to address the historic legacy of the unfair allocation of public resources and goods.
Spatial Sustainability: Sustainable patterns of consumption and production.
Spatial Resilience: Protection of ecological systems to reduce vulnerability to environmental degradation.
Spatial Quality: Aesthetic and functional features of the built environment
Spatial Efficiency: Efficient commuting patterns to bring jobs, houses and social facilities closer to people and people closer to jobs, houses and social facilities.
Joburg 2040 Outcome : Provide a resilient, liveable, sustainable urban environment – underpinned by infrastructure supportive of a low-carbon economy
Key Performance
Indicator (2013/16)
Projects / interventions
Target (2013/16) Baseline (2006/11)
Actual 2013/14 financial year
Target 2014/15 financial year 2014/15 Budget (‘000) 2015/16 target
Capex Opex
services package
Facilitation of local micro enterprise/co-operatives to maintain and roll-out off-grid services package as a first step to developing capability in deprived areas to deliver and maintain permanent services infrastructure
50 informal settlements
New Development of financial operating model for co-operatives and micro enterprises Specification of a training trajectory designed to build the skills and capabilities of the same co-operatives and micro-enterprises Development of a candidate profile and screening process for local unemployed youth and adults in informal settlements
100% development of financial operating model 100% specification of training trajectory 100% development of candidate profile and screening process
50 clusters of Micro enterprises and co-ops linked to 50 target informal settlements
109
PRIORITY 4, 8 & 9: ECONOMIC DEVELOPMENT
A brief description of the services provided which may include the level and standard of
service provided to each customer group;
Investment Promotion & Facilitation
Promotion of Investment Opportunities
Marketing of Investment Projects
Information on the various investment sectors and industries within South
Africa
Facilitation of investment missions, including travel itineraries
Introduction to key stakeholders in private and public sectors
Introduction to potential joint venture partners and black economic
partnerships
Consultation on the prevailing regulatory environment
Information on incentive packages
Guidance with plant/site locations – Industrial Development Zones
Assistance with work permit applications
Logistical support for relocation
Dedicated aftercare service
Input into policy formulation
110
111
Investment Promotion & Facilitation
FIRST PHASE PROJECT IDENTIFICATION / EVALUATION /
SCOPING
PACKAGING
AND SCOPING THE
PROJECT
JOBURG T&IP
STEP 1 STEP 2 STEP 3 STEP 4
TIME FRAME OF ONE MONTH
STEP 5
T&IP
DRAFT INVESTMENT
BRIEF TEMPLATE
AND PROJECT
MATRIX
STEP 6
EVALUATION OF PROJECT
REQUEST COMMENT
TAKE FINAL DECISION
ON PROJECT
T&IP / FER /
GGDA/ DTI / FER /GGDA / DTI
•PRE-FEASIBILITY
OF PROJECT •OBTAIN
PRELIMENARY INVESTMENT
RESEARCH AND ANALYSE MARKET
INTELLIGENCE •PRELIMENARY
COMPANY & PROJECT
IDENTIFICATION
FINAL REVIEW
/ SIGN OFF ON PROJECT
BRIEF
T&IP
IDENTIFY
POTENTIAL INVESTORS
T&IP/GGDA/FER
112
Investment Promotion & Facilitation
SECOND PHASE MARKETING, RECRUITMENT AND
PLANNING
SCREENING AND SELECTION INVESTORS/ PROJECTS
STEP 8
T&IP / FER
SITE VISIT, COMPANY
AUDIT/INVESTMENT APPRAISAL & DUE
DILIGENCE (ONLY WHEN REQUIRED)
STEP 9
T&IP / GGDA / EC
PREPARE COMPANIES
AND TECHNICAL INTERVEN-
TIONS
& INVESTMENT APPRAISAL /DUE
DILIGENCE
STEP 11
T&IP / EC / GGDA
STEP 7
DOMETSIC PROMOTIONAL
AND RECRUITMENT
ACTIVITIES
T&IP/EC/GEDA/
CoJ MKTNG/
STEP 10
T&IP/FER/
EC/
COMPLETE *MB
AND SCREENING AND SELECTION OF
PROJECTS/INVESTORS
(TARGETING ACTIVITIES)
TIME FRAME OF ONE MONTH TO SIX MONTHS
MATCHMAKING &
INVESTMENT SEMINARS
STEP 12
FER/T&IP
113
A description of senior management capability and structure;
A cadre of highly experienced and qualified Trade and investment promotion with proven
track record. The team that possesses the ability to use both the left hand side and the right
hand side of their brains. Dedicated and highly skilled personnel with proven track record.
The team with strategic international networks and economic diplomacy..
Objective
A programme of all the activities leading towards trade and investment attraction , business
retention expansion, growth and job facilitation towards 2040. The following are the building
blocks of strategic activities that makes up the BSIV programmes :
• Sector Research v/s Trade and investment markets & Economic Corridors
• Identification and Packaging Investment Project and Opportunities
• Investors Roundtable
• Investment Fast tracking
• International Investment Forum
• Investor’s Day -Infrastructure Investment Economic Corridors
• Market Day- Agro-processing Market of the Future
• Tourism Roundtable
• Investor’s Days –Property Development and Construction
• Trade Exhibition - Export Week • Permanent Exhibition – displaying value added products
• Exporter’s Roundtable- Freight and logistics
• Generic Marketing Campaign – Fresh Produce & Agro-processing
• Export Development
• Export readiness
• Product Component Model
• Market penetration/off-take- Walmart & export
• Joburg –GEP-SEDA –Walmart 180 clients (small and emerging
exporters)
• CoJ Incentives Programme
• Investment Global Outreach Programme
• Why is this a priority?
This is a mayoral priority as it supports the City’s GDS 2040 for:
– job creation
– Increased rand value of exports and investment
– Investment attraction in line with NDP and Millennium Development Goal 8
114
– Raising export in line with NDP
– Contribute towards critical and strategic economic infrastructure development to
make conditions conducive for Foreign Direct Investment.
• Link to strategy
The primary outcome of the cluster is to create an environment that will ensure economic
growth that is job inclusive, resilient, and competitive, and harness the potential of citizens.
The cluster will ensure the realisation of the following outputs:
Job intensive economic growth;
Promotion and support to small exporters;
Support skills acquisition
Increased competitiveness of the economy;
Balanced spatial economic development
Support economic corridors of freedom
Strategic and employment intensive sectors
A smart city of Johannesburg that is able to deliver quality services to
citizens in an efficient and reliable manner.
• Narrative on strategic focus areas and plans to address issue
1. Joburg Export Development Programme
The Programme is linked to the national integrated export strategy and caters for
small exporters based in Johannesburg in any sector that have an exportable
commodity or service. Enterprises applying to participate must have been
established in the South African market for at least two years. The Project aims to
help these companies take that giant stride from local enterprise into export markets.
Make companies export ready administratively, technically and product wise.
Expanding the exporter base. Growth and diversification of Joburg’s export basket.
Focus on the enhancement of the national export culture, provision of information
and advice, capacity building, creation of opportunities. Assist companies at all levels
to ensure retention, expansion and diversification by company, product and market
(Global Exporter) . The Trade and Investment’s medium and short term master
programmes (Five year IDP) and key flagship projects:
• Buy Sell Invest and Visit Joburg 2013
• Export Development
Exporter Development
115
• Administrative readiness
• Technical
• Business readiness
• Export readiness
Product Development
Market Development
2. Global Outreach programme
The World Economic Forum is the leading business convening and networking forum
in the world. It is proposed that the COJ align a number of its commercial diplomacy
engagements to the regional summits held by the WEF. This would facilitate
networking with the top leadership of the world’s leading firms. The City of
Johannesburg is lobbying the WEF to be hosted for the first time in Johannesburg
which will have an impact on Johannesburg Business Tourism and Conferencing.
The City further aims to commensalise on Brand S.A as an accredited strategic
stakeholder . The City will have access to 2500 investors and decision makers
attending WEF by hosting a sideline Joburg Forum in partnership with Brand S.A.
Targeted WEF summits for the COJ’s consideration are:
• Davos-Kloster, Switzerland
• Abuja, Nigeria –
• Tianjin, China – 11-13 September 2014 ( Fresh Produce-Citrus & Agro-
processing)
• Delhi, India – November 2014
A combination of economies from the BRICS, leading emerging markets and
developed economies have been prioritized.
• China (Beijing/Tianjin)
• India (Delhi)
• Nigeria (Abuja, Lagos)
• Switzerland (Davos) Fresh Produce and Agro-processing, Jewellery
• Singapore/Indonesia –Fresh Produce and Agro-processing
• UAE –Fresh Produce and Agro-processing
• Germany (Frankfurt) Fresh Produce and Agro-processing, Auto ,Energy
• Turkey (Istanbul) leather and agro-processing
• Sri Lanka Common Wealth Business Forum
• Key Desired outcomes
– Increased rand value of exports
116
– Increased rand value of investment
– Job creation
– To ensure successful implementation of the trade and investment BSIV
programme
– To develop and review a brochure of fully costed and bankable projects
annually.
– To develop and review the incentives booklet annually
– To institutionalise the Executive Investment Fast tracking Committee
– To have a business to business matchmaking
– To generate the rand value of trade and Investment business transactions
– To expose small exporters ,emerging exporters and aspiring exporters
(SMME’s , BEE’s ,WE & Cooperatives)
– To showcase value added goods and services with elasticity of demand
– Branding and image building of the City of Johannesburg
3. Incentives Development
In order to increase industrial competitiveness and increase broad participation of enterprises in the economy, the City and the dti provides financial and non-financial support to qualifying companies in various sectors of the economy. Financial support is offered for various activities, including manufacturing , business competitiveness , export development and market access as well as foreign direct investment. The aim is to:
Identify and collate city wide investment incentives
Identify Relevant Incentives from the dti, GEP,SEFA,IDC and DBSA
Annual review existing incentives with relevant stakeholders in the City
Package and market incentives
4. Investment Project Packaging
The project approach is to firstly make an initial review of all the sectors of economic importance as guided by the CoJ. The review will consider the characteristics of each sector including existing infrastructure, competitive benefits, special needs, tax incentives, establishment of new trade partners, labour force skill and capacity as well as present private sector interest in that specific sector. This will be mapped in line with economic corridors of freedom as well as international investors and the strategic targeted market. The potential impact of projects will be considered on the local economy, future growth rates, foreign investment, job creation as well as advantages to previously disadvantaged
communities.
Post the development of a project database the projects will be evaluated for their current degree of project preparation. A project preparation budget will be implemented in order to develop bankable business plans. Additional project preparation will include financial engineering and modelling, legal advice, design work, economic impact and feasibility studies of the projects. Funding strategies will be developed though consideration of possible sources of capital, likely terms as well as projected returns for investors. Due consideration will be given to the availability and extent of CoJ’s internal resources.
117
The business plans will be prepared to the point that it can be presented to external funders to gain commitment and generate appetite for them to conduct a due diligence. In its broad sense, investment programming is a complex concept which covers project identification and prioritisation, project planning and financing, program and project management and monitoring and evaluation, therefore given the complex nature of such an assignment the preferred service provider should demonstrate capability but most importantly the proper fit for this assignment
5. Conducting In-depth Sector Research per Market , Economic Corridor and Formulating a Strategy to Promote and Position Economic Sectors in the City of Johannesburg vis-à-vis Exports and FDI Inflows Aim of project:
a. Creating an in-depth understanding of economic sectors in Johannesburg based on rigorous analysis of past and current performance in order to pragmatically position identified sector opportunities in Johannesburg to attract foreign direct investment to identified economic corridors of freedom
b. The in-depth understanding of identified sectors will be able to inform a detailed strategy of which investors to approach for fostering investment and growth in different sectors, and map/plan of how to implement this
c. Attracting FDI into the City of Johannesburg will have broad spillovers, including across departments of the City, various regions of the City, as well as provincial and national implications
Key components of the project:
d. In-depth Sector Research e. Trade, Investment, Market & Economic Corridor Mapping f. Investment optimization strategy for Corridors g. Services export strategy in line with national integrated export strategy h. Strategy Implementation
118
i. Establishment of the Competitiveness Council j. Trade and Investment roundtables
Green Economy Roundtable
Incentives Roundtable
Competitiveness roundtable
Institutionalisation of the investment fast tracking committee
Tourism roundtable
Exporter development roundtable:
Youth In Export Seminar k. International Investment Forum l. SAITEX Trade Exhibition m. Foodex Japan in partnership with Joburg Market n. Joburg Permanent Trade Exhibition
119
6. Key policies and strategies linked to the priority that guidesTrade and Investment
promotion are as follows:
Follow National, Provincial & COJ Policies & Mandates
IPAP II GEGDS IDP
ASGISA Industrial Policy Framework GDS 2040
(New Growth Path) Econ Dev Pol &Strat Framwk NSDP
Action PLAN 1&2 Region Spatial D Framework Green accord
Procurement Accord Macro Economic Policy National
Development plan Integrated Manufacturing Strategy
Gauteng Employment Growth Development Strategy
7. Job creation & Employment
Reduction in poverty and unemployment
New skills or additional skills development and labour absorption
Small business opportunities & market entry
Low skills requirement for entry into job market
Trade and Investment Promotion
8. Millenium Development Goal 8
9. NEPAD priorities
10. NGP POLICY ALIGNMENT
11. NDP POLICY ALIGNMENT
Aims:
– To create 11mil jobs by 2030
– Reduce unemployment to14% by 2020 & to 6% by 2030
– Increase GDP 2.7 times in real terms between now and 2030
– GDP per capita increase from R50k/person in 2010 to R110k in 2030
– Export volume growth by 6% a year to 2030
– Savings rate should rise from 15% of GDP to 25%
– Gross Fixed Capital rise from 17%-30%
Targets:
– Increase Exports
– Support Small Business
– Improve Education
– Boost Rural Development
– Provide affordable transport
– Reform public health
– Improve labour market
120
STRATEGIC ANALYSIS
Reflection of the previous financial year:
As stipulated by the MFMA, this section should include commentary on the past years
performance and the impact on future performance objectives. Highlight impediments,
achievements and progress against the department/ME priority programmes. Further, a
description of the changes to the service levels and standard over the period covered in the
medium term revenue and expenditure framework.
Analysis:
The aim of this section is to identify the context in which the department/ME plans are
drafted. This is an environmental scan which provides insight into key drivers which will
impact directly on the work of the department/ME. It is recommended that
departments/MEs do a contextual analysis as well as the SWOT analysis of its environment.
This exercise will assist department/ME in understanding forces driving risk and change so
that a response can be developed.
PESTL Analysis:
This analysis reflects on the political, economic, social, technological and legal environment
in which the department/ME operates in. This analysis will assist the department/ME in
answering the following questions:
121
Political:
Politically stable environment
Economic:
Competitiveness
Increasing traffic congestion
High telecommunication costs
Competition from other cities
Physical distance from certain markets e.g. Europe and
Other cities offer more competitive incentives
Investment climate
Ageing local infrastructure e.g. Sewage and rain water drain
systems
Electricity supply constraints
Perceptions of crime
Increasing skills shortage
Volatility of the international financial markets
Technology:
Disruptive and intermittent IT system
Legal:
Strong legal environment
122
Where are we now?
How is the situation in which we operate under changing?
What is likely to happen?
What should we do?
123
Strengths:
Organisational and Institutional
Investment Promotion Unit established
Competitiveness
Geographic position in the SADC region and proximity to
markets in SADC and Sub Saharan Africa
International gateway to the rest of the continent
Home of the largest stock exchange on the continent
Linkages to national, regional and global supply chains
Investment climate
Security of property rights
A stable and working democracy
Functioning court system
English language proficiency
Advanced telecommunications, transport and other
infrastructure
Availability of good educational institutions
Sophisticated financial services system
Opportunities:
Organisational and Institutional
Advocating for investment incentive changes with Treasury and
the Directorate of Trade and Industry
Competitiveness
Position as a leading investment destination in
Investment climate
Collaboration with universities and other high learning institutions
to build skills in selected areas
Facilitate investments in upgrading the infrastructure within the
city
Facilitating Investment in upgrading the transport infrastructure
within the city and linking the city to other economic centres in
124
Weaknesses:
Organisational and Institutional
Limited financial and human resources within the Investment
Promotion Unit
No direct control over all aspects of the investment climate e.g.
investment incentives
Even though there are relationships with Business chambers
links between the private sector and the TIPD can be improved
Threats:
Organisational and Institutional
Failure to manage diffused governance
Traditional investment incentives are managed by national
government
Competitiveness
Increasing traffic congestion
High telecommunication costs
Competition from other cities
Physical distance from certain markets e.g. Europe and
Other cities offer more competitive incentives
Investment climate
Ageing local infrastructure e.g. Sewage and rain water drain
systems
Electricity supply constraints
Perceptions of crime
Increasing skills shortage
Volatility of the international financial markets
125
The ‘SWOT Analysis’ considers the department/ME internal strengths and weaknesses in
relation to the external opportunities and threats. Some of the opportunities and threats
might have emerged from the contextual analysis that would have been done.
Strength: What do we do well?
Weakness: What do we not do well?
Opportunity: Where can we improve?
Threat: If we do not improve, what is likely to happen?
126
Key Success Factors vs. CoJ Objectives
Key Factors in order of priority for the City of Joburg Trade & Investment
Market Share 95% 0.5% 0.5% 3%
Key for Success CoJ other other other
1 Situational analysis(Swot,Pestie) Strong
2 Identify opportunities Strong
3 Manage operational activities Strong
4 Buy-in and teamwork Strong
5 Motivated Staff Ave
6 Quantity of skilled staff Ave
7 Financial Muscle/Budget Strong
8 Align B/plan with vision Weak
9 Identify 5 flagship projects/year Strong
10 Establish and manage staff Strong
127
PESTL Analysis:
This analysis reflects on the political, economic, social, technological and legal environment
in which the department/ME operates in. This analysis will assist the department/ME in
answering the following questions:
Where are we now?
How is the situation in which we operate under changing?
What is likely to happen?
What should we do?
SWOT Analysis:
The ‘SWOT Analysis’ considers the department/ME internal strengths and weaknesses in
relation to the external opportunities and threats. Some of the opportunities and threats
might have emerged from the contextual analysis that would have been done.
Strength: What do we do well?
Weakness: What do we not do well?
Opportunity: Where can we improve?
Threat: If we do not improve, what is likely to happen?
128
2014/15: IMPLEMENTATION AND PERFORMANCE OVERVIEW
This section outlines the critical path to be followed by the department/ ME in the year
ahead. As the title suggests, this should the “what”, the “why”, the “when”, and the “how” as
well as the desired outcomes. As outlined in the MFMA the following key areas should be
covered:
Measurable objectives;
Expected outcomes;
Programme outputs and targets of the institutions programmes;
Projects aligned to priorities
Performance measurements
Quarterly cumulative targets
The table below can be used as a guide to present in summary this information.
129
JOBURG 2040 OUTCOME: An inclusive, job-intensive, resilient and competitive economy that
harnesses the potential of citizens
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy
Key Priority Long term
impact (Joburg
2040 related
output)
IDP programme Key
Performance
Indicator
(2013/16)
Target (2013/16) Baseline
(2006/11)
Target 2013/14
financial year
Target 2014/15
financial year
Target
2015/16
financial
year
2014/15 Budget (per programme)
Capex Opex
SMME and Entrepreneurship Development
Promotion and support to small business Job intensive economic growth
Number of SMME and Entrepreneurs that are supported by the COJ and other Agencies Number of permanent jobs created Number of SMME hubs launched
7 SMME Hubs 12 Sector-based Incubators 15 000 SMME and 150 Cooperatives supported by COJ and other agencies 5 000 jobs created by SMME supported
10 000 SMME supported across City Depts. & ME 15 000 sustainable jobs created by supported SMME A measured improvement in the rate of job creation by SMME
1250 SMME supported
4 000 SMME 5 000 SMME 10 000 SMME
Nil R5m
SMME and Entrepreneurship
Promotion and support to small business
Linear Markets Number of linear markets implemented
5 Linear Markets implemented
New 0 5 Linear Markets implemented in the Inner City or Corridors
5 Linear Markets Implemented
R50,58m Nil
Creation of Work Opportunities using the EPWP Incentive Grant
Creation of 35 000 Work Opportunities 2012/2013 Creation of 50 000 Work Opportunities
Creation of 50 000 Work Opportunities 2013/2014
Creation of 50 000 Work Opportunities created
Creation of 50 000 Work Opportunities
Nil R36.492 000
130
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy
Key Priority Long term
impact (Joburg
2040 related
output)
IDP programme Key
Performance
Indicator
(2013/16)
Target (2013/16) Baseline
(2006/11)
Target 2013/14
financial year
Target 2014/15
financial year
Target
2015/16
financial
year
2014/15 Budget (per programme)
Capex Opex
2013/2014
Joburg Broadband Network(JBN)
Reduce cost of doing business Reliable fast broadband infrastructure
Access and connectivity
% reduction in the CoJ telecommunication costs by 30 June 2016
20% reduction in CoJ telecommunication costs
Terms of references Appoint Service Provider
Migration Plan and Audit verification of the Broadband fibre optic network
Migration to phase City service unto the broadband network
Nil R50m (still to be requested)
Green Economy Deliver a thriving Green and competitive Economy that maximises government and private sector assets such as land to create green industries, green jobs and green SMME entrepreneurs.
Sector Diversification, Productivity and Competitiveness Support – Green Economy
Deliver a thriving Green and competitive Economy that maximises government and private sector assets such as land to create green industries, green jobs and green SMME entrepreneurs.
Number of SMMEs (artisanal and apprentices) re-oriented and trained in green skills Number of SMMEs/co-ops facilitated with opportunities in the green sector; Number of jobs facilitated in the roll out of City wide green infrastructure initiatives and through the demand created by the City’s green procurement and practices
Green Re-orientation Facilitated Staff costs Green Economy and Incentives Policy and Stakeholder facilitation
Research in emerging green sectors Green procurement reform facilitated to empower SMMEs uptake
Two (2) newly identified green industries and implemented
Nil R7m
Buy Sell Invest and Visit Trade & Investment Promotion,
Increased competitiveness of the City’s economy
Investment Promotion Targeting WEF and CBF summits and
Increased Rand value of trade and investment and/or business transactions
R1 billion value of Investment and /or business transactions facilitated
R1 billion value of Investment and /or business
R300 million value of business transactions and/or
R300 million value of business transactions and/or
R400 million value of business transactions and/or
Nil R2m
131
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy
Key Priority Long term
impact (Joburg
2040 related
output)
IDP programme Key
Performance
Indicator
(2013/16)
Target (2013/16) Baseline
(2006/11)
Target 2013/14
financial year
Target 2014/15
financial year
Target
2015/16
financial
year
2014/15 Budget (per programme)
Capex Opex
Attraction, Business Retention Expansion
sector specific roundtables (Buy Sell Invest and Visit Joburg)
facilitated. Increased number of jobs facilitated
transactions facilitated
investment attracted 2630 construction jobs 4602 permanent jobs
investment attracted 2630 construction jobs 4602 permanent jobs
investment attracted 2630 construction jobs 4602 permanent jobs
Rejuvenation of the inner City
ICPS Properties released for development
New target Property released for development
4 properties 6 properties R11m Nil
Increased inner city competitiveness and commercialisation of economic activity nodes within the corridors
Catalisation of economic activity nodes in priority corridors through commercialisation
Mapping financial modelling , overlaying of commercialised concepts for investment optimisation
10 000 jobs 60 SMME’S
10 000n jobs 60 SMME’s
nil 5000 5000
Institutionalisation of Executive Investment Fast tracking Committee
Executive Investment fast tracking Committee institutionalised
Executive Investment fast tracking Committee institutionalised
Report approved by Sub mayoral committee
Report approved by mayoral committee ,launch and operation
Operationalisation
Nil R100K
132
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy
Key Priority Long term
impact (Joburg
2040 related
output)
IDP programme Key
Performance
Indicator
(2013/16)
Target (2013/16) Baseline
(2006/11)
Target 2013/14
financial year
Target 2014/15
financial year
Target
2015/16
financial
year
2014/15 Budget (per programme)
Capex Opex
Increased export and sector competitiveness of the City’s economy
Trade Promotion SAITEX & Foodex Japan Exhibition and Joburg Permanent Trade Exhibition and targeting sector specific roundtables
Rand value of business transaction
R1.5 billion value of business transactions
R1.5 billion value of business transactions
R600 million value of business transactions
R700 million value of business transactions
R800 million value of business transactions
Nil R2m
Increased export and sector competitiveness of the City’s economy
Trade Promotion SAITEX & Foodex Japan Exhibition and Joburg Permanent Trade Exhibition and targeting sector specific roundtables
Rand value of business transaction
R1.5 billion value of business transactions
R1.5 billion value of business transactions
R600 million value of business transactions
R700 million value of business transactions
R800 million value of business transactions
Nil R2m
133
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy
Key Priority Long term
impact (Joburg
2040 related
output)
IDP programme Key
Performance
Indicator
(2013/16)
Target (2013/16) Baseline
(2006/11)
Target 2013/14
financial year
Target 2014/15
financial year
Target
2015/16
financial
year
2014/15 Budget (per programme)
Capex Opex
Increased investment competitiveness of the City’s economy
Develop an investment optimisation strategy for economic corridors
Implementation of the investment optimisation strategy for economic corridors
Investment optimisation strategy
Investment optimisation strategy
Investment optimisation strategy implemented
Implementation
Nil R3m
134
PRIORITY 5: ENGAGED ACTIVE CITIZINERY
This priority is focused on residents’ daily experiences as they interact with the municipality. The engaged active citizenry concept advances a simple principle and notion that every resident of the City is an important stakeholder and deserves to be heard and engaged with consistently on matters of public governance and service delivery. In return, every resident is expected to be an active and responsible participant in shaping the future of the City and the general well-being of society. Through mutual coproduction the City aims to continue working together with communities to produce better outcomes. These depend upon using diverse skills and expertise of both the professionals and residents. This is particularly valuable where problems cannot be easily solved with standard solutions. A ward-based approach to active citizenry is envisaged, using a multi-centric model to promote active and participative citizenry embedded on a better understanding of residents’ needs and issues. In addition, organisational culture change, pro-active engagement, continuous citizen interaction, creation of social capital, community based planning and budgeting, advancing the ideals of responsible citizenry, civic education and empowerment will be focused on through this priority. Key outcomes
Active citizenry showing inspirational leadership at all level of society;
Enlisting of community based structures to re-energise the City and develop the interest of shared responsibility and values for the development of the city and neighbourhoods;
Creation of social compact and effective urban governance;
Enhancement of the vision of a caring municipality;
Meaningful state-society engagement;
Promote values of responsible citizenship and solidarity; and
Mobilisation of communities to take charge of their future and assume responsibility for outcomes.
135
Priority
programmes
Projects Intended
impact of
project
Key Project
Performanc
e Indicators
Measurement
unit
Baseline 2014/15
Performance
Target
Cumulative performance targets
(Tangible, measurable targets that fulfil requirements of
being SMART)
Quarter1 Quarter2 Quarter3 Quarter4
Engaged Active Citizenry
Citizen Relationship and Social Mobilisation
Active citizenship and social mobilisation
Implementation of city wide engaged active citizenry action plan
% implementation
70% 29
100% implementation of engaged active citizenry priority mobilizing 13 000 people to become active, patrons and local champions for sustainable and better communities
Finalise and approve city wide integrated priority programme action plan
50% implementation city wide targeting 3000 citizens
75% implementation city wide targeting 5000 citizens
100% implementation city wide targeting 5000 citizens
Integrated service delivery monitoring and performance assessment in line with service standards
Improved citizen satisfaction
Achievement of the Customer Charter Service Standards by reporting Department and MEs focusing on service delivery
% achievement of the Customer Charter Service Standards
70% achievement of the Customer Service Charter Standards
3090%
achievement of the Customer Service Charter Standards
60% 70% 80% 90%
29 Engaged Active Citizenry action plan to include CBP community conversations, GDS outreach, City PIPs, civic empowerment, self- reliance community initiatives, active citizenship, proactive
leadership outreach and reinforcement programme, strategic partnerships and public awareness
30 The achievement of the target solely depends on the delivery and performance by reporting departments and MEs
136
Priority
programmes
Projects Intended
impact of
project
Key Project
Performanc
e Indicators
Measurement
unit
Baseline 2014/15
Performance
Target
Cumulative performance targets
(Tangible, measurable targets that fulfil requirements of
being SMART)
Quarter1 Quarter2 Quarter3 Quarter4
Engaged Active Citizenry
Community Based Planning
Community Based Planning
Active and responsible citizenship
% percentage coordination and implementation facilitation of approved CBP Catalyst Projects
New 31
100% coordination and facilitation of CBP Catalyst and Partnership Projects
Finalised region based roll out plan of CBP Catalyst and Partnership Projects
30% implementation
70% implementation
100% implementation
31
The CBP strategic partnership projects are subject to approval of such projects by the City following community engagements
137
PRIORITY 5: RESOURCE SUSTAINABILITY
JOBURG 2040 OUTCOME: Provide a resilient, liveable, sustainable urban environment – underpinned
by infrastructure supportive of a low-carbon economy
Resource Sustainability: Description and Focus
Economic growth is strongly interrelated with the demand for water,
electricity, liquid fuel and mining and the resultant generation of
waste.
Managing natural resources as either pristine resources or as
valuable economic commodities is the prime objective of this Priority
with a focus on the consequences of using these natural resources
for human activity. Human actions are depleting Earth’s natural
capital, putting strain on the environment that the ability of the planet’s
ecosystems to sustain future generations can no longer be taken for
granted.
This means that the City has an obligation to ensure ecological
sustainable development and the use of natural resources while
furthering justifiable economic and social or human development for
purposes of survival and prosperity.
Johannesburg population will grow from 4.4 million people (2010/11)
to 5.5 million in the next ten years (2020). Taking current capacity
levels into consideration most of the infrastructure to support this
growth must therefore still be provided in years to come.
It is now the opportune time to ensure that such infrastructure are
sustainable, resilient and of a low carbon nature.
The City needs to explore and invest in new innovative measures that
will not only protect the City’s life-supporting ecosystems, but will
enhance the quality of life of its citizens. The concept of resource
sustainability includes the following key elements:
Climate change and air quality
Water security and water resource management
Biodiversity
Ecological infrastructure and open spaces
Integrated waste management
138
Key outcomes:
Reduce impact on climate change and supply of an energy mix
(diversification)
Acceptable levels of clean air
Improved and protected water courses
Water Conservation and Demand Reduction
Protection of biodiversity
Ecologically functional open space system and equitable provision of
recreational open spaces
Reduce waste to landfill sites and increasing recycling initiatives
Behavioural change around demand side management (DSM) and
environmental sustainability
Broad Assumptions
Politically-driven governance model to ensure long-term regional
focus
Joburg in the short term incrementally builds towards the city-region
through the 3 decades
Joburg will adapt NDP 2030 into its planning horizons from 2014
Decade 2 provides the NDP tie-in and delivery based on current NDP
The City needs to explore and invest in new innovative measures that
will not only protect the City’s life-supporting ecosystems, but will
enhance the quality of life of its citizens. The concept of resource
sustainability includes the following key elements:
139
Key Performance Area Policy Framework Regulatory Framework
Respond to climate change impacts.
Long-term Mitigation Scenarios for SA, 2007
Climate vulnerability assessment & action plan, 2008
Climate Change Adaptation Plan, 2009
SA Integrated Resource Plan, version 2, 2010
Discussion Paper on Carbon Tax for SA, 2010
National Climate Change Response White Paper, 2011
Energy & climate change Strategy & Action Plan, 2013
None
Air pollution reduction 2010 Air Quality Management Plan (to be reviewed in 2014/15 FY))
National Environmental Management: Air Quality Act, 39 of 2004
Air permitting & licensing (By-laws)
140
Key Performance Area Policy Framework Regulatory Framework
Demand side management (water and energy)
National White Paper on Energy, 1998 National Energy Efficiency Strategy, 2005 Energy Efficiency Design Guidelines for
buildings, 2008 Energy Demand Side Management Policy,
2012
Water Conservation & Demand Management (Accelerated Water Conservation and Demand Management Strategy towards 2014), 2012
National White Paper of Renewable Energy Policy, 2003
National Energy Bill, 2008
Strategic Framework For Water
Services , September 2003 National Water Services
Regulation Strategy, 2010
Protection of the ecological reserve and river ecosystems and conservation of water resources
Catchment Management Policy (2008) Wetland Protection & Management Plan
(2009) State of Rivers Report (2010)
Stormwater By-laws Stormwater manual
Biodiversity conservation and enhancement of ecosystem goods and services
Biodiversity Strategy & Action Plan (2009) Open Space Management Framework
(2008) Bioregional Plan (2011)
Constitution (Act 108 of 1996) The National Environmental
Management Act (Act 107 of 1998)
National Environmental Act (Protected Areas Act)
Conservation of Agricultural
141
Key Performance Area Policy Framework Regulatory Framework
Resources Act Environmental Conservation
Act Municipal Systems Act (Act 32
of 2000
Integrated waste management and regulation of the city’s waste streams
Integrated Waste Management Policy & Plan, 2011
National Waste Management Strategy,2011
Waste Management Act 59 (2008)
Waste Management Bylaws (2013)
Integration and mainstreaming of environmental issues
Requirements for High Density Areas Environmental Management Frameworks
for priority areas State of the Environment Report – 2014
(underway)
142
Annexure A: Implementation Plan: Resource Sustainability
Programme CLIMATE CHANGE, AIR QUALITY AND ENERGY PROGRAMME ( Flagship Programme)
Problem Statement Increase in atmospheric Green House Gas (GHG) emissions & High levels of air pollution High impact on Climate Change and vulnerability Declining revenue base from electricity sales
Desired Outcome Reduction in atmospheric greenhouse gas emissions/ carbon footprint Identification of opportunities and revenue streams created by Clean Development Mechanisms (CDM) under Kyoto Protocol Adaptation to the impacts of climate change by increasing resilience
Impact Indicator % Reduction in GHG emissions % Impact on enhanced resilience
Baseline Used national baseline (5-10% reduction by 2020), developing a Joburg baseline through Global Protocol for GHG emissions for Communities (GPC) measurement process
Key Performance Indicator
(2013/16) Projects / interventions Target
(2013/16) Baseline (2007/11)
MtCO2
Target 2013/14 FY
2014/15 Budget (per programme) 2015/16 target
Opex Capex
Sector: Energy % Reduction in GHG emissions as a result of purchasing less electricity from coal-base source (ESKOM)
Roll-out of Solar water heaters (City Power)
15% 8% new R50m R7.9m 15%
Retrofitting council-owned buildings (City Power)
5% 3% New To be confirmed
To be confirmed
5%
Sector: Transport % Reduction in GHG emissions from council owned fleet
Rollout for BRT Metrobus green fuel and other transport
30% 26% New To be confirmed
To be confirmed
30%
Sector: Water % Reduction in GHG emissions from
Installation of biogas plant at other WWTW’s (Joburg Water)
10% 7% new To be confirmed
To be confirmed
10%
143
Key Performance Indicator (2013/16)
Projects / interventions Target (2013/16)
Baseline (2007/11)
MtCO2
Target 2013/14 FY
2014/15 Budget (per programme) 2015/16 target
Opex Capex
WWTW’s Sector: Waste % Reduction in GHG emissions from waste to energy
Harvesting landfill gas to energy (EISD)
20% 7% 10% Nil Nil 20%
Conversion of organic waste to energy (Fresh Produce)
7% new To be confirmed
To be confirmed
7%
Sector: Biodiversity % Reduction in GHG emissions from waste to energy
Tree planting – 20 000 20% 20 000 trees planted
t.b.c t.b.c 20%
144
Programme WATER DEMAND MANAGEMENT
Problem statement Limited water supply (limited resources)
Desired Outcome Adequate water supply for urban use
Impact Indicator Maintain supply volumes at the approved extraction volumes (WUL allows for 1570Ml/day by 2020)
Baseline 2013 (Actual volumes extracted)
Key
Performance Indicator (2013/16)
Projects / interventions
Target (2013/16) Baseline (2006/11)
Target 2013/14 financial year
2014/15 Budget (per programme) 2015/16 target
Opex Capex
Limit daily usage of water (not to exceed target of 1500ML/day
Interventions to reduce water losses (non-revenue water)
6% Reduction32 (from 31% losses to 25% losses)
New
(12/13 NRW= 40.7%)
JW still using % UFW for this year and target is 29%
R98 286 25%
Interventions to increase the use of rain water harvesting:
Households (JW)
Institutions (EISD)
TBD TBD New TBD
Increase in Ground water TBD TBD New TBD
32
15.7% reduction = ± 246.49 Ml/day
145
Key Performance
Indicator (2013/16)
Projects / interventions
Target (2013/16) Baseline (2006/11)
Target 2013/14 financial year
2014/15 Budget (per programme) 2015/16 target
Opex Capex
supply from alternative sources (additional ML/day)
(exploring phase)33
Programme RIVER HEALTH & ECOLOGICAL INFRASTRUCTURE
Problem statement Poor state of river health (water quality, aquatic life, erosion, sedimentation, alien vegetation etc.) Fragmentation and degradation of open space networks and associated ecological infrastructure
Desired Outcome To improve the ecological state of rivers Well managed and ecological functional open space system and equitable provisioning of open spaces contributing to livable communities
Impact Indicator
Number of water courses rehabilitated to improve river health (measured in terms of present ecological status class which is an aggregate of the total river health including water quality, aquatic life, habitat integrity, riparian vegetation)
% increase in secured and well managed open space
Baseline 2 Water courses improved; 5 % Reduction of E.coli in Water Quality Hotspot Areas State of river Report 2010: Improvement of PESC; Klipspruit Environmental Management Framework Report; Jukskei Environmental Management Framework Report
Key Performance Indicator (2013/16)
Projects / interventions Target (2013/16) Baseline (2006/11)
Target 2013/14 financial year
2014/15 Budget R‘000 (per programme)
2015/16 target
Opex Capex
Number of water courses
Various interventions34
Number of river health monitoring
New New Nil Nil Improve 2 river health monitoring points
33
An investigation into the feasibility of ground water is included in the EISD business plan for 2014/15
146
Key Performance Indicator (2013/16)
Projects / interventions Target (2013/16) Baseline (2006/11)
Target 2013/14 financial year
2014/15 Budget R‘000 (per programme)
2015/16 target
Opex Capex
rehabilitated points improved from a lower class to a higher class35
River clean-ups (EISD)
8 River clean-ups conducted
New 3 River clean-ups
R4.6 mill R40 mill 4 River clean ups
Rehabilitation projects
Number of rehabilitation projects completed
New 2 7 projects completed
Jobs created in river health programme (EISD)
450 350 150 500
2011/12 2012/13 2013/14 2014/15 2015/16
POLLUTION CONTROL (RIVER CLEANUP) 1. Alexandra
Jukskei River: Litter and Debris control
POLLUTION CONTROL (RIVER CLEANUP) 1. Diepklooof (Bailey
Spruit tributary of klip river): Litter and Debris control
2. Lower Jukskei river in Diepsloot: Litter
POLLUTION CONTROL (RIVER CLEANUP) 1. Diepkloof (Bailey
Spruit tributary of klip river): Litter and Debris control
2. Lower Jukskei river in Diepsloot : Litter and
POLLUTION CONTROL (RIVER CLEANUP)
1. Diepkloof (Bailey
Spruit tributary of klip river): Litter and Debris control
2. Lower Jukskei river in Diepsloot
POLLUTION CONTROL (RIVER CLEANUP)
34
Various types of interventions are being undertaken to improve the quality of water courses. These interventions include pollution control (river clean-ups),
and rehabilitation projects such as fencing, embankment repairs and impoundment repairs, wetland rehabilitation, silt control, etc.
35 A new measurement to determine the general river health in a broader context is being explored. It must be determine in terms of the desired state of a
river which is based on the Present Ecological State (PES) and the viability of improving the PES.
147
2011/12 2012/13 2013/14 2014/15 2015/16
and Debris control 3. Weltevreden Park:
Litter and Debris control
4. Bruma Lake: Litter and Debris control
Debris control 3. Pampoen spruit
tributary of little jukskei river in Kysands: Litter and Debris control
4. Kaalspruit: Litter and Debris control
Diepsloot: Litter and Debris control
3. Pampoen spruit tributary of little jukskei river in Kysands: Litter and Debris control
4. Klip river
REHABILIATION 2. Kelland:
rehabilitation of wetland
3. Zola Wetland: rehabilitation of wetland
REHABILIATION 5. Orlando dam:
removal of alien invasive and fencing the conservation area
6. Zoo Lake: desilting of silt pond
7. Zola Wetland: rehabilitation of wetland
REHABILIATION 5. Bruma Lake:
rehabilitation of the lake 6. Zola wetland:
rehabilitation of wetland
REHABILIATION 5. Bruma lake:
rehabilitation of the lake
6. Mshenguville: Wetland rehabilitation
7. Princess Dump: rehabilitation measures to improve the water quality of
REHABILIATION 1. Mshenguville –
cont.: Wetland rehabilitation
2. Princess Dump- cont.: rehabilitation measures to improve the water quality of Klip river
3. Cottesmore Wetland Rehabilitation
4. Diepsloot Wetland Rehabilitation
5. Soweto Klipriver Klipspriut Rehabilitation
6. Alexandra/ Modderfontien/ Lombardy East New Ecological Infrastructure: Jukskei River
148
2011/12 2012/13 2013/14 2014/15 2015/16
Rehabilitation 7. Orange Farm New
Ecological Infrastructure: Klip River and wetland Rehabilitation
149
Programme BIO DIVERSITY PROTECTION
Problem statement Loss of biodiversity and associated ecological goods and services (flood attenuation, pollination, prevention of heat island effects, climate change resilience)
Desired Outcome Ensure persistence of ecological goods and services
Impact Indicator % of critical Biodiversity areas protected (Total area = 30,349ha). (10% protection by 2020)
Baseline Bioregional plan (high level identification and spatial representation of critical biodiversity areas in Bioregional plan) Biodiversity strategy and action plans
Key
Performance Indicator (2013/16)
Projects / interventions
Target (2013/16)
Baseline (2006/11)
Target 2013/14 financial year
2014/15 Budget (per programme) 2015/16 target
Opex Capex
% of critical Biodiversity areas conserved
Proclamation of Protected Areas (EISD)
5% of total metropolitan conserved under the Protected Areas Act
No areas currently conserved under the Protected Areas Act
2% of total metropolitan conserved under the Protected Areas Act
R1 500 5% of total metropolitan protected under the Protected Areas Act
Alien and invasive control (EISD through JZP)
50% of Alien and Invasive species infested land cleared
nil 25% of Alien and Invasive species infested land cleared
R3 500 50% of alien and invasive species (AIS) infested land cleared
150
Programme INTEGRATED WASTE MANAGEMENT PROGRAMME ( Flagship Programme)
Problem Statement Increasing waste generation and lack of landfill space
Desired Outcome Reduce waste to landfill site
Impact Indicator % Reduction in waste disposal by landfill (70% by 2020)
Baseline 8% of total waste disposed at landfill site
Key Performance
Indicator (2013/16) Projects /
interventions Target
(2013/16) Baseline (2006/11)
Target 2013/14 financial year
2014/15 Budget (per programme) R’000
2015/16 target
Opex Capex
% Reduction in Waste generation
Separation at source (household & garden waste Pikitup)
20% waste reduction (EISD & PikitUp)
8% 15% waste reduction (household, garden & commercial waste)
R500 (EISD) 20% waste reduction
Commercial waste recycling (EISD)
Establishment of waste-to-energy plant
To be determined (EISD)36
Feasibility study
To be determined Nil Nil To be determined
Number of Jobs created in waste management sector
Jobs created in recycling economy
1000jobs 1434 1000jobs created (cumulative)
Nil Nil 1000
36
Volumes of waste diverted unknown at this stage. Feasibility study underway to establish a plant – see Business Plan.
151
PRIORITY 6: SMART CITY (DRAFT)
The objective of this priority is to build Johannesburg as a smart city that provides services that are easy to access and use, while being efficient and responsive in an open and transparent way. A smarter City of Johannesburg will be based on promoting social development, service delivery efficiency, better decision making, stimulating economic activity, active citizen participation and creating a sustainable & liveable environment for its citizens. The Smart City Strategy Roadmap has been drafted as the City’s guiding document towards a holistic smart city approach which is cross domain & multidisciplinary, citizen and people oriented (active engagement), leveraging local infrastructure, connectivity, resources and providing a common underlying smart platform (interoperable). The roadmap defines a number of focus areas in creating a smarter City of Johannesburg starting with the following catalytic projects;
Smart Institution (creation of real-time platform that ensure business process
integration in terms of data governance, ICT architecture, skills development
and change management)
Smart Public Safety (creation of a safer city through the deployment of
technology & intelligent law enforcement)
Universal Access (utilise technology to eradicate digital divide and
connectivity
Green Intelligent Infrastructure/Smart Technology (focus on resource
sustainability/ automated meter reading/ connectivity and communication tool)
Mobility/ Intelligent traffic management (an integrated approach for improving
the flow of traffic through network enabled traffic lights that are synchronized
and adapting to the actual traffic load)
Citizen Engagement (platforms that promote active engagement with citizens
as co-creators, improved communication, accessible information and
services)
Innovation (research support on smart city trends);
Key outcomes:
CoJ a technologically competent institution (cutting edge SMART technology,
innovation and knowledge, skills generators, research and business
intelligence)
Johannesburg a Smart City with enhanced service efficiencies and
productivity which is maintained as the norm ;
Augmented CoJ Information, Communication and Technology (ICT) systems
and services to support and enhance citizen active involvement and
engagement;
152
Sustained provision of municipal services to households utilising the
broadband infrastructure;
Job creation through improved economic development environment; and
Achieved green economy (resilience and resource sustainability).
153
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy that harnesses the potential of citizens
Long term
impact
(Joburg 2040
related
output)
IDP
programme
Key
Performan
ce
Indicator
(2013/16)
Target
(2013/16)
Projects /
intervention
s
Target 2013/14
financial year
Target 2014/15
Financial year
2014/15
Budget (per
programme)
2014/15 target
Cap
ex
Opex Q1 Q2 Q3 Q4
A smart city of
Johannesburg
that is able to
deliver quality
services
Creation of a
smart
institution
% creation
of a Smart
Institution
100%
creation of
a Smart
Institution
New 100% integration of business processes/ architecture and application systems
25% ? 50% ? 75% ? 100% ?
80% creation of
a single
platform that
provides unified
data repository
(intelligent data,
and data
management)
20% ? 20% ? 20% ? 20% ?
154
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy that harnesses the potential of citizens
Long term
impact
(Joburg 2040
related
output)
IDP
programme
Key
Performan
ce
Indicator
(2013/16)
Target
(2013/16)
Projects /
intervention
s
Target 2013/14
financial year
Target 2014/15
Financial year
2014/15
Budget (per
programme)
2014/15 target
Cap
ex
Opex Q1 Q2 Q3 Q4
A smart city of
Johannesburg
that is able to
deliver quality
services
Integrated/ intelligent smart technology
% reduction of crime through creation of an Intelligent Operation Centre by 30 June 2016
20% reduction of crime leveraging from smart technology offered by the Intelligent Operation Centre by 30 June 2016
Intelligent Operations Centre (IOC)
Operability of the CCTV section of the IOC by June 2014
10% reduction of crime leveraging from smart technology offered by the Intelligent Operations Centre by 30 June 2015
Policing
linked to
IOC
technolo
gy &
intelligen
t law
enforcem
ent (data
analytics
an
preventat
ive
interventi
ons
Policing linked to IOC technology & intelligent law enforcement (data analytics and preventative interventions
Policing linked to IOC technology & intelligent law enforcement (data analytics and preventative interventions
Policing linked to IOC technology & intelligent law enforcement (data analytics and preventative interventions
155
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy that harnesses the potential of citizens
Long term
impact
(Joburg 2040
related
output)
IDP
programme
Key
Performan
ce
Indicator
(2013/16)
Target
(2013/16)
Projects /
interventions
Target
2013/14
financial year
Target 2014/15
Financial year
2014/15
Budget (per
programme)
2014/15 target
Cape
x
Opex Q1 Q2 Q3 Q4
A smart city of
Johannesburg
that is able to
deliver quality
services
Access and connectivity
% reduction in the CoJ telecommunication costs by 30 June 2016
20% reduction in CoJ telecommunication costs
Terms of
reference and
appointment of
service
provider
10% reduction
of the
telecommunic
ation costs
%
access
to
affordabl
e internet
access
to
libraries,
househol
ds and
100%
access to
affordabl
e internet
access to
libraries,
other CoJ
facilities,
selected
public
Wi-Fi hotspots, connectivity using city broadband infrastructure
broadband infrastructure roll out
50%
eradication
of the digital
divide(univer
sal access to
libraries
other CoJ
facilities,
public
spaces ,
All targeted
buildings/
BRT stations
and public
spaces
connected
(%
eradication
of the digital
156
Joburg 2040 outcome: An inclusive, job-intensive, resilient and competitive economy that harnesses the potential of citizens
Long term
impact
(Joburg 2040
related
output)
IDP
programme
Key
Performan
ce
Indicator
(2013/16)
Target
(2013/16)
Projects /
interventions
Target
2013/14
financial year
Target 2014/15
Financial year
2014/15
Budget (per
programme)
2014/15 target
Cape
x
Opex Q1 Q2 Q3 Q4
other
CoJ
facilities,
public
spaces,
BRT
stations,
zoo,
parks,
spaces,
48 BRT
stations,
zoo and
selected
parks.
BRT
stations, zoo,
parks, etc)
divide)
A smart city of Johannesburg that is able to deliver quality services
Integrated/ intelligent smart technology
% coverage of traffic lights as part of traffic management improvement
New
Conceptualisation of Mobility/ Intelligent traffic management approach
?
?
?
?
157
Long term
impact
(Joburg 2040
related
output)
IDP
programme
Key
Performan
ce
Indicator
(2013/16)
Target
(2013/16)
Projects /
intervention
s
Target 2013/14
financial year
Target 2014/15
Financial year
2014/15
Budget (per
programme)
2014/15 target
Cape
x
Opex Q1 Q2 Q3 Q4
A smart city of
Johannesburg
that is able to
deliver quality
services
Integrated/ intelligent smart technology
Number of
household
s
connected
to
electricity
smart
meters
250 000
households
connected
to electricity
smart
meters by
30 June
2016
Migration of
LPU
metering
data to the
new MDMS
platform
Installation
of smart
meters in 52
suburbs /
50 000 meters
and Metering
Data
Management
System to be
installed by
June 2014
25 000
(150 000
domestic
meters installed
cumulative to
end June 2015)
R550
m
100,0
00
meter
s for
2014/
15 FY
20 000 30 000 25 000 25 000
158
Long term
impact
(Joburg 2040
related
output)
IDP
programme
Key
Performan
ce
Indicator
(2013/16)
Target
(2013/16)
Projects /
intervention
s
Target 2013/14
financial year
Target 2014/15
Financial year
2014/15
Budget (per
programme)
2014/15 target
Cape
x
Opex Q1 Q2 Q3 Q4
townships
%
reduction
of billing
costs
40%
reduction in
electricity
billing costs
by 30 June
2016
Reduce billing costs by 10%
Reduce billing
costs by 12%
Reduce
billing
costs by
12%
%
improveme
nt on
electricity
consumpti
on
payment
levels
96.2%
increase in
electricity
consumptio
n payment
levels by 30
June 2016
Increase
electricity
payment levels
to 96%
Increase
electricity
payment levels
to 96.2%
Increase
electricity
payment
levels to
96.2%
159
Page 160 of 359
PRIORITY 10: SAFER CITY
JOBURG 2040 OUTCOME: Improved quality of life and development driven resilience for all
1. Overview
A Safer City approach encompasses a range of multi-disciplinary approaches and
collaborative interventions in order to address the challenges associated with crime,
violence, human security, vulnerability and resilience.
To enhance urban safety a number of key interventions and approaches will guide the City
to drive a different future, using a Safer City approach.
The City interprets one of its mandates of creating a safer city to include, investment in
public safety through community development, urban design and management, the
protection of vulnerable groups, infrastructure upgrades, improvements to by-law compliance
and enforcement, and responding to emergency and disaster situations.
Safe communities will be achieved through integration of these mandates. The Safer City
approach is dependent on enduring partnerships both within and outside of government.
Safety intersects with a number of pillars in the GDS and has mutual dependencies with
being a smart city, resilient city, social, competitive city, developmental city, liveable city and
the manner in which the drivers reflected in the City’s priority IDP programmes are
supported.
The Jo’burg 10Plus initiative, will serve as the mechanism to strengthen the implementation
of the Safer City priority, based on an integrated and multi-disciplinary approach, in dealing
with crime, violence and safety and security in Johannesburg. Through this approach law
enforcement will be well positioned to identify and report safety problems such as broken
street lights or unsafe buildings to relevant authorities through joint forums.
Building safer communities will require community participation and partnerships both within
and outside of government. Jo’burg 10Plus is further supported by the “Engaged Active
Citizenry” and “Sustainable Human Settlements and Urbanization” programmmes, which will
promote safety as a common responsibility for all citizens by building a culture of prevention.
Engaging the communities to co-manage the spaces they use and building ownership in the
city through its community based planning approach and citizen interaction will foster
Page 161 of 359
participatory processes of engaging the citizens in the planning and design of their
neighbourhoods.
1.1 Objective
The over-arching objective of this priority is to promote and create a safe, healthy, secure
and resilient environment for all citizens.
Important aspects of securing the safety of citizens include the need for citizens:
To be safe from crime;
To feel safe while travelling, as drivers, pedestrians, and passengers;
To feel safe in public spaces;
To be safe from fires and emergencies;
To be safe from the effects of natural and un-natural disasters;
1.2 Alignment to the GDS 2040
The Safer City programme contributes to outcome 1 “improved quality of life and
development driven resilience for all”, which has the following specific outputs specified by
the GDS:
a) Reduced poverty and dependency
b) Food security that is both improved and safeguarded
c) Increased literacy, skills and lifelong learning amongst all our citizens
d) Substantially reduced HIV prevalence and non-communicable diseases – and a society characterised by healthy living for all
e) A safe and secure city
f) A city characterised by social inclusivity and enhanced social cohesion
Page 162 of 359
1.3 Strategic focus areas
The following Safer City Programmes will form the basis for the City’s interventions in
targeted projects and programmes.
Programme 1: Enabling Safety through Urban Design, Management and Governance
Building safe communities and neighbourhoods require a multi-dimensional focus.
In this respect the reflection on safety as a spatial issue of design and purpose and
management is an important aspect of making communities safe. Sustainable community
safety approaches will entail environmental (re)design (CPTED) and management strategies
combined with place specific interventions informed by safety audits.
Through the development of safe design and management guidelines, City planning projects
and programmes will strengthen the safety lens/components of how it fosters sustainable
communities and neighbourhoods.
Benefits from more integration of community needs and ideas into the earlier phases of
design and planning, particularly for places that have the intention of collective use will
promote generic and situation-specific collaborative good practices. Parks, transport hubs,
community centers, service access points and shopping centers will be designed to meet
community needs, while incorporating principles of safe design; light, access and intended
user needs will be primary concerns for new developments. Connecting social well-being
with place will be important to improve liveability in the City.
The Transit Oriented Development (TOD) approach to urban planning will seek to be safety
conscious especially for women, children and the elderly in order to facilitate the use of
public transport and more public space usage. A TOD approach will support a safe and
healthy lifestyle as it aims to promote less car use, more dense use of urban spaces and
more public spaces as well as more walking and cycling
Page 163 of 359
Desired Outcome:
Changing the conditions in neighbourhoods by reducing opportunities that influence
offending and victimization through applying sensible urban safety principles.
Programme 2: Creating a Safe and Resilient City
Key Focus Areas:
• Resilient City
The reduction of the city’s most prevalent risks through data collection, mitigation plans,
education and awareness initiatives will be an important focus in building resilient
communities better prepared in times of disaster management.
• Healthy City
In addition to fostering a safe and resilient city, the focus of this programme will also be on
building a healthy city through interventions aimed at reducing prevalence of communicable
diseases.
• Smart Safety
The focus on smart safety through the establishment of a “Joint Intelligence Operations
Centre” (IOC) will enable the City to enhance early warning systems; establish good data
systems and GIS Platforms and integrate real time data from different Departments and
MOE’s , in order for City departments to respond effectively to service delivery, public safety
and security issues.
The collection and collation of relevant and reliable information will form an important
platform for reporting, monitoring and evaluation of safety initiatives in the City.
Desired Outcome:
A safe, healthy and resilient city
Programme 3: Policing Public Spaces
Key Focus Areas:
• Winning back the Streets
Page 164 of 359
The City is committed to working towards the reduction of crime. This will be advanced
through the ward-based approach adopted by the City, which aims to further promote a
community based/problem oriented policing methodology adopted in the City’s Safety
Strategy.
This approach aims to strengthen the engagement with communities on policing issues and
solutions through existing partnerships and structures such as Community Policing Forums
(CPF), Community Safety Forums as well as forging new partnerships, for e.g. with the
Private Security Industry, directed at achieving maximum impact on safety and security in
the City of Jo’burg.
The City will initiate joint crime prevention projects and initiatives in partnership with SAPS in
order to have a clear crime reduction strategy focused on the key drivers of crime in priority
hotspot areas. Inner City and tourist areas which are particularly high profile crime areas will
receive focused attention. Interventions will focus on street crimes like muggings, assaults,
and robberies.
Property crimes like house breaking and business robberies which are prevalent across the
metro will also be prioritised through ward based policing.
Social interventions with respect to substance abuse is an important building block to
promoting prevention. Here the City will implement inter-governmental interventions to
address the underlying causes of crime.
The programme will ensure that the appropriate policing resources, solutions and tactics are
assigned and implemented to address the specific safety and security needs of the city
• Creating a law abiding and regulated city
The City is committed to work towards creating a law abiding and regulated City in which the
organic dynamism of the growing city can thrive absent from the crime and grime that
threatens to engulf it. The benefits of the approach will include reducing the burden on the
law enforcement environment and the criminal justice system by promoting respect for the
rule of law and based on a growing understanding of the potential for improved safety and
quality of life by living in a well regulated city.
This programme will focus on a priority list of by-laws for enforcement that will have the most
impact. Realising this objective will require addressing compliance to by-laws and traffic
regulations by improving enforcement and setting standards for enforcement levels and
Page 165 of 359
improving the effectiveness of the municipal court and thus promote respect for the rule of
law.
By-law enforcement will be leveraged as a crime prevention tool where information will
underpin an evidence based strategy for response to and reduction of crime in public places.
Regular compliance inspections to promote safe buildings in the city will be an important
goal.
Public Safety will also work with the City’s Citizen Relations and Urban Management
Department to build a critical mass of citizens who willing comply and encourage others to
comply. Communication and education campaigns in community crime prevention initiatives
will be improved and formalised through the Engaged Active Citizen Programme.
Desired Outcomes:
Deliver a measurable improvement in safety for citizens
2. Key policies and strategies:
Growth and Development Strategy 2040
Jo’burg City Safety Strategy
National Development Plan
Page 166 of 359
Programme Accountability Matrix
Programme Sub Programme Lead department
Enabling Safety through
Urban Design, Management
and Governance
Safe design and
management guidelines
Development Planning
Spatial assessments and
safety audits
CRUM
Creating a safe and resilient
city
Reduction of City’s top
10 risks
Public Safety (Disaster
Management)
Reduce communicable
diseases
Health Department
Integrated Operations
Centre
GSPCR.
Group ICT and IM
Policing Public Spaces Reduction of Crime Public Safety (JMPD)
Reduce prevalence of
substance abuse
Social Development
3. Integrated cross-cutting priorities to support the Safer City priority
Priority Lead department
Active Engaged Citizenry CRUM
Sustainable Human
Settlements
Development Planning
Agriculture and Food
Security
Social Development
SMME and Entrepreneurial Support
Economic Development
Page 167 of 359
National outcome: All people in South Africa are and feel safe
Joburg 2040 outcome: Improved quality of life and development-driven resilience for all
Long term
impact (Joburg
2040 related
output)
IDP programme Key Performance
Indicator (2013/16)
Target
(2013/16)
Projects /
interventions
Baseline
Target
2013/14
Target
2014/15
Target
2015/16
A safe and secure city
Enabling Safety through Urban Design, Management and Governance
Implementation of safe design and management guidelines guidelines to support area based safety improvement measures through applying sensible urban safety principles - .( for SHSUP programme roll-out and public transport facilities )
n/a Implementation of safe design and management guidelines
New Changing the conditions in neighbourhoods by reducing opportunities that influence offending and victimization through applying sensible urban safety principles.
SHSUP
programme roll-
out and a public
transport facility
pilot site.
Implementation of safe design and management guidelines to support Development Planning applications and community safety initiatives.
Conduct spatial assessments and safety audits of precincts / public spaces in high risk areas to inform safety improvement intervention to improve safety in communities .
n/a Spatial assessments and safety audits bi-annually
Urban Decay Framework & Assessment tool
n/a Conduct spatial assessments and safety audits bi-annually to inform safety improvement plans
Conduct spatial assessments and safety audits bi-annually to inform safety improvement plans.
Page 168 of 359
Long term
impact (Joburg
2040 related
output)
IDP programme Key Performance
Indicator (2013/16)
Target
(2013/16)
Projects /
interventions
Baseline
2012/13
Target
2013/14
Target
2014/15
Target
2015/16
A safe and
secure city
Policing Public
Spaces
% reduction of assaults
and robberies in areas
covered by CCTV
15%
Winning Back
the Streets
3% -
2011/12:
Assaults and
robberies = 2342
2012/13 :
Assaults and
robberies = 2263
5% 2150 5%
2042
5%
1940
% reduction of priority
crimes across the City
15% 7%
5%
5% 5%
% Reduction in
prevalence of
substance abuse
through social
interventions
10 %
reduction in
social crime
and
substance
abuse in
highest risk
areas
New Tier 1- youth led
multi-media
campaign.
Tier 2- Positive
life style prog.
Tier 3- Family
casework
intervention
Tier 1- youth led
multi-media
campaign.
Tier 2- Positive
life style prog.
Tier 3- Family
casework
intervention
system for
10 % reduction
in social crime
and substance
abuse in highest
risk areas
through a 3 tier
programme
targeting youth
at risk
Page 169 of 359
Long term
impact (Joburg
2040 related
output)
IDP programme Key Performance
Indicator (2013/16)
Target
(2013/16)
Projects /
interventions
Baseline
2012/13
Target
2013/14
Target
2014/15
Target
2015/16
10% of
reduction
from what to
what
system for
identified
beneficiaries
identified
beneficiaries
Improved quality
of life and
development-
driven resilience
for all
Effective
implementation of
traffic management /
enforcement operations
in targeted areas in the
city to enhance road
safety
15% reduction in road accident fatalities
Creating a law
abiding and
regulated city
TBD (base on %
of National
target)
8% reduction in
road accident
fatalities
12% reduction in
road accident
fatalities
15% reduction in
road accident
fatalities
Increase in by-law
compliance through
regular and consistent
inspections,
enforcement and
educations - In order to
promote respect for the
rule of law and
demonstrating an
20%
Increase in
compliance
inspections
to city By-
Laws
TBD 10% Increase in
compliance
inspections of
priority by-laws
through targeted
ward based
policing
interventions
15% Increase in
compliance
inspections to
city By-Laws
through targeted
ward based
policing
interventions
20% Increase in
compliance
inspections to
city By-Laws
through targeted
ward based
policing
interventions
Page 170 of 359
Long term
impact (Joburg
2040 related
output)
IDP programme Key Performance
Indicator (2013/16)
Target
(2013/16)
Projects /
interventions
Baseline
2012/13
Target
2013/14
Target
2014/15
Target
2015/16
improved environment
and quality of life
Compliance to by-laws
in buildings, flammable
liquid outlets and
dangerous goods
Developed
database of
all City’s
buildings
and
flammable
liquid
outlets.
68% compliance
to by-laws of the
City’s buildings
& flammable
liquid outlets
Developed
database of all
City’s buildings
and flammable
liquid outlets.
Buildings
compliant - 83%,
Flammable
liquid outlets &
dangerous
goods -83%,
Events
compliance -
100% ; back
yard dwellings -
10%
Buildings
compliance -
84%, Flammable
liquid outlets &
dangerous
goods - 84%,
Events
compliance -
100%; back yard
dwellings - 12%
Buildings
compliant - 95%,
Flammable
liquid outlets &
dangerous
goods - 95%,
Events
compliance -
100%; back yard
dwellings -15%
8. Intergovernmental planning and partnerships
The Intergovernmental Relations Framework (IGR) Act No 13 of 2005 requires that all
spheres of government effectively co-ordinate, communicate, align and integrate service
delivery to ensure access to services and delivery. The IGR Act provides this framework and
legislative expression to inter-governmental alignment:
By taking into account the circumstances, material interests and budgets of
government departments and organs of state when exercising statutory powers or
performing statutory functions;
By consulting the affected organs of state in accordance with formal procedures, as
determined by the applicable legislation, or accepted convention, or as agreed with
them or, in the absence of formal procedures, consulting them in a manner best
suited to the circumstances, including direct contact or through relevant inter-
governmental structures;
By co-ordinating actions when implementing policy or legislation affecting the
material interests of other governments;
In avoiding unnecessary and wasteful duplication or jurisdictional contests;
By taking all reasonable steps to ensure that sufficient institutional capacity and
effective procedures prevail, i.e. to consult, co-operate and share information with
other organs of state and to respond promptly to requests by such organs for
consultation, co-operation and information sharing; and
By participating in inter-governmental structures and efforts to improve the
implementation of projects.
The City of Johannesburg has adopted a co-ordinated process of intergovernmental and
inter-municipal relations to ensure effective delivery of services to residents as well as to
maximise impact. The City participated in the formulation of the Provincial IGR Framework
which outlines guidelines for the practice of intergovernmental relations in the Gauteng
Province. The City is represented in the MMC-MEC Forums to deliberate on issues of
mutual and cross-cutting interest.
In its practice and discourse in the realm of intergovernmental relations the City is guided by
its IGR Strategy. The framework essentially outlines strategic initiatives for it to be properly
represented in all relevant forums. The purpose of such initiatives is to:
Establish a process to facilitate the City’s participation in key IGR and other beneficial
forums and structures within government spheres (e.g. SALGA) for effective and
relevant representation to take place and to ensure that participation assists the City
in achieving its strategic goals.
To develop an understanding within Council and amongst stakeholders of the role
that IGR plays in the municipality and for the effective usage of such relationships to
achieve the City’s strategic objectives.
To establish partnerships with the Provincial Government, National Government
departments and other strategic role players to ensure a common approach and
partnering on Integrated Development Planning implementation.
To establish and maintain twinning or sister city, project cooperation, information
exchange arrangements and agreements with other municipalities nationally to assist
in achieving Council’s strategic objectives.
This chapter highlights some of the national and provincial paradigms to which this IDP
document is developed and aligned. In addition, the City takes careful note of statements
made at national and provincial levels that may require the City to shift its focus in terms of
resource allocation towards the development trajectory.
IGR Structures
The following are key IGR Forums that the City is represented and participates in:
Premier’s Coordinating Forum
The forum consists of the Premier, all mayors and municipal managers. The function
of the forum is to discuss issues pertaining to developmental local government and
other common issues between province and local government to improve service
delivery.
MEC-MMC Forums
These forums exist within areas of joint competency between provincial departments
and local government. It is an important instrument for intergovernmental cooperation
as it allows interface between different sectoral role-players where provincial leaders
meet with counterpart Members of Mayoral Committees from local government.
South African Local Government Association
The South African Local Government Association (SALGA) is an autonomous
association of municipalities with its mandate derived from the 2006 Constitution of
the Republic of South Africa. This mandate defines SALGA as the voice and sole
representative of local government. SALGA interfaces with Parliament, the National
Council of Provinces (NCOP), Cabinet as well as provincial legislatures.
The four key roles of SALGA are:
o Advice and support – policy analysis, research and monitoring, knowledge
exchange and support to members.
o Representation – stakeholder engagement; lobbying on behalf of local
government in relation to national policies and legislation
o Act as an employer body – collective bargaining on behalf of its members;
capacity building and municipal human resources.
o Strategic Profiling – building the profile and image of local government locally and
internationally.
Gauteng Provincial IDP Engagement
o A provincial IDP Engagement is held annually between the City and Gauteng
Province to discuss plans encapsulated in the City’s draft IDP and provincial
sector departments’ plans. This engagement ensures that government spheres
participate in inter-governmental structures to improve the implementation of
projects. The engagement further provides a platform for provincial departments
to provide feedback on the City’s IDP for possible alignment.
o
o The IDP provincial engagement session addresses the challenge of how the
three spheres of government can jointly respond to community issues, especially
given that issues raised during the consultation process at various community
sessions relate to local government as well as provincial and national
government. The City also used the opportunity of the provincial engagement to
factor in comments by provincial government to the final IDP.
o
o At the provincial engagement session it was agreed to hold ongoing and periodic
engagements between sector departments and the City to align and coordinate
implementation of projects, especially at a technical level. This will strengthen
integrated and effective planning between both spheres of government.
National Development Plan (NDP), 2030
The National Development Plan (NDP) is a 2030 plan for the country to enhancing the
capability of the state and leaders working together to solve complex problems. Moreover,
the National Development Plan states that we should “take a more proactive approach to
resolving coordination problems and a more long-term approach to building capacity”.
It goes without saying that strong IGR is central in attaining the objectives of NDP and
especially at a local level because that is where service delivery happens. The NDP
recognizes the burden of unequal and inefficient spatial arrangements placed on
communities, especially the poor who, for example, have to bear significant transport costs
to commute long distances to and from work.
The NDP offers a long-term perspective and defines a desired destination including the
identification of the role different sectors of society need to play in reaching that goal.
As a long-term strategic plan, it serves four broad objectives:
1. Providing overarching goals for what South Africa wants to achieve by 2030.
2. Building consensus on the key obstacles to achieving these goals and what needs to
be done to overcome these obstacles.
3. Providing a shared long-term strategic framework within which more detailed
planning can take place in order to advance the long-term goals set out in the NDP.
4. Creating a basis for making choices about how best to use limited resources.
The NDP highlights the need to strengthen the ability of local government to fulfill its
developmental role. Municipal Integrated Development Plans (IDPs) need to be used more
strategically to focus attention on critical priorities in the NDP that relate to the mandate of
local government such as spatial planning, infrastructure and basic services.
Political leadership is critical for effective implementation. The President and Deputy
President are the lead champions of the Plan within Cabinet, in government and throughout
the country. Premiers and Mayors are also visible and active champions of the NDP, with
their offices being the catalytic agencies to drive implementation at provincial and municipal
levels.
Twelve national outcomes of Government
Cabinet approved 12 national outcomes in 2010 that collectively address the main strategic
priorities of Government. Each outcome has a limited number of outputs and sub-outputs as
well as clear targets. These outcomes and outputs are the strategic focus of the Government
until the year 2014. All of these outcomes have implications for local government’s future
plans. The City’s long term strategic plan, the Growth and Development Strategy 2040
contains similar outcomes to those of national government. As a result the City is playing a
major role in the realization of these outcomes.
Outcome 1: Improve the quality of basic education
The Joburg 2040 Strategy identifies the need for a skilled labour force as key to shared
economic growth and labour absorption.
Outcome 2: Improve health and life expectancy
Health programmes and projects remain a critical focus area for the City. The City will
ensure that the majority of CoJ clinics comply with the prescribed Public Health Care norms
and standards as outlined in the National Health Insurance.
The City is committed to implementing and strengthening the HIV/Aids and TB programmes
to ensure a further decline in HIV prevalence rates. The City has also managed to offer
basic, comprehensive, primary healthcare services to its residents.
Outcome 3: All people in South Africa should be protected and feel safe
While the City is aware of the devastating effects high crime levels have on the population,
economic development and general wellbeing of its residents, the Johannesburg Metro
Police Department (JMPD), in collaboration with the South African Police Services (SAPS),
will continue its efforts to reduce crime in the city. Furthermore JMPD will focus on city-wide
crime prevention, by-law enforcement and road-traffic-management services.
The Joburg 10-plus programme, spearheaded by the JMPD, assists in achieving the
objective of the outcome. This programme aims to bring metro police officers closer to
communities through ward-based deployment, and aims to strengthen the engagement with
communities on policing issues and solutions through existing partnerships and structures
such as Community Policing Forums (CPF).
Outcome 4: Create decent employment through inclusive economic growth
Economic development and job creation is of primary importance in the City. This is evident
through three priorities that have been identified focusing on economic growth and
development. This includes facilitating economic growth in Johannesburg through initiatives
such as the creation of Urban Development Zones (UDZ) as a tax-incentive measure for
private investment and Business Process Outsourcing Parks. The City is also cognisant of
the effect service delivery and maintenance of essential services infrastructure have on
economic development and has, therefore, prioritised basic service repairs and maintenance
in this IDP.
More information on these initiatives can be found in Chapter 7, focusing on the City’s
Priority Implementation Plans. The Expanded Public Works Programme (EPWP) resulted in
the creation of about 153 000 jobs in the previous mayoral term against a target of 120 000.
The City will continue to ensure that wherever possible, the projects implemented are done
through the EPWP to allow for greater creation of jobs and development of skills for the
unemployed.
Outcome 5: A skilled and capable workforce to support inclusive growth
Internally, the City’s workforce plays a vital role in the delivery of services and programmes
across the city. The provision of skilled, competent and satisfied human capital is therefore
an important component of the City’s plans for the current term of office.
Outcome 6: An efficient, competitive and responsive economic infrastructure network
The City has experienced high demand for bulk services in recent years that have put
pressure on its services. A number of bulk-services challenges therefore exist for the City. A
R110 billion commitment has been made to address these challenges. The focus will be on
the development of new infrastructure, while maintaining existing infrastructure in order to
ensure a reliable provision of services.
The City is rolling-out the BRT to its identified strategic TOD nodes and corridors, including
the implementation of station precinct upgrades.
Outcome 7: Vibrant, equitable and sustainable rural communities and food security
While the City is an urban environment and does not have a substantial role to play in
improving rural services and communities, it is particularly aware of the issue of food
security. The priority focused on agriculture and food security clearly outlines some of the
critical programmes for this outcome.
Outcome 8: Sustainable human settlements and improved quality of household life
The City has identified sustainable human settlements as a key priority for this term of office.
Among these is the City’s commitment to providing basic services and infrastructure to all
settlements, regardless of the settlement’s state of formality. The City is re-stitching itself
through “corridors of freedom” in order to reverse apartheid’s spatial planning. In these
reconfigured developments issues of mixed-income developments and rental housing, and
quality, density and access to social and economic opportunities will be taken into
consideration.
Outcome 9: A responsive and accountable, effective and efficient local-government
system
The cluster approach that has been adopted is a way of ensuring efficient and effective
local government through a holistic, integrated approach to service delivery. This allows the
City to have a targeted approach to development and thus allows for the measurable outputs
and desirable outcomes.
The City has adopted Community-Based Planning with the main objective to give impetus to
meaningful public participation in the context of the City’s planning processes.
Since Outcome 9 is specific to local government more detail is given in terms of the outputs
for local government. The following are outputs for local government as communicated by
the Office of the Presidency:
Implementing a differentiated approach to municipal financing, planning and support;
Improving access to basic services;
Implementing the Community Work Programme;
Actions supportive of the human settlement outcomes;
Deepen democracy through a refined ward-committee model;
Administrative and financial capability; and
A single window of coordination.
The information below outlines the City’s contributions to these outputs. It should be noted
that most of the City’s contribution will be within its powers and functions as articulated in the
Constitution.
Implementing a differentiated approach to municipal financing, planning and support
The City acknowledges that its financial resources are limited while the demand for the
goods and services that it provides is increasing. With this in mind, the City has prioritised
financial sustainability and specifically, maximising financial efficiency. This includes
exploring alternative sources of funding and establishing partnerships for infrastructure and
social investment.
Improving access to basic services
The City has made progress in improving access to basic services. In line with this, the City
will continue to pursue the following targets by 2014:
Water (100% access);
Sanitation (100% access);
Refuse removal (100% access); and
Electricity (92% access).
To achieve this, the City employs a capital investment management tool that allows for
investment in infrastructure in a manner that is transformative and promotes economic
growth.
While the City seeks to ensure the expansion of infrastructure, attention is being paid to
challenges such as unaccounted for water and electricity theft. Through its operations, the
City has put in place measures to address these. In line with the Joburg 2040 Strategy these
initiatives are, where possible, carried out in a manner that demonstrates environmental
sustainability through the use of green technology.
Implementing the Community Work Programme
The Community Work Programme (CWP) intends to tackle poverty and provide livelihood
support for poor households. This programme is a key initiative to mobilise communities to
provide regular and predictable work opportunities at local level.
The City will therefore continue with its EPWP programme. Focus in this mayoral term is to
ensure that the initiative is coordinated throughout the City and that participants in the
programme are assisted to take part in the job market.
Actions supportive of human-settlement outcomes
The Joburg 2040 Strategy recognises the spatial imbalances that exist in the City and the
fact that efforts to address these have, in some instances, perpetuated this phenomenon. In
a bid to reverse this, the City has identified the following measures towards spatial balance:
Sustainable and integrated delivery of water, sanitation, energy and waste;
Ensuring eco-mobility through the promotion of mass public transportation; and
Creating sustainable human settlements through spatial planning, economic and
social investment.
As part of this mayoral term, the City has identified sustainable human settlements as one of
the most critical pillars around which it concentrates much of its work. Focus is on a range of
housing options including rental housing, hostel development, mixed-income projects and
gap-market accommodation.
Deepen democracy through a refined ward-committee model
Since the initial election of ward committees, the City has ensured the support and
functioning of these committees. The City has developed plans to give ward committees the
capacity to participate meaningfully in the development processes.
Administrative and financial capability
The City has restructured itself in a way that will assist it in delivering on its development
goals. While this is necessary,the City will ensure that it continues to be accountable,
transparent and prescribe to the principles of good governance. This means working towards
a clean audit, eradicating corruption and improving the financial health of the City.
A single window of coordination
A single window of coordination is an organisational form intended to bring key departments
together to facilitate cross-departmental collaborative partnerships to have a more decisive
and positive impact on municipal performance. It is acknowledged that this will be achieved
through a well thought-out process between all spheres of government. Engagement with
both national and provincial government has taken place and the City will continue with this
to allow for more efficient planning and service delivery across all spheres of government.
The City’s institutional and administrative configuration in the form of regions is intended to
realize the objective of outcome nine. The entry point for implementation of community-
based planning is the regions. The regions will, through the CBP process, seek to realize the
following outcomes:
Progressive and systematic reduction of service delivery breakdowns and
backlog across all seven regions;
Integration of service delivery machinery at ward level using a multi- disciplinary
approach;
Fully capacitate and operational ward structures;
100% adherence to turnaround times –Service Level Agreements (SLAs);
Galvanising communities to be part of service delivery solutions and to look after
their own urban environment –community activism;
Enhanced regional political oversight;
Community profiles to inform interventions;
Integrated planning and execution of programmes and projects between
departments and municipal entities at regional level;
Focus on preventative repairs and maintenance;
Enhanced civic education, communication and community mobilisation using
integrated platform for community interface;
Quality customer care, accountability and feedback;
Dedicated multi-disciplinary teams to be active at least five days a week –“every
day to be a service delivery day”;
Dedicated and ring-fenced budget for Regions A-G focusing on “doing the basics
right”
Focus on sustainability and visibility; and
Adoption of an Integrated Visible Service Delivery as a model to drive service
delivery at ward level without any deviation.
Outcome 10: Protection and enhancement of environmental assets and natural
resources
One of the key aspects of the Joburg 2040 Strategy is focused on how the City can provide
services in a manner that takes cognisance of the environmental challenges that it faces.
The themes of resilience and sustainability are core to the City’s long-term outcomes and the
priorities identified correspond to the issues highlighted by the Joburg 2040 Strategy.
The City is aware of the scarcity of water and energy and programmes for sustainable
resource management will be strengthened. Among those identified is the urban water-
management programme which will intensify efforts to reduce unaccounted for water.
Moreover, Johannesburg recognised the importance of building a resilient city in pursuit of a
low-carbon economy, mitigating and reducing the potential impact of climate change, natural
resource management in an ever-changing urban landscape.
Outcome 11: A better South Africa, a better and safer Africa and world
While local government’s involvement in this area is fairly limited, the City does have a
number of partnerships in place with other local governments, both regionally and
internationally. These are intended to be sharing engagements where municipalities can
learn from each other and include twinning agreements, project coordination and information
sharing.
The City has recently reviewed its International Relations Strategy as part of its goal to refine
and develop strategic partnerships with cities across the world.
Outcome 12: A development-orientated public service and inclusive citizenship
The City is committed to improving human-capital-management strategies in a way that will
ensure that the public service is oriented towards delivering the best service for residents.
The monitoring and evaluation framework of the City is critical to ensure that its desired
goals are met and that they have a desired outcome for the citizen. In addition, the City’s
focus on active engaged citizenry will ensure that it continues to empower and involve
residents and communities in the City’s planning processes and delivery of services.
MEC: Local government and Housing’s comments on the 2013/14 IDP
review
The MEC for Local Government and Housing (DLGH) provides comments on an annual
basis on the City’s approved IDP. The following comments were made on the 2012/16 IDP
and have been included in this document, with the City’s responses.
MEC Comments
Provincial
Intervention
(if applicable)
Responsible CoJ
department COJ response
CROSS-CUTTING ISSUES
Planning for Migration:
Since the release of the recent Census results, it is documented that Gauteng is the biggest province
with regards to population size in the country. These points to upward trends regarding in-migration at
both international and local levels. Whilst migration presents a number of opportunities for the province,
it also comes with pressing challenges, key among which is the ability of municipalities to keep up with
demands for basic services. A number of Gauteng municipalities are undertaking various initiatives to
respond to this challenge which is commendable. However, a Provincial Migration Strategy is essential
in enabling the province to respond effectively to the challenges posed by migration. To this effect,
Gauteng COGTA will lobby all relevant stakeholders towards ensuring the development of a Provincial-
wide Migration Strategy.
Provincial Migration
Strategy
Social
Development
Noted. Its addressesd in the city’s plans such as the
inner city road map, SHUSHP, CoF
Inter-Municipal Planning: Section 31 (c) (i) of the Municipal Systems Act imposes a requirement on
COGTA to facilitate the alignment of IDPs of neighboring municipalities. Furthermore, inter-municipal
planning is a critical component towards the achievement of the Gauteng Global City Region. Much of
the efforts contained in the IDPs in this regard are around information sharing, which points to a glaring
gap regarding inter-municipal planning. Municipalities are urged to start investigating collaborative
initiatives in areas such as investment in strategic economic infrastructure; transportation planning (in
line with the provincial long term transport plan; as well as corridor and cross-boundary nodal
development). The department will be convening a GCR Indaba aimed at facilitating a process of
dialogue among various stakeholders in the bid to build a Globally Competitive Gauteng City Region.
COGTA to facilitate
the alignment of
IDPs of neighboring
Municipalities
GCR Indaba
GSPCR/
Development
Planning
GSPCR finalizing review of its IGR Strategy that is to
emphasize this aspect of inter-municipal planning.
Re-configuring the apartheid space: Linked to the above, Gauteng still bear evidence of apartheid
spatial configuration, characterized by, among others, inequality and service disparities among various
communities within municipalities. As a result of this, historically disadvantaged communities remained
predominantly poorly-serviced as opposed to the wealthier areas. Foremost to the agenda of
municipalities should be to reverse this trend through acceleration of service delivery to the poor
communities. One of the most effective mechanisms of achieving this is area-based planning, through
which municipalities are again urged to prioritise certain areas and make development impact in them as
opposed to spreading the limited budgetary resources across a myriad of services with little impact. The
success achieved by the City of Johannesburg in Soweto is the most glaring example of the kind of
impact that this community-based planning model of service delivery can attain.
Development
Planning
The City has through corridors of freedom embarked on
a deliberate objective of restitching the City to reverse
apartheid’s spatial planning. To this effect spatial area
frameworks have been developed.
MEC Comments
Provincial
Intervention
(if applicable)
Responsible CoJ
department COJ response
Operation Clean Audit: The year 2014 marks the deadline for Gauteng municipalities to achieve Clean
Audits. Whereas some municipalities have made significant strides in this regard, some are still lagging
behind. Municipalities are called upon to utilise 2014/15 financial year IDP review process to address the
matters raised by the Auditor General (AG) in the bid to deliver Operation Clean Audit (OPCA).
Group Finance
The City has achieved unqualified for the previous
financial year. With the programs and projects that
have been introduce the city is well on its way to
attaining this objective.
Planning for outcomes: Since the introduction of national outcomes, Gauteng Municipalities have
made commendable progress in ensuring that IDPs are aligned to them. Municipalities are urged to
continue striving for the attainment of all government outcomes through the IDP and not just to focus on
outcome 9. The Department is currently coordination the development of an intergovernmental
engagement roadmap whose main aim is to facilitate structured engagements between Municipalities
and sector departments in the bid to entrench coordination and alignment.
Intergovernmental
engagement
roadmap
GSPCR Noted
Gender, Youth and People with Disabilities (GEYODI): Although Municipalities in Gauteng have
made strides in their attempt to integrate GEYODI issues in their planning, serious challenges remain.
The general picture with regard to the mainstreaming of GEYODI issues in IDPs still shows gaps
especially in relation to employment equity, accommodating special groups of people in public
participation processes. At the moment it is not clear how Municipalities facilitate participation of the
above-mentioned group of people during IDP public participation processes. In order to accommodate
special groups, sign language skills should be developed as well as targeted sessions where women,
youth and people with disabilities are priorities to ensure meaningful participation. Efforts should also be
intensified to prioritise GEYODI in areas of Service Delivery, Employment Equity as well as Economic
Empowerment.
GSPCR The city has developed and EEP which tries to address
the GEYODI issues.
COJ SPECIFIC ISSUES
Good Governance and Institutional Development
Employment Equity Plan: As desired by the Employment Equity Plan (EEP), the city is also
urged to improve the representation of people with disability in the Municipal structure as
these are currently under-represented. Furthermore in terms of the work place skills plan there
are high vacancy rates of critical posts. An urgent improvement to the above –mentioned
challenge is needed in order to enhance service delivery.
GCSS Noted
MEC Comments
Provincial
Intervention
(if applicable)
Responsible CoJ
department COJ response
Research and Development: The city is commended for conducting regular service delivery
satisfactory surveys. The above-mentioned initiatives can provide important feedback from
communities to the city administration such as whether or not the IDP is improving the socio-
economic conditions of local communities. As part of R & D the city is urged to continue
partnering with various research institutions and capacitating internal research units to deliver
sustainable and quality services to its citizenry.
GSPCR The City has entered into partnerships with tertiary
institutions and the HSRC for this purpose. Already the
City has conducted Quality of Life Survey to
understand the impact of its services.
Local Economic Development
Local economy: The concentration of the city’s economy in financial and business services
exposes it to the external shocks and the vagaries of the modern global economy with high
contagion across the economic regions. The City expresses intent to diversify the local
economy given the risks associated with finance and business sector, which naturally exposes
the municipality to global risks and factors beyond their control. However, the IDP does not
show how any plans or strategies geared towards diversification of the local economy. It is
therefore important that the City begins to work on concrete strategies towards the
actualization of such. To guard against the risks and cyclical shocks, domestic and regional
demand should be stimulated and more domestic production encouraged through strategic
procurement of locally produced goods with stipulated minimum threshold for local production
and content.
Department
Economic
Development
The City is acutely aware of its economic status and
already an economic roundtable was held with experts
to explore economic options for the City. An economic
summit will be held later with the aim of developing an
economic strategy to chart the way forward in this
regard.
Youth unemployment: The 2013/14 IDP indicates that Youth unemployment remains high
(35%) in the city majority of which has low levels of education. The formal employment sector
is slowing down and has a direct negative impact for the absorption of youth into the labour
market. It is therefore important that any job creation as well as skills development initiatives
prioritise the youth by linking skills development to the domestic market requirements.
Department
Economic
Development
Noted
MEC Comments
Provincial
Intervention
(if applicable)
Responsible CoJ
department COJ response
Small, Medium and Micro-sized Enterprises and entrepreneurial support: The 2013/14
final IDP has identified Small, Medium and Micro-sized Enterprises and entrepreneurial
support as key levers through which the city will be turned into a “SMME Centric City” and as
instruments for fighting poverty, unemployment and inequality. However, the global trends in
City Regions show a negative trend in that SMMEs are shedding jobs at a higher rate that the
conventional formal sector. It is therefore important that the City continues to provide support
to SMMEs and cooperatives aligned to Preferential Procurement as well as BEE frameworks
as a way of ascertaining their sustainability.
Department
Economic
Development
Noted
Informal economy: Although the informal economy contributes only 3.2% to the City’s
Growth Domestic Product (GDP) the city is commended for proactively providing support to
the sector. Installation of linear markets in designated areas will go a long way in ensuring a
deliberate incorporation and strategic location of the informal sector into the city’s economic
and spatial landscape. However, the city should exercise utmost prudence in the application of
informal economy policies and by-laws as they have the potential to stifle innovation and
transition to the formal economy. Therefore, in their application of policies and by-laws, the
City should strive to limit constraints and maximize opportunities through targeted support
programme and stimulation of demand for local (domestic) goods and services.
Department
Economic
Development
Noted
Financial viability
Supply chain management: The IDP addresses Supply Chain Management (SCM) issues at
a high level, indicating the review of policies. It is recommended that the City considers setting
targets on implementation of the SCM in the IDP. The latter should address, among others,
indicators such as the number of jobs created through awarding tenders, number of tenders
awarded to the historically disadvantaged people, people with disabilities and women as well
as issues regarding localized procurement.
Group Finance
The City SCM policy seeks to address this concern.
Payment of creditors: The IDP identifies Payment of creditors within 30 days as one of the
key risks. However the measures in place to address this may be inadequate. The City is
urged to ensure that contracts and Service Level Agreements (SLAs) are finalized prior to
commencing of the project implementation at all times to ensure that projects are monitored in
line with the SLA and payments are initiated within agreed terms.
Group Finance Noted
MEC Comments
Provincial
Intervention
(if applicable)
Responsible CoJ
department COJ response
“Business tax”: The IDP identifies a project titled “Business Tax” to enhance the City’s
revenue generation. It is anticipated that the said project, whose feasibility is still being
investigated, will make substantial contributions to the City’s revenue. This is a commendable
initiative towards sourcing alternative revenue streams and the City is encouraged to fully
pursue the said project.
Group Finance Noted
Service delivery
Basic service delivery: The City’s commitment to providing basic services to un-proclaimed
townships is a commendable initiative. The IDP points to the growth in size of informal
settlements resulting from migration. This imposes an additional responsibility on the City to
enhance provision of access to basic services (specifically water, sanitation and waste
removal) to these communities. Whereas the City will most likely generate no revenue from
providing the said services to these communities, this will be a critical programme to ensure
protection of human dignity as enshrined in the country’s Constitution, The Department will
coordinate a process towards the development of a province-wide migration strategy as a
means to enable Provincial and Local Government as a whole to better respond to migration.
The City’s support in this initiative will be of vital importance.
Provincial Migration
Strategy
Development
Planning / EISD /
Social
Development
Noted
Ward-based service delivery: Ward-based service delivery structure has been finalized to
facilitate provision of services. Ward-based planning is an essential model to facilitate
provision of basic services (water, sanitation, waste removal and electricity). However, when
dealing with built infrastructure services, the City is encouraged to develop communities
instead of wards. The model adopted by the City in 2006-2011 term of office towards Soweto
is the most profound example of the kind of impact that can be achieved through focused
investment in communities. The City is urged to replicate this service delivery model across all
historically disadvantaged communities as part of its Nodal Development Initiatives.
Development
Planning /
GSPCR / CRUM
Through Community Based Planning the City intends to
build communities and transcend artificial boundaries.
Infrastructure maintenance: Investment in infrastructure maintenance is key to ensuring
sustainability and reliability of services. The City will spend R110 billion over the next 10 years
in replacement and expansion of infrastructure. However there is limited detail on the
infrastructure maintenance element that will accompany the investment. The City is urged to
develop a detailed infrastructure maintenance plan to accompany the R110 billion investment.
EISD Noted
MEC Comments
Provincial
Intervention
(if applicable)
Responsible CoJ
department COJ response
Unaccounted -for water and electricity: Unaccounted -for water and electricity theft are
cited as major problems. Whereas the IDP identifies a number of commendable initiatives with
regard to water losses, electricity theft is only addressed through a plan to install pre-paid
meters. The City is called upon to investigate other initiatives to curb electricity theft, given the
multi-faceted nature of this phenomenon.
EISD
Spatial planning
Spatial Development Framework: The City’s Spatial Development Framework (SDF) does
not contextualize itself in relation to the provincial space and adjoining Municipalities. As one
of the anchor Cities of the Gauteng City Region (GCR), the City is urged to reference the
provincial, regional and adjoining space in the spatial planning component of the Integrated
Development Plan and demonstrate linkages in this regard. This will contribute significantly
towards the spatial construction of the Gauteng City Region.
Development
Planning
Capital Investment Framework: The City is commended for aligning the Capital Investment
Framework (CIF) to both the SDF and the long term vision. Subsequently, the consideration
given to the Government-wide as well as the City-specific outcomes forms the integral part of
the CIF. The Capital Investment Framework is also spatially referenced in the Integrated
Development Plan which ensures that the Spatial Development Framework forms the basis for
prioritisation of capital investment.
Development
Planning
Noted.
Restructuring of apartheid spatial patterns: Restructuring of apartheid spatial patterns
remains one of the big challenges confronting post-apartheid Cities. The City is therefore
applauded for pursuing urban growth through policies that advance strategic densification, an
Urban Development Boundary and an emphasis on public transport as a key lever towards
spatial transformation and promotion of access in the City. These initiatives, if implemented
adequately, will greatly re-configure the apartheid spatial configuration.
Development
Planning
Noted.
9. Community Based Planning and Stakeholder
consultation
A developmental local government should ensure a local democracy that empowers ordinary
citizens (the people) and allows them to participate meaningfully in development of
communities. The City remains committed to ongoing consultation and engagements with
communities and continues to focus on improving consultation sessions to be more effective
and meaningful. In order to give effect to this commitment, the City introduced the
Community Based Planning approach which seeks to ensure that planning, implementation
and monitoring of development interventions forge partnerships with all stakeholders.
The City’s commitment to participatory planning is underpinned by the following legislative
requirements governing the systems and functions of local government:
Chapter 2 of the Constitution (1996): Sections 151(1)(e), 152, 195(e) pronounce on
participatory requirements;
White Paper on Local Government (1998): Emphasises that political leaders remain
accountable and work within their mandate to allow consumers to have input on the
way services are delivered;
Municipal Structures Act 117 of 1998: Section 72 states that the objective of a ward
committee is to enhance participatory democracy in local government;
Municipal Systems Act (2000): Sections 16(1) and 29(b) on the development of a
culture of governance that complements formal representative government with a
system of participatory governance; and
Municipal Systems Act sections (2000): Section 26 states that each municipality at
the beginning of its term of office must develop a five-year IDP and review this plan
annually in terms of Section 34 performance and changing circumstances.
2012/16 Community Based Planning Approach
The City’s Community Based Planning (CBP) approach focuses on driving social change in
the city. In the context of the City of Johannesburg driving social change implies the changes
people make to their behaviour that, when taken collectively, benefit the entire community.
Examples of social change are the following:
Recycling or separations at source;
Food gardening;
Reduce crime rate;
Increased entrepreneurship;
Lower student drop-out rates; and or
Local inclusion of the poor.
The basis for driving social change is through sustained and meaningful involvement of the
community in the City’s planning processes as well as the capacitation of residents to take
ownership of development in their communities. Local government should not simply be a
representative democracy but rather a proactive developmental democracy that facilitates
participatory democracy, ensuring that people are involved in issues of local government and
development. It is this responsibility that gives effect to the concept of community based
planning.
The basic tenets of the City’s CBP approach are the following:
Ensuring that all citizens are included in planning;
Realistic and practical systems that are implementable and achievable;
Linked to a legitimate structure i.e. ward councillors and committees;
CBP is citizen focused and empowering;
The process builds on the strengths and opportunities of areas, and not only
addresses problems;
Plans are holistic and cover issues of service delivery, social and economic
development, growth and innovation, capital development etc; and
CBP promotes mutual accountability between communities and officials.
In driving social change the City and communities start by jointly formulating and analysing
community needs and thereafter enter into developmental partnerships to achieve
sustainable development. Focus is placed on local resources and abilities to deliver on the
interventions. It allows for all stakeholders to play a role in development and planning of the
City. Residents participate in identification, analysis, implementation and monitoring and
evaluation of development interventions based on the lived experience. This approach is
premised on the City delivering on its mandate and entering into developmental or strategic
partnerships where necessary to bring about social change.
The following are key attributes of developmental partnerships:
People participate in joint analysis of community strategic needs, development of
action plans and strengthening of local institutions;
Use knowledge and local resources to strengthen the City’s plans and development
of communities; and
Create a culture of volunteerism and participation in local community priorities and
development.
Community Based Planning – 2013/14 Process
CBP Pilot in Region E
Prior to the city wide implementation of the CBP, the CBP pilot was rollout in Region E in
order to test the approach and identify challenges or opportunities. A total of 18 Community
driven CBP projects were conceptualised during the cluster community conversations held in
November 2012. It is anticipated that the City will have identified 7 strategic partnerships in
these areas by the end of 2013/14 and be in a position to roll them out in the 2014/15
financial year. In order to achieve these partnerships the City will focus on local resources
and abilities. However, the City has also allocated a budget of R50 million Opex and R50
million Capex to CBP in the 2013/14 financial year, in order to ensure that there is sufficient
budget available to initiate and support strategic partnerships, as well as to respond to
immediate and urgent issues of service delivery.
City Wide CBP Rollout
In 2013/14, the City rolled out community based planning in Region A, B, C, D, G and F. The
following process was followed in the implementation of the community based planning
region wide:
• Councillors Forum briefing session (Only councillors in attendance)
• Detailed CBP workshop to present the CBP concept and clarify roles and
responsibilities for various stakeholders i.e. Councillors, ward committee members,
Community Development Workers and departmental representatives and ME (Capex
Units) during the CBP rollout process
• Cluster Community Conversations (CCC) focused on mobilising the communities and
key stakeholders around addressing areas of need. These mobilised communities
around taking steps towards initiation of ward based initiatives (supported by the city)
and allowed an opportunity for communities to engage towards crafting their
developmental future
• Feedback councillors forum meeting where councillors deliberated on the outcome of
the community conversation. These discussions formed the foundation for the
development of the community based plans. ME and Departments invited to
confirmation Capex and Opex in the ward plans
• Departments and Entities response – ward issues emanating from Cluster
Community Conversations were routed to the departments and municipal entities for
consideration in their plans.
Regional CBP Cluster Community Conversations
A total of 27 CBP cluster community conversations were held across the five regions and the
number of cluster meetings varied according to the number of wards in the region. These
sessions targeted community members, NGOs, CBOs, ward councillors and committees,
and other interested stakeholders. The agenda for each cluster meeting was a CBP
presentation stating the interface of the CBP and IDP. This was followed by a discussion and
inputs from communities.
Table: Regional Cluster Community Conversation schedule
Region Number of Ward
Clusters
A 4
B 2
C 5
D 8
F 5
G 4
Region A
Region A to commence with Cluster Community Conversation in earlier 2014
Region B
Region B has 12 wards which were clustered into 2 Cluster Community Conversations and
held as follows:
Cluster 1 (Wards 87, 88, 90, 98, 99, 102, 104 and 117), 4 December 2013 at Marks
Park, Emmarentia, Attendance – 117
Cluster 2 (Wards 68, 69, 82 and 86), 5 December 2013 at Danie van Zyl Recreation
Centre, Montclare, Attendance – 124
Region C
Region C has 17 wards which were clustered into 5 Cluster Community Conversations and
held as follows:
Cluster 1 (Wards 100, 101 and 114), 11 November 2013 at Cosmo City Multi-
Purpose Centre, Attendance – 70
Cluster 2 (Wards 89, 97 and 126) at Roodepoort Athletic Stadium, Attendance – 55
Cluster 3 (Wards : 71,83, 84 and 85), 13 November 2013 at Witpoortjie Recreation
Centre, Attendance – 114
Cluster 4 (Wards : 70, 127 and 128), 14 November 2013 at Discovery Recreation
Centre, Attendance –127
Cluster 5 (Wards : 44, 49, 50 and 129), 18 November 2013 at Braamfischer Multi-
Purpose Centre, Attendance – 174
Region D
Region D has 37 wards which were clustered into 8 Cluster Community Conversations and
held as follows:
Cluster 1 (Wards 22, 24, 25 and 26), 4 November 2013 at Pimville Recreation
Centre, Pimville, Attendance – 53
Cluster 2 (Wards 36, 38, 39 and 40), 6 November 2013 at Uncle Toms Hall, Orlando
West, Attendance 50
Cluster 3 (Wards 41, 42, 43, 45, 47 and 48), 11 November 2013 at Meadowland Hall,
Meadowlands, Attendance – 121
Cluster 4 (Wards 27, 28, 29, 30 and 31), 13 November 2013 at Diepkloof Welfare
Centre, Diepkloof, Attendance – 72
Cluster 5 (Wards 13, 14 and 53), 18 November 2013 at Protea Glen Recreation
Centre, Protea Glen, Attendance – 48
Cluster 6 (Wards 11, 12, 15, 16 and 19), 20 November 2013 at Dlamini Multipurpose
Centre, Attendance – 68
Cluster 7 (Wards 20, 21, 46, 51, 52 and 130), 25 November 2013 at Naledi Hall,
Naledi, Attendance – 15. The meeting was then postponed.
Cluster 8 – Wards 33, 34, 35 and 37 – 27 November 2013 at Mavis Hall, White City
Jabavu, Attendance – 98
Region F
Region F has 19 wards which were clustered into 4 Cluster Community Conversations and
held as follows:
• Cluster 1 (Wards 62, 63, 64, 66, 67 and 123), 20 November 2013 at Yeoville
Recreational Centre,
• Cluster 2 (Wards 57, 61, 65 and 118), 21 November 2013 at Bertha Solomon
Recreation Centre
• Cluster 3 (Wards 23, 54, 55, 56, and 125), 25 November 2013 at Kliprivierburg
Recreation Centre
• Cluster 4 (Wards 58, 59, 60, 124), 26 November 2013 at Braamfontein Recreational
Centre
Region G
Region G has 13 wards which were clustered into four Cluster Community Conversations
and held as follows:
• Cluster 1 (Wards 1, 2, 3, 4 and 5), 12 October 2013 at Corobrick Canteen, Lenasia
South East
• Cluster 2 (Wards 6, 7, 120 and 121), 2 November 2013 at Corobrick Canteen,
Lenasia South East
• Cluster 3 (Wards 8,9,10. And 122), 16 November 2013, Corobrick Canteen, Lenasia
South East
• Cluster 4 (Wards 17, 18 and 119), 22 November 2013, JD Opperman hall, Eldorado
Park
The table below covers an overview of the key issues raised in each region, as well as areas
identified for potential developmental partnerships.
Region B Region C Region D Region F Region G
Summary of issues raised
Traffic calming measures, speed signs, speed humps;
Upgrading/maintenance of infrastructure, water, roads, storm water; pavements;
Law enforcement – illegal dumping, buildings, illegal electricity and water connections;
Maintenance of parks, sidewalks;
Public toilets in Melville;
Maintenance and upgrading of parks, sidewalks;
Electricity, cable theft and street lighting;
Extreme Park Phase 2 Toilets and lights;
Maintenance and upgrading of recreation centres, libraries, swimming pools, sports grounds;
Maintenance of Council owned flats and houses;
Vagrants, shelter for homeless; and
Overcrowding and drug trading.
Storm water drainage;
Upgrading of gravel roads;
Connecting roads, road signs and bridges;
Potholes;
Street lights and widening of roads;
Unused public transport facility;
Building control violations (encroachments);
Lack of public health facilities; and
Construction of schools in the ward without community engagement, as a result some facilities become white elephants.
Request for storm water drainage system;
Restoration of the golf course and enclose it;
Request for a pedestrian bridge;
Ablution facility requires major repairs;
Traffic signal and traffic calming measures at Heroes bridge;
Request for a satellite police station;
Establishment of an Industrial Park and Skills Centre at the public open space
24 hour creche/Early Learning Centre (Place of Safety for Children);
Indoor sporting facility and restoration of shanty soccer grounds;
Dilapidated Salvation Army Building and empty school are haven for criminal activities;
Maintenance of all public open spaces and establishment of a park
Restoration of the libraries;
Pedestrian bridge over the railway line and some major roads;
Develop a park at the Mshenguville public open
Communities felt that their areas do not have clinics. In some instances clinics are there, but are too small, not capacitated or equipped with medical staff and tools
There was a general feeling that the region is not being prioritised when it comes to affordable housing. People live in overcrowded hostel and dilapidated buildings in the Inner City
Parks all across the city are said to be dark and creating a crime haven for criminals. Maintenance projects of all park lights is needed
Due to increase in drug-use, communities feel that the City must build a rehabilitation centre soon
Communities are concerned about neglect of senior citizens. The homes are in a dire state and need some infrastructure upgrades e.g. roof repainting, plumbing, painting, safety etc.
Rehabilitation and construction of bridge at Denver informal settlement
Rehabilitation of the stadium for community meetings and events
Communities are concerned about the growing
Illegal dumping in storm water drains;
Open/undeveloped stands cause problems in the ward;
Johannesburg Water projects have not been completed;
Requests roads to be upgraded in the area;
Complaints about storm water drainage;
Complaints about the lack of sport grounds and facilities in Poortjie, as well as the lack of services;
Illegal waste dumping and insufficient distribution of plastic refuse bags by Pikitup;
Complaints about illegal land invasion in Lenasia South Ext. 4;
Ward needs an old age home and hospice;
Complaints about sewerage in Thembalihle;
Complaints about crime in the area;
The construction of a pedestrian bridge at Lenz railway station;
The development of pavements and the widening of roads in the CBD;
Bus and taxi services from the Lenz CBD to the Johannesburg CBD;
Region B Region C Region D Region F Region G
space to curb the high rate of crime and illegal dumping;
Maintenance of Council facilities;
Illegal dumping;
Council office be accessible to the community for other uses and projects;
City Parks to employ local youth;
Traffic signal at intersection Pela Street and Klipvalley Road;
Improve pedestrian safety on the Phefeni Station Pedestrian Bridge;
Request for doctors and dentists at Diepkloof Clinic and Upgrade Shanty Clinic;
Pikitup does not deliver refusal plastic bags; and
Drug abuse is prevalent.
unemployment in the Region. Outside people are given projects which locals can do
MAI-MAI is said to have been fixed for R4 million but the quality of work is so poor that it leaks, rents being collected but nor reaching JPC etc.
Young artists feels that the City do not support their activities and are left out when major projects/programmes that can expose their talents take place in the region.
Development of skills centre/ economic incubation centre
General maintenance of public infrastructure o Roads o Parks o Street lights o Side walks o Sports facilities e.g.
swimming pools play grounds etc.
o Sewer lines, bridges etc.
The regulation of vehicle parking areas in the Lenz CBD, vis-à-vis illegal traders and scholar transport;
Surveillance cameras for the CBD;
Regulation of delivery vehicle parking zones in the industrial area;
Request information on how the community of Vlakfontein can become involved with Joburg 10 Plus
Projects identified for developmental partnerships
Food gardens and feeding scheme;
Brick work;
Assistance to youth organisations;
Partnerships between communities and SAPS to eradicate crime;
Economic development hub required in partnership with private sector to accommodate
Agriculture/vegetable gardens
Livestock (Small scale farming)
Empowerment of emerging contractors in the ward
Community buy back centre
Beautification of the mountain to enhance tourism;
Provision of facility for the upholstery project;
Establishment of a buy-back centre;
Establishment of food gardens at public open spaces;
A cleaning project for women’s hostel;
Community proposes the establishment of a Mayfair Precinct and to be involved therein;
Communities want to be empowered to recycle waste and generate an income out of it
Partnership with community to look after parks
The City of Johannesburg to
For economic development to succeed markets should be closer to the people. Mini-markets may be the solution. Co-operatives should be encouraged and assistance provided with their establishment;
Proposes a system where the local community assists in home based care;
Region B Region C Region D Region F Region G
unemployed and unemployable people;
Unemployed people can be used to plant grass and trees on mine dumps to alleviate dust pollution;
Establishment of public-community partnership to bring the City’s vision to fruition with the City and the community aligning their objectives to bring mutual benefits;
City to empower SAPS, ADT and Cortac by JPC issuing a Letter of Trespass for the Car Park and Bus Terminus property;
Mandating the appointment of Public Safety Officers empowered by the Metro who can assist in the policing of the parking;
Eviction of the so-called “squatters” on City property;
City Power’s permission for the PNRA to green and cultivate the areas around the substations; and
City’s investment in the creation of an achievable model of a sustainable Neighbourhood.
Establishment of cooperatives and training of the members thereof;
An established cooperative dealing with chicken farming requires land to carry out their business;
Backyard mechanics are requesting a place from which to conduct their business;
A Women’s forum to capacitate other women needs assistance from the City;
Establishment of a cultural village; and
Lake View requires the development of a tourism place that will link with Regina Mundi.
consider Gauteng housing co-operative for management of existing co-operatives
Agricultural activities – support to communities so that they can be self-sustainable
Urban agriculture should be promoted with communities;
Proposes that the community assists in running the Lenasia Clinic on a twenty-four hour basis;
To develop Lenasia Cricket Stadium in partnership with the City;
Project in Eldorado Park is doing well and should be supported;
Recycling of waste and buy back centre in the region.
197
2014 Draft IDP and Budget Participatory Process
The 2014 IDP and Budget outreach process provides the City an opportunity to
communicate its draft plans and budget to a specific audience through cluster community
conversations. The outreach process traditionally takes place in March, following the tabling
of the draft IDP and Budget. This allows for communities at a local level to reflect on the IDP
to determine to what extent the City’s plans respond to the issues raised during previous
outreach processes.
In addition an extensive communication campaign provides the platform for community
mobilisation and greater publicity around the IDP and Budget process. Through these
engagements, the City encourages the involvement of communities in local government.
A number of processes will be followed post tabling of the IDP at Council in March which will,
amongst others, include:
Call for public comment advertisement in newspapers prior to tabling of the IDP and
Budget
Councillor engagement session
Launch of the IDP and budget outreach
Regional Cluster Community Conversation
Other public and private stakeholders and NGO and CBO’s.
198
10. Medium Term Budget
In order for the City to achieve its goals as set out in this document, it needs to clearly
prioritise resource allocation. The City of Johannesburg therefore publishes its medium term
budget every financial year, to reflect changes in anticipated spending patterns and report on
expenditure and revenue progress.
Long Term Financial Overview
The City has developed a long term Financial Development Plan to fund capital spending of
R100 billion over the next eight to ten years on infrastructure replacement and expansion.
The long term Financial Development Plan is part of the ongoing financial planning and
medium-term budgeting processes. The long term Financial Development Plan aims to
ensure that the City is in a sound financial condition and can finance services on a
sustainable basis on the long-term. The medium-term budget represents a detail three-year
operating and capital budget that enables the City to meets its operational and strategic
objectives for the three years and in the outer years.
Financial sustainability means that future generations will not be burdened with paying for
services that today’s taxpayers enjoy. While some expenses do not have to be immediately
paid, the City still must have the ability to pay them in the future.
The long term Financial Development Plan was developed as part of the IDP and budget
cycle for 2013/14 and was updated for the 2014/15 financial year. The long-term
development financial plan uses economic, financial, policy assumptions and the
expenditure outlook to project expenses, revenue and changes in the balance sheet. The
three year Medium Term Budget of the City is in line with the long term Financial
Development Plan of the City.
Budget process
The City engages in a similar process as that of developing its Integrated Development Plan,
when finalising its budget. In January 2014, a Technical Budget Steering Committee
reviewed each department and entity’s plans and budget submissions. Thereafter a Budget
Steering Committee sessions took place, chaired by the MMC: Finance. This committee
provides strategic direction and prioritises budget according to the submissions received.
199
Budget Steering Committee outcomes
The Budget Steering Committee was held on 23-24 January 2014 reaffirmed the need for
changing the City’s course. To do this, it is necessary to change the way the City delivers
within its limited resources. It also noted a number of other critical points that clusters and
departments have taken into account in their planning. These include:
Increasing productivity – managing human resources effectively
An inter-clusteral approach is critical to ensure co-ordination of programmes.
As part of changing the course, there is a need to continue to stabilise the revenue
base of the City
Customer centric approach
Addressing the culture of abundance
Tariff increases should be reviewed taking into account macroeconomic challenges
Medium Term Budget Framework
The CoJ is heeding the national call of expanding public sector investment in infrastructure.
The City continues to increase capital investment on infrastructure over the medium term
and projects a spending plan of approximately R32.4 billion over the next three-year period.
In line with this increased capital investment on infrastructure, the City has developed the
long term Financial Development Plan which encompasses:
Achievement of a net operating margin of 15% and above
Reduction in the quantum of personnel remuneration, including the charge out of
project manager’s cost to capital
Elimination of unnecessary expenditure
Pursuing other revenue sources
Improvement in strategic and budget planning and processes, including zero- based
budgeting
Improvement in monthly operational revenue and expenditure control and monthly
operational reporting.
The City has focused attention on achieving its goals as outline in the Joburg 2040 GDS.
The City acknowledges the challenge of balancing the need to change course with limited
resources and delivering towards Joburg 2040. To respond to this, the City developed short,
medium and long term interventions in the 2012 budget cycle. These are still on track. In the
short-term, the City will continues to focus on stabilising its finances, refining and
200
implementing its IDP, accelerating service delivery and improving customer and citizen’s
experience of the City. In the medium-term it will consolidate its finances and ensure that
service excellence becomes a norm in the city. In addition, there will be acceleration of the
implementation of IDP key programmes. In the long-term, the City will focus on financial
sustainability and resilience as well as conduct impact assessments of the IDP key
programmes against the GDS outcomes.
Medium Term Budget
In order to achieve financial stabilisation and long term sustainability the City has a set of
parameters within which financial planning should be aligned. These key financial indicators
are included in the table below.
Key Financial Indicators
Actual Adjusted Bench-
2012/13 Budget Marks Budget Estimate Estimate
2013/14 2014/15 2015/16 2016/17
Current ratio 1:1 1.1:1 Above 1:1 1:1 1:1 1:1
Solvency ratio 2:1 2.1:1 Above 2:1 2.1:1 2.2:1 2.3:1
Debt: Revenue 49.7% 39.0% Below 45% 42.4% 43.6% 45.0%
Remuneration to Expenditure ratio
(excluding bulk purchases)36.6% 36.3% Below 30% 36.1% 35.1% 34.4%
Remuneration to Expenditure ratio
(including bulk purchases)23.7% 24.0% Below 30% 23.8% 23.1% 22.6%
Maintenance to Expenditure ratio 3.4% 4.6% 7% 5.0% 5.3% 5.2%
Interest to Expenditure ratio 5% 4% Below 7% 5% 5% 6%
Net operating margin 10% 13% Above 15% 12% 13% 13%
Ratios
201
Tariffs
Tariff setting in the City takes place within the framework of the City’s Tariff Policy. The
Policy is premised on the following principles:
Social: affordability of services, promotion of access to services, cross- subsidisation
of the poor where necessary and feasible, simple and easy to implement tariff
structure.
Economic: competitiveness of the City, in support of macroeconomic policies of the
country, tariffs must positively influence microeconomic input costs facing firms.
Financial: Cost- reflective tariffs linked to medium term financial framework.
The proposed tariffs per service for the 2014/15 financial year can be accessed on the City’s
website.
Operating and Capital Budget
In 2014/15, the City’s total budget amount to approximately R47.4 billion, the split between
operating and capital are as follows:
Operating R36.5 bn
77%
Capital R10.9 bn
23%
202
High level budget of the City are as follows: Financial Performance (revenue and expenditure)
Adjusted
Budget Budget Estimate Estimate
2013/14 2014/15 % 2015/16 2016/17
R 000 R 000 R 000 R 000
Revenue 36 118 703 38 521 467 7% 41 758 610 44 743 468
Internal Revenue 3 861 293 4 381 294 13% 4 668 891 4 816 601
39 979 996 42 902 761 7% 46 427 501 49 560 069
Expenditure 34 222 576 36 512 567 7% 39 051 825 41 624 384
Internal Expenditure 3 861 293 4 381 294 13% 4 668 891 4 816 601
38 083 869 40 893 861 7% 43 720 716 46 440 985
Surplus (Deficit) 1 896 127 2 008 900 2 706 785 3 119 084
Taxation 499 499 528 805 6% 648 787 729 052
Surplus (Deficit) for the year 1 396 628 1 480 095 2 057 998 2 390 032
Capital Grants & Contributions 3 094 028 3 154 275 3 231 886 3 230 582
Surplus (Deficit) for the year
including Capital Grants & Contr.4 490 656 4 634 370 5 289 884 5 620 614
Capital Budget
R7700 263
R10861 642R11439 195
R10137 959
4 000 000
8 000 000
12 000 000
2013/14 2014/15 2015/16 2016/17
Capital ExpenditureR 000
Capital Budget – sources of funding
Adjusted
Budget Budget Budget Budget
2013/14 2014/15 2015/16 2016/17
COJ - Loans 1 458 631 3 276 000 3 440 000 2 506 000
COJ - Cash 3 147 604 4 431 367 4 767 309 4 401 377
National 1 028 634 996 021 1 011 247 1 034 074
Provincial 35 000
USDG 1 565 316 1 695 189 1 755 074 1 848 093
Other 465 078 463 065 465 565 348 415
Total 7 700 263 10 861 642 11 439 195 10 137 959
Further details of the split in budgets between departments and municipal entities are
available in the City’s Medium Term Budget document.
203
Conclusion
The 2014/15 Medium Term Budget continues the City’s approach to shift the budget from
consumption to investment. Massive infrastructure investments are planned over the coming
years to transform Joburg spatially and economically. The stability of the City’s finances is
an enabler for the realization of this vision. This requires the City to implement operational
efficiencies, ensure that Capex spend is in line with prudential ratios, review tariffs to reflect
the cost of providing a service taking into account the current macro economic climate.
Funding in the City is allocated to critical service delivery pressures as well as changing the
City’s course to deliver on its long term outcomes, as revenue improvement is achieved.
In order for the City to achieve its goals as set out in this document, it needs to clearly
prioritise resource allocation. The City of Johannesburg therefore publishes its medium term
budget every financial year, to reflect changes in anticipated spending patterns and report on
expenditure and revenue progress.
The information contained here is a summary of the 2014/15 medium term budget and
provides a high level overview for the next financial year.
204
11. 2014/15 Capital Investment Framework
The City uses its Capital Investment Framework (CIF) to identify and prioritise capital
projects for implementation in the following financial year and medium term period. The
objectives of the CIF are to:
Contribute towards the eradication of service delivery backlogs, especially in poor
and marginalised areas by prioritising capital projects in these locations;
Ensure the improved management of the City’s existing infrastructure;
Improve new service delivery through infrastructure and services that are planned,
delivered, and managed in an objective and structured manner;
Prioritise projects and programmes through a strategic and spatially-linked
information system known as the Capital Investment Management System (CIMS) in
the context of a limited capital budget; and
Direct future public and private investment, by aligning capital budget requirements of
departments and entities to priority areas, defined in the Joburg 2040 Strategy, the
Integrated Development Plan, Capital Investment Priority Areas (CIPAs) and the
Sustainable Human Settlement Urbanisation Plan (SHSUP).
City Priorities
The City has aligned itself to the outcomes of the National Government specifically in
relation to ‘Outcome 9’ which aims to ensure, “A responsive and accountable, effective and
efficient local government system”.
In addition the City’s planning and budget is aligned to City policy notably the Joburg 2040
Strategy, the IDP and the Spatial Development Framework (SDF) which outlines the City’s
spatial developmental path.
The Capital Investment Framework is a component of the City of Johannesburg’s IDP and
meets the City’s obligations in terms of Chapter 5, Section 26(i) of the Municipal Systems
Act (Act 32 of 2000). This requires local government to present “a financial plan, which must
include a budget projection for at least the next three years”. The three year detailed capital
budget is a companion document to the City’s IDP.
Each of the priority areas as identified earlier in this document has cost implications for the
City. The capital budget has been orientated to cater for these focus areas and to
205
progressively meet the City’s long term goals. For example, major capital projects in the City
such as the construction of City Power’s new electricity intake facilities at Sebenza and
Rivasdale contributes to improving resource sustainability by ensuring long term power
supply to the City. The focus areas associated with the Joburg 2040 Strategy provide a tool
for guiding the City’s capital spending.
Two city policies: the Capital Investment Priority Areas (CIPA) and the Sustainable Human
Settlement Urbanisation Plan (SHSUP), define where, how and when the capital budget
must be spent.
The CIPA is a refinement and re-orientation of the Growth Management Strategy (GMS) that
identified priority areas for future development in the City. The CIPA take into account the
original investment areas of the Growth Management Strategy and the recent changes to the
Rea Vaya Bus Rapid Transit routes known as the Corridors of Freedom(see figure below).
The current budget identifies three key development corridors (Louis Botha, Perth-Empire
and Turffontein) for which detailed capital planning has been undertaken. Detailed planning
for the other corridors of freedom is to be undertaken in the short to medium term. In addition
the CIPA prioritises the inner city that remains a critical mixed use node for the City, as well
as the marginalised areas of the City (Diepsloot, Ivory Park, Alexandra and surrounds,
Soweto and Greater Orange Farm. The footprint of development corridors and prioritisation
has been used as the means to prioritise and assess capital projects using CIMS in the
capital budgeting process.
206
Figure: Capital Investment Priority Areas – Including marginalised areas and key public transport
corridors
The Sustainable Human Settlement Urbanisation Plan (SHSUP) defines future shelter
solutions for the City. It provides housing typologies, strategies for residential densification,
possible locations for future housing development and models infrastructure requirements to
achieve the plan’s proposals. It promotes housing provision along the Corridors of Freedom,
closer to the existing City away from peripheral locations. SHSUP provides the capital
budgeting process with a guide to the nature of future City investment in residential
development, and an indicator of which housing and related infrastructure projects should be
prioritised within the City.
2014/15 Capital Budget
The total 2014/15 capital budget allocation for the City is R11 034 462 000. This is a 45%
increase in capital budget from the 2013/14 financial year of R7 594 678 000. The sources of
funding of this budget are illustrated in the figure below. The majority of the funding comes
207
from Cash Reserves (5 192 778 000), City of Johannesburg Loans (R2 525 000 000) and
the Urban Settlement Development Grant (R1 684 778 000)
Table: 2014/15 Sources of Funding
Sources Capital Budget
City of Johannesburg (loans/Revenue) R 3,276,000,000.00
CRR (Cash Reserves) for Operational Capex R 4,431,367,000.00
National Grant R 996,021,000.00
Provincial Grant R 0.00
Urban Settlement Development Grant (USDG) R 1,695,189,000.00
Other (e.g. Developer’s contribution) R 463,065,000.00
Total R 10,861,642,000.00
Capital Budget Allocation in 2014/15 for Priority Investment Areas
There are areas within the city where the need for basic services and amenities is
concentrated and most urgent. These marginalised areas of the city include Greater Orange
Farm, Alexandra, Greater Soweto, Greater Ivory Park and Diepsloot. The City has approved
Urban Development Frameworks (UDF’s) that outline the interventions needed to address
the development issues in all these areas.
In addition to the marginalised areas, the Inner City has also been identified as a priority for
City investment through the Inner City Charter. The Charter’s commitments form the basis
for Inner City projects defined below.
With the finalisation of the Capital Investment Priority Areas the Corridors of Freedom with
an emphasis on Louis Botha, Perth-Empire, and Turffontein have been added to the
marginalised and Inner City areas as priority investment areas (see figures below). These
areas will also be analysed below.
In addressing the needs of the City’s priority areas in the 2014/15 budget, allocations per
programme area can be summarised as follows: Soweto receives the largest portion of the
investment (R 1 579 867 120.00); followed by the Inner City (R 633 357 000.00), Corridors of
Freedom (R 564 948 476.00), Orange Farm (R 238 863 000.00), Alexandra (R 233 243
000.00), Ivory Park (R 204 313 000.00), and Diepsloot (R 134 260 000.00).
:
208
Figure: Value of Capital Projects in the capital investment priority areas for 2014/15 (%)
The location of the priority areas in relation to the capital projects allocated in 2014/15 is
represented in the figure below. This highlights the City’s commitment to ensure that
marginalised areas within the City have access to services, indicating spatially the
concentration and clustering of capital projects to be undertaken during 2014/15 within the
priority areas.
209
Figure: Location of capital projects approved for 2014/15 located in priority areas
210
Greater Orange Farm
Figure: Percentage value allocation by department/ME to Greater Orange Farm for 2014/15
The figure above illustrates the division of budget by department/municipal entity for the
Greater Orange Farm area, located in the far south of the City, bordering on Sedibeng. The
divisions that spent the most in 2013/14 in the area are again the divisions that are projected
to spend the most in 2014/15. The division that is spending the most in the Greater Orange
Farm area in 2014/15 is Joburg Water with sewer upgrade and pipe replacement projects
continuing work in Lakeside but also undertaking work in the broader catchment area. In
addition, Joburg Water is also upgrading the water infrastructure in the area and constructing
a water tower and reservoir. Housing’s projects in the area relate to the provision of bulk
infrastructure to Drieziek exts 3 and 5, Lakeside Ext 1, 2, 3 and 5; and Orange Farm Ext 9.
The Johannesburg Road Agency’s projects in Orange Farm include the tarring of gravel
roads in Orange Farm and Drieziek, the covering of open drains and planning for the
extension of James Street.
Alexandra
Figure: The percentage value allocation by department/ME to Alexandra for 2014/15
211
Alexandra is a very dense residential area adjacent to Sandton. A significant proportion of
capital projects are managed by the Alexandra Renewal Project which has been relocated
from the Development Planning Department to the Johannesburg Development Agency
(JDA). Alexandra will benefit from the Rea Vaya Bus Rapid Transit route to be built along the
Louis Botha Ave Corridor of Freedom between Alexandra and the Inner City. Other
departments with projects within Alexandra include Joburg Water which speaks to water
upgrades and sewer mains replacement in Alexandra and surrounding areas, and City
Power for the normalisation of the electricity network and the provision of public lighting in
Alexandra.
212
Soweto
Figure: Percentage value allocation by department/ME to the Greater Soweto Area for 2014/15
Housing (32%), Joburg Water (25%), City Power (15%), JRA (12%) and JOSHCO are to
spend the greatest proportion of the capital in the Greater Soweto area in 2014/15. Key
projects to be undertaken include:
Housing: The provision of bulk services for Braamfischerville Ext 12 and 13, Lufhereng,
Elias Motsoaledi, Devland Ext 1, 27, 30, 31 and 33, various Kliptown housing projects,
Dube Hostel, Orlando Women’s Hostel, Eldorado Park Infill, Jabulani Hostel, Jabulani
Flats.
Joburg Water: The on-going Operation Gcin’ Amanzi project for the replacement of
water and sewer pipes; and the construction of the Ennerdale/ Lenasia High Level
Reservoir.
City Power: The installation of a fourth intake at Rivasdale, the provision of street
lights, the provision of pre-paid meters, and the electrification of Elias Motsoaledi and
Lufhereng.
JRA: Construction of the Naledi / Protea pedestrian bridge across the railway line;
planning for the Jabulani/Molapo and Klipspruit West pedestrian bridges; stormwater
intervention projects on the Klipriver including at Kliptown; resurfacing of the Soweto
Highway and planning for the construction of the Spenser Road link.
213
JOSHCO: Provision of Nancefield Station Housing; the Orlando Ekaya Staff Hostel
redevelopment; the Dobsonville Social Housing Project; and the Golden Highway
Social Housing Project
Ivory Park
Figure: Percentage value allocation by department/ME to the Ivory Park Area for 2014/15
In Greater Ivory Park, the divisions spending the greatest proportion of the R204 313 000
allocated for 2014/15 are JRA (31%), Housing (11%) and Development Planning (10%). Key
projects for Ivory Park include: the tarring of gravel roads, the covering of open drains; initial
work on KwaGreen, Hlope, Goniwe and Thabo Mbeki associated housing initiatives; the
development of industrial facilities at Bambanani.
214
Diepsloot
Figure: Percentage value allocation by department/ME to the Diepsloot Area for 2014/15
The figure above represents the division of budget by department or municipal entity for the
Diepsloot Area for 2014/15. Of the R134 260 000 allocated to Diepsloot, Housing is
undertaking the Diepsloot Redevelopment Project on Northern Farms. Johannesburg Water
(12%) is constructing a reservoir for Diepsloot and upgrading sewers within the township.
JRA projects for Diepsloot include the tarring of gravel roads, and the covering of open
drains.
215
Inner City
Figure: Percentage value allocation by department/ME to the Inner City Area for 2014/15
The Inner City’s budget is skewed due to a majority of departments and municipal entities
having their offices within the Inner City. This inflates the budget for the Inner City, and why
a wider range of role players is reflected. The estimated 2014/15 budget for the Inner City is
R 633 357 000. Development Planning is the largest contributor. This is for public
environment upgrade projects in the vicinity of Westgate, Park Station and Hillbrow to be
executed by the Johannesburg Development Agency. JOSHCO has the second largest
budget in the Inner City. This is for a number of social housing projects, notably: 11 Ellof
Street and 195 Commissioner Street. JRA has the third largest budget in the inner city for
the resurfacing and upgrading of the M1 and M2 highways and associated bridges, and for
the refurbishment of the Robinson Canal.
216
Corridors of Freedom: Louis Botha Corridor
Figure: Percentage value allocation by department/ME to the Louis Botha Corridor for 2014/15
An amount of R 119 270 000 has been allocated to the Louis Botha Corridor. City Power
has the highest budget for the upgrading and refurbishment of the existing electrical
infrastructure. Community Development and City Park’s allocation is primarily for the
upgrading of Patterson Park facilities in Orange Grove. Health’s allocation is for the
upgrading of the existing clinics located within the corridor.
Corridors of Freedom: Perth-Empire Corridor
Figure: Percentage value allocation by department/ME to the Perth-Empire Corridor for 2014/15
217
An amount of R 232 533 436 has been allocated to the Perth-Empire Corridor. Similarly to
the Louis Botha corridor, City Power has been allocated funding to upgrade the existing
electrical infrastructure on the Perth-Empire Corridor. Joburg Water has been allocated
budget for the upgrade of the existing water and sewer networks within the corridors. The
third highest budget allocation is for JOSHCO for social housing at Pennyville and for the
refurbishment of the Geldenhuys Hostel.
Corridors of Freedom: Turffontein Corridor
Figure: Percentage value allocation by department/ME to the Turffontein Corridor for 2014/15
Of the three Corridor’s Turffontein does not have a bus rapid transit system that serves the
entire area under consideration. The expectation is that in future the area will be serviced by
a feeder route to the existing bus Rea Vaya Network. In 2014/15 JOSHCO is the division
that has the highest budget in Turffontein primarily for the Bellavista, City Deep and
Turffontein social housing projects. Joburg Water and JRA receive the next highest
allocations respectively for the upgrading of existing roads, stormwater and water
infrastructure.
The analysis of the individual Corridors of freedom does not take into account the R250
million allocated to strategic projects within the three corridors. Neither does it take into
account the R 1 059 571 000.00 of grant funding for the construction of the Rea Vaya in the
Perth-Empire and Louis Botha Corridors.
218
Service Capacity Backlogs
In addition to the Capital Investment Priority Areas defined above, there are critical capital
interventions required to ensure that bulk infrastructure remains operational within the City.
In this regard City Power, Joburg Water, the Johannesburg Roads Agency and the
Department of Housing have identified ‘hotspot’ areas where projects are required to meet
demands placed on the network.
City Power defines two types of infrastructure constraints to identify ‘hotspot areas’. These
are those substations whose load readings are over 100% of capacity; and those areas
where user demand is growing and the network capacity is over 100%. When looking at City
Power projects it must be noted that a project to resolve a particularly ‘hotspot’ may be
located outside the ‘hotspot’ area itself.
City Power’s ‘hotspot’ areas for the 2014/15 year are located primarily in the north of the City
(e.g. parts of Roodepoort, Randburg and Midrand) and areas in the south such as Lenasia,
Ennerdale and Lehae.
219
Figure: Power Capacity Hotspot Areas – City Power Capital Projects 2014/15
Joburg Water defines ‘hotspots’ as those areas where the water and sewer capacities are
operating at levels that are in excess of the infrastructure’s design.
The water hotspot areas are located in a west–east band to the north of the City
incorporating Sandton and Randburg, and in the south of the City centred on the Greater
Orange Farm area. The sewer hotspots are centred on the Braamfontein and Zandspruit
basins, as well as the portion of the Klipspruit catchment that incorporates Soweto and
Orange Farm.
As in the case of City Power, water and sewer projects that would alleviate these areas may
be located outside of the actual ‘hotspot’ areas.
220
Joburg Roads Agency has identified backlogs in relation to the tarring of gravel roads in
marginalised areas, and backlogs in relation to storm water projects.
There are serious constraints in relation to storm water management across the City and
associated river catchments. There is currently an under-investment in storm water
management in the City. This situation is to be addressed in the next 5 -10 year period.
Currently there is a poor correlation between storm water projects and those areas that have
been identified as ‘hotspots’.
With regards to the gravel roads upgrading programme, there is a strong correlation
between the projects to be undertaken in 2014/15 and the areas that have been identified as
requiring upgrading.
Figure: Water Capacity Pressure Areas – Joburg Water Capital Projects 2014/15
Figure: Sewer Capacity Pressure Areas – Joburg Water Capital Projects 2014/15
221
Figure: Priority Gravel Road and Storm Water Areas – JRA Capital Projects
222
Housing backlogs relate to the informal settlements located within the City as well as the
large scale issue of backyard shack rentals, which are concentrated in the marginalised
areas within the City.
The housing figure below shows the relationship between the Department of Housing’s
capital projects and the existing informal settlements in the City. While at a citywide level
there is not a significant correlation between projects and informal settlements, at the level of
individual marginalised areas which also have informal settlements – namely Orange Farm,
Kanana Park, Ennerdale, Soweto and Diepsloot – there is correlation between housing
projects and adjacent informal settlements.
The Capital Budget and Identified Deprivation Areas
In 2008 the Social Development Department identified areas of relative deprivation across
the City of Johannesburg. The areas that were considered to be most deprived were closely
linked to marginalised areas, as defined by this report. These were the Greater Orange Farm
Area, Diepsloot, Ivory Park and Alexandra, as well as informal settlements in the North West
of the City. In the study, Soweto was viewed as being more complex as there were areas of
extreme deprivation located adjacent to areas of relative wealth, which indicates that public
investment over the past 10 years has improved the lives of a significant number of people
within Soweto.
The City is locating the majority of its capital interventions in those areas that are considered
to be most deprived.
223
Figure: Housing Projects on the 2014/15 capital budget relative to Informal Settlements
Figure: Deprivation Focus Areas – Capital Projects 2014/15
224
2014/15 Capital Budget by cluster, department and municipal entity
The remainder of the CIF provides a breakdown of the most significant projects to be
undertaken in 2014/15 by cluster, and then according to department and municipal entity.
For coordination purposes within the City the departments and municipal entities are defined
in terms of clusters. There are four clusters: the sustainable services cluster; the economic
growth cluster, the human and social development cluster and the sound governance
cluster. Departments and municipal entities refer to the individual administration units into
which the City is divided, where ‘departments’ represent core administration functions, and
‘municipal entities’ represent corporate entities/utilities.
The breakdown of the capital budget for 2014/15 by department and municipal entity is
captured in Figure x below. The divisions receiving the highest budget in 2014/15 are: City
Power (R 2,221,762,200.00 ); Group Corporate and Shared (R 1 431 268 000);
Johannesburg Roads Agency (R 1,423,210,000.00); Joburg Water (R1 091 585 000)
and.Transportation (R 971,511,000.00)
225
Project Name External COJ Funds CRR Cash Provincial State Grant USDG Other Total 2014/15
R 112,400,000.00 R 0.00 R 0.00 R 0.00 R 54,000,000.00 R 0.00 R 166,400,000.00
R 891,030,000.00 R 760,667,200.00 R 0.00 R 31,000,000.00 R 90,000,000.00 R 449,065,000.00 R 2,221,762,200.00
R 21,500,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 0.00 R 21,500,000.00
R 600,000.00 R 2,084,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 2,684,000.00
R 22,651,000.00 R 0.00 R 0.00 R 0.00 R 3,300,000.00 R 0.00 R 25,951,000.00
R 32,901,000.00 R 7,000,000.00 R 0.00 R 0.00 R 20,000,000.00 R 0.00 R 59,901,000.00
R 400,550,000.00 R 0.00 R 0.00 R 98,958,000.00 R 0.00 R 0.00 R 499,508,000.00
R 0.00 R 42,389,000.00 R 0.00 R 36,492,000.00 R 0.00 R 0.00 R 78,881,000.00
R 0.00 R 46,830,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 46,830,000.00
R 158,400,000.00 R 1,272,868,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 1,431,268,000.00
R 2,700,000.00 R 499,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 3,199,000.00
R 0.00 R 25,026,000.00 R 0.00 R 0.00 R 60,000,000.00 R 0.00 R 85,026,000.00
R 0.00 R 150,500,000.00 R 0.00 R 0.00 R 792,862,000.00 R 0.00 R 943,362,000.00
R 0.00 R 165,100,000.00 R 0.00 R 0.00 R 69,589,000.00 R 0.00 R 234,689,000.00
R 68,829,000.00 R 220,128,000.00 R 0.00 R 0.00 R 133,044,000.00 R 0.00 R 422,001,000.00
R 372,756,000.00 R 193,461,000.00 R 0.00 R 0.00 R 89,367,000.00 R 14,000,000.00 R 669,584,000.00
R 208,322,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 0.00 R 208,322,000.00
R 8,300,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 0.00 R 8,300,000.00
R 210,750,000.00 R 299,422,000.00 R 0.00 R 0.00 R 20,000,000.00 R 0.00 R 530,172,000.00
R 0.00 R 124,500,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 124,500,000.00
R 500,000,000.00 R 574,183,000.00 R 0.00 R 0.00 R 349,027,000.00 R 0.00 R 1,423,210,000.00
R 2,200,000.00 R 65,760,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 67,960,000.00
R 70,000,000.00 R 130,151,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 200,151,000.00
R 187,050,000.00 R 0.00 R 0.00 R 0.00 R 14,000,000.00 R 0.00 R 201,050,000.00
R 0.00 R 102,687,800.00 R 0.00 R 0.00 R 0.00 R 0.00 R 102,687,800.00
R 0.00 R 60,112,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 60,112,000.00
R 5,061,000.00 R 15,139,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 20,200,000.00
R 0.00 R 30,920,000.00 R 0.00 R 0.00 R 0.00 R 0.00 R 30,920,000.00
R 0.00 R 141,940,000.00 R 0.00 R 829,571,000.00 R 0.00 R 0.00 R 971,511,000.00
Grand Total R 3,276,000,000.00 R 4,431,367,000.00 R 0.00 R 996,021,000.00 R 1,695,189,000.00 R 463,065,000.00 R 10,861,642,000.00
City Parks and Zoo
City Power
Community Dev: Arts, Culture
and Heritage
Community Dev: Head Office
Community Dev: Libraries
Community Dev: Sport and
Recreation
Development Planning
Economic Development
Environment and Infrastructure
Group Corporate and Shared
Services
Group Finance: Finance
Health
Housing
JDA
JHB Water: Sewer
JHB Water: Water
Joburg Market
Johannesburg Theatre
Management CompanyJOSHCO
JPC
JRA
Mayor's Office/ City Manager
Metrobus
Pikitup
Public Safety: EMS
Public Safety: JMPD
Social Development
Speaker: Legislative Arm of the
Council
Transportation
2014/2015 Source Amount
Figure x: 2014/15 Capital Budget by Division and Source of Funding
The Sustainable Services Cluster has the highest capital allocation within the City for
2014/15. The cluster consists of: the Environment and Infrastructure Services Department
(EISD); the Housing Department; the Johannesburg Social Housing Company (JOSHCO);
PIKITUP, responsible for waste disposal; City Power; Joburg Water; the Development
Planning Department; the Johannesburg Development Agency; and the Johannesburg
Roads Agency.
In the 2014/15 draft Budget the Environment and Infrastructure Services Department has
been allocated R46 830 000. The primary project for the department is the Bruma Lake
Rehabilitation, which will result in the closure of the dam given that it is a major source of
pollution in the area.
The Housing Department has a budget of R943 362 000 for 2014/15. The primary source of
capital funding for the Housing Department is the Urban Settlement Development Grant
226
(USDG) (R792 862 000) which is for the construction of bulk infrastructure for low income
housing projects. The Housing Department is in the process of shifting from RDP housing
projects located on the periphery of the City to a strategy that focuses on higher density
housing solutions in more centrally accessible locations. The intention is to complete the
more peripheral projects in the medium term (two years) and to begin to plan for better
located housing projects. Key projects to be undertaken by the Housing Department in
2013/14 are: Klipspruit/Kliptown Housing Projects (R309 million), Fleurhof (R60 million) and
Devland Ext 1, 27, 30, 31&33 (R66 million).
The projects that will cost the City the most in the three year medium term budget period are
the Klipspruit/Kliptown Project (R465 million), Fleurhof (R156 million) and Devland Ext
1,27,30,31&33 (R133 million).
In order to shift to a strategy that provides better located housing solutions for the poor,
R50 million has been put aside for land purchases in 2014/15. Similarly, an amount of R30
million has been allocated to the implementation of Sustainable Human Settlement
Urbanisation Plan (SHSUP) in 2014/15 to facilitate the implementation of the policy and to
change how and where residential development is provided in the City.
The Johannesburg Social Housing Company (JOSHCO) will receive R 530,172,000.00 in
2014/15. This will be used to provide high density social housing for the Company. The key
projects for the municipal entity include: Fleurhof Junction (R 60 million, Dobsonville (R 50
million) and Lombardy East Social Housing Projects (R 46 million).
Major staff hostel redevelopment projects for 2014/15 include: City Deep (R30 million)
Nancefield Station)/ Klipspruit (R60 million).
It is envisaged that JOSHCO will play an increasingly important role in the restructuring of
human settlements through the provision of alternative accommodation solutions.
A total allocation of R 201 050 000 is to be given to Pikitup in 2014/15. Significant projects
include: the purchase of underground bins (R20 million); ensuring that existing PIKITUP
facilities (landfills/depots) meet OHASA safety standards; the construction of composting
plants for green waste (R20 million). The intention of Pikitup in the medium term is to focus
on projects that reduce waste and promote recycling.
City Power received an allocation of R 2,221,762,200 for 2014/15; the breakdown for a
significant portion of this budget is as follows:
227
R200 million has been allocated to the on-going construction of an intake at
Sebenza, which takes power from the Eskom Grid for the north of the City. The
project’s ultimate cost will be approximately R900 million. The project aims to provide
a stable supply of bulk energy from Eskom for the northern areas of the City.
The construction of a fourth intake for the City at Rivasdale in Soweto is shifting to
the construction phase in 2014/15. R70 million has been set aside for the project in
2014/15. The project is set to cost the City approximately R900 million. The project
aims to provide a stable supply of bulk energy for the southern areas of the City.
R70 million has been allocated for the upgrading of identified 88kV overhead lines in
the 2014/15 budget. This is an on-going project that is to cost the City R230 million in
the next three years
R690 million will be used to implement Pre-paid system installation of semi-
automated pre-paid & automated pre-paid smart meters). This project will allow for
automatic centralised meter reading, so that meter readings will not have to be
undertaken manually on a monthly basis. This project is to cost the City
approximately R1.4 billion over the next three financial years. Timelines, scope and
costs of this project have increased since the last financial year.
Approximately R120 million will be spent on the provision of new connections to
developments predominantly in the north of the City. These projects are largely
funded from service contributions
R11.3 million will be spent on public lighting in marginalised areas
Joburg Water receives an allocation of R 1 091 585 000 for 2014/15. An overview of the
budget is provided below:
R88 million will fund the upgrade of the Bushkoppies Waste Water Treatment Works
(WWTW) in the south of the City, and R46 million is budgeted for the Driefontein
WWTW expansion in Mogale City. Approximately R50 million each has been
allocated to Northern Works and Olifantsvlei WWTWs.
R50 million has been put aside for the construction of the new Lanseria waste water
treatment plant to the north of the City.
Operation Gcin’ Amanzi has been allocated an amount of R 250 million to fund water
infrastructure rehabilitation and water resource management in Soweto
Bryanston, Woodmead, Douglasdale and Sandton will receive R 43 million for the
upgrading and refurbishment of water infrastructure.
228
The Development Planning Department is responsible for the, Inner City Regeneration
Programme, for coordinating the Neighbourhood Development Partnership Grant and Public
Transport Corridor Development in the City. R 499 508 000.00 was allocated to the
Department for 2014/5.
The Inner City Regeneration Programme has received an allocation of R150 million. This will
be used to upgrade the public environment in the Inner City.
An amount of R250 million has been allocated to Development Planning to facilitate capital
interventions in the Corridors of Freedom.
The Neighbourhood Development Partnership Grant, which is funded by National Treasury,
is coordinated in the City through Development Planning. Projects to be funded from the
grant include the reconstruction of Ngonyama Road, public upgrades in Jabulani and the
Bambanani and Marlboro Industrial Production Facilities.
The Johannesburg Development Agency is to receive an allocation of R 234 689 000 for
2014/5.
Under this funding upgrading to the public environment will take place at the following
locations: Jabulani, Kliptown, Nancefield, and Randburg.
Responsibility for the Alexandra Renewal Project has been shifted to the JDA. The amount
set aside for the Alexandra Renewal Project in 2014/15 is approximately R70 million for a
number of projects.
The Joburg Roads Agency received an allocation of R 1 423 210 000 million for 2014/15.
This is a 92% year on year increase for the municipal entity, and continues the City’s
commitment to improving roads, bridges and stormwater infrastructure. R87 million will go
towards bridge upgrading; R110 million for the resurfacing of the M1, M2 and Soweto
Highways; R287 million for the resurfacing of other roads; R100 million for Road
Rehabilitation and Road Reconstruction; R46 million for stormwater related projects; and
R262 million for the tarring of gravel roads in marginalised areas.
The Economic Growth Cluster consists of the Economic Development, Joburg Market and
Johannesburg Property Company, Transportation and Metro Bus.
229
The Department of Economic Development received R 78 881 000 in the 2014/15 capital
budget. R21 million is for the construction of linear markets; R11 million is for the Inner City
Property Scheme for the purchase and redevelopment of property in the Inner City; and R10
million for the Inner City Skills Development Centre. R 36 492 000 is for projects under the
Extended Public Works Programme
Johannesburg Property Company incorporates the Metro Trading Company (MTC) and the
Facilities Management and Maintenance Unit (FMMU). The Municipal Entity is to receive
R124.5 million in 2014/15. Of this amount R35 million is for the Construction of a taxi rank
and the Sandton Gautrain Station; and R20 million is for the Jabulani precinct.
R7.5 million has been put aside for FMMU related projects. R1.3 million has been put aside
for the upgrading of existing Metro Trading Facilities in the City.
The Joburg Market has been allocated R 208 322 000.00 primarily for the Market of the
Future project (R95 million) that will expand the capacity of the existing facility, but also for
the refurbishments of infrastructure within the market precinct at City Deep.
The Transportation Department has a budget of R 971 511 000.00. R 829 571 000.00 of this
funding is from the National Public Transport Infrastructure and Systems Grant, for the
continued construction of the Rea Vaya: Bus Rapid Transit System. The remainder of the
funding is to go to various taxi rank and non-motorised transport projects being undertaken
by the department.
Metrobus received an allocation of R 200 151 000.0 for 2014/15 to fund the purchase of new
buses (R 187 591 000.00), and upgrade the bus company’s existing assets.
The Human and Social Development Cluster includes: Community Development, Health,
Social Development, City Parks and Zoo, the Johannesburg Theatre Company (JTC),
Emergency Management Services (EMS) and the Johannesburg Metropolitan Police
Department (JMPD).
The focus for the core Community Development Department for the 2014/15 financial year is
to continue the refurbishment of existing facilities. However there are new facility projects on
the budget for 2014/15. The total amount to be allocated to the Community Development
Department is R 110 036 000.00. Of this amount: Arts, Culture and Heritage receives R 21
500 000.00; Libraries R 25 951 000.00; Sports and Recreation – R 59 901 000.00 and R 2
684 000.00 to Head Office. Key projects for 2013/14 include: refurbishment of the
230
Johannesburg Art Gallery (R 11 647 000.00); Construction of a new sports facility at Rabie
Ridge (R 2 713 000.00); Construction of a new Multi-purpose Centres at Orlando Ekaya (R 2
588 000.00) and Diepsloot (R 2 000 000.00); and R 10 000 000.00 for the upgrading of
Union Stadium. There are also a number of upgrading and refurbishment projects that are to
be undertaken in the Corridors of Freedom
The Health Department is to be allocated 85 026 000.00 in 2014/15. Key projects to be
undertaken by the Health Department include the construction of the Mountain View Clinic
outside Ennerdale (R3 million), and the Mpumelelo Clinic – Phase 2 in Ivory Park (R4
million).
The Social Development Department has been allocated R20.2 million in 2014/15. This is to
be spent primarily on the construction of the Golden Harvest Drug Rehabilitation Centre (R 7
350 000.00); and the refurbishment of the Zakheni Skills Development Centre (R 6 000
000.00).
The Johannesburg Theatre Company is the umbrella management company for the Joburg,
Soweto and Promusica (Roodepoort) Theatres. The Company is to receive R8.3 million rand
for various capital projects at the three theatres.
Johannesburg City Parks and Zoo have been allocated R 166 400 000.00 for 2014/15. Of
this amount the Zoo has been allocated R 24 283 000.00 for various capital projects. City
Park’s major projects for 2014/15 include: the development of the Olifantsvlei Cemetery
(R 30 000 000.00; and the development of an urban agriculture facility (R 10 000 000.00).
There will also be significant expenditure on parks in the Corridors of Freedom and in the
Inner City.
In relation to the public safety departments, Emergency Management Service’s allocation of
R 102 687 800.00 is to be spent on among other projects: ambulance equipment (R 10 000
000.00); the construction of the Protea Glen Fire Station (R 11 200 000.00) and the
reconstruction of the Inner City Fire Station (R 20 000 000.00). The Johannesburg
Metropolitan Police Department’s allocation of R 60 112 000.00 is to be spent primarily on
upgrading the Langlaagte Station Offices (R 5 350 000.00); the Tetra Radio System (R 10
000 000.00) and for stormwater management at the JMPD facilities at Rosettenville.
The Sound Governance Cluster consists of the Speaker’s Office, the Office of the Executive
Mayor and the Corporate and Shared Services Department and Group Finance.
231
The Speaker’s Office has received an amount of R 30 920 000.00 for the construction of a
new Council Chamber in the Mayoral Wing of the Metropolitan Building in Braamfontein.
This project will cost R100 million over two years.
The Office of Executive Mayor/City Manager has been allocated R 67 960 000.00 primarily
for Community Based Planning Activities (R50 million); the establishment of an Integrated
Disaster Management Centre (R4 million); the purchase of base-stations as part of the smart
city initiative (R 10 000 000.00) Joburg Tourism’s E-marketing platform and associated
website (R1, 7 million).
Group Finance which includes the Finance and Revenue Departments will receive R 3 199
000.00.
.
Group Corporate and Shared Service’s has been allocated R 1 431 268 000.00. Of this
amount R 158 000 000.00 is for IT infrastructure renewal and optimisation, and R 1 058 400
000.00 for the upgrading of computer software for the City and will be overseen by the Office
of the Chief Information Officer. A further R 142 800 000.00 will be spent on the City’s
vehicle fleet contract from CAPEX by the Department.
The section above has provided an overview of the major capital projects to be undertaken
by departments and municipal entities in 2014/15.
The Capital Investment Framework has provided an overview of the policy and processes
that the City uses to identify and prioritise capital projects within the City. It has highlighted
the City’s commitment to providing services to the City’s marginalised, for addressing
upgrading requirements of existing infrastructure and facilities and to fundamentally alter the
urban form of the City. The CIF in turn has interpreted these commitments into the capital
budget, and the key projects that each department and municipal owned entity is to
undertake within 2014/15. In so doing the CIF sets out the rationale, and the tangible
outcomes of that rationale, in relation to the capital.
232
233
City-wide Projects- Capital budget by project
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
30555 City Parks House - IT Equipment New Computer Hardware New Computer Hardware JOHANNESBURG F Ward
IT Equipment New Computer Hardware
Intangibles Computers - software and programming
3 500 000.00
1 000 000.00
2 363 000.00
City Parks and Zoo
City Wide
New
30556 City Parks House – Building upgrade New Building Alterations JOHANNESBURG F Ward
Buildings upgrade Infrastructure Other 5 000 000.00
4 000 000.00
4 000 000.00
City Parks and Zoo
City Wide
New
30557 Plant and equipment New Plant and Equipment JOHANNESBURG F Ward
Plant and equipment Community Parks & gardens 4 000 000.00
2 500 000.00
2 500 000.00
City Parks and Zoo
City Wide
New
31077 Road islands and Town Entrances developments & Beautification New Park JOHANNESBURG F City Wide
Development of road islands and town entrances
Community Parks & gardens 2 000 000.00
2 000 000.00
2 000 000.00
City Parks and Zoo
City Wide
New
33802 Study and Implementation of NMT and tree planting New Park JOHANNESBURG F City Wide
The undertaking of detailed studies and investigations into the parameters for the development of NMT paths and appropriate tree planting
Community Parks & gardens 2 000 000.00
2 000 000.00
2 000 000.00
City Parks and Zoo
City Wide
New
32781 Upgrade of existing parks to Occupational health and safety standards New Park JOHANNESBURG F City Wide
Upgrade of Parks developed in the last five year period to comply with new health and safety regulations
Community Parks & gardens 4 000 000.00
2 000 000.00
2 000 000.00
City Parks and Zoo
City Wide
New
33447 Urban Agriculture New Park JOHANNESBURG F Regional
Food security project City wide Community Parks & gardens 10 000 000.00
7 302 315.00
5 697 685.00
City Parks and Zoo
City Wide
New
33620 Alarm monitoring devices for Miniature Sub Stations New Security Equipment REUVEN F City Wide
Install alarm/monitoring devices in high risk miniature substations
Infrastructure Electricity Reticulation
6 000 000.00
5 000 000.00
-
City Power City Wide
New
234
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
27696 Acquire servitudes and sub station sites New Transmission Line REUVEN F City Wide
Acquisition of servitudes for transmission lines and sub station sites.
Investment Property
Other 12 000 000.00
12 000 000.00
14 000 000.00
City Power City Wide
New
27008 Capital Program to replace aged and critical switchgear Renewal Bulk Infrastructure REUVEN F City Wide
Switchgear Capital Program to replace aged and critical switchgear
Infrastructure Electricity Reticulation
20 000 000.00
20 000 000.00
20 000 000.00
City Power City Wide
Renewal
29881 Earthing and lightning protection at Major sub stations Renewal Bulk Infrastructure REUVEN F
Earthing and Lightning protection at all major sub stations
Infrastructure Electricity Reticulation
5 000 000.00
5 000 000.00
20 000 000.00
City Power City Wide
Renewal
31129 Emergency work on the transmission network Renewal Bulk Infrastructure REUVEN F City Wide
Emergency work on the transmission network
Infrastructure Electricity Reticulation
5 000 000.00
10 000 000.00
20 000 000.00
City Power City Wide
Renewal
33364 Eskom payments. New Bulk Infrastructure REUVEN F City Wide
Eskom payments for feasibility quotes.
Infrastructure Electricity Reticulation
30 000 000.00
22 000 000.00
30 000 000.00
City Power City Wide
New
33634 ICT Network upgrade for smart grids to substations New Load Management REUVEN F City Wide
ICT Network upgrade for smart grids to substations
Intangibles Computers - sofware and programming
20 892 000.00
10 000 000.00
15 000 000.00
City Power City Wide
New
33636 Implementation of Sharepoint Portal New Computer Software REUVEN F City Wide
Implementation of Sharepoint Portal
Intangibles Computers - sofware and programming
6 000 000.00
3 000 000.00
3 000 000.00
City Power City Wide
New
33641 Infills for adhoc projects, All Areas Renewal Electrification REUVEN F City Wide
Infills for adhoc projects, All Areas
Infrastructure Electricity Reticulation
500 000.00
-
-
City Power City Wide
Renewal
30697 Install new IED's in substations Renewal Protection REUVEN F City Wide
Install new IED's in substations with grading problems
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
City Power City Wide
Renewal
30696 Install public lights in formal areas New Public Lighting REUVEN F City Wide
Install public lights in formal areas based on petitions received
Infrastructure Street Lighting 10 000 000.00
10 000 000.00
10 000 000.00
City Power City Wide
New
33618 Install Pylon monitoring alarms New Security Equipment REUVEN F City Wide
Install Vibration alarms on Pylons
Infrastructure Electricity Reticulation
2 000 000.00
-
-
City Power City Wide
New
235
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
32820 Install statistical meters on all distributors New Load Management REUVEN F City Wide
Install statistical meters at all substations
Infrastructure Electricity Reticulation
50 000 000.00
25 000 000.00
50 000 000.00
City Power City Wide
New
30105 Operating Capital New Operational Capex REUVEN F City Wide
Operating Capital Intangibles Computers - software and programming
20 000 000.00
20 000 000.00
20 000 000.00
City Power City Wide
New
29830 Pre-engineering design of sub stations New Bulk Infrastructure REUVEN F City Wide
Pre Engineering design of sub stations
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
City Power City Wide
New
33622 Protection, Supply and delivery of Secondary Plant equipment Renewal Protection REUVEN F City Wide
Replacement of secondary plant equipment of old technology
Infrastructure Electricity Reticulation
3 000 000.00
3 000 000.00
5 000 000.00
City Power City Wide
Renewal
32822 refurbish distribution transformers and miniature substations. Renewal Medium Voltage Network REUVEN F City Wide
Refurbish distribution transformers and miniature substations.
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
City Power City Wide
Renewal
30698 Refurbish obsolete protection relays Renewal Protection REUVEN F City Wide
Refurbish obsolete protection relays in various sub stations
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
City Power City Wide
Renewal
27007 Refurbish transformers and switchgear Renewal Bulk Infrastructure REUVEN F City Wide
Transformer Capital Program to eliminate high risk transformers.
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
15 000 000.00
City Power City Wide
Renewal
30670 Replace batteries in sub stations Renewal Bulk Infrastructure REUVEN F City Wide
Replace batteries in sub and switching stations
Infrastructure Electricity Reticulation
1 000 000.00
2 000 000.00
3 000 000.00
City Power City Wide
Renewal
32808 Replace obsolete energy meters with prepaid units Renewal Service Connections REUVEN F City Wide
Replace obsolete energy meters with prepaid units
Infrastructure Electricity Reticulation
291 473 000.00
115 000 000.00
115 000 000.00
City Power City Wide
Renewal
28792 Replace open LV conductors with ABC Renewal Low Voltage REUVEN F City Wide
Turnkey project to replace bare OH mains in problematic areas with ABC.
Infrastructure Electricity Reticulation
12 500 000.00
30 000 000.00
30 000 000.00
City Power City Wide
Renewal
236
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
31141 Revenue Generation Efficiency Project. Pre-paid system installation of semi automated pre-paid & automated pre paid (smart meters) Renewal Service Connections REUVEN F City Wide
Revenue Generation Efficiency Project. Pre-paid system installation of semi automated pre-paid & automated pre paid (smart meters)
Other Assets Other 390 000 000.00
420 000 000.00
90 000 000.00
City Power City Wide
Renewal
32837 Roll out of smart grid to all substations New Protection REUVEN F City Wide
Roll out of smart grid to all substations
Infrastructure Other 3 000 000.00
5 000 000.00
8 000 000.00
City Power City Wide
New
31121 Telecommunications, Fibre optic installations and upgrades Renewal SCADA REUVEN F Regional
Fibre optic installations and upgrades
Infrastructure Other 10 000 000.00
10 000 000.00
10 000 000.00
City Power City Wide
Renewal
25856 Tetra Radio system New Tools and Loosegear REUVEN F City Wide
Mobile radio system with dispatch capability
Other Assets Plant & equipment 500 000.00
500 000.00
500 000.00
City Power City Wide
New
30840 Transformer capital program to eliminate high risk transformers Renewal Bulk Infrastructure REUVEN F City Wide
Transformer capital program to eliminate high risk transformers
Infrastructure Electricity Reticulation
15 000 000.00
15 000 000.00
15 000 000.00
City Power City Wide
Renewal
33638 Upgrade of Virtualization Infrastructure New Computer Software REUVEN F City Wide
Upgrade of Virtualization Infrastructure
Intangibles Computers - sofware and programming
-
5 000 000.00
5 000 000.00
City Power City Wide
New
32459 Upgrading of 88 kV overhead lines Renewal Bulk Infrastructure REUVEN F City Wide
Upgrade 88 kV overhead lines Infrastructure Electricity Reticulation
70 000 000.00
76 003 000.00
84 896 000.00
City Power City Wide
Renewal
33457 ACH - Building Restorations (City Wide) Renewal Heritage Area Upgrade JOHANNESBURG F
Upgrading of building Community Recreational facilities
1 500 000.00
2 000 000.00
-
Community Dev: Arts, Culture and Heritage
City Wide
Renewal
33762 Inner City (Comm Dev: ACH) Renewal Inner City Intervention JOHANNESBURG F
Inner City ring-fenced amount for undertaking capital projects
Community Recreational facilities
3 353 000.00
9 000 000.00
2 000 000.00
Community Dev: Arts, Culture and Heritage
City Wide
Renewal
30712 Operational Capital JOHANNESBURG F
Operational capital for Comm Devt
Other Assets Other 2 084 000.00
2 185 000.00
1 824 000.00
Community Dev: Head Office
City Wide
Renewal
237
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
33344 Rec - People with disabilities access JOHANNESBURG F
PWD access Community Recreational facilities
600 000.00
600 000.00
600 000.00
Community Dev: Head Office
City Wide
New
33328 ACH - New Monuments Citywide New Incineration JOHANNESBURG F
New monuments Community Museums & Art Galleries
1 000 000.00
1 500 000.00
-
Community Dev: Libraries
City Wide
New
33012 Lib.Installation of book security system in Libraries New Library BRAAMFONTEIN WERF F
Installation of book security to various libraries
Community Libraries 1 000 000.00
1 000 000.00
1 000 000.00
Community Dev: Libraries
City Wide
New
33010 Lib.Pail Project Library New Library BRAAMFONTEIN WERF EXT.1 F
Upgrade of internet to various facilities
Community Libraries 3 400 000.00
4 500 000.00
7 000 000.00
Community Dev: Libraries
City Wide
New
33011 Lib.RFID asset tagging for books New Library BRAAMFONTEIN WERF F
Installation of asset tag for books
Community Libraries 8 051 000.00
949 000.00
-
Community Dev: Libraries
City Wide
New
33013 Lib.Satelite Libraries New Corridors of Freedom Intervention BRAAMFONTEIN WERF F
Construction of satellite libraries
Community Libraries 2 000 000.00
2 000 000.00
2 000 000.00
Community Dev: Libraries
City Wide
New
32553 Aqua - Minor upgrading of Swimming Pools Renewal Community Centre JOHANNESBURG F City Wide
Upgrading of filtration system and pumps in the city
Community Swimming pools 2 000 000.00
1 000 000.00
1 500 000.00
Community Dev: Sport and Recreation
City Wide
Renewal
33342 Rec - Construction of Clay soccer field New Community Centre JOHANNESBURG F City Wide
Construction of Clay soccer fields
Community Recreational facilities
1 200 000.00
1 200 000.00
1 200 000.00
Community Dev: Sport and Recreation
City Wide
New
33602 NDPG Hub Projects New Programme JOHANNESBURG F City Wide
Hub Identification Infrastructure Other -
-
-
Development Planning
City Wide
New
29624 Operating Capital: DPUM Renewal Operational Capex BRAAMFONTEIN WERF F City Wide
new Other Assets Surplus Assets - (Investment or Inventory)
550 000.00
580 000.00
610 000.00
Development Planning
City Wide
Renewal
33600 Public Transport Corridor Development (TOD) New Operational Capex JOHANNESBURG F City Wide
Corridor Development Infrastructure Other 250 000 000.00
250 000 000.00
250 000 000.00
Development Planning
City Wide
New
238
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
33824 Integrated City Development Grant
Infrastructure Other 50 497 000.00
-
Development Planning
City Wide
29027 Operational Capital (DED) Renewal Operational Capex BRAAMFONTEIN WERF F City Wide
Monies required to ensure ongoing operation of projects
Other Assets Surplus Assets - (Investment or Inventory)
440 000.00
470 000.00
500 000.00
Economic Development
City Wide
Renewal
33603 EPWP Projects 36 492 000.00
-
-
Economic Development
City Wide
33822 Green Energy Initiative New Green Infrastructure JOHANNESBURG F City Wide
Project for green energy Infrastructure Other 6 000 000.00
10 000 000.00
-
Environment and Infrastructure
City Wide
New
29048 Operational Capital (EISD) Renewal Operational Capex BRAAMFONTEIN WERF EXT.1 F City Wide
To ensure ongoing maintenance of existing capital
Other Assets Surplus Assets - (Investment or Inventory)
830 000.00
880 000.00
930 000.00
Environment and Infrastructure
City Wide
Renewal
33558 ICT - Infrastructure renewal and optimisation Renewal Computer Hardware JOHANNESBURG F City Wide
Renewal of existing computer hardware in the City
Intangibles Computers - software and programming
158 000 000.00
-
-
Group Corporate and Shared Services
City Wide
Renewal
33556 ICT: Infrastructure new hardware New Computer Hardware JOHANNESBURG F City Wide
Purchase of new computers and other hardware for the City
Intangibles Computers - software and programming
71 600 000.00
24 000 000.00
20 761 000.00
Group Corporate and Shared Services
City Wide
New
33557 ICT: Software Upgrades, implementation and broadband migration Renewal Computer Software JOHANNESBURG F City Wide
Upgrade of software packages used by the City of Johannesburg
Intangibles Computers - software and programming
1 058 400 000.00
-
-
Group Corporate and Shared Services
City Wide
Renewal
29039 Operational Capital - Corporate Services New Operational Capex JOHANNESBURG F City Wide
Operational Capital Other Assets Surplus Assets - (Investment or Inventory)
468 000.00
494 000.00
560 000.00
Group Corporate and Shared Services
City Wide
New
33553 Procurement of Fleet vehicles New Operational Capex JOHANNESBURG F City Wide
Contract for vehicles for use of Council
Other Assets Plant & equipment 142 800 000.00
-
-
Group Corporate and Shared Services
City Wide
New
239
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
29030 Operational Capital Renewal Operational Capex BRAAMFONTEIN WERF F City Wide
operational capital inclusive of Comprehensive Infrastructure Plan
Other Assets Surplus Assets - (Investment or Inventory)
3 199 000.00
3 499 000.00
3 047 000.00
Group Finance: Finance
City Wide
Renewal
32941 AIRCONDITIONERS: Supply, installation and repairs of air conditioners in Health Facilities across the city New Clinic JOHANNESBURG F City Wide
Supply, installations and repairs of air conditioners in clinics across the city
Community Clinics 500 000.00
500 000.00
500 000.00
Health City Wide
New
32387 City Wide - BULK FILING SYSTEMS FOR RECORDS, supply and installation in Health facilities and offices New Office Equipment JOHANNESBURG A City Wide
Acquisition of Bulk Filing Systems for Health Facilities across the City for keeping patient records safe, confidential and in accordance with legislation
Other Assets Furniture and other office equipment
500 000.00
500 000.00
-
Health City Wide
New
32419 City Wide - Tools of trade and equipment for Vector Control Personnel Renewal Operational Capex JOHANNESBURG F City Wide
Purchase of equipment to prevent the spread of disease at all 80 clinics
Other Assets Plant & equipment 300 000.00
300 000.00
250 000.00
Health City Wide
Renewal
30328 City wide Operational Capital spend for Health Renewal Operational Capex JOHANNESBURG F City Wide
Operational Capital Spend Community Clinics 1 726 000.00
1 826 000.00
1 730 000.00
Health City Wide
Renewal
32943 ELECTRICITY UPGRADE for health facilities across the city New Clinic JOHANNESBURG F City Wide
Electricity upgrade for health facilities across the city
Community Clinics 300 000.00
300 000.00
300 000.00
Health City Wide
New
32395 Guardhouse construction at various facilities across the city New Building Alterations Johannesburg City Wide
construction of guardhouses across the city at various health facilities
Community Clinics 1 000 000.00
500 000.00
500 000.00
Health City Wide
New
30339 MINOR WORKS at various clinics across the City Renewal Clinic JOHANNESBURG F City Wide
MINOR WORKS across the City Of Johannesburg, design and layout of Clinics, construction of buildings and carports, furniture and equipment, landscaping, paving and signage.
Community Clinics 6 000 000.00
1 000 000.00
3 000 000.00
Health City Wide
Renewal
240
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
30693 Formalisation of informal settlements across the City. Renewal Bulk Infrastructure JOHANNESBURG F City Wide
Formalisation of Informal Settlements within the City of Johannesburg Administration Regions A-G
Investment Properties
Housing development
50 000 000.00
50 000 000.00
25 000 000.00
Housing City Wide
Renewal
29798 Land Purchases New Operational Capex BRAAMFONTEIN WERF EXT.1 F City Wide
Land purchases for properties in Princess Plots (R14,748,602), Lindhaven (R8,021,040), Jameson Field (R2m) and Vlakfontein (R1,402,767)
Other Assets Civic Land & Buildings
50 000 000.00
-
-
Housing City Wide
New
29041 Operational capital (HS) New Operational Capex BRAAMFONTEIN WERF F City Wide
Operational Capital for maintenance of Housing Stock
Other Assets Surplus Assets - (Investment or Inventory)
500 000.00
530 000.00
560 000.00
Housing City Wide
New
33601 SHSUP Interventions New Operational Capex JOHANNESBURG F City Wide
SHSHUP Interventions Infrastructure Other 30 000 000.00
10 000 000.00
20 000 000.00
Housing City Wide
New
32377 Biogas to electricity at NW, GK ,BK New Bulk Waste Water DIEPSLOOT WES EXT.5 C Regional
Biogas to electricity at NW, GK, BK
Infrastructure Sewerage Purification & Reticulation
10 000 000.00
25 600 000.00
30 000 000.00
JHB Water: Sewer
City Wide
New
29385 WWTW : Scada and PLC Replacements for infrastructure investigations Renewal JOHANNESBURG F
WWTW: Scada and PLC Replacements Person W Longhow
Intangibles Other 4 251 000.00
-
-
JHB Water: Sewer
City Wide
Renewal
32776 WWTW General:Skid steer loaders # 6 New Bulk Waste Water JOHANNESBURG F Regional
WWTW General:Skid steer loaders # 6
Infrastructure Sewerage Purification & Reticulation
3 000 000.00
-
-
JHB Water: Sewer
City Wide
New
33806 WWTW: Install flume at Tshwane / JHB boundary New Bulk Waste Water LANSERIA EXT.17 A
Construction of aqueduct to transport waste water
Infrastructure Sewerage Purification & Reticulation
-
-
-
JHB Water: Sewer
City Wide
New
33121 WWTW: Upgrade and Refurbish New Inner City Intervention BERTRAMS F
Install flume Infrastructure Sewerage Purification & Reticulation
10 000 000.00
-
30 000 000.00
JHB Water: Sewer
City Wide
New
241
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
22371 Basic Water Service New Basic Water and Sewer Services ORANGE FARM EXT.8 G Regional
Provision of a basic level of sanitation in the form of VIP toilet to individual households in informal impermanent settlements earmarked for relocation.
Other Assets Other 30 000 000.00
30 000 000.00
50 000 000.00
JHB Water: Water
City Wide
New
24116 Corporate Requirements of Johannesburg Water New Corporate Service Assets JOHANNESBURG F City Wide
Corporate Requirements Intangibles Other 7 859 000.00
7 658 000.00
6 400 000.00
JHB Water: Water
City Wide
New
22334 Operation Gcin amanzi - water conservation New Operate and Maintenance Assets JOHANNESBURG D City Wide
Unaccounted for Water initiative
Infrastructure Sewerage Purification & Reticulation
248 205 000.00
429 005 000.00
350 854 000.00
JHB Water: Water
City Wide
New
26902 Unplanned bulk water & sewer connections to new townships New Basic Water and Sewer Services JOHANNESBURG F City Wide
Unplanned bulk water & sewer connections to new townships.
Infrastructure Other 1 000 000.00
1 000 000.00
1 000 000.00
JHB Water: Water
City Wide
New
23819 Operations and Maintenance Renewal Operate and Maintenance Assets JOHANNESBURG F City Wide
Operations and Maintenance of Water and Sewer networks across the City
Infrastructure Other 49 120 000.00
39 198 000.00
23 600 000.00
JHB Water: Water
City Wide
Renewal
23791 Planning and engineering studies for Johannesburg Water New Operate and Maintenance Assets MARSHALLS TOWN F City Wide
Planning and Engineering Studies
Intangibles Other 19 000 000.00
18 000 000.00
18 200 000.00
JHB Water: Water
City Wide
New
29010 Provision for Emergency Work Renewal Operate and Maintenance Assets MARSHALLS TOWN F City Wide
Provision: for Emergency Work Infrastructure Other 10 000 000.00
10 000 000.00
10 000 000.00
JHB Water: Water
City Wide
Renewal
26423 FMMU - Public Conveniences New Public toilets JOHANNESBURG F Ward
Construction of Public Conveniences at various sites over the city
Community Other 7 500 000.00
7 500 000.00
7 500 000.00
JPC City Wide
New
242
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
33550 Land Regularisation Renewal Operational Capex JOHANNESBURG F City Wide
Add value to existing City Owned Property by formalising tenure and land rights and then distributing land to beneficiaries in Orange Farm and Ivory Park
Community Social Renting Housing
10 000 000.00
50 000 000.00
32 286 000.00
JPC City Wide
Renewal
33797 Purchase of land in Perth/Empire, Louis Botha and Turffontein Corridors New Corridors of Freedom Intervention CORONATIONVILLE F City Wide
Purchase of Land within the Perth/Empire, Louis Botha and Turffontein Corridors of Freedom as defined in the relevant Strategic Area Frameworks
Community Social Renting Housing
22 402 000.00
56 005 000.00
7 780 000.00
JPC City Wide
New
33692 Site Development Projects New Land Preparation JOHANNESBURG F City Wide
land preparation of various site within the City of Johannesburg
Other Assets Civic Land & Buildings
16 298 000.00
41 102 000.00
28 700 000.00
JPC City Wide
New
32802 BRID 10 - Bridge Expansion Joints. Renewal Bridges (Pedestrian and Vehicles) JOHANNESBURG F City Wide
Ongoing improvements to bridge expansion joints: Chilvers Str Bridge; Bridge 6 Heidelberg I/C; Crown I/C; Heidelberg I/C EB + WB; Treu Rd Bridge.
Infrastructure Roads, Pavements, Bridges & Storm Water
15 000 000.00
15 000 000.00
15 000 000.00
JRA City Wide
Renewal
28344 BRID 11 - Bridge Rehabilitation. Renewal Bridges (Pedestrian and Vehicles) JOHANNESBURG F City Wide
Bridge Management System (BMS): Detailed inspections completed for urgent work to be done in 2012-13 as part of Motorway and District Bridge Rehabilitation Programme including ongoing make safe items in the following bridges: Rockridge Rd Bridge; Treu Rd Bridge; M1 Double Deck; Killarney Bridge; Jan Smuts Av Bridge.
Infrastructure Roads, Pavements, Bridges & Storm Water
3 000 000.00
23 000 000.00
3 000 000.00
JRA City Wide
Renewal
32804 BRID 11 - Bridges: Visual and Detailed (Principal) Inspections. New Bridges (Pedestrian and Vehicles) JOHANNESBURG F City Wide
Ongoing visual inspections of all bridges, major culverts, retaining walls, gantries and other structures for inclusion in BMS on: M1 Bridge over Empire Rd; M1 Bridge over Booysens Rd; M1 over Oxford Rd; M2 Kazerne Viaduct;
Infrastructure Roads, Pavements, Bridges & Storm Water
5 000 000.00
10 000 000.00
10 000 000.00
JRA City Wide
New
243
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
Mandela Bridge.
32803 BRID 12 - Motorway Gantries. Renewal Roads: Rehabilitation JOHANNESBURG F City Wide
Urgent and ongoing replacement and/or improvements of overhead motorway sign gantries in: M1 N 1st Ave; M2 W Heidelberg I/C; M2 W Benrose; 9 others.
Infrastructure Roads, Pavements, Bridges & Storm Water
10 000 000.00
5 000 000.00
5 000 000.00
JRA City Wide
Renewal
32805 BRID 20 - Bridges: Overtopping (Flooding). Renewal Bridges (Pedestrian and Vehicles) JOHANNESBURG F City Wide
Ten major bridges (and 10 minor structures also)that overtop in large storms because of their low capacity need to be upsized. Investigate reasons for overtopping and safety problems and provide solutions. Bridges also need upgrade and rehabilitation. The major ones are: Canada Rd over river; Gertrude St over river (2) in Fontainebleau; Bridge St over river in Dhlamini; Nirvana Dr East over river in Lenasia; Stone Haven St over river in Paulshof; and Nxumalo St, Kinini-Leselinyana St, Zulu-Mahalefele Rd, and Mzilikatzi St over river in Dube-Mofolo.
Infrastructure Roads, Pavements, Bridges & Storm Water
30 000 000.00
50 000 000.00
40 000 000.00
JRA City Wide
Renewal
27980 CATCH 210 - Bosmont Catchment: Stormwater Drainage: Central Areas New Stormwater Catchments BOSMONT F Ward
Infrastructure Roads, Pavements, Bridges & Storm Water
2 000 000.00
15 000 000.00
50 000 000.00
JRA City Wide
New
31034 CS - Capital Equipment. New Plant and Equipment JOHANNESBURG F City Wide
Fleet and Plant required equipment
Other Assets Plant & equipment 15 000 000.00
15 000 000.00
15 000 000.00
JRA City Wide
New
244
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
33478 CS - Construction of Archiving Facility. New Operational Capex JOHANNESBURG F City Wide
Construction of archiving facility for JRA to be prioritised (Physical,not inclusive of IT).
Other Assets Other 5 000 000.00
20 000 000.00
-
JRA City Wide
New
32871 CS - Depot Upgrading and Standardization. Renewal Operational Capex JOHANNESBURG F City Wide
Upgrading and standardization of JRA's depots up to standards to accommodate people and functions including demolition, reconstruction and new construction.
Other Assets Other Buildings 30 000 000.00
110 000 000.00
50 000 000.00
JRA City Wide
Renewal
33489 CS - IT Security. New Computer Software JOHANNESBURG F City Wide
Replace JDE and Hansen with SAP ERP (Enterprise Resource Planning) System to enhance security and performance at the Head Office.
Intangibles Computers - software and programming
1 000 000.00
1 000 000.00
1 000 000.00
JRA City Wide
New
29922 CS - Operational Capex. Renewal Operational Capex JOHANNESBURG F City Wide
Continue upgrading of lifts; OHSA compliance; furniture; training facilities; laboratory upgrade; disaster/emergency equipment.
Other Assets Surplus Assets - (Investment or Inventory)
20 000 000.00
25 000 000.00
25 000 000.00
JRA City Wide
Renewal
32906 IT - ERP Migration. New Computer Software JOHANNESBURG F City Wide
Replace current Enterprise Resource Planning (ERP) system in place at Head Office by a SAP ERP integrated system to enhance security and performance required for financials, HR and workflow management.
Intangibles Computers - software and programming
20 000 000.00
20 000 000.00
-
JRA City Wide
New
32234 MISCL - Dam Safety Rehabilitation Renewal Stormwater Management Projects JOHANNESBURG F City Wide
Urgent upgrading work according to dam inspections and updating of inspections to comply with statutory legislation and ensure public safety. Dams are moving to EISD; however there is nothing in writing confirming the movement.
Infrastructure Roads, Pavements, Bridges & Storm Water
10 000 000.00
40 000 000.00
30 000 000.00
JRA City Wide
Renewal
245
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
30729 MISCL - Emergency Stormwater Interventions. Renewal Stormwater Management Projects JOHANNESBURG F City Wide
Emergency stormwater improvements (Recurring): Erosion protection; installation of water control measures; stormwater infrastructure reconstruction
Infrastructure Roads, Pavements, Bridges & Storm Water
5 000 000.00
5 000 000.00
5 000 000.00
JRA City Wide
Renewal
27825 MISCL - Emergency, Critical and Urgent Depot Stormwater Improvements. New Stormwater Management Projects JOHANNESBURG F City Wide
Emergency stormwater improvements which have temporarily been put in holding action by OPEX but are too large to be completed by OPEX funding.
Infrastructure Roads, Pavements, Bridges & Storm Water
40 000 000.00
40 000 000.00
40 000 000.00
JRA City Wide
New
28002 MISCL - Environmental Compliance. New Operational Capex JOHANNESBURG F City Wide
Preliminary planning for legislative requirements in relation to environmental aspects (EIA, WUL).
Infrastructure Roads, Pavements, Bridges & Storm Water
1 500 000.00
1 500 000.00
1 500 000.00
JRA City Wide
New
32030 MISCL - Inner City Improvement. Renewal Roads: Construction and Upgrades JOHANNESBURG F Regional
Road network upgrade: Sidewalks; stormwater; pedestrianization and managed lanes. Priority interventions to commence in 2014-15.
Infrastructure Roads, Pavements, Bridges & Storm Water
7 000 000.00
15 000 000.00
15 000 000.00
JRA City Wide
Renewal
28162 MISCL - Integrated Roads and Stormwater Master planning. New Stormwater Management Projects JOHANNESBURG F City Wide
Determination of floodlines and all the roads and stormwater studies as part of master planning throughout the City of Johannesburg.
Infrastructure Roads, Pavements, Bridges & Storm Water
6 000 000.00
6 000 000.00
6 000 000.00
JRA City Wide
New
28119 MISCL - Investigate and Design Future Schemes. New Operational Capex JOHANNESBURG F City Wide
Ongoing. Investigate and design future schemes as required.
Intangibles Other 10 000 000.00
10 000 000.00
10 000 000.00
JRA City Wide
New
31473 MOB - Alternative Energy: Alternative Power Sources (LED). New Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Energy efficiency: Light Emitting Diodes(LED)installation at traffic signals.
Infrastructure Other 5 000 000.00
5 000 000.00
6 000 000.00
JRA City Wide
New
246
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
31827 MOB - Alternative Energy: Alternative Power Sources (UPS). New Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Installation of Uninterruptible Power Supply (UPS) at critical identified intersections.
Infrastructure Other 5 000 000.00
7 000 000.00
7 000 000.00
JRA City Wide
New
32161 MOB - CCTV Cameras. New Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Install 50 CCTV cameras to monitor intersections and roads.
Infrastructure Roads, Pavements, Bridges & Storm Water
2 500 000.00
2 500 000.00
4 000 000.00
JRA City Wide
New
29905 MOB - Complete Streets (Streets Alive). New Roads: Construction and Upgrades JOHANNESBURG F City Wide
Upgrade streets to the complete streets principles in: 2014-15 Ivory Park, Braamfischerville, Soweto, Diepsloot, Orange Farm; 2015-17 City wide; including also June 16 in Soweto and Alexandra retrofitting.
Infrastructure Roads, Pavements, Bridges & Storm Water
35 000 000.00
70 000 000.00
80 000 000.00
JRA City Wide
New
31516 MOB - Geometric Improvements. Renewal Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Planning, design & construction/implementation of geometric improvements at: 3rd Av & 1st St, Linden (Region B); 2nd Av & 3rd St, Linden (Region B); Paul Kruger and Amplifier St (Region C); Jim Fouche and Constantia/Wilhelmina Av (Region C); and Rivonia & Marion St (Region E).
Infrastructure Roads, Pavements, Bridges & Storm Water
10 000 000.00
10 000 000.00
10 000 000.00
JRA City Wide
Renewal
31898 MOB - Guardrails. Renewal Roads: Construction and Upgrades JOHANNESBURG F Regional
Installation/substitution of guardrails along main roads.
Infrastructure Roads, Pavements, Bridges & Storm Water
15 000 000.00
35 000 000.00
30 000 000.00
JRA City Wide
Renewal
30733 MOB - Installation of New Warranted Traffic Signals in All Wards City Wide. New Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Installation of new warranted traffic signals identified through the CBP process.
Infrastructure Roads, Pavements, Bridges & Storm Water
10 000 000.00
10 000 000.00
10 000 000.00
JRA City Wide
New
247
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
28875 MOB - Intelligent Transport Systems (ITS) Projects. New Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
This is a broad range of advanced communications technologies applied to the transportation system to make it safe, efficient and reliable without necessarily altering the existing transport infrastructure.
Infrastructure Roads, Pavements, Bridges & Storm Water
20 000 000.00
22 000 000.00
22 000 000.00
JRA City Wide
New
32846 MOB - Recabling of Old Redundant Cables at Signalized Traffic Intersections. Renewal Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Replacement of old cables at signalized intersections.
Infrastructure Roads, Pavements, Bridges & Storm Water
15 000 000.00
10 000 000.00
4 000 000.00
JRA City Wide
Renewal
31619 MOB - Remote Monitoring: Urban Traffic Control (UTC). New Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
The Project aims to enhance security & safety of people and assets; maximize efficiency and reliability; ensure fast and co-ordinated response; support co-ordination and co-operation across geographic organizational and institutional boundaries.
Infrastructure Roads, Pavements, Bridges & Storm Water
14 000 000.00
7 000 000.00
7 000 000.00
JRA City Wide
New
31457 MOB - SARTSM: Upgrade of Existing Signalised Intersections. Renewal Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Upgrade of JRA's signalised intersections according to the SARTSM (South African Road Traffic Manual).
Infrastructure Roads, Pavements, Bridges & Storm Water
5 000 000.00
2 000 000.00
1 000 000.00
JRA City Wide
Renewal
31925 MOB - Upgrading Controllers and Phasing. Renewal Mobility: Intelligent Transportation System & Networks JOHANNESBURG F Regional
New phasing to be installed in Inner City where many controllers are old / outdated; and the equipment is neither compatible nor interchangeable.
Infrastructure Transportation 8 000 000.00
8 000 000.00
8 500 000.00
JRA City Wide
Renewal
33490 RAMS - GIS Improvement. New Computer Software JOHANNESBURG F City Wide
Group of support audit management system for RAMS (Road Assets Management System) including various GIS tools
Intangibles Computers - sofware and programming
10 000 000.00
10 000 000.00
5 000 000.00
JRA City Wide
New
248
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
(BMS, PMS).
33742 RAMS - Stormwater Asset Monitoring System. New Computer Software JOHANNESBURG F City Wide
Asset audit system. Intangibles Computers - software and programming
10 000 000.00
5 000 000.00
5 000 000.00
JRA City Wide
New
28057 REHAB - Road Rehabilitation and Reconstruction Programme. Renewal Roads: Construction and Upgrades JOHANNESBURG F City Wide
Roads in very poor condition to be reconstructed according to PMS to improve VCI (Visual Condition Index).
Infrastructure Roads, Pavements, Bridges & Storm Water
100 000 000.00
160 000 000.00
220 000 000.00
JRA City Wide
Renewal
32626 RESUR - Resurfacing of Roads. Renewal Roads: Rehabilitation JOHANNESBURG F City Wide
According to PMS resurfacing work is urgently required to prolong the life of roads in poor condition between 5 to 6 years depending on type of surface treatment. It includes all regions plus access to motorways.
Infrastructure Roads, Pavements, Bridges & Storm Water
287 244 000.00
486 941 000.00
516 417 600.00
JRA City Wide
Renewal
32783 Anti Fraud and Anti Corruption Programme New Computer Software JOHANNESBURG F City Wide
Purchase of IT system to assist in the implementation of City programme to ensure fraud and corruption awareness
Other Assets Computers - hardware/equipment
-
500 000.00
500 000.00
Mayor's Office/ City Manager
City Wide
New
33823 Broad Band Base Stations New Plant and Equipment JOHANNESBURG F City Wide
The construction of Base Station with speed WiFi connection link by the city's Broad Bank network
Intangibles Computers - software and programming
10 000 000.00
10 000 000.00
10 000 000.00
Mayor's Office/ City Manager
City Wide
New
32784 Combined assurance planning and monitoring system Renewal Computer Software JOHANNESBURG F City Wide
Integrate enterprise risk management, internal audit, risk finance, performance monitoring, forensic investigations and compliance through the purpose of the updated Information Technology system, and therefore enable combined assurance planning
Other Assets Computers - hardware/equipment
-
500 000.00
750 000.00
Mayor's Office/ City Manager
City Wide
Renewal
249
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
management and reporting
26432 E Marketing Platform and JTC Website Renewal Computer Software ROSEBANK B City Wide
JTC Website Phase 2 - Business Tourism Website - Photography for Image Library - Touch Screen Kiosks - Tourism Office Upgrades - IT Infrastructure & Office Equipment - Trade Extranet - Media Extranet - Department of Foreign Affairs and Investment Portal - Interactive DVD creation - Multilingual Multimedia - Backend integration into route planning systems - Tourism Satellite account website - Stakeholder system and Credit Card Portal - Market Segmentation and Data Warehousing software - Interactive E-Learning platform - Backend integration into payment - systems (touch pay, sms payment, credit card, banks etc) - Image Library and Guard Book - Call Centre Integration into Joburg Connect SAP system
Intangibles Computers - software and programming
1 700 000.00
1 310 000.00
1 526 000.00
Mayor's Office/ City Manager
City Wide
Renewal
250
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
32782 Group compliance with laws, rules, codes and standards Renewal Operational Capex JOHANNESBURG F City Wide
Purchase of tools of trade required to ensure the City's compliance with MFMA regulations, and to accommodate additional staff
Other Assets Computers - hardware/equipment
-
90 000.00
30 000.00
Mayor's Office/ City Manager
City Wide
Renewal
33545 Insurance Claims Administration software New Computer Software BRAAMPARK F City Wide
Insurance Claims Administration software
Intangibles Computers - software and programming
500 000.00
-
-
Mayor's Office/ City Manager
City Wide
New
33598 Integrated Disaster Management Centre New Building Alterations JOHANNESBURG F City Wide
Integrated Disaster Management Centre
Infrastructure Other 4 000 000.00
4 077 000.00
24 874 000.00
Mayor's Office/ City Manager
City Wide
New
29028 Operational Capital New Operational Capex JOHANNESBURG F City Wide
Other Assets Other 1 760 000.00
1 903 000.00
940 000.00
Mayor's Office/ City Manager
City Wide
New
33599 Ward-based Planning Interventions New Operational Capex JOHANNESBURG F City Wide
CBP interventions Community Other 50 000 000.00
50 000 000.00
50 000 000.00
Mayor's Office/ City Manager
City Wide
New
30345 building - various upgrades New Building Alterations BRAAMFONTEIN WERF EXT.1 F City Wide
building alterations Heritage Assets
Buildings 1 200 000.00
2 000 000.00
1 200 000.00
Metrobus City Wide
New
29609 Engine + gear box New Vehicle BRAAMFONTEIN WERF F Ward
Replacements Community Buses 8 200 000.00
2 620 000.00
2 610 000.00
Metrobus City Wide
New
22393 Furniture and office equipment New Office Equipment BRAAMFONTEIN WERF EXT.1 F Ward
Comp/Furn/Equip: Computers, furniture, office equipment
Other Assets Furniture and other office equipment
120 000.00
400 000.00
400 000.00
Metrobus City Wide
New
30344 It equipment, new computers and hardware New Computer Hardware BRAAMFONTEIN WERF EXT.1 F City Wide
IT infrastructure and system implementation.
Other Assets Computers - hardware/equipment
300 000.00
300 000.00
300 000.00
Metrobus City Wide
New
26240 Plant and machinery - Metro bus New Plant and Equipment BRAAMFONTEIN WERF EXT.1 F Ward
MB Office equipment Other Assets Plant & equipment 240 000.00
300 000.00
300 000.00
Metrobus City Wide
New
251
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
26197 Purchasing of New Busses New Plant and Equipment JOHANNESBURG F City Wide
Recap of Buses Community Buses 187 591 000.00
60 000 000.00
-
Metrobus City Wide
New
30346 Replace vehicle fleet (Cars and bakkies) New Vehicle BRAAMFONTEIN WERF EXT.1 F Ward
depots vehicle replacement Community Buses 400 000.00
250 000.00
300 000.00
Metrobus City Wide
New
30343 software licenses New Computer Software BRAAMFONTEIN WERF EXT.1 F City Wide
software licences Intangibles Computers - software and programming
1 100 000.00
-
-
Metrobus City Wide
New
33543 Tools and Loose gear replacement New Operational Capex BRAAMFONTEIN WERF EXT.1 F City Wide
Replacement of material due to wear and tear
Other Assets Plant & equipment 1 000 000.00
-
-
Metrobus City Wide
New
32695 10 Facilities to facilitate separation at source city wide New waste collection JOHANNESBURG F City Wide
To facilitate waste minimisation across the city
Infrastructure Refuse 13 200 000.00
13 200 000.00
16 500 000.00
Pikitup City Wide
New
32799 19 Street Furniture in Marginalised Areas and the Inner City New waste collection JOHANNESBURG F City Wide
Purchase of infrastructure for street litter collection
Other Assets Other 1 500 000.00
1 500 000.00
1 500 000.00
Pikitup City Wide
New
30352 2 Branding of Facilities Renewal Branding & Marketing JOHANNESBURG F City Wide
Erection and placement of signage for landfill sites, depots, garden sites and compost plant
Other Assets Civic Land & Buildings
3 000 000.00
2 000 000.00
1 000 000.00
Pikitup City Wide
Renewal
30349 25 Facility for compliance renewal building alterations including HR academy and assessment centre. Renewal Building Alterations JOHANNESBURG F City Wide
Upgrade of existing Facilities to comply with the OHS Act. Depots are increasingly posing a risk to staff in terms of health, electrucution and serous injury to the Community and Oikitup staff. This project will also include the Provision of Pikitup Learning centre and the assessment centre.
Infrastructure Refuse 32 000 000.00
3 750 000.00
3 750 000.00
Pikitup City Wide
Renewal
33537 3 Bulldozers, Compactors and Graders New Plant and Equipment JOHANNESBURG
To purchase 7 Bulldozers, Compactors and Graders
Infrastructure Refuse 1 000 000.00
-
-
Pikitup City Wide
New
252
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
F City Wide
22316 4 IT Hardware and Software New Computer Hardware BRAAMFONTEIN WERF EXT.1 F City Wide
Upgrade I T software and hardware in order for staff to perform better.
Other Assets Computers - hardware/equipment
14 650 000.00
14 750 000.00
1 500 000.00
Pikitup City Wide
New
32694 8 EIA for all Pikitup's waste facilities (including Depots, landfills, Garden sites) New waste collection JOHANNESBURG F City Wide
Waste collection method Infrastructure Refuse 1 500 000.00
1 500 000.00
1 500 000.00
Pikitup City Wide
New
30650 Garden Sites, Buy Back Centres and Sorting Facilities Renewal waste collection BRAAMPARK F City Wide
Development of separation at source facilities and waste collection methods
Infrastructure Refuse 15 000 000.00
10 000 000.00
12 500 000.00
Pikitup City Wide
Renewal
33286 Air Conditioners in all EMS Buildings New Building Alterations MARTINDALE C City Wide
air conditioners for the regions Investment Property
Other 250 000.00
250 000.00
250 000.00
Public Safety: EMS
City Wide
New
32602 Ambulance equipment replacement Programme Renewal Plant and Equipment MARTINDALE B City Wide
Equipping ambulances with required medical supplies
Community Fire, safety & emergency
10 000 000.00
10 000 000.00
10 000 000.00
Public Safety: EMS
City Wide
Renewal
32584 Bay Doors Renewal Building Alterations MARTINDALE B City Wide
Replacement of existing bay doors to all fire stations across the City
Community Fire, safety & emergency
3 543 000.00
-
-
Public Safety: EMS
City Wide
Renewal
30659 CCTV cameras for security network at all Fire Stations New Computer Hardware MARTINDALE B City Wide
CCTV cameras at all fire stations for security to be beefed up to safeguard Council's assets.
Community Fire, safety & emergency
5 200 000.00
-
-
Public Safety: EMS
City Wide
New
33391 Centralised Data Base New Computer Software MARTINDALE C City Wide
Purchase of System Intangibles Computers - software and programming
5 000 000.00
-
-
Public Safety: EMS
City Wide
New
23407 EQUIPMENT CHECHE FOR URBAN SEARCH AND RESCUE(jaws of life, breathers for Gautrain)and Air lifting equipment New Plant and Equipment MARTINDALE B City Wide
Purchase of Specialised search and rescue equipment
Other Assets Plant & equipment 5 000 000.00
500 000.00
5 000 000.00
Public Safety: EMS
City Wide
New
253
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
33283 Fire and Rescue Equipment New Plant and Equipment MARTINDALE C City Wide
Rescue equipment Other Assets Other 3 000 000.00
4 000 000.00
13 000 000.00
Public Safety: EMS
City Wide
New
32603 Fire and Rescue Medical Equipment Tracking System New Plant and Equipment MARTINDALE B City Wide
Equipment and Related software to monitor the condition of EMS equipment and whether the equipment is lost or not
Community Fire, safety & emergency
6 000 000.00
6 000 000.00
-
Public Safety: EMS
City Wide
New
23412 FIRE PROTECTIVE CLOTHING for 150 firefighters New Operational Capex MARTINDALE C City Wide
Fire Protective clothing Other Assets Other 1 400 000.00
1 800 000.00
1 900 000.00
Public Safety: EMS
City Wide
New
30925 First phase Disaster Management Centre New Building Alterations SANDOWN E City Wide
Disaster management centre to be done in phases this is for the first phase.
Community Fire, safety & emergency
-
-
-
Public Safety: EMS
City Wide
New
30991 Level 3 Incident Command Vehicle New Operational Capex MARTINDALE B Ward
Purchase of a mobile command and control centre to accommodate 12 EMS officers to manage a disaster on site
Community Fire, safety & emergency
2 700 000.00
12 300 000.00
-
Public Safety: EMS
City Wide
New
29044 Operational Capital (EMS): New Operational Capex MARTINDALE F City Wide
Fire Equipment Other Assets Surplus Assets - (Investment or Inventory)
-
530 000.00
560 000.00
Public Safety: EMS
City Wide
New
23411 STANDBY GENERATORS for current fire stations and replacement New Plant and Equipment MARTINDALE C City Wide
Standby Generators Other Assets Plant & equipment 5 000 000.00
5 000 000.00
5 000 000.00
Public Safety: EMS
City Wide
New
32433 Wash Bay Project New Building Alterations MARTINDALE F City Wide
wash bays for EMS Other Assets Other Buildings 7 000 000.00
8 350 000.00
8 350 000.00
Public Safety: EMS
City Wide
New
27506 CCTV for the protection of City of Johannesburg Council owned property. New Plant and Equipment CITY AND SUBURBAN EXT.9 F City Wide
CCTV for the protection of City of Johannesburg Council owned buildings.
Other Assets Other 1 800 000.00
2 100 000.00
2 400 000.00
Public Safety: JMPD
City Wide
New
254
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
29436 IMPROVE AREA LIGHTING AT JHB, MIDRAND, RANDBURG, ROODEPOORT AND WEMMER COMPLEX New Plant and Equipment MARTINDALE B City Wide
Improvement area lighting buildings, terrain consisting of supply, installation, commissioning of new lights, masts, cabling, wiring, switches, electricity power and supply upgrading.
Other Assets Other Buildings 4 600 000.00
4 800 000.00
5 000 000.00
Public Safety: JMPD
City Wide
New
29443 Installation of CCTV cameras at JMPD HQ, Dube, Licensing HQ & Langlaagte for Internal control New Plant and Equipment MARTINDALE B City Wide
Install CCTV cameras in all JMPD facilities for internal control.
Other Assets Other 3 400 000.00
3 600 000.00
3 800 000.00
Public Safety: JMPD
City Wide
New
28872 LIGHTING MAST AT POUNDS New Building Alterations WEMMER F Ward
INSTALLATION OF LIGHTING MASTS AT VON WIELIGH POUND,FENNEL ROAD POUND AND WEMMER COMPLEX POUND,FOR THE IMPROVEMENT OF SECURITY AND REDUCTION OF RISK TO COJ.
Other Assets Other 1 600 000.00
1 800 000.00
1 600 000.00
Public Safety: JMPD
City Wide
New
29045 Operational Capital (JMPD) New Operational Capex BRAAMFONTEIN WERF F City Wide
NEW OPERATION CAPEX Other Assets Surplus Assets - (Investment or Inventory)
909 000.00
949 000.00
740 000.00
Public Safety: JMPD
City Wide
New
30431 Supply Firearms to the JMPD new recruits Renewal Plant and Equipment CITY AND SUBURBAN EXT.6 F
Supply new hand guns to JMPD Officers recruitment and 2010 compliance
Other Assets Other 2 178 000.00
2 822 000.00
2 800 000.00
Public Safety: JMPD
City Wide
Renewal
26858 Upgrading and improving security at JMPD Cash Sites. Renewal Building Alterations MARLBORO E City Wide
Upgrading and improving security for the various pay points of JMPD
Other Assets Other Buildings 2 500 000.00
3 000 000.00
3 500 000.00
Public Safety: JMPD
City Wide
Renewal
32777 Upgrading of Weighbridges at JMPD Testing Centres Renewal Plant and Equipment MARLBORO E City Wide
Upgrading of Weighbridge to ensure that they comply to the new SANS no. 1838-1 accreditation at Marlboro,Laanglagte, Randburg and Roodepoort.
Other Assets Plant & equipment 1 400 000.00
1 600 000.00
1 800 000.00
Public Safety: JMPD
City Wide
Renewal
255
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Location New Or Renewal
33341 Establishment of Day Care Facilities for the Elderly New Skills Development Centre JOHANNESBURG F City Wide
Design, layout and construction of buildings and carports, furniture and equipment, landscaping, paving and signage in Regions A-G.
Community Other -
2 000 000.00
2 000 000.00
Social Development
City Wide
New
33542 Operational Capital Renewal Skills Development Centre BRAAMPARK F City Wide
Operational capital for the department
Other Assets Plant & equipment 1 200 000.00
1 400 000.00
1 600 000.00
Social Development
City Wide
Renewal
30746 Rec - Upgrading of the People With Disabilities (PWD) access in community facilities Renewal Skills Development Centre PHIRI D City Wide
Installation of dedicated PWD parking bays, ramps to buildings and lifts if needed.
Community Recreational facilities
1 000 000.00
1 000 000.00
1 000 000.00
Social Development
City Wide
Renewal
33343 Shelters for Displaced People New Skills Development Centre JOHANNESBURG F City Wide
Design and layout and construction of buildings, carports, furniture and equipment, landscaping, paving and signage in Regions A,B,C,D,E,G
Community Other -
2 000 000.00
-
Social Development
City Wide
New
30367 Operational Capital (Speaker's Office) Renewal Operational Capex JOHANNESBURG F Ward
Purchasing of laptops and furniture
Other Assets Furniture and other office equipment
920 000.00
970 000.00
844 000.00
Speaker: Legislative Arm of the Council
City Wide
Renewal
29533 Operational Capital New Operational Capex JOHANNESBURG F City Wide
Purchase of computer equipment (not covered under Masana Agreement), furniture, and office machines, intended for new and certain existing staff
Other Assets Surplus Assets - (Investment or Inventory)
900 000.00
470 000.00
500 000.00
Transportation City Wide
New
30886 Rea Vaya New Bus Rapid Transit JOHANNESBURG F City Wide
Bus Rapid Transit (BRT) System: roads and ancillary works, depots, termini, land, Intelligent Transport System (Automatic Public Transport Management System & Automated Fare Collection System). Also NMT links feeding Rea Vaya Stations
Infrastructure Transportation 829 571 000.00
900 693 000.00
930 412 000.00
Transportation City Wide
New
256
Regional Projects
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Regional Location
New Or Renewal
27419 New Parks development in Ivory Park New Park KAALFONTEIN EXT.7 A Ward
Development of parks in Ivory Park
Community Parks & gardens
4 000 000.00
-
-
City Parks and Zoo
Region A New
33767 Perth/Empire (City Parks) Renewal Corridors of Freedom Intervention WESTBURY B City Wide
Implementation of Park Related Projects to realise the corridors of freedom
Infrastructure Other 8 000 000.00
13 000 000.00
15 000 000.00
City Parks and Zoo
Region B Renewal
33774 Perth/Empire (City Power) Renewal Corridors of Freedom Intervention WESTBURY B City Wide
Implementation of City Power Projects to realise the Corridors of Freedom
Infrastructure Electricity Generation
50 000 000.00
177 039 000.00
-
City Power Region B Renewal
33804 Perth Empire Corridor (Comm Dev: Libraries) Renewal Corridors of Freedom Intervention WESTBURY B
Libraries in the Corridors of Freedom
Community Libraries 3 000 000.00
3 000 000.00
-
Community Dev: Libraries
Region B Renewal
33780 Perth/Empire (Comm Dev: S&R) Renewal Corridors of Freedom Intervention WESTBURY B City Wide
Implementation of Community Facilities to realise the Corridors of Freedom
Community Recreational facilities
5 000 000.00
15 000 000.00
15 000 000.00
Community Dev: Sport and Recreation
Region B Renewal
33769 Perth Empire Corridor (Health) Renewal Corridors of Freedom Intervention WESTBURY B Regional
Ring-fenced amount for undertaking capital project in the corridor
Infrastructure Other 20 000 000.00
8 000 000.00
10 000 000.00
Health Region B Renewal
33773 Perth Empire Corridor (Housing) Renewal Corridors of Freedom Intervention WESTBURY B Regional
Ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Other -
-
30 000 000.00
Housing Region B Renewal
33777 Perth Empire Corridor (JDA) Renewal Corridors of Freedom Intervention WESTBURY B Regional
Ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Other 15 000 000.00
66 200 000.00
20 000 000.00
JDA Region B Renewal
33792 Perth Empire Corridor (JW: Sewer) Renewal Corridors of Freedom Intervention WESTBURY B
Ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Sewerage Purification & Reticulation
-
-
10 000 000.00
JHB Water: Sewer
Region B Renewal
33787 Perth Empire Corridor (JW: Water) Renewal Corridors of Freedom Intervention WESTBURY B Regional
ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Water, Reservoirs & Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
JHB Water: Water
Region B Renewal
257
Regional Projects
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Regional Location
New Or Renewal
28698 Emergency Work Renewal Medium Voltage Network NORTH RIDING EXT.30 C Regional
Execute emergency work of a capital nature in the Northern Region.
Infrastructure Electricity Reticulation
10 000 000.00
20 000 000.00
30 000 000.00
City Power Region C Renewal
25914 Refurbishment of LV infrastructure Renewal Low Voltage NORTH RIDING EXT.54 C Regional
Northern Region, Refurbish LV infrastructure in the Northern Region.
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
City Power Region C Renewal
25887 Refurbishment of MV infrastructure(Switchgear and transformers) Renewal Medium Voltage Network NORTH RIDING EXT.30 C City Wide
Refurbish MV infrastructure in Northern Region.
Infrastructure Electricity Reticulation
5 000 000.00
10 000 000.00
30 000 000.00
City Power Region C Renewal
26224 Replacement of aged and/or faulting MV cables Renewal Medium Voltage Network NORTH RIDING EXT.30 C City Wide
Replace obsolete MV cables Northern Region
Infrastructure Electricity Reticulation
5 000 000.00
10 000 000.00
15 000 000.00
City Power Region C Renewal
27694 Upgrading of Load Centres Renewal Medium Voltage Network NORTH RIDING EXT.30 C City Wide
Upgrade load centres in existing townships - Northern Region
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
20 000 000.00
City Power Region C Renewal
33764 Louis Botha (City Parks) Renewal Corridors of Freedom Intervention ORANGE GROVE E Regional
Project interventions to realise the Corridors of Freedom
Community Parks & gardens
10 000 000.00
2 000 000.00
8 000 000.00
City Parks and Zoo
Region E Renewal
33772 Louis Botha (City Power) Renewal Corridors of Freedom Intervention ORANGE GROVE E City Wide
Implementation of City Power Interventions to realise the Corridors of Freedom
Infrastructure Electricity Reticulation
17 020 000.00
42 550 000.00
25 530 000.00
City Power Region E Renewal
33778 Louis Botha (Comm Dev: S&R) Renewal Corridors of Freedom Intervention ORANGE GROVE E City Wide
Execution of Community Development related projects in order to realise the Corridors of Freedom
Community Recreational facilities
20 000 000.00
27 500 000.00
-
Community Dev: Sport and Recreation
Region E Renewal
33768 Louis Botha (Health) Renewal Corridors of Freedom Intervention ORANGE GROVE E Regional
Ring-fenced amount for undertaking capital project in Corridor
Infrastructure Other 30 000 000.00
10 000 000.00
3 676 000.00
Health Region E Renewal
258
Regional Projects
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Regional Location
New Or Renewal
33771 Louis Botha Corridor (Housing) Renewal Corridors of Freedom Intervention ORANGE GROVE E Regional
Ring-fenced amount for the undertaking of capital project in the corridor
Infrastructure Sewerage Purification & Reticulation
-
54 300 000.00
35 100 000.00
Housing Region E Renewal
33776 Louis Botha Corridor (JDA) Renewal Corridors of Freedom Intervention ORANGE GROVE E Regional
Ring-fenced amount for undertaking capital projects in corridor
Infrastructure Other -
15 000 000.00
8 560 000.00
JDA Region E Renewal
33791 Louis Botha Corridor (JW: Sewer) Renewal Corridors of Freedom Intervention ORANGE GROVE E
ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Water, Reservoirs & Reticulation
-
-
10 000 000.00
JHB Water: Sewer
Region E Renewal
33786 Louis Botha Corridor (JW: Water) Renewal Corridors of Freedom Intervention ORANGE GROVE E Regional
Ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Water, Reservoirs & Reticulation
25 000 000.00
10 000 000.00
20 000 000.00
JHB Water: Water
Region E Renewal
33761 Turffontein (City Parks) Renewal Corridors of Freedom Intervention TURFFONTEIN F Regional
Implementation of park projects to realise the Corridor of Freedom
Community Parks & gardens
5 600 000.00
8 000 000.00
14 400 000.00
City Parks and Zoo
Region F Renewal
28800 Emergency work Renewal Medium Voltage Network REUVEN F City Wide
Carry out emergency work of a capital nature. Southern Region
Infrastructure Electricity Reticulation
10 000 000.00
20 000 000.00
30 000 000.00
City Power Region F Renewal
32460 Refurbish TSS's as required by Area Maintenance Renewal Medium Voltage Network JOHANNESBURG F Regional
Refurbish TSS's in the Siemert Rd depot area
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
15 000 000.00
City Power Region F Renewal
27028 Refurbishment of LV infrastructure Renewal Low Voltage REUVEN F Regional
Refurbish LV infrastructure. Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
City Power Region F Renewal
27030 Refurbishment of MV infrastructure(Switchgear and transformers) Renewal Medium Voltage Network REUVEN F Regional
Refurbishment of MV infrastructure (switchgear and transformers)
Infrastructure Electricity Reticulation
10 000 000.00
15 000 000.00
15 000 000.00
City Power Region F Renewal
259
Regional Projects
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Regional Location
New Or Renewal
27031 Replacement of aged and/or faulting MV cables Renewal Medium Voltage Network REUVEN F Regional
replace aged and/or faulting MV cables Southern Region.
Infrastructure Electricity Reticulation
5 000 000.00
10 000 000.00
10 000 000.00
City Power Region F Renewal
33770 Turffontein (City Power) Renewal Corridors of Freedom Intervention TURFFONTEIN F Regional
City Power related interventions to realise the Corridors of Freedom Initiative
Infrastructure Electricity Generation
10 262 200.00
25 655 500.00
30 464 900.00
City Power Region F Renewal
27695 Upgrading of Load Centres Renewal Medium Voltage Network REUVEN F City Wide
Upgrade load centres in the Southern Region
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
20 000 000.00
City Power Region F Renewal
33763 Inner City (Comm Dev: S&R) Renewal Inner City Intervention JOHANNESBURG F Regional
Ring-fenced amount for undertaking capital Projects in the Inner City
Community Recreational facilities
4 600 000.00
2 400 000.00
8 200 000.00
Community Dev: Sport and Recreation
Region F Renewal
33765 Inner City (Dev Planning) Renewal Inner City Intervention JOHANNESBURG F Regional
Ring-fenced amount for undertaking capital projects in the Inner City
Infrastructure Other 150 000 000.00
210 000 000.00
259 574 000.00
Development Planning
Region F Renewal
33775 Turffontein Corridor (Housing) Renewal Corridors of Freedom Intervention TURFFONTEIN F Regional
Ring-fenced amount for the undertaking of capital projects in the corridor
Infrastructure Other -
3 000 000.00
30 000 000.00
Housing Region F Renewal
33779 Turffontein Corridor (JDA) Renewal Corridors of Freedom Intervention TURFFONTEIN F Regional
Ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Other 5 600 000.00
8 000 000.00
14 500 000.00
JDA Region F Renewal
33794 Turffontein Corridor (JW: Sewer) Renewal Corridors of Freedom Intervention TURFFONTEIN F
ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Sewerage Purification & Reticulation
-
-
-
JHB Water: Sewer
Region F Renewal
33789 Turffontein Corridor (JW: Water) Renewal Corridors of Freedom Intervention TURFFONTEIN F Regional
Ring-fenced amount for undertaking capital projects in the corridor
Infrastructure Water, Reservoirs & Reticulation
9 947 000.00
10 000 000.00
10 000 000.00
JHB Water: Water
Region F Renewal
33785 Turffontein Corridor (JRA) Renewal Corridors of Freedom Intervention TURFFONTEIN F Regional
Ring-fenced amount for undertaking capital project in corridor
Infrastructure Roads, Pavements, Bridges & Storm Water
18 373 600.00
45 934 000.00
27 560 400.00
JRA Region F Renewal
260
Regional Projects
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Regional Location
New Or Renewal
33793 Turffontein (Transport) Renewal Corridors of Freedom Intervention TURFFONTEIN F Regional
Implementation of Transportation Interventions in order to realise the Corridors of Freedom
Infrastructure Transportation 4 000 000.00
26 000 000.00
28 000 000.00
Transportation Region F Renewal
33175 New Parks Development Orange Farm New Park ORANGE FARM EXT.2 G Ward
Development of parks in Orange Farm
Community Parks & gardens
4 000 000.00
1 000 000.00
1 000 000.00
City Parks and Zoo
Region G New
Region A
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33539 Construction of linear market(informal trading shelter) in Kopanong - Ivory Park New Informal trading Stalls IVORY PARK EXT.2 A Ward
To formalise about 240 informal trading stalls in Ivory Park
Other Assets Markets 10 000 000.00
-
-
Economic Development
77 New
32379 MPUMELELO PHASE 2 New Clinic IVORY PARK EXT.12 A Ward
Mpumelelo Clinic - Professional Services, Building Construction, Carports, Signage, Landscaping and Beautification.
Community Clinics 4 000 000.00
-
-
Health 77 New
261
Region A
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32585 Ivory Park Ext 9( Goniwe) New Bulk Infrastructure IVORY PARK EXT.9 A Ward
Construction of Bulk Services Investment Properties
Housing development
10 000 000.00
10 000 000.00
3 139 000.00
Housing 77 New
32583 Ivory Park Ext 8 Hlophe New Bulk Infrastructure IVORY PARK EXT.8 A Ward
Formalisation and Construction of Bulk Services
Investment Properties
Housing development
2 000 000.00
3 000 000.00
-
Housing 78 New
32598 Ivory Park Ext 2 KwaGreen New Bulk Infrastructure IVORY PARK EXT.2 A Ward
Formalisation and Construction of Bulk Services
Investment Properties
Housing development
10 000 000.00
540 000.00
-
Housing 79 New
33151 Ivory Park sewer upgrade Renewal IVORY PARK EXT.2 G
Sewer Upgrade Infrastructure Sewerage Purification & Reticulation
1 900 000.00
-
-
JHB Water: Sewer
79 Renewal
30534 CONV - Conversion of Open Drains to Underground/Covered Drains in Ivory Park. Renewal Stormwater Management Projects IVORY PARK EXT.7 A Ward
Conversion of open drains to underground/covered drains in Ivory Park.
Infrastructure Roads, Pavements, Bridges & Storm Water
15 000 000.00
15 000 000.00
15 000 000.00
JRA 79 Renewal
27966 MISCL - Gravel Roads: Ivory Park. New Gravel Road IVORY PARK EXT.9 A Ward
Gravel Roads Upgrade as per IDP priority.
Infrastructure Roads, Pavements, Bridges & Storm Water
47 700 000.00
49 800 000.00
34 000 000.00
JRA 79 New
32855 COMPL: Cycling Lanes: Ivory Park Midrand Route New Complete Streets IVORY PARK EXT.2 A Regional
Cycle Lanes to provide access to 3 secondary schools and Midrand Gautrain Station
Infrastructure Transportation 15 000 000.00
12 500 000.00
-
Transportation 79 New
28543 Allandale Substation: Upgrade 2 X 10 MVA transformers to 40 MVA Renewal Bulk Infrastructure COMMERCIA EXT.11 A Regional
At Allandale, upgrade the existing 10 MVA transformers to 20 MVA each.
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
30 000 000.00
City Power 80 Renewal
33654 Sandton/ Alexandra: Diepsloot sewer pipelines and bridge Renewal DIEPSLOOT WES B
Sewer Upgrade Infrastructure Sewerage Purification & Reticulation
15 000 000.00
30 000 000.00
27 000 000.00
JHB Water: Sewer
92 Renewal
262
Region A
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
31042 MISCL - Pedestrian Bridge in Kaalfontein New Bridges (Pedestrian and Vehicles) KAALFONTEIN EXT.2 A Ward
Walkway across a wetland between Kaalfontein Ext 2 and Ext 5 in Ward 92 that is a threat for children as well as adults crossing in both directions.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
3 000 000.00
4 000 000.00
JRA 92 New
33721 Sandton/ Alexandra: Witkoppen pipe Replacement Renewal WITKOPPEN B
Pipe Replacement Infrastructure Sewerage Purification & Reticulation
3 800 000.00
-
-
JHB Water: Sewer
93 Renewal
28044 CATCH 220 - Jukskei Catchment: Fourways Mall Dam and Downstream Works. New Stormwater Catchments FOURWAYS EXT.16 A Ward
Implementation of study to arrest hydraulic and environmental degradation of Fourways Stream from upstream of Monte Casino to Jukskei River, Dainfern.
Infrastructure Roads, Pavements, Bridges & Storm Water
3 000 000.00
3 000 000.00
3 000 000.00
JRA 94 New
32491 Diepsloot river -wetland rehabilitation studies/Eco Park development New Park DIEPSLOOT WEST EXT.3 A Ward
New Park development Community Parks & gardens
2 000 000.00
500 000.00
1 000 000.00
City Parks and Zoo
95 New
30749 Rec - Construction of the multipurpose centre at Diepsloot New Community Centre DIEPSLOOT WES A Ward
Development of the soccer fields, hard-core courts, multipurpose courts, Hall, Library, Youth Hall, wellness centre, athletic track
Community Community halls
2 000 000.00
2 000 000.00
2 482 000.00
Community Dev: Sport and Recreation
95 New
30330 Reconstruction of Ngonyama Road Renewal Precinct Redevelopment DIEPSLOOT WES A Regional
NDPG project to be implemented by JDA
Infrastructure Other 40 000 000.00
30 000 000.00
-
Development Planning
95 Renewal
30552 Diepsloot West: Upgrade Sewers New Sewer Mains DIEPSLOOT WEST EXT.3 A Ward
Upgrade sewers Infrastructure Sewerage Purification & Reticulation
1 200 000.00
-
-
JHB Water: Sewer
95 New
33474 CONV - Conversion of Open Drains to Underground/Covered Drains in Diepsloot. Renewal Stormwater Management Projects DIEPSLOOT WES A Ward
Conversion of open drains to underground/covered drains in Diepsloot.
Infrastructure Roads, Pavements, Bridges & Storm Water
-
9 000 000.00
9 000 000.00
JRA 95 Renewal
263
Region A
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32529 MISCL - Pedestrian Bridges in Diepsloot. New Bridges (Pedestrian and Vehicles) DIEPSLOOT WES A Ward
Construction of walkways across the wetland for safe pedestrian crossing. Investigate future bridge requirements.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
-
-
JRA 95 New
30953 Upgrade MV supply to and in Kya Sands. Renewal Medium Voltage Network KYA SAND A Regional
Upgrade MV supply to and in Kya Sands.
Infrastructure Electricity Reticulation
8 000 000.00
12 000 000.00
-
City Power 96 Renewal
32758 LA: Module 1 New Bulk Waste Water LANSERIA EXT.17 C Regional
Lanseria: Module Infrastructure Water, Reservoirs & Reticulation
50 165 000.00
80 000 000.00
120 000 000.00
JHB Water: Sewer
96 New
33228 Roodepoort/ Diepsloot: Lanseria sewer upgrade Renewal Bulk Waste Water LANSERIA AIRPORT C
Sewer Upgrade Infrastructure Sewerage Purification & Reticulation
-
10 000 000.00
-
JHB Water: Sewer
96 Renewal
29388 Roodepoort/Diepsloot: Lanseria Reservoir New Reserviors LANSERIA EXT.21 A Ward
Lanseria Reservoir Infrastructure Water, Reservoirs & Reticulation
-
20 000 000.00
-
JHB Water: Water
96 New
30769 16 Landfill - Kya Sands New waste collection KYA SAND EXT.48 C City Wide
To maintain and upgrade facilities to conform to standard and regulations-(Compliance, cell developments and landfill recycling)
Infrastructure Refuse 200 000.00
200 000.00
200 000.00
Pikitup 96 New
25064 Installation of new service connections New Service Connections HALFWAY HOUSE EXT.74 E Regional
Provision of new service connections
Infrastructure Electricity Reticulation
29 200 000.00
29 200 000.00
29 200 000.00
City Power 110 New
26032 New public lights Midrand New Public Lighting IVORY PARK EXT.2 A Regional
Public Lighting Midrand Infrastructure Other 2 000 000.00
2 000 000.00
2 000 000.00
City Power 110 New
29882 Rec - Construction of the new sports centre New Community Centre RABIE RIDGE EXT.1 A Ward
Construction of the new sports facility IN Region A
Community Sportsfields & stadia
2 713 000.00
2 000 000.00
-
Community Dev: Sport and Recreation
110 New
33582 Construction of Industrial Facilities New Building IVORY PARK EXT.7 A Regional
Construction of Industrial Nodes in order facilitate entrepreneurial enterprise at Bambanani - Ivory Park and at
Infrastructure Other 8 461 000.00
30 554 000.00
63 662 000.00
Development Planning
110 New
264
Region A
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
Marlboro
33166 Midrand: Pretoriusrand water upgrade New Water Mains PRESIDENT PARK A.H. A Regional
Water upgrade Infrastructure Water, Reservoirs & Reticulation
4 000 000.00
4 000 000.00
-
JHB Water: Water
110 New
30551 Midrand:President park: Reservoir 50Ml and water Upgrade New Reserviors PRESIDENT PARK A.H. A Regional
50Ml Reservoir Infrastructure Water, Reservoirs & Reticulation
4 000 000.00
18 000 000.00
-
JHB Water: Water
110 New
31012 RNP022_Richards Drive Upgrading Renewal Roads: Construction and Upgrades HALFWAY HOUSE EXT.95 A Regional
The upgrading of Richards Drive in Halfway House Estate AH. To be part of Ten Year Plan.
Infrastructure Roads, Pavements, Bridges & Storm Water
-
27 000 000.00
-
JRA 110 Renewal
32591 Ivory Park Thabo Mbeki New Bulk Infrastructure IVORY PARK EXT.10 A Ward
Formalisation and Construction of Bulk Services and Low Cost Houses
Investment Properties
Housing development
-
1 000 000.00
-
Housing 111 New
33154 Ivory Park Social Housing New Building IVORY PARK EXT.10 A City Wide
Development of affordable Rental stock in region A
Infrastructure Other -
-
2 000 000.00
JOSHCO 111 New
30841 Vorna Valley. Upgrade sub station Renewal Bulk Infrastructure VORNA VALLEY EXT.7 A Regional
Upgrade Vorna Valley sub station to 2 X 40 MVA transformers and new feeder board
Infrastructure Electricity Reticulation
25 000 000.00
10 000 000.00
-
City Power 112 Renewal
33078 Midrand: Carlswald Reservoir New Reserviors CARLSWALD A.H. A Regional
Reservoir 10Ml Infrastructure Water, Reservoirs & Reticulation
5 000 000.00
15 000 000.00
-
JHB Water: Water
112 New
33605 Midrand: Carlswald Water Infrastructure Upgrade Renewal CARLSWALD A.H. A
Upgrade of existing water infrastructure
Infrastructure Water, Reservoirs & Reticulation
7 000 000.00
7 000 000.00
-
JHB Water: Water
112 Renewal
28735 Midrand: Erand: Upgrade water infrastructure Renewal Water Mains SUMMERSET EXT.13 A Regional
Upgrading water infrastructure for region A
Infrastructure Water, Reservoirs & Reticulation
3 750 000.00
-
-
JHB Water: Water
112 Renewal
265
Region A
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33163 Midrand: Planned replacement: watermains Renewal Water Mains BLUE HILLS A.H. A Regional
Replacement water mains Infrastructure Water, Reservoirs & Reticulation
10 000 000.00
-
10 000 000.00
JHB Water: Water
112 Renewal
33739 BRID 05 - Le Roux Avenue Widening. New Roads: Construction and Upgrades HALFWAY HOUSE ESTATE A Regional
Widening of Le Roux Ave between Bekker/Janadel Street and Old Pretoria Main as a result of the doubling of Le Roux Ave Bridge and traffic congestion.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
20 000 000.00
-
JRA 112 New
33535 23 Depot Midrand New Depots HALFWAY GARDENS EXT.80 A Regional
Pikitup Depot in Midrand Infrastructure Refuse 500 000.00
7 000 000.00
-
Pikitup 112 New
33288 Lib - Construction of the new Diepsloot Library (forms part of the multipurpose centre at Diepsloot) in Diepsloot West Ext 2 New Incineration DIEPSLOOT WES EXT.2 A
Construction of a new Library in Diepsloot West Ext 2 Region A
Community Libraries -
-
1 500 000.00
Community Dev: Libraries
113 New
33345 Aqua - Construction of the new swimming pool in Diepsloot Ext 1 New Community Centre IVORY PARK EXT.2 A Ward
Construction of a new swimming pool in Diepsloot
Infrastructure Other -
-
2 500 000.00
Community Dev: Sport and Recreation
113 New
33067 Diepsloot Redevelopment Northern Farms New Bulk Infrastructure DIEPSLOOT A.H. A Regional
Construction of Bulk Services Infrastructure Roads, Pavements, Bridges & Storm Water
50 000 000.00
40 000 000.00
40 000 000.00
Housing 113 New
26871 Northern Works: Belt Presses New Bulk Waste Water DIEPSLOOT WES EXT.5 A Regional
Belt Presses:Northern Works Infrastructure Sewerage Purification & Reticulation
-
20 000 000.00
-
JHB Water: Sewer
113 New
33712 Northern Works: Desludge and line Dam 02 Renewal DIEPSLOOT WES A
Desludge and line Dam 02 Infrastructure Water, Reservoirs & Reticulation
-
15 000 000.00
15 000 000.00
JHB Water: Sewer
113 Renewal
28977 Northern Works: desludge Dam 01 Renewal DIEPSLOOT WES EXT.5 A
Northern Works: Desludge Dam 01
Infrastructure Sewerage Purification & Reticulation
53 538 000.00
10 000 000.00
-
JHB Water: Sewer
113 Renewal
266
Region A
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
28721 Northern Works: Unit 2 Digesters refurbish #2 Renewal Bulk Waste Water DIEPSLOOT WES EXT.5 A Regional
Refurbish digesters at Northern Works
Infrastructure Sewerage Purification & Reticulation
-
10 000 000.00
-
JHB Water: Sewer
113 Renewal
33713 Northern Works: Unit 3 electro mech/ cabling bios 1 and 3 Renewal DIEPSLOOT WES A
Unit 3 electro mech/ cabling bios 1 and 3
Infrastructure Sewerage Purification & Reticulation
-
40 000 000.00
-
JHB Water: Sewer
113 Renewal
33710 Northern Works: Unit 4 liquor treatment New DIEPSLOOT WES A
Unit 4 liquor treatment Infrastructure Sewerage Purification & Reticulation
-
14 000 000.00
-
JHB Water: Sewer
113 New
28733 Roodepoort/Diepsloot: Diepsloot Reservoir New Reserviors DIEPSLOOT WES A Ward
New Diepsloot reservoir Infrastructure Water, Reservoirs & Reticulation
25 411 000.00
15 000 000.00
-
JHB Water: Water
113 New
28045 MISCL - Gravel Roads: Diepsloot. New Roads: Construction and Upgrades DIEPSLOOT WEST EXT.3 A Ward
Gravel Roads Upgrade, IDP priority.
Infrastructure Roads, Pavements, Bridges & Storm Water
46 060 000.00
47 060 000.00
34 000 000.00
JRA 113 New
30756 11 Landfill New Cell Development Works - Potential New development New waste collection DIEPSLOOT A.H. A Regional
Feasibility, Design and construction of a new landfill site for the North of the city
Infrastructure Refuse 3 000 000.00
17 000 000.00
8 500 000.00
Pikitup 113 New
30654 22 Waste Treatment - Waste treatment facilities New Plant and Equipment DIEPSLOOT A.H. A City Wide
Construction of Waste Treatment facilities for waste conversion
Infrastructure Refuse 17 000 000.00
5 000 000.00
-
Pikitup 113 New
32857 COMPL: Cycling Lanes: Diepsloot - Fourways Route (Wm Nicol - W Bypass) New Complete Streets DIEPSLOOT A.H. A Regional
Cycle paths: Diepsloot Fourways route (Wm Nico to W Bypass)
Infrastructure Transportation -
3 000 000.00
15 000 000.00
Transportation 113 New
267
Region B
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33801 Westdene Dam park development New Park WESTDENE B Regional
Development of Westdene Park
Community Parks & gardens -
10 000 000.00
11 970 000.00
City Parks and Zoo
68 New
33017 Replace feederboard at Industria sub station. Renewal Bulk Infrastructure INDUSTRIA B Regional
Replace feederboard at Industria sub station.
Infrastructure Electricity Reticulation
10 000 000.00
-
-
City Power 68 Renewal
32961 Lib.Coronationville Public Library New Library CORONATIONVILLE B
Upgrading of the Library Community Libraries 800 000.00
-
-
Community Dev: Libraries
68 New
33407 Aqua - Coronationville Public Swimming Pool Renewal Community Centre Coronationville B Ward
Upgrading of the pool Community Recreational facilities 2 000 000.00
-
-
Community Dev: Sport and Recreation
68 Renewal
32882 Geldenhuis Transnet Hostel Renewal Building Alterations INDUSTRIA EXT.1 F City Wide
Conversion of Transnethostel
Community Social Renting Housing
5 000 000.00
20 000 000.00
20 000 000.00
JOSHCO 68 Renewal
33820 Penny Flats Social Housing New Building Alterations PENNYVILLE B Regional
Social Housing development in Pennyville
Community Social Renting Housing
-
3 000 000.00
2 000 000.00
JOSHCO 68 New
33698 Pennyville Communal Rooms Renewal Operational Capex PENNYVILLE EXT.1 C Regional
Upgrading and repairs of Communal rooms
Community Social Renting Housing
6 000 000.00
1 000 000.00
1 000 000.00
JOSHCO 68 Renewal
33718 Pennyville TOD/Corridor Development New Bulk engineering services PENNYVILLE C City Wide
Mixed use housing development next to the BRT and New Canada Station
Investment Properties
Housing development
20 000 000.00
70 000 000.00
60 000 000.00
JOSHCO 68 New
31283 MISCL - Pedestrian Bridge in Slovo Park (also Ashanti) New Bridges (Pedestrian and Vehicles) CORONATIONVILLE B Ward
A safe walkway is required across the railway line in Ward 68, near to the informal settlement to facilitate the movement of people to Coronation and Helen Joseph Hospitals; to High School; to work in Industria and the residential areas around; as well as to the Croesus Railway Station.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
5 000 000.00
6 000 000.00
JRA 68 New
268
Region B
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33795 Perth Empire Corridor Co - Production Zone for Social Development Renewal Corridors of Freedom Intervention WESTBURY B Regional
Ring-fenced amount for undertaking capital project in the corridor
Community Community halls 2 650 000.00
6 000 000.00
-
Social Development
68 Renewal
32563 Upgrade of Sir Drummond Chaplin Park Crosby Renewal Park CROSBY B Ward
Park upgrade Community Parks & gardens 2 000 000.00
2 000 000.00
-
City Parks and Zoo
69 Renewal
32569 Upgrading of Katjiepiering Street Park in Vrededorp Renewal Park VREDEPARK B Ward
Upgrading of the Park Community Parks & gardens -
-
500 000.00
City Parks and Zoo
69 Renewal
25070 New Service connections New Service Connections HURST HILL B Regional
Provision of new service connections
Infrastructure Electricity Reticulation
9 370 000.00
9 370 000.00
9 370 000.00
City Power 69 New
33450 Union Stadium Renewal Building Alterations WESTBURY EXT.3 B Ward
Upgrading of the courts Community Recreational facilities 10 000 000.00
4 000 000.00
4 000 000.00
Community Dev: Sport and Recreation
69 Renewal
26893 Johannesburg Central: Hursthill-Brixton District:Upgrade water infrastructure New Water Mains BRIXTON B Regional
Hursthill-Brixton District upgrading water infrastructure
Infrastructure Water, Reservoirs & Reticulation
2 400 000.00
-
-
JHB Water: Water
69 New
30942 Park Development in Claremont New Park CLAREMONT B
New Park Development Community Parks & gardens 2 000 000.00
1 000 000.00
-
City Parks and Zoo
82 New
33409 Aqua - Newclare Swimming Pool Renewal Community Centre NEWCLARE B Ward
Upgrading of the pool Community Recreational facilities -
1 000 000.00
2 000 000.00
Community Dev: Sport and Recreation
82 Renewal
269
Region B
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33680 Bosmontspruit Rehabilitation Renewal Ecological Infrastructure BOSMONT C Regional
Rehabilitation of the wetlands including ecological infrastructure as recommended in the State of the River study in 2009/10, CoJ Bioregional plan,CoJ Wetland management plan (2009). To conserve and protect City's natural heritage and resourses, promoting River health through integrated catchment management
Infrastructure Other -
-
3 000 000.00
Environment and Infrastructure
82 Renewal
33529 Claremont Renewal Clinic CLAREMONT B Ward
Design and layout of clinic, construction of buildings and carpots, furniture and equipment, landscaping, paving and signage
Community Clinics 2 700 000.00
-
-
Health 82 Renewal
33208 Roodepoort/ Diepsloot: Whiteridge north little falls constatia Water upgrade New Water Mains WHITERIDGE C Regional
water upgrade Infrastructure Water, Reservoirs & Reticulation
14 500 000.00
5 000 000.00
-
JHB Water: Water
86 New
32618 E-Learning system for Training Academy New Computer Software MARTINDALE B City Wide
Computer Software system with associated hardware to assist the training of EMS Staff to be installed at Brixton, Florida and Rietfontein Training Centres
Community Fire, safety & emergency
2 500 000.00
5 000 000.00
-
Public Safety: EMS
86 New
30943 Furniture and office equipment, work stations New Furniture MARTINDALE B City Wide
Furniture for new staff appointees and new fire stations
Other Assets Furniture and other office equipment
2 000 000.00
6 000 000.00
2 000 000.00
Public Safety: EMS
86 New
30938 IT Needs New Computer Hardware MARTINDALE B City Wide
Computer equipment required to equip new staff with tools of trade.
Other Assets Computers - hardware/equipment
1 407 000.00
2 000 000.00
1 500 000.00
Public Safety: EMS
86 New
32617 Telephone System and Alarm bell system New Operational Capex MARTINDALE B City Wide
Installation of security system at the entrances of fire stations across the City.
Other Assets Computers - hardware/equipment
-
600 000.00
-
Public Safety: EMS
86 New
270
Region B
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32601 Tetra Upgrade Communication and Despatch Network Systems - Phase 3 Renewal Computer Upgrades MARTINDALE B City Wide
Third phase of improving EMS's communication system
Community Fire, safety & emergency
11 187 800.00
-
-
Public Safety: EMS
86 Renewal
33285 USAR Equipment New Computer Upgrades MARTINDALE C City Wide
New equipments Other Assets Computers - hardware/equipment
300 000.00
300 000.00
300 000.00
Public Safety: EMS
86 New
28534 BY - LAW MANAGEMENT UNIT UPGRADE OF BUILDING FENNEL ROAD POUND Renewal Building Alterations MARTINDALE B Ward
Other Assets Other Buildings 2 400 000.00
2 600 000.00
2 800 000.00
Public Safety: JMPD
86 Renewal
28531 By-Law Management Unit (CCTV Cameras) New Office Equipment MARTINDALE B City Wide
Closed Circuit Television cameras for security of impounded goods.
Other Assets Other -
5 000 000.00
2 800 000.00
Public Safety: JMPD
86 New
27940 CATCH 200 - Braamfontein Spruit Catchment: Erosion Protection: Conrad Drive to Rustenburg Road New Stormwater Catchments BRAAMFONTEIN WERF B Ward
Erosion protection Infrastructure Roads, Pavements, Bridges & Storm Water
5 000 000.00
5 000 000.00
-
JRA 87 New
27955 CATCH 205 - Robinson Canal Catchment: Structural Improvement: Robinson Canal Sub 3, Sub 6 and Sub 7 Renewal Stormwater Catchments ROBINDALE F Ward
Upgrade spalling and exposed steel reinforcing in Robinson Canal sub 3 and sub 6. Eliminate the crack in the wall of Robinson Canal Sub 7.
Infrastructure Roads, Pavements, Bridges & Storm Water
4 500 000.00
10 000 000.00
10 000 000.00
JRA 87 Renewal
32570 JHB Botanical Gardens Infrastructure upgrade in Emmarentia Renewal Park EMMARENTIA B City Wide
Botanical Gardens scientific research centre
Community Parks & gardens 8 000 000.00
4 000 000.00
2 000 000.00
City Parks and Zoo
88 Renewal
271
Region B
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
26884 Johannesburg Central:Northcliff District:Upgrade water infrastructure Renewal Water Mains NORTHCLIFF EXT.1 B Regional
Northcliff District Upgrding water infrastructure
Infrastructure Water, Reservoirs & Reticulation
-
-
-
JHB Water: Water
88 Renewal
22292 1 Bins (Skip) - Refuse collection New Plant and Equipment WATERVAL ESTATE B City Wide
Supply of bulk containers to commercial customers to create revenue
Infrastructure Refuse 1 500 000.00
1 500 000.00
1 500 000.00
Pikitup 88 New
32031 BRID 20 - Conrad Drive Bridge, Blairgowrie. Renewal Bridges (Pedestrian and Vehicles) CRAIGHALL B Ward
Reconstruction of Conrad Drive Bridge over Braamfontein Spruit for road widening and increase in stormwater capacity.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
20 000 000.00
-
JRA 90 Renewal
27960 CATCH 210 - Klein Jukskei Catchment: (CBP) Stormwater Control: Willows Development - Windsor New Stormwater Catchments JUKSKEI PARK B Ward
Upgrading of culvert under Willow Crescent and the arrest of erosion in the vicinity.
Infrastructure Roads, Pavements, Bridges & Storm Water
5 000 000.00
5 000 000.00
-
JRA 98 New
33631 Rooseveldt Park:Replace 2 X 45 MVA transformers and replace 11kV switchgear New Bulk Infrastructure LINDEN E Regional
Replace 2 X 45 MVA transformers and replace 11kV switchgear
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
City Power 99 New
33212 Roodepoort/ Diepsloot: Linden water upgrade New Water Mains LINDEN C Regional
water upgrade Infrastructure Water, Reservoirs & Reticulation
-
10 000 000.00
-
JHB Water: Water
99 New
32571 Bird Sanctuary - City wide Renewal Park JOHANNESBURG F Regional
Bird Sancttuary - Ablution facility
Community Parks & gardens -
500 000.00
500 000.00
City Parks and Zoo
102 Renewal
32687 Rietfontein Nature Reserve and EE centre upgrade in Bryanston Renewal Park BRYANSTON EXT.5 E Ward
Bryanston wards 106 Community Parks & gardens 4 000 000.00
1 000 000.00
-
City Parks and Zoo
102 Renewal
272
Region B
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
25065 New service connections New Service Connections FERNDALE EXT.25 B Regional
Provision of new service connections in Randburg
Infrastructure Electricity Reticulation
36 700 000.00
37 600 000.00
37 600 000.00
City Power 102 New
23485 Randburg CBD regeneration Renewal Precinct Redevelopment FERNDALE B Regional
Infrastructure Roads, Pavements, Bridges & Storm Water
40 000 000.00
30 000 000.00
30 000 000.00
JDA 102 Renewal
31087 Randburg Civic Precinct Upgrade Renewal Precinct Redevelopment FERNDALE B Regional
Property development PPP to provide a mixed use development with civic and transport facilities
Other Assets Civic Land & Buildings
26 500 000.00
-
-
JDA 102 Renewal
27572 Selkirk Social Housing project New Housing Development BLAIRGOWRIE B Ward
Development of 300 medium density housing within Randburg CBD which will assist in attracting investors in the area
Investment Properties
Housing development
35 000 000.00
90 000 000.00
70 000 000.00
JOSHCO 102 New
25002 Randburg Civic Precinct Renewal Building Alterations FERNDALE B Regional
Upgrading of Randburg CBD - Hilltop taxi rank site and Selkirk precinct
Other Assets Civic Land & Buildings
2 000 000.00
1 000 000.00
1 000 000.00
JPC 102 Renewal
31051 RNP017_Ballyclaire Drive Widening Renewal Roads: Construction and Upgrades RIVER CLUB EXT.2 E Regional
The widening of Ballyclaire Drive and Bridge from William Nichol to Outspan Drive. To be part of Ten Year Plan.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
10 000 000.00
10 000 000.00
JRA 102 Renewal
33218 Roodepoort/ Diepsloot: Ferndale Sewer upgrade Renewal Bulk Waste Water FERNDALE C
Sewer Upgrade Infrastructure Sewerage Purification & Reticulation
7 000 000.00
-
-
JHB Water: Sewer
104 Renewal
26887 Sandton/ Alexandra : Kensington Reservoir 15Ml New Reserviors KENSINGTON B Regional
Kesington B District upgrading water infrastructure
Infrastructure Water, Reservoirs & Reticulation
-
5 000 000.00
12 000 000.00
JHB Water: Water
104 New
28097 CATCH 210 - Klein Jukskei Catchment: Bond Stream Relief System, Ferndale. New Stormwater Catchments FERNDALE B Ward
Construction of a new stormwater relief system to augment the existing culvert which is over capacity due to increasing CBD runoff.
Infrastructure Roads, Pavements, Bridges & Storm Water
2 000 000.00
5 000 000.00
-
JRA 104 New
273
Region B
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
22301 12 (a) New garden Sites - Fourways New Plant and Equipment MALANSHOF EXT.9 C City Wide
Redirect garden refuse to garden sites and then remove to composting facility
Infrastructure Refuse 700 000.00
1 200 000.00
1 100 000.00
Pikitup 104 New
32877 Zoo - Animal hospital upgrade Renewal Bulk engineering services SAXONWOLD E City Wide
Upgrade of hospital infrastructure
Community Recreational facilities -
3 500 000.00
-
City Parks and Zoo
117 Renewal
33571 Zoo - Animal Purchases New Operational Capex SAXONWOLD E City Wide
Purchase of new animals for Zoo
Community Parks & gardens 1 000 000.00
2 000 000.00
-
City Parks and Zoo
117 New
30047 Zoo - Parking Area Development(Zoo & Zoo lake Prencinct) New Bulk engineering services SAXONWOLD E Regional
Establishment of new parking lot for the Zoo and Zoo lake park upgrade
Community Parks & gardens 15 283 000.00
4 615 000.00
-
City Parks and Zoo
117 New
31156 Zoo - Water Saving project Renewal Internal Water Reticulation SAXONWOLD E Regional
Replacement of steel water line
Infrastructure Water, Reservoirs & Reticulation
2 000 000.00
-
-
City Parks and Zoo
117 Renewal
33607 Zoo - Zoo Infrastructure Renewal Building Alterations SAXONWOLD F Ward
zoo infrastructure Community Parks & gardens 4 000 000.00
5 000 000.00
-
City Parks and Zoo
117 Renewal
31161 Zoo Conservation and research farm accomodation -Safari Park Development New Building Alterations SAXONWOLD G City Wide
Accomodation for reseachers at Parys facility
Community Cemeteries 2 000 000.00
2 000 000.00
-
City Parks and Zoo
117 New
30765 Replace 30 MVA transformers with 45 MVA units Renewal Bulk Infrastructure PARKHURST B Regional
Replace 30 MVA transformers with 45 MVA units and new 11 kV feederboard
Infrastructure Electricity Reticulation
-
10 000 000.00
10 000 000.00
City Power 117 Renewal
30077 Parkhurst Renewal Clinic PARKHURST B Ward
Design and layout of clinic, construction of buildings and carports, furniture and equipment, landscaping, paving and signage.
Community Clinics 6 000 000.00
-
-
Health 117 Renewal
274
Region C
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33476 CONV - Conversion of Open Drains to Underground/Covered Drains in Bram Fischerville. Renewal Stormwater Management Projects BRAM FISCHERVILLE C Ward
Conversion of open drains to underground/covered drains in Bram Fischerville.
Infrastructure Roads, Pavements, Bridges & Storm Water
9 500 000.00
9 500 000.00
9 500 000.00
JRA 44 Renewal
29064 MISCL - Gravel Roads: Bram Fischerville. New Roads: Construction and Upgrades BRAM FISCHERVILLE D Ward
Gravel road upgrade, IDP priority
Infrastructure Roads, Pavements, Bridges & Storm Water
35 000 000.00
15 000 000.00
33 537 000.00
JRA 44 New
29831 Braamfischerville Ext 12&13:Roads and Stormwater Management Systems inlcuding a Pedestrian Bridge New Bulk Infrastructure BRAM FISCHERVILLE EXT.13 C Ward
Construction of Roads and Stormwater
Infrastructure Roads, Pavements, Bridges & Storm Water
13 000 000.00
11 000 000.00
-
Housing 49 New
32482 PTF: Small Public Transport Facilities: Braamfischerville New Public Transport Facility BRAM FISCHERVILLE C City Wide
Design & construction of "model" taxi facility
Infrastructure Transportation -
-
30 000 000.00
Transportation 49 New
28135 MISCL - Gravel Roads: Doornkop/Thulani. New Roads: Construction and Upgrades DOORNKOP D Ward
Gravel roads upgrade as per IDP priority. It includes also required interventions in Protea (R5.0m).
Infrastructure Roads, Pavements, Bridges & Storm Water
16 100 000.00
16 100 000.00
34 000 000.00
JRA 50 New
30424 Fleurhof Mixed Development (Bulk and internal infrastructure) New Bulk Infrastructure FLEURHOF C Ward
The provision of bulk infrastructure including reticulation for specifically the following: Water, Sewer, Roads and Stormwater Management Systems. R500k for planning and R20m for bulk infra.
Infrastructure Sewerage Purification & Reticulation
60 000 000.00
80 000 000.00
16 000 000.00
Housing 70 New
275
Region C
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33219 Roodepoort/ diepsloot: Florida Sewer upgrade Renewal Bulk Waste Water FLORIDA EXT C
Sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
-
-
JHB Water: Sewer
70 Renewal
33205 Roodepoort/ Diepsloot: Finch kite Florida water upgrade Renewal Water Mains FLORIDA EXT C Ward
Water upgrade Infrastructure Water, Reservoirs & Reticulation
-
5 000 000.00
-
JHB Water: Water
70 Renewal
33084 Roodepoort/ Diepsloot: Robertville water upgrade infrastructure and Reservoir 25Ml New Reserviors ROBERTVILLE C Regional
Water Upgrade Infrastructure Water, Reservoirs & Reticulation
10 000 000.00
-
-
JHB Water: Water
70 New
30421 FLEURHOF JUNCTION SOCIAL HOUSING PROJECT New Housing Development FLEURHOF C Ward
Development of 600 rental housing units
Investment Properties
Housing development
20 000 000.00
-
500 000.00
JOSHCO 70 New
31029 RNP003_Westlake Road Extension New Roads: Construction and Upgrades RAND LEASES EXT.1 C Regional
Extension of Westlake Road from Main Reef Road to Soweto Township. Only Design.
Infrastructure Roads, Pavements, Bridges & Storm Water
4 000 000.00
20 000 000.00
-
JRA 70 New
32628 Lindhaven Plot 6,8&10 New Bulk Infrastructure LINDHAVEN EXT.1 C Ward
Construction of Bulk Services Investment Properties
Housing development
1 200 000.00
12 000 000.00
15 000 000.00
Housing 71 New
33060 PRINCESS PLOT New Bulk Infrastructure PRINCESS C Regional
Construction of Roads and stormwater
Investment Properties
Housing development
15 000 000.00
20 000 000.00
33 000 000.00
Housing 71 New
33237 Roodepoort/ Diepsloot: Witpoortjie Sewer upgrade Renewal Bulk Waste Water WITPOORTJIE C
sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
-
2 000 000.00
JHB Water: Sewer
71 Renewal
33209 Roodepoort/ Diepsloot: Witpoottjie water upgrade New Water Mains WITPOORTJIE C Regional
water upgrade Infrastructure Water, Reservoirs & Reticulation
5 000 000.00
10 000 000.00
-
JHB Water: Water
71 New
33483 Princess Plots Social HousingProject New Housing Development PRINCESS EXT.22 C City Wide
Development of 600 social housing units
Investment Properties
Housing development
2 000 000.00
20 000 000.00
50 000 000.00
JOSHCO 71 New
276
Region C
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33289 Lib - Upgrading of the in library Wilro Park - Region C Renewal Corridors of Freedom Intervention WILROPARK EXT.1 C
Construction of a new library in Wilro Park
Community Libraries 1 000 000.00
-
-
Community Dev: Libraries
83 Renewal
33808 Robertville Tower New Reserviors ROBERTVILLE C Regional
Construction of water tower Infrastructure Water, Reservoirs & Reticulation
3 000 000.00
10 000 000.00
-
JHB Water: Water
83 New
25066 New service connections New Service Connections ROODEPOORT EXT.2 C Regional
Provision of new service connections
Infrastructure Electricity Reticulation
16 600 000.00
16 600 000.00
16 600 000.00
City Power 84 New
33048 Rainbow Valley Sub divisions New Bulk Infrastructure ROODEPOORT C Regional
Construction of roads and stormwater
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
2 500 000.00
3 000 000.00
Housing 84 New
32578 Sol Plaatjies New Bulk Infrastructure ROODEPOORT EXT.2 C Ward
Construction of Bulk Roads & Stormwater and Internal Roads & Stormwater
Investment Properties
Housing development
-
2 072 000.00
-
Housing 84 New
33230 Roodepoort sewer upgrade Renewal Bulk Waste Water ROODEPOORT C
Sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
10 000 000.00
-
JHB Water: Sewer
84 Renewal
33213 Roodepoort/ Diepsloot: Planned replacement sewer mains Renewal Bulk Waste Water ROODEPOORT C
Sewer replacement Infrastructure Sewerage Purification & Reticulation
-
10 000 000.00
20 000 000.00
JHB Water: Sewer
84 Renewal
33236 Roodepoort/ Diepsloot: Wilgespruit Sewer Upgrade Renewal Bulk Waste Water ROODEPOORT C
sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
13 000 000.00
-
JHB Water: Sewer
84 Renewal
33206 Roodepoort water upgrade New Water Mains ROODEPOORT C Regional
Water Upgrade Infrastructure Water, Reservoirs & Reticulation
10 000 000.00
10 000 000.00
-
JHB Water: Water
84 New
33204 Roodepoort/ Diepsloot: Cornelius De larey water upgrade New Water Mains ROODEPOORT C Regional
water upgrade Infrastructure Water, Reservoirs & Reticulation
-
-
5 000 000.00
JHB Water: Water
84 New
277
Region C
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32757 Roodepoort/Diepsloot: Lion Park Reservoir 15ml New Water Mains ROODEPOORT C Regional
Bulk infrastructure Infrastructure Water, Reservoirs & Reticulation
5 000 000.00
5 000 000.00
10 000 000.00
JHB Water: Water
84 New
30418 Roodepoort Extension 2 New Building Alterations ROODEPOORT EXT.2 C Ward
Development of additional 150 social housing units
Investment Properties
Housing development
2 000 000.00
35 000 000.00
-
JOSHCO 84 New
33809 Roodepoort Social Housing Upgrades Renewal Building Alterations ROODEPOORT C Regional
Upgrading of two social housing facilities in Roodepoort
Community Social Renting Housing
6 000 000.00
12 000 000.00
1 000 000.00
JOSHCO 84 Renewal
33026 REFURBISHMENT OF ROODEPOORT DRIVER'S TESTING STATION Renewal Building Alterations FLORIDA LAKE C Ward
RENOVATION OF ROODEPOORT TESTING STATION
Other Assets Other Buildings
-
520 000.00
2 290 000.00
Public Safety: JMPD
84 Renewal
30923 Replace 20 MVA transformers with 2X40 MVA units Refurbish breakers, CT's VT's Links etc and convert 33kV to 88kV. Renewal Bulk Infrastructure KLOOFENDAL C Regional
Replavce 20 MVA transformers with 2X40 MVA units
Infrastructure Electricity Reticulation
-
25 000 000.00
40 000 000.00
City Power 85 Renewal
33547 Promusica Theatre - Building renovations and upgrades Renewal Building Alterations FLORIDA PARK EXT.9 C Regional
Upgrading of the theatre auditorium, catering facilities and re-branding of the theatre
Community Recreational facilities
-
600 000.00
500 000.00
Johannesburg Theatre Management Company
85 Renewal
33548 Promusica Theatre - Information Technology New Computer Software FLORIDA PARK EXT.9 C City Wide
Installation of hardware and software for the new ticketing system
Community Other 200 000.00
200 000.00
150 000.00
Johannesburg Theatre Management Company
85 New
30771 Promusica Theatre - Purchasing of vehicle for the theatre Renewal Operational Capex FLORIDA PARK EXT.9 C Regional
Equipment required for the functioning of theatre
Community Other 150 000.00
-
-
Johannesburg Theatre Management Company
85 Renewal
278
Region C
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
26167 Promusica Theatre - Upgrading of technical equipment (sound and lighting) Renewal Theatre redevelopment FLORIDA PARK EXT.9 C Regional
Infrastructural and upgrading of facilities
Other Assets Plant & equipment
600 000.00
-
600 000.00
Johannesburg Theatre Management Company
85 Renewal
27461 lutz: Establish new 88/11 kV substation New Bulk Infrastructure HONEYDEW MANOR EXT.11 C Ward
Lutz, New 88/11kV 3x45MVA substation including 2 x 200MVA cables and 2 x 160MVA OHL's
Infrastructure Electricity Reticulation
30 000 000.00
40 000 000.00
120 000 000.00
City Power 97 New
33115 Driefontein Works: Infrastructure Renewal Plan Renewal Bulk Waste Water LITTLE FALLS EXT.1 A
Infrastructure renewal plan Infrastructure Sewerage Purification & Reticulation
-
1 040 000.00
15 000 000.00
JHB Water: Sewer
97 Renewal
27674 Roodepoort/Diepsloot: Bushkop Honeydew District Upgrade Water Infrastructure New Water Mains HONEYDEW EXT.5 C Regional
Honeydew Boschkop District Upgrade water Infrastructure Phase 2
Infrastructure Water, Reservoirs & Reticulation
13 750 000.00
21 000 000.00
-
JHB Water: Water
97 New
33066 COSMO CITY PHASE 2 ( MALIBONGWE RIDGE) New Bulk Infrastructure COSMO CITY C Regional
CONSTRUCTION OF ROADS AND STORMWATER
Infrastructure Roads, Pavements, Bridges & Storm Water
25 000 000.00
10 000 000.00
25 000 000.00
Housing 100 New
29435 Driefontein Works: Conc lining overflow New Auxiliary Water & Sewer Fittings COSMO CITY EXT.2 C Regional
Driefontein Works: Conc lining to overflow dam
Infrastructure Sewerage Purification & Reticulation
20 000 000.00
-
-
JHB Water: Sewer
100 New
28731 Driefontein Works: Extension New Bulk Waste Water COSMO CITY EXT.2 C Regional
Driefontein Works: Unit 1 Infrastructure Sewerage Purification & Reticulation
26 000 000.00
-
-
JHB Water: Sewer
100 New
31007 Roodepoort/ Diepsloot: Lion park water upgrade infrastructure New Reservoirs COSMO CITY EXT.6 C Regional
Water upgrade infrastructure Infrastructure Water, Reservoirs & Reticulation
1 000 000.00
1 000 000.00
-
JHB Water: Water
100 New
24741 Roodepoort/Diepsloot: Planned replacement of water mains Renewal Water Mains NORTH RIDING A.H. C Regional
Replacement of watermains Infrastructure Water, Reservoirs & Reticulation
-
10 000 000.00
53 600 000.00
JHB Water: Water
100 Renewal
279
Region C
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33541 Construction of Golden Harvest Drug and Rehab Centre New Plant and Equipment GOLDEN HARVEST A.H. C City Wide
To construct a drug rehabilitation centre
Community Community halls
7 350 000.00
-
-
Social Development
101 New
30014 Zandspruit New Clinic ZANDSPRUIT EXT.4 C Ward
Acquisition of land, layout and design of buildings, construction of buildings and carports, landscaping and paving, furniture, equipment and signage.
Community Clinics 1 000 000.00
-
-
Health 114 New
31006 Roodepoort/ Diepsloot: Zandspruit Reservoir 25Ml New Reserviors ZANDSPRUIT C Regional
Water upgrade infrastructure Infrastructure Water, Reservoirs & Reticulation
5 000 000.00
-
-
JHB Water: Water
114 New
33578 Leratong Village Park New Park LERATONG VILLAGE C Regional
Park development in Leratong Community Parks & gardens
3 000 000.00
-
-
City Parks and Zoo
127 New
33068 Repair damage to substation and convert to 88/11/6.6 kV. Extend 88 KV busbar at Roodetown to supply Roodepoort. Renewal Bulk Infrastructure ROODEPOORT C Regional
Repair damage to substation and convert to 88/11/6.6 kV. Extend 88 kV busbar at Roodetown to supply Roodepoort.
Infrastructure Electricity Reticulation
40 000 000.00
45 000 000.00
40 000 000.00
City Power 127 Renewal
31053 Goudrand Rental Development New Bulk Infrastructure GOUDRAND C Ward
The Construction of Bulk Services and Internal Reticulation.
Investment Properties
Housing development
10 000 000.00
5 000 000.00
-
Housing 127 New
32572 Leratong Village Preliminary Desgin Report Roads and Related Stormwater Renewal Bulk Infrastructure LERATONG VILLAGE C Regional
Review of existing Water and Sewer PDR and New PDR for Roads and Stormwater
Investment Properties
Housing development
7 647 880.00
2 500 000.00
-
Housing 127 Renewal
31055 Matholesville New Bulk Infrastructure MATHOLESVILLE C Ward
Construction of Roads and Stormwater including Water and Sewer.
Investment Properties
Housing development
6 000 000.00
21 000 000.00
-
Housing 127 New
22305 17 Landfill - Marie Louise New waste collection MEADOWLANDS EXT.12 D City Wide
To maintain and upgrade facilities to conform to standards and regulations - (Compliance, cell developments and landfill recycling)
Infrastructure Refuse 200 000.00
200 000.00
200 000.00
Pikitup 127 New
280
Region C
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33023 Vlei, upgrade the supply from Eskom and build new switching station. Renewal Bulk Infrastructure TSHEPISONG D Regional
Vlei, upgrade the supply from Eskom and build new switching station.
Infrastructure Other 10 000 000.00
20 000 000.00
-
City Power 128 Renewal
33514 MISCL - Gravel Roads: Tshepisong. New Roads: Construction and Upgrades TSHEPISONG C Ward
Gravel Roads Upgrade as per IDP priority.
Infrastructure Roads, Pavements, Bridges & Storm Water
20 000 000.00
20 000 000.00
20 000 000.00
JRA 128 New
33269 Soweto: Thulani sewer upgrade Renewal Bulk Waste Water THULANI E
sewer upgrade Infrastructure Sewerage Purification & Reticulation
1 100 000.00
-
-
JHB Water: Sewer
129 Renewal
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32723 Upgrade of Lenasia Cemetery Renewal Park LENASIA G Regional
Upgrade of the Cemetery Community Cemeteries 500 000.00
500 000.00
500 000.00
City Parks and Zoo
10 Renewal
28693 Olifantsvlei Works: Digester heating and mixing New KLIPRIVIERSOOG ESTATE G
Bulk Wastewater Infrastructure Sewerage Purification & Reticulation
38 418 000.00
-
-
JHB Water: Sewer
10 New
33096 Ennerdale: Lenasia high level Reservoir New Reservoirs LENASIA EXT.1 F Regional
reservoir 11.1Ml Infrastructure Water, Reservoirs & Reticulation
10 000 000.00
5 000 000.00
10 000 000.00
JHB Water: Water
10 New
33744 MISCL - Gravel Roads: Protea South. New Roads: Construction and Upgrades PROTEA SOUTH EXT.1 G Ward
Gravel roads upgrade. Infrastructure Roads, Pavements, Bridges & Storm Water
25 000 000.00
20 000 000.00
15 000 000.00
JRA 10 New
281
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32892 PTF: Transfer Facility: Scholar Transport Interchange- Lenasia New Public Transport Facility LENASIA G City Wide
Scholar transport interchange including NMT
Infrastructure Transportation 25 000 000.00
3 510 000.00
-
Transportation 10 New
29863 Soweto:Doornkop west/Protea Glen district: Upgrade water infrastructure Renewal Water Mains PROTEA GLEN EXT.12 D Regional
Doornkop west/Protea Glen district: Upgrade water infrastructure
Infrastructure Water, Reservoirs & Reticulation
-
-
-
JHB Water: Water
13 Renewal
29912 CATCH 10 - Emergency Stormwater Improvement (Multi year): Protea Glen Ext 1-4 (Phase 1-5). New Stormwater Catchments PROTEA GLEN D Ward
Total costs to implement stormwater masterplanning proposals is R25m
Infrastructure Roads, Pavements, Bridges & Storm Water
15 000 000.00
5 000 000.00
5 000 000.00
JRA 13 New
30753 6 Depot Haylon Hill New Plant and Equipment HAYLON HILL A.H. C Ward
Construction of new depots to service Glenridge, Honeydew, Ivory Park and Midrand Randburg communities
Infrastructure Refuse 1 000 000.00
4 000 000.00
12 500 000.00
Pikitup 13 New
29919 BRID 05 - Naledi/Protea Bridge (Between Wards 20 and 14). New Bridges (Pedestrian and Vehicles) NALEDI D Regional
Construction of a linkage across the railway line to provide safety for pedestrians and eventually shorten the vehicular movement in the area.
Infrastructure Roads, Pavements, Bridges & Storm Water
20 000 000.00
10 000 000.00
-
JRA 14 New
33284 Fire Station - Protea Glen New Building New Building Alterations PROTEA GLEN EXT.1 D Regional
Building of 3 Stations Investment Property
Other 11 200 000.00
11 161 000.00
-
Public Safety: EMS
14 New
29584 Kliptown Renewal Precinct Redevelopment KLIPSPRUIT EXT.4 D Ward
The area-based regeneration programme undertaken in Greater Kliptown has intended to build an economic base in this area.
Infrastructure Roads, Pavements, Bridges & Storm Water
20 000 000.00
-
14 000 000.00
JDA 19 Renewal
31353 MISCL - Pedestrian Bridge in Klipspruit West. New Bridges (Pedestrian and Vehicles) KLIPSPRUIT WEST D Ward
Pedestrian railway crossing at Fuscia Road in Ward 11 (eventually vehicular) to safely connect Klipspruit West and Chiawelo at Fuscia and Foxglove Rd.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
6 000 000.00
7 000 000.00
JRA 19 New
282
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32654 Park development in Moletsane New Park MOLETSANE D Ward
Park development Community Parks & gardens
-
-
1 000 000.00
City Parks and Zoo
21 New
30680 Mapetla Hostel Renewal Building Alterations TLADI D
Upgrading of Hostel Infrastructure Roads, Pavements, Bridges & Storm Water
-
15 000 000.00
19 000 000.00
Housing 21 Renewal
26387 Build new 275kV Intake Station to replace Orlando 88kV switch yard. New Bulk Infrastructure RIVASDALE D City Wide
Orlando replace 88kv switchgear and introduce 275 KV
Infrastructure Electricity Reticulation
70 000 000.00
260 000 000.00
230 000 000.00
City Power 24 New
31140 Bulk infrastructure for the electrification of Elias Motswaledi New Electrification POWER PARK D Ward
Bulk infrastructure for the electrification of Elias Motswaledi
Infrastructure Electricity Reticulation
20 000 000.00
20 000 000.00
20 000 000.00
City Power 24 New
32474 Electrification of Elias Motswaledi. New Electrification POWER PARK G Ward
Electrification of Elias Motswaledi
Infrastructure Electricity Reticulation
7 500 000.00
20 000 000.00
15 000 000.00
City Power 24 New
32663 Elias Motsoaledi New Bulk Infrastructure DIEPKLOOF EXT.10 D Ward
Construction of Bulk and Internal Roads and Culvert Bridge
Investment Properties
Housing development
4 300 000.00
4 300 000.00
15 000 000.00
Housing 24 New
33102 Goudkoppies Works: Infrastructure Renewal Plan Renewal Bulk Waste Water POWER PARK D
Infrastructure renewal Infrastructure Sewerage Purification & Reticulation
-
56 060 000.00
17 451 000.00
JHB Water: Sewer
24 Renewal
33266 Soweto: Devland sewer upgrade Renewal Bulk Waste Water DEVLAND E
sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
500 000.00
-
JHB Water: Sewer
24 Renewal
33610 Golden highway Social Housing project New Housing Development DEVLAND EXT.9 D City Wide
The development of 580 Social Housing Rental stock consisting of 2 and 3 storey buildings. Unit typologies will be one and two bedroom units to accommodate tenants families earning between 2500 and 7500 around Devland
Investment Properties
Housing development
30 000 000.00
75 000 000.00
65 000 000.00
JOSHCO 24 New
283
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
30755 15 Landfill - Goudkoppies New Building Alterations ZONDI D City Wide
To maintain and upgrade facilities to conform to standand and regulations - (Compliance, cell developments and landfill recycling)
Infrastructure Refuse 10 000 000.00
200 000.00
200 000.00
Pikitup 24 New
32679 Pimville Koppies Conservation Ecom Tourism Upgrade Renewal Park PIMVILLE ZONE 1 EXT D Regional
Upgrade Koppies Community Parks & gardens
-
1 000 000.00
-
City Parks and Zoo
25 Renewal
25135 New public lights New Public Lighting ORLANDO EKHAYA D Regional
Public Lighting Infrastructure Street Lighting 5 000 000.00
5 000 000.00
5 000 000.00
City Power 25 New
32540 Rec - Construction of the Orlando Ekhaya New Community Centre ORLANDO EKHAYA D Ward
Construction of a new Orlando Ekhaya multipurpose centre and sport facility
Community Community halls
2 588 000.00
2 050 000.00
4 000 000.00
Community Dev: Sport and Recreation
25 New
32666 Klipspruit/Kliptown New Bulk Infrastructure KLIPSPRUIT D Ward
Construction of Link and Internal Roads and Stormwater including Water and Sewer
Investment Properties
Housing development
309 091 120.00
95 981 000.00
59 927 880.00
Housing 25 New
33037 Sector 2 New Bulk Infrastructure KLIPSPRUIT D Regional
Construction of Roads and Stormwater
Infrastructure Roads, Pavements, Bridges & Storm Water
-
7 490 000.00
-
Housing 25 New
32414 Nancefield Station Precinct Development New Precinct Redevelopment KLIPSPRUIT D Regional
Provision of bulk infrastructure to support the development of a mixed land use development supporting a range of housing typologies to benefit from the transit options currently available within the precinct
Infrastructure Other 60 000 000.00
20 000 000.00
10 000 000.00
JDA 25 New
33250 Johannesburg Central: Klipspruit sewer upgrade KLIPSPRUIT D
sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
10 000 000.00
-
JHB Water: Sewer
25 Renewal
33162 Kliptown Golf Course New Building Alterations PIMVILLE ZONE 1 EXT B City Wide
Requirement of more social housing in the are
Community Social Renting Housing
-
2 000 000.00
2 000 000.00
JOSHCO 25 New
284
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33696 Kliptown Square Housing Estate Renewal Operational Capex KLIPRIVIERSOOG D Regional
Upgrading of the Kliptown property security and painting
Investment Properties
Housing development
2 000 000.00
1 000 000.00
1 000 000.00
JOSHCO 25 Renewal
27584 NANCEFIELD STATION HOUSING/KLIPSPRUIT STAFF HOSTEL REDEVELOPMENT Renewal Housing Development KLIPSPRUIT EXT.11 D Ward
Redevelopment and conversion of Council staff Hostel into rental family units
Investment Properties
Housing development
60 000 000.00
60 000 000.00
55 000 000.00
JOSHCO 25 Renewal
29391 Orlando Ekhaya Waterfront Development Renewal Park ORLANDO EKHAYA D Regional
Infrastructure Other 10 000 000.00
13 793 000.00
10 000 000.00
JPC 25 Renewal
30535 CATCH 240 - Klipriver Catchment: Upgrading of Stormwater Drainage System in Mogaseview Renewal Stormwater Catchments KLIPSPRUIT D Ward
Upgrading of Stormwater drainage system in Mogaseview
Infrastructure Roads, Pavements, Bridges & Storm Water
2 000 000.00
1 000 000.00
-
JRA 25 Renewal
33267 Soweto: Diepkloof Corridor sewer upgrade Renewal Bulk Waste Water DIEPKLOOF E
sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
-
5 000 000.00
JHB Water: Sewer
26 Renewal
31088 Aqua - Noordgesig swimming pool Renewal Community Centre NOORDGESIG D Ward
Upgrading of Noordgesig swimming pool
Community Swimming pools
800 000.00
-
-
Community Dev: Sport and Recreation
29 Renewal
31058 Diepkloof Hostel Renewal Bulk Infrastructure DIEPKLOOF EXT.10 D Ward
Construction of Bulk Services. Investment Properties
Housing development
-
20 000 000.00
30 000 000.00
Housing 29 Renewal
33513 RESUR - Resurfacing of Soweto Highway. Renewal Roads: Rehabilitation ORLANDO D City Wide
Resurfacing work is required to prolong the life of the road and to increase the VCI (Visual Conditions Index).
Infrastructure Roads, Pavements, Bridges & Storm Water
30 392 000.00
50 000 000.00
110 000 000.00
JRA 29 Renewal
27583 Orlando Ekhaya Staff Hostel Redevelopment New Building Alterations ORLANDO EAST D Ward
Redevelopment and conversion of Council Stahh hostel into rental family units
Heritage Assets
Buildings 5 000 000.00
-
-
JOSHCO 30 New
285
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
29191 Orlando East Station Precinct New Precinct Redevelopment ORLANDO EAST D Ward
BRT route Section 1&2 runs from Dobsonville to Fuel/Price intersection. It runs along the Klipspruit Valley Road. The funding would be required for a BRT station precinct development in Orlando East and proximate to Orlando Stadium which would be developed as a strategic node thereby building on the potential of the existing economic and community infrastructure.
Community Sports fields & stadia
40 000 000.00
20 000 000.00
10 000 000.00
JDA 31 New
30683 Jabulani Flats Renewal Building Alterations JABULANI D Ward
Upgrading of Hostel Investment Properties
Housing development
30 000 000.00
15 000 000.00
18 000 000.00
Housing 34 Renewal
32539 Jabulani Station Renewal Nodal Transportation Facilities JABULANI D Regional
upgrading of streets, public spaces, development of public properties and the encouragement of investment in the Jabulani precinct
Infrastructure Other 15 000 000.00
18 500 000.00
30 000 000.00
JDA 34 Renewal
33549 Soweto Theatre - Information technology New Computer Software JABULANI D City Wide
Installation of new hardware and software for the theatre for new employees and e-ticketing
Community Other 200 000.00
200 000.00
150 000.00
Johannesburg Theatre Management Company
34 New
33355 Soweto Theatre - Upgrading of Technical Equipment Renewal Building Alterations JABULANI D City Wide
Purchase of technical equipment and related infrastructure for the Soweto Theatre
Other Assets Other -
-
400 000.00
Johannesburg Theatre Management Company
34 Renewal
30419 IKWEZI RENTAL HOUSING PROJECT New Housing Development JABULANI D
ZOLA RENTAL HOUSING Investment Properties
Housing development
1 000 000.00
2 000 000.00
40 000 000.00
JOSHCO 34 New
29392 Jabulani CBD New Operational Capex JABULANI D Ward
Investment Property
Other 20 000 000.00
25 000 000.00
5 000 000.00
JPC 34 New
32676 Upgrade of Oppenheimer Towers in Central west Jabavu Renewal Park JABAVU CENTRAL WESTERN D Ward
Upgrading of the park Community Parks & gardens
-
-
1 000 000.00
City Parks and Zoo
35 Renewal
286
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32985 Lib.Jabavu Public Library New Library JABAVU CENTRAL WESTERN D
Upgrading of the facility Community Libraries 1 000 000.00
-
-
Community Dev: Libraries
35 New
22300 12 (b) New Garden Sites - Northern Works, Southdale & Randburg New Garden Sites SOUTHDALE F Regional
Provide dumping facilities for garden refuse to increase life of landfill and to make saleable compost
Infrastructure Refuse 700 000.00
1 300 000.00
1 100 000.00
Pikitup 35 New
30985 Mshenguville wetland rehabilitation New Ecological Infrastructure MOFOLO NORTH D Ward
Wetland rehabilitation and park development to protect water resources and restore recreational amenity for community.
Community Parks & gardens
7 500 000.00
2 500 000.00
3 364 000.00
Environment and Infrastructure
36 New
32537 New streetlights in Nancefield. New Public Lighting KLIPSPRUIT D Ward
New streetlights in Nancefield. Infrastructure Street Lighting 4 700 000.00
-
-
City Power 37 New
30681 Dube Hostel Renewal Building Alterations DUBE EXT.2 D Ward
Upgrading of Hostel Investment Properties
Housing development
12 000 000.00
15 000 000.00
15 000 000.00
Housing 38 Renewal
26830 Dube Holding Facility New Building Alterations DUBE D Ward
Holding facility for confiscated goods from the public in contravention of COJ's by laws at Marlboro and Dube
Other Assets Other Buildings
4 400 000.00
4 800 000.00
2 200 000.00
Public Safety: JMPD
38 New
31057 Orlando Womens Hostel Renewal Bulk Infrastructure ORLANDO D Ward
The construction of Bulk Services
Investment Properties
Housing development
3 500 000.00
8 000 000.00
5 000 000.00
Housing 39 Renewal
33040 Oldviasta New Bulk Infrastructure ORLANDO D Regional
Construction of Roads and Stormwater
Infrastructure Roads, Pavements, Bridges & Storm Water
10 000 000.00
10 630 000.00
15 000 000.00
Housing 40 New
31046 RNP005_Spencer Road New Link New Roads: Construction and Upgrades FLEURHOF C Regional
New link and upgrading of Spencer Road connecting Main Reef Road with Soweto Highway through Fleurhof Township. To be part of Ten Year Plan.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
12 000 000.00
12 000 000.00
JRA 40 New
33265 Soweto: Bramfisherville sewer upgrade Renewal BRAM FISCHERVILLE E
Sewer upgrade Infrastructure Sewerage Purification & Reticulation
1 000 000.00
-
-
JHB Water: Sewer
42 Renewal
287
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32657 Park development in Meadowlands Zone 7 New Park MEADOWLANDS D Ward
Park development Community Parks & gardens
2 000 000.00
-
-
City Parks and Zoo
43 New
30682 Meadowlands Hostel Renewal Building Alterations MEADOWLANDS D Ward
Upgrading of Hostel including the bulk services
Investment Properties
Housing development
-
12 000 000.00
15 000 000.00
Housing 43 Renewal
33065 JABULANI HOSTEL New Bulk Infrastructure JABULANI D Regional
UPGRADE OF BULKWATER LINK PIPE
Investment Properties
Housing development
15 000 000.00
15 000 000.00
7 000 000.00
Housing 46 New
29917 BRID 30 - Jabulani/Molapo Bridge. New Bridges (Pedestrian and Vehicles) JABULANI D Ward
New bridge over the railway to provide access to development zone. Requires investigation and preliminary work.
Infrastructure Roads, Pavements, Bridges & Storm Water
2 000 000.00
20 000 000.00
30 000 000.00
JRA 46 New
30405 Dobsonville Social Housing Project New Building DOBSONVILLE EXT.2 D Ward
Dobsonville Housing development
Investment Properties
Housing development
50 000 000.00
75 000 000.00
40 000 000.00
JOSHCO 48 New
31143 Electrification of Lufhereng New Electrification LUFHERENG D Ward
Electrification of Lufhereng Infrastructure Electricity Reticulation
12 000 000.00
20 000 000.00
15 000 000.00
City Power 53 New
29892 Lufhereng Substation. Establish new 88/11 kV sub station. New Bulk Infrastructure LUFHERENG D Ward
Establish new 88/11 kV sub station
Infrastructure Electricity Reticulation
60 000 000.00
8 000 000.00
-
City Power 53 New
33639 Slovoville: New Public Lights New Public Lighting SLOVOVILLE D Regional
Public Lighting Infrastructure Street Lighting 4 000 000.00
-
-
City Power 53 New
29832 Lufhereng Mixed Development (Bulk Infrastructure Roads, Stormwater Management Systems, Sewer & Water for 24 000 houses) New Bulk Infrastructure DOORNKOP EXT.1 C Regional
Land=R10m, planning=R3.5m and bulk=71,631,491.00. The project involves the provision of bulk, link and internal roads, sewer, water & stormwater to the Doornkop Greenfields Project (a mixed housing scheme consisting of 25,000 subsidies) being implemented by the Gauteng Department of Housing under its incremental housing programme.
Infrastructure Roads, Pavements, Bridges & Storm Water
28 600 000.00
28 659 000.00
10 000 000.00
Housing 53 New
288
Region D
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
26897 LUFHERENG SOCIAL HOUSING PROJECT New Housing Development LUFHERENG D Ward
DEVELOPMENT OF HOUSING UNITS IN LUFHERENG(DOORNKOP. PROJECT IS LOCATED WEST OF JOHANNESBURG
Investment Properties
Housing development
2 000 000.00
20 000 000.00
30 000 000.00
JOSHCO 53 New
32485 PTF: Small Public Transport Facilities: Slovoville Ext 1 New Public Transport Facility SLOVOVILLE EXT.1 D City Wide
Design & construction of taxi rank
Infrastructure Transportation 21 040 000.00
-
-
Transportation 53 New
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
26934 Sebenza Substation. Build a new 88kV GIS (30circuits) yard. New Bulk Infrastructure SEBENZA EXT.6 E City Wide
Transmission: Sebenza - Build a new 275/88kV GIS (30circuits) yard and demolish existing yard
Infrastructure Electricity Reticulation
200 000 000.00
326 313 500.00
265 000 000.00
City Power 32 New
32809 Service connections Modderfontein New Service Connections MODDERFONTEIN A.H. E Regional
Service connections Modderfontein
Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
21 000 000.00
City Power 32 New
32831 Supply AEL Factory from Westfield. New Medium Voltage Network MODDERFONTEIN EXT.2 E Ward
Supply AEL Factory from Westfield.
Infrastructure Electricity Reticulation
10 000 000.00
17 000 000.00
25 000 000.00
City Power 32 New
25123 Upgrade existing 44kV, 10 MVA transformer to a 88kV, 30 MVA transformer with associated feeder board Renewal Bulk Infrastructure KLIPFONTEIN VIEW EXT.3 E
Bulk Infrastructure Infrastructure Electricity Reticulation
30 000 000.00
35 000 000.00
35 000 000.00
City Power 32 Renewal
289
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33180 Sandton/ Alexandra: Founder Hill Water upgrade New Water Mains FOUNDERS HILL B Regional
Water upgrade Infrastructure Water, Reservoirs & Reticulation
-
-
2 500 000.00
JHB Water: Water
32 New
26880 Sandton/Alexandra: Linbro District: Upgrade water infrastructure and reservoir 40ml Renewal Water Mains MODDERFONTEIN A.H. E Regional
Linbro District upgrading water infrastructure
Infrastructure Water, Reservoirs & Reticulation
7 000 000.00
-
-
JHB Water: Water
32 Renewal
30537 Santon/Alexanda: Moderhill: Upgrade water infrastructure New Water Mains GREENSTONE HILL EXT.11 E Ward
Upgrade water infrastructure Infrastructure Water, Reservoirs & Reticulation
-
5 000 000.00
15 000 000.00
JHB Water: Water
32 New
32787 20 (a) Transfer station New waste collection LINBRO PARK EXT.1 C City Wide
Construction of a transfer stations/material recovery facility
Infrastructure Refuse 20 000 000.00
10 000 000.00
31 668 000.00
Pikitup 32 New
33652 Roodepoort/Diepsloot: Diepsloot Sewer upgrade New ROODEPOORT C
Sewer Upgrade Infrastructure Sewerage Purification & Reticulation
10 000 000.00
10 000 000.00
-
JHB Water: Sewer
72 New
33126 Park Upgrade Charltendale Park Orange Grove Renewal Park ORANGE GROVE E Ward
Portion Re/1/58-1R Charleten Park Ward 74
Community Parks & gardens
3 000 000.00
1 000 000.00
1 000 000.00
City Parks and Zoo
73 Renewal
33123 Park Upgrade Orange Grove Park Renewal Park ORANGE GROVE E Ward
Stand number 2006 Orange Grove ward 73
Community Parks & gardens
2 500 000.00
2 500 000.00
2 500 000.00
City Parks and Zoo
73 Renewal
33124 Park Upgrade Rumarais Park Bramley Renewal Park BRAMLEY VIEW EXT.1 E Ward
Portion PK1148 Bramley ward 74
Community Parks & gardens
3 000 000.00
1 000 000.00
-
City Parks and Zoo
74 Renewal
29531 Reconfigure the 88 kV double busbar at CYDNA sub station. Renewal Bulk Infrastructure ABBOTSFORD E Regional
Reconfigure the 88 kV double bus bar at Cydna
Infrastructure Electricity Reticulation
20 000 000.00
-
-
City Power 74 Renewal
290
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
26878 Sandton/Alexandra: Randjeslaagte District: Upgrade water infrastructure Renewal Water Mains BRAMLEY E Regional
Randjeslaagte District upgrading water infrastructure
Infrastructure Water, Reservoirs & Reticulation
600 000.00
-
-
JHB Water: Water
74 Renewal
33511 RESUR - Resurfacing of M1 Motorway. Renewal Roads: Rehabilitation MELROSE E City Wide
Resurfacing work is required to prolong the life of the road and improve the VCI (Visual Conditions Index).
Infrastructure Roads, Pavements, Bridges & Storm Water
50 000 000.00
100 000 000.00
100 000 000.00
JRA 74 Renewal
30748 Refurbishment and Upgrading of M2 Hostel Renewal Building Alterations ALEXANDRA EXT.52 E
refurbishment of M2 Hostel infrastructure
Other Assets Other Buildings
8 000 000.00
7 000 000.00
8 000 000.00
Housing 75 Renewal
28853 M2 Nobuhle Hostel(Completion of 286 and commencement of 298 rooms Upgrade Building Alterations ALEXANDRA EXT.27 C
Upgrading of M2 Hostel Alexandra
Heritage Assets
Buildings -
-
-
JDA 75 Renewal
32594 Fire Station - Alexandra and 'Be Safe Centre' New Building ALEXANDRA EXT.25 E Regional
Reconstruction of existing Alexandra Firestation with the addition of a 'Be Safe Centre'
Community Fire, safety & emergency
-
20 000 000.00
9 438 000.00
Public Safety: EMS
75 New
32990 Lib.Alexander 3rd Avenue Children Library New Library ALEXANDRA EXT.4 D
Upgrading of the facility Community Libraries 800 000.00
-
-
Community Dev: Libraries
76 New
29424 Alexandra Hostel Redevelopment (M1) Renewal Building Alterations ALEXANDRA EXT.9 E Ward
Upgrading of M1 Hostel and Helen Joseph
Investment Properties
Housing development
-
-
-
JDA 76 Renewal
33720 Sandton/ Alexander: Benmore Gardens, Bramley North Renewal BENMORE GARDENS B
Upgrade water Infrastructure Water, Reservoirs & Reticulation
2 429 000.00
-
-
JHB Water: Sewer
76 Renewal
33185 Sandton/ Alexander: Planned replacement: sewer mains Renewal Bulk Waste Water ALEXANDRA EXT.4 B
Sewer main Infrastructure Sewerage Purification & Reticulation
-
-
10 000 000.00
JHB Water: Sewer
76 Renewal
291
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33184 Sandton water upgrade New Water Mains ALEXANDRA EXT.4 B Regional
Water upgrade Infrastructure Water, Reservoirs & Reticulation
25 000 000.00
5 000 000.00
10 000 000.00
JHB Water: Water
76 New
33178 Sandton/ Alexandra: Alexandra Park water upgrade New Water Mains ALEXANDRA EXT.4 B Regional
Water upgrade Infrastructure Water, Reservoirs & Reticulation
900 000.00
-
-
JHB Water: Water
76 New
33693 Bothlabella Housing Project Renewal Operational Capex ALEXANDRA EXT.12 E City Wide
Upgrading and planned maintenance of Council stock
Investment Properties
Housing development
5 000 000.00
2 500 000.00
2 500 000.00
JOSHCO 76 Renewal
33532 River Park New Clinic LOMBARDY EAST E Ward
Design and layout of clinic, construction of buildings and carports, furniture and equipment, landscaping, paving and signage.
Community Clinics -
-
-
Health 81 New
30495 Lombardy West Housing New RDP Flats ALEXANDRA EXT.27 E Ward
The development of mix RDP/higher income group flats for sale in the Lombardy area
Investment Properties
Housing development
-
-
-
JDA 81 New
27567 LOMBARDY EAST HOUSING PROJECT New Housing Development LOMBARDY EAST E Ward
Development of 350 medium density housing units between Lombardy East and Alex.
Investment Properties
Housing development
46 940 000.00
75 000 000.00
40 977 000.00
JOSHCO 81 New
33538 Construction of linear market(informal trading shelter) in Alexandra Pan Africa New Informal trading Stalls ALEXANDRA EXT.4 E Ward
To formalise about 340 trading stalls in and around the Pan Africa Mall.
Other Assets Markets 10 949 000.00
-
-
Economic Development
91 New
33186 Sandton/ Alexandra: Atholl sewer upgrade Renewal Bulk Waste Water ATHOLL B
sewer upgrade Infrastructure Sewerage Purification & Reticulation
1 500 000.00
-
-
JHB Water: Sewer
91 Renewal
29337 Sandown Extension 49 Erf 575RE Renewal Building Alterations SANDOWN EXT.49 E
Investment Property
Other 35 000 000.00
35 000 000.00
20 000 000.00
JPC 103 Renewal
292
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
31013 RNP021_Outspan Road Upgrading Renewal Roads: Construction and Upgrades LITTLEFILLAN E Ward
Upgrading of Outspan Road from Rivonia Road to 15th Street in Parkmore. To be part of Ten Year Plan.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
10 000 000.00
13 000 000.00
JRA 103 Renewal
33640 Public Lighting Alexandra West Bank New Public Lighting ALEXANDRA EXT.4 E Regional
Public Lighting Alexandra West Bank
Infrastructure Street Lighting
4 300 000.00
1 000 000.00
500 000.00
City Power 105 New
26708 Jukskei River Environmental Upgrading and Rehabilitation Renewal Bulk Infrastructure ALEXANDRA EXT.1 E
Jukskei River Environmental Upgrading and Rehabilitation
Infrastructure Roads, Pavements, Bridges & Storm Water
1 250 000.00
7 000 000.00
3 000 000.00
JDA 105 Renewal
31000 Linear Markets New Building Alterations ALEXANDRA EXT.45 E Regional
the construction of linear markets at various localities to formalize informal traders
Community Other -
2 000 000.00
-
JDA 105 New
31009 Pedestrian Bridge Vincent Tshabalala Road New Bulk Infrastructure FAR EAST BANK EXT.9 E
pedestrian bridge across Vincent Tshabalala road (London Road)
Infrastructure Roads, Pavements, Bridges & Storm Water
700 000.00
9 000 000.00
-
JDA 105 New
31010 Refuse Bins New Bulk Infrastructure FAR EAST BANK EXT.9 E
purchase of 80l refuse bins for new housing developments
Infrastructure Refuse 229 000.00
300 000.00
300 000.00
JDA 105 New
25790 Replace feeder cables and 6.6kV load centres with dual ratio mini's Renewal Medium Voltage Network BRYANSTON EXT.77 E Regional
Replace cables & mini subs with dual ratio
Infrastructure Electricity Reticulation
5 000 000.00
5 000 000.00
5 000 000.00
City Power 106 Renewal
24717 Sandton/Alexandra: Planned replacement of watermains Renewal Water Mains WOODMEAD EXT.5 E Regional
Planned replacement of watermains
Infrastructure Water, Reservoirs & Reticulation
20 000 000.00
-
15 000 000.00
JHB Water: Water
106 Renewal
30750 Helen Josephs Refurbishment and Upgrading of Women's Hostel Renewal Building Alterations ALEXANDRA EXT.52 E Ward
Upgrading of Infrastructure and Services
Infrastructure Other 7 000 000.00
8 000 000.00
9 000 000.00
Housing 107 Renewal
293
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
30262 Alfred Nzo road widening New Bulk Infrastructure ALEXANDRA EXT.24 E Ward
Road to be made ready for the implementation of Bus Rapid Transit Route
Infrastructure Roads, Pavements, Bridges & Storm Water
-
-
12 000 000.00
JDA 107 New
30506 Clinic 4th Avenue Renewal Clinic ALEXANDRA EXT.42 E Ward
The refurbishment and up grading of the 4 th Avenue Clinic. This is a specialist female clinic
Community Clinics 3 000 000.00
-
-
JDA 107 Renewal
32490 People’s Court, 7th Avenue (Old Alexandra) New Heritage ALEXANDRA EXT.4 E Ward
Restoration of Historical Site Community Other 410 000.00
-
2 000 000.00
JDA 107 New
22486 Installation of new service connections New Service Connections ALEXANDRA EXT.63 E Regional
new service connections Infrastructure Electricity Reticulation
1 495 000.00
1 495 000.00
1 495 000.00
City Power 108 New
30488 Development of open Space New Precinct Redevelopment ALEXANDRA EXT.53 E
Open space development for recreation
Community Parks & gardens
1 500 000.00
5 000 000.00
-
JDA 108 New
32450 Old Ikage housing development New Building Alterations ALEXANDRA EXT.57 E Ward
Development of 85 housing in old Alexandra
Investment Properties
Housing development
2 500 000.00
-
20 000 000.00
JDA 108 New
33552 Marlboro Holding Facility Renewal Building Alterations MARLBORO E Regional
Upgrading of Marlboro JMPD facility to include a vehicle pound
Community Fire, safety & emergency
4 000 000.00
5 000 000.00
-
Public Safety: JMPD
108 Renewal
33798 Louis Botha - Co - Production zone for social interventions Renewal Corridors of Freedom Intervention ORANGE GROVE E Regional
Refurbishment and future construction of Social Development centre
Community Community halls
-
-
5 934 000.00
Social Development
108 Renewal
30498 Setswetla Land Reclamation and Redevelopment New Bulk Infrastructure ALEXANDRA EXT.60 E Regional
The development of engineering infrastructure as well as housing on Setwetla Site. This site used to be a old solid waste and ash dumping site
Investment Properties
Housing development
-
-
-
JDA 109 New
30505 Thoko Mngoma Clinic Marlboro Renewal Clinic ALEXANDRA
The refurbishment and upgrading of the Marlboro
Community Clinics 3 000 000.00
-
-
JDA 109 Renewal
294
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
EXT.53 E Clinic
26892 Sandton/ Alexandra: Yeoville Water Upgrade infrastructure New Water Mains ALEXANDRA EXT.4 B Regional
upgrading water infrastructure Infrastructure Water, Reservoirs & Reticulation
-
-
10 000 000.00
JHB Water: Water
109 New
27561 KELVIN RENTAL STOCK New Building Alterations KELVIN VIEW E Ward
Taking over some rental units projects from the Alex Renewal Programme, Develop and manage the stock
Investment Properties
Housing development
2 000 000.00
-
40 000 000.00
JOSHCO 109 New
26983 Upgrade MV Network. Northern Region. Replace bare OH lines in problematic areas with ABC Renewal Network Development NORTH RIDING EXT.30 C City Wide
Replace obsolete bare overhead lines with insulated aerial bundle conductor (ABC)
Infrastructure Electricity Reticulation
12 500 000.00
30 000 000.00
30 000 000.00
City Power 115 Renewal
27666 Sandton/Alexandra: Bryanston Water Upgrade Infrastructure New Water Mains DOUGLASDALE EXT.96 E Regional
Brynston District Upgrade Water Infrastructure Phase
Infrastructure Water, Reservoirs & Reticulation
13 686 000.00
-
-
JHB Water: Water
115 New
295
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
31328 MISCL - Gravel Roads: Agricultural Holdings. Renewal Gravel Road JOHANNESBURG F Regional
Re-gravelling of gravel & dirt roads in poor conditions by blading, shaping, gravelling, etc City Wide including: Blue Hills (Mercury & Tambotie Rd); Buccleuch (Engela Place, Gibson, John & Wendy Rd); Chartwell AH (Runnymead, Forest & Second Rd); Douglasdale (Hornbill Rd); Ennerdale (Zirconium Cl); Farmall AH (1st Rd); Glen Austin (Hampton, Dale, Milner & Donovan Rd); Halfway Gardens (Sturgess Av & Vermaak Rd); Honeydew (Plein, Glover, Coleen, Bothma & Flora Haase Rd); Kyalami AH (Cactus Rd); Lombardy West (Dublin, Pitt and Birmingham Rd); Northriding (Derby, Reier, Kraanvoel, Spionkop, Felstead, Off Boundary Rd into Constantia and Carmen St also Quorn Dr); President Park x 14 (Brand, Steyn & Boshoff St); Randpark Ridge (Bush Hill & Redwood St); Sunninghill (Katumba Rd); Witpoort (Rose, 23rd, Shetland, Lourens Dr & Springfield Rd); Zonnehoewe (Cypress, Chestnut & Walnut Rd); and roads in Limbro Park.
Infrastructure Roads, Pavements, Bridges & Storm Water
10 000 000.00
5 000 000.00
25 000 000.00
JRA 115 Renewal
33049 RENOVATION AND EXTENTION OF RANDBURG DLTC Renewal Building Alterations DOUGLASDALE EXT.37 F Regional
RENOVATION AND EXTENTION OF RANDBURG DLTC
Other Assets Other Buildings
-
556 000.00
2 294 000.00
Public Safety: JMPD
115 Renewal
296
Region E
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
29467 Normalisation Renewal Medium Voltage Network ALEXANDRA EXT.42 E Regional
Normalisation of Alexandra Infrastructure Electricity Reticulation
20 000 000.00
38 000 000.00
-
City Power 116 Renewal
30517 Banakekelen Hospice New Clinic ALEXANDRA EXT.38 E Ward
The construction of a Hospices Clinic as well as bulk contribution from CoJ
Community Clinics -
2 500 000.00
-
JDA 116 New
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33254 Soweto: Planned replacement sewer mains THETA E
sewer replacement Infrastructure Sewerage Purification & Reticulation
25 000 000.00
10 000 000.00
10 000 000.00
JHB Water: Sewer
54 Renewal
33089 Southdale/ Laaglaagte: Crown Gardens Reservoir New Reservoirs CROWN GARDENS D Regional
Reservoir 16.3Ml Infrastructure Water, Reservoirs & Reticulation
-
5 000 000.00
-
JHB Water: Water
54 New
32621 Rem 163/100-Turffontein New Bulk Infrastructure TURFFONTEIN F Ward
Formalisation, construction of bulk services and Low cost Houses
Investment Properties
Housing development
1 000 000.00
5 000 000.00
-
Housing 55 New
27576 BELLAVISTA ESTATE INFILLS New Housing Development BELLAVISTA ESTATE F Ward
upgrading and maintenance of Council Housing stock which is in a poor condition
Investment Properties
Housing development
38 560 000.00
500 000.00
500 000.00
JOSHCO 55 New
33694 Citrine Court Building Renewal Operational Capex BELLAVISTA ESTATE F Regional
Upgrading of the Bellavista Building
Investment Properties
Housing development
1 172 000.00
3 503 000.00
900 000.00
JOSHCO 55 Renewal
27574 Turffontein rental housing development New Housing Development TURFFONTEIN F Ward
Development of 400 affordable rental units in the Turfontein area
Investment Properties
Housing development
54 000 000.00
75 000 000.00
40 000 000.00
JOSHCO 55 New
30656 18 Landfill - Robinson deep New waste collection
Landfill compliance and water pond development
Infrastructure Refuse 5 000 000.00
1 000 000.00
1 000 000.00
Pikitup 55 New
297
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
TURFFONTEIN D City Wide
33380 Rec - Upgrading of Southern Suburbs Sport and Recreational Centre Renewal Community Centre OAKDENE F Ward
Upgrading of Southern Suburbs Sport and Recreational Centre
Community Recreational facilities
500 000.00
-
-
Community Dev: Sport and Recreation
56 Renewal
27503 Horse Building for additional JMPD horses New Building Alterations SPRINGFIELD EXT.4 F
Buildings - equipment, feed, farrier, clinic to be built for the horses that are needed for 2010 World Cup Soccer
Other Assets Other Buildings -
3 260 000.00
3 320 000.00
Public Safety: JMPD
56 New
29960 Stormwater Management Renewal Drainage System ROSETTENVILLE EXT.2 F Ward
upgrading the existing stormwater system
Infrastructure Roads, Pavements, Bridges & Storm Water
6 600 000.00
800 000.00
5 000 000.00
Public Safety: JMPD
56 Renewal
32730 Kliprivier Nature Reserve Upgrade Renewal Educational Centre finalisation Renewal Park KLIPRIVIERSBERG F Regional
Pegy Vera Road, Kibler Park Community Parks & gardens 3 000 000.00
2 000 000.00
-
City Parks and Zoo
57 Renewal
25827 Convert PPC cement and Haggie Rand from 20.5kV to 11kV Renewal Bulk Infrastructure HERIOTDALE F Ward
Convert from 20.5 kV to 11 kV Infrastructure Electricity Reticulation
-
10 000 000.00
90 126 000.00
City Power 57 Renewal
32607 Moffat View Ext 6 New Bulk Infrastructure MOFFAT VIEW EXT.6 F Ward
Formalisation Investment Properties
Housing development
2 000 000.00
5 000 000.00
-
Housing 57 New
32878 Audio in trading halls New Computer Software CITY DEEP EXT.22 F Regional
Audio systems for the halls Other Assets Markets 1 500 000.00
1 500 000.00
-
Joburg Market 57 New
32920 Building Management Software New Bulk engineering services CITY DEEP EXT.22 F Regional
Software for bulk building services
Intangibles Computers - software and programming
2 000 000.00
3 000 000.00
9 000 000.00
Joburg Market 57 New
298
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32937 Civil Resurfacing of all platforms within the Market New Building Alterations CITY DEEP EXT.22 F Regional
Resurfacing of all platforms of the halls( 1-10)
Infrastructure Roads, Pavements, Bridges & Storm Water
4 000 000.00
14 000 000.00
5 000 000.00
Joburg Market 57 New
29940 Computer Equipment Renewal Computer Upgrades CITY DEEP EXT.2 F Regional
Computer Hardware Other Assets Markets 4 400 000.00
5 000 000.00
10 000 000.00
Joburg Market 57 Renewal
33707 Computer Hardware New/Renewal Renewal Computer Hardware CITY DEEP EXT.22 F Regional
Computer Hardware Other Assets Computers - hardware/equipment
5 900 000.00
5 000 000.00
10 000 000.00
Joburg Market 57 Renewal
33708 Computer Software New/Renewal New Computer Software CITY DEEP EXT.22 F Regional
Computer Software Intangibles Computers - software and programming
2 300 000.00
2 500 000.00
4 000 000.00
Joburg Market 57 New
32917 Consignment control software and hardware New Computer Software CITY DEEP EXT.22 F Regional
Consignment control software development
Intangibles Computers - software and programming
1 000 000.00
-
-
Joburg Market 57 New
32881 Directional signage within market premises New Building Alterations CITY DEEP EXT.22 F Regional
installation of directional signage within the market premises
Infrastructure Other 1 500 000.00
1 500 000.00
-
Joburg Market 57 New
30028 Electricity Reticulation Upgrade Renewal Building Alterations JOHANNESBURG F Ward
Upgrade and replacement of light in hall 1 & 2 and Hall 9 &10
Infrastructure Electricity Reticulation
3 000 000.00
3 000 000.00
-
Joburg Market 57 Renewal
32885 Emergency evacuation alarm New Plant and Equipment CITY DEEP EXT.22 F Regional
installation of emergency evacuation alarms
Other Assets Other 220 000.00
235 000.00
249 000.00
Joburg Market 57 New
32889 Emergency evacuation chairs New Plant and Equipment CITY DEEP EXT.22 F Regional
Emergency evacuation chairs Other Assets Markets -
-
70 000.00
Joburg Market 57 New
32890 Equipment for safety surveillance New Plant and Equipment CITY DEEP EXT.22 F Regional
Equipment to conduct safety surveillance for wellness
Other Assets Markets 1 000 000.00
-
1 500 000.00
Joburg Market 57 New
299
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32929 Foodbank sorting centre New Building Alterations CITY DEEP EXT.22 F Regional
Sorting centre for foodbank Other Assets Markets -
-
5 000 000.00
Joburg Market 57 New
27709 General and QA Inspection Trolleys New Plant and Equipment CITY DEEP EXT.22 F Regional
Trolleys for quality inspection, for security and other departments
Other Assets Markets 700 000.00
1 000 000.00
-
Joburg Market 57 New
32923 Humidifiers New Bulk engineering services CITY DEEP EXT.22 F Regional
Installation of humidifiers Other Assets Plant & equipment 2 000 000.00
2 000 000.00
-
Joburg Market 57 New
33563 Installation of Lights in Halls 1,2,9,10 Renewal Operational Capex CITY DEEP EXT.22 G City Wide
Replacement of existing lights/ Electrical Infrastructure
Other Assets Markets -
-
5 000 000.00
Joburg Market 57 Renewal
32884 Installation of sprinkler systems New Building Alterations CITY DEEP EXT.22 F Regional
installation of sprinkler systems
Other Assets Markets 6 200 000.00
6 200 000.00
6 200 000.00
Joburg Market 57 New
32898 IT Software upgrade New Computer Software CITY DEEP EXT.22 F Regional
New IT software Other Assets Markets -
-
570 000.00
Joburg Market 57 New
30024 IT support system New Computer Upgrades CITY DEEP EXT.2 F Ward
Integration to stake holders, virtual market support, logistic support
Intangibles Computers - software and programming
-
-
4 000 000.00
Joburg Market 57 New
30022 Main Building Refurbishments Renewal Building Alterations CITY DEEP EXT.22 F Regional
Refurbishment of ageing offices
Other Assets Markets 5 000 000.00
2 000 000.00
2 000 000.00
Joburg Market 57 Renewal
32895 Main Building Renewal Building Alterations CITY DEEP EXT.22 F Regional
Renovation in the main building at the Market
Other Assets Markets 4 000 000.00
6 000 000.00
3 000 000.00
Joburg Market 57 Renewal
30759 Main market signage New Building Alterations CITY DEEP EXT.22 F Regional
Improving the ascetic value of the building.
Other Assets Markets 3 400 000.00
1 600 000.00
-
Joburg Market 57 New
300
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32916 Market of the Future New Building CITY DEEP EXT.22 F Regional
Upgrading Market facilities to enable new legislation, maintain Market relevance, and enhance Food Safety & Security
Other Assets Markets 95 535 000.00
212 935 000.00
169 273 000.00
Joburg Market 57 New
29946 New Rocker Bins Renewal Plant and Equipment CITY DEEP EXT.22 F Regional
Rocker Bins Infrastructure Refuse 300 000.00
500 000.00
1 000 000.00
Joburg Market 57 Renewal
32914 Office equipment New/Renewal New Office Equipment CITY DEEP EXT.22 F Regional
new office equipment Other Assets Furniture and other office equipment
2 000.00
3 000.00
120 000.00
Joburg Market 57 New
32925 Pallet Pool New Bulk engineering services CITY DEEP EXT.22 F Regional
Creation of Pallet Pool Other Assets Markets 2 000 000.00
3 000 000.00
1 000 000.00
Joburg Market 57 New
30470 Potable water to halls and washbasins New Building Alterations CITY DEEP EXT.22 F Regional
Potable water to halls and washbasins
Infrastructure Roads, Pavements, Bridges & Storm Water
-
1 000 000.00
-
Joburg Market 57 New
30016 Provision of new Transformers New Building Alterations CITY DEEP EXT.2 F
Provision of new transformers for electric supply to future extensions in the southern side of the Market
Infrastructure Electricity Generation
5 000 000.00
5 400 000.00
-
Joburg Market 57 New
32922 Refurbishments/ Construction of ablution facilities Renewal Building Alterations CITY DEEP EXT.22 F Regional
Ablution Facilities Infrastructure Sewerage Purification & Reticulation
3 500 000.00
4 000 000.00
5 000 000.00
Joburg Market 57 Renewal
29943 Replacement of Ammonia Plant Renewal Plant and Equipment CITY DEEP EXT.22 F Regional
Replacement of Amonia Compressor
Other Assets Markets 4 000 000.00
-
6 000 000.00
Joburg Market 57 Renewal
30761 Replacement of Assets New/Renewal New Plant and Equipment CITY DEEP EXT.22 F Regional
Plant and equipment Other Assets Markets 3 000 000.00
13 000 000.00
5 000 000.00
Joburg Market 57 New
32933 Replacement of the roof at trading halls New Building Alterations CITY DEEP EXT.22 F Regional
Replacement of the roof at the trading halls
Other Assets Markets 9 000 000.00
5 000 000.00
5 000 000.00
Joburg Market 57 New
301
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
30435 Revamp sewer and drainage system New Drainage System CITY DEEP EXT.22 F Regional
Sewer and drainage upgrade for the whole of the market
Infrastructure Sewerage Purification & Reticulation
5 000 000.00
6 000 000.00
5 000 000.00
Joburg Market 57 New
32919 Road Rehabilitation Project New Bulk engineering services CITY DEEP EXT.22 F Regional
Upgrade of the road Other Assets Markets 7 000 000.00
9 000 000.00
12 000 000.00
Joburg Market 57 New
29615 Standby Generator upgrade Renewal Building Alterations CITY DEEP EXT.22 F Regional
Standby Power Generators for the Market
Other Assets Markets 6 000 000.00
7 500 000.00
-
Joburg Market 57 Renewal
30020 Temperature Control Systems Renewal Building Alterations CITY DEEP EXT.22 F Regional
Cold stores, Banana ripening, instrument for central temperature logging.
Other Assets Markets 1 000 000.00
-
1 500 000.00
Joburg Market 57 Renewal
32903 Trading System Archiving New Computer Software CITY DEEP EXT.22 F Regional
Archiving of trading system Other Assets Markets -
-
1 000 000.00
Joburg Market 57 New
32928 Trading System at other markets New Computer Software CITY DEEP EXT.22 F Regional
Software system for other markets
Other Assets Markets 300 000.00
-
-
Joburg Market 57 New
26025 Two Way Radios New Operational Capex CITY DEEP EXT.22 F Regional
Two-way radios Other Assets Markets 65 000.00
65 000.00
65 000.00
Joburg Market 57 New
29200 Upgrade Hall 9 Renewal Building Alterations CITY DEEP EXT.22 F Regional
Upgrade of existing hall to bring in line with HACCP requirements
Other Assets Markets 9 000 000.00
5 000 000.00
5 000 000.00
Joburg Market 57 Renewal
27719 Upgrade of Exit and entrance gates Renewal Building Alterations CITY DEEP EXT.22 F Regional
Upgrade Exit Gate Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
2 000 000.00
1 000 000.00
Joburg Market 57 Renewal
26020 Upgrade of Hall 1 and 2 Renewal Building Alterations CITY DEEP EXT.22 F Regional
Refurbishing 23 000 m2 into a Value Added Services Centre to attract Retailers back to the Market.
Other Assets Other Buildings 7 000 000.00
6 000 000.00
8 000 000.00
Joburg Market 57 Renewal
302
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
27714 Upgrade of Watermelon Section Renewal Building Alterations CITY DEEP EXT.2 F Regional
Upgrade of Watermelon Section
Other Assets Markets 1 500 000.00
-
-
Joburg Market 57 Renewal
27562 CITY DEEP MIXED HOUSING DEVELOPMENT Renewal Building Alterations CITY DEEP F Ward
Redevelopment of City Deep staff hostel into family units by converting existing and building of new units
Investment Properties
Housing development
30 000 000.00
20 000 000.00
-
JOSHCO 57 Renewal
33695 City Deep Upgrading Renewal Operational Capex CITY DEEP F Regional
Upgrading of Existing stock Investment Properties
Housing development
2 000 000.00
2 000 000.00
1 000 000.00
JOSHCO 57 Renewal
33515 MOB - City Deep Freight Hub. Renewal Roads: Construction and Upgrades CITY DEEP F City Wide
Road and traffic management interventions in the City Deep/Kaserne area to solve mobility issues in this major freight traffic hub.
Infrastructure Roads, Pavements, Bridges & Storm Water
30 000 000.00
30 000 000.00
-
JRA 57 Renewal
28357 Upgrade John Ware sub station Renewal Bulk Infrastructure FORDSBURG F Regional
Install an additional 88/11 kV transformer and feeder board
Infrastructure Electricity Reticulation
14 000 000.00
10 000 000.00
-
City Power 58 Renewal
24751 Johannesburg Central:planned replacement watermains Renewal Water Mains MAYFAIR F Regional
Planned replacement: Watermain
Infrastructure Water, Reservoirs & Reticulation
-
10 000 000.00
15 000 000.00
JHB Water: Water
58 Renewal
29920 CATCH 205 - Robinson Canal Catchment Structural Improvement: Robinson Canal Sub 4 Renewal Stormwater Catchments ROBIN ACRES F Ward
Structural intervention on existing holes in the floor, deck, and exposed steel reinforcing. Project needs prioritization.
Infrastructure Roads, Pavements, Bridges & Storm Water
500 000.00
8 000 000.00
-
JRA 58 Renewal
27954 CATCH 205 - Robinson Canal Catchment: Structural Improvement: Robinson Canal Sub 10 Renewal Stormwater Catchments ROBINDALE F Ward
Structural intervention on existing holes in the floor, deck, and exposed steel reinforcing
Infrastructure Roads, Pavements, Bridges & Storm Water
4 240 000.00
10 000 000.00
10 000 000.00
JRA 58 Renewal
26799 LANGLAAGTE ONE STOP SHOP - LICENSING Renewal Building Alterations LANGLAAGTE NORTH F Ward
One Stop shop (new building)for JMPD Licensing and Metro Police activities at Langlaagte.
Other Assets Other Buildings 5 350 000.00
6 350 000.00
7 350 000.00
Public Safety: JMPD
58 Renewal
303
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
29543 Inner City Upgrading (Transitional/Emergency and Rental Stock) Renewal Rental Flats JOHANNESBURG F Regional
Upgrading of rental accommodation within Inner City
Investment Properties
Housing development
40 000 000.00
40 000 000.00
40 000 000.00
Housing 59 Renewal
33484 MBV Inner-city Rental Housing Renewal Housing Development JOHANNESBURG F City Wide
Redevelopment and upgrading of the MBV building in the inner city to increase the rental stock
Investment Properties
Housing development
500 000.00
500 000.00
900 000.00
JOSHCO 59 Renewal
22290 5 Composting Organic Waste New Plant and Equipment ORANGE FARM EXT.8 G City Wide
Waste reduction and collection methods and interventions, and supply of bins to new/developing areas.
Infrastructure Refuse 20 000 000.00
14 550 000.00
13 450 000.00
Pikitup 59 New
29445 New Radio Communication system New Plant and Equipment CITY AND SUBURBAN EXT.6 F
Supply 2000 new Tetra radio's to JMPD officers (Phase 2).
Intangibles Other 10 000 000.00
7 010 000.00
3 333 000.00
Public Safety: JMPD
59 New
33760 Inner City (City Parks) New Inner City Intervention JOHANNESBURG F Regional
Ring-fenced amount for capital projects intended for the Inner City
Community Parks & gardens 15 017 000.00
8 400 000.00
3 700 000.00
City Parks and Zoo
60 New
33805 Installation of Online Gas Monitoring units to detect possible transformer failures New Bulk Infrastructure REUVEN F City Wide
Installation of online gas monitors to detect transformer failures
Infrastructure Electricity Reticulation
5 000 000.00
-
-
City Power 60 New
32534 New 88/11 kV substation near Park station. New Bulk Infrastructure NEWTOWN F Regional
New 88/11 kV substation near Park station
Infrastructure Electricity Reticulation
-
38 700 000.00
30 000 000.00
City Power 60 New
29291 Newtown Eliminate MV pillar boxes Renewal Medium Voltage Network NEWTOWN EXT.1 F Ward
Eliminate MV pillar boxes Infrastructure Electricity Reticulation
5 000 000.00
5 000 000.00
-
City Power 60 Renewal
31071 ACH - Refurbishment of the Joburg Art Gallery Heritage Area Upgrade JOHANNESBURG F
Major refurbishment of the Joburg Art Gallery including structural repairs and waterproofing the entire centre
Community Recreational facilities
11 647 000.00
1 000 000.00
8 445 000.00
Community Dev: Arts, Culture and Heritage
60 Renewal
304
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33019 ACH. Museum Africa Renewal Heritage Area Upgrade NEWTOWN F
Upgrading of the facility Community Museums & Art Galleries
5 000 000.00
-
-
Community Dev: Arts, Culture and Heritage
60 Renewal
33373 Rec - Upgrading of Hillbrow Recreation Centre Renewal Community Centre JOHANNESBURG F Regional
Upgrading of Hillbrow Recreational Centre
Community Recreational facilities
-
-
500 000.00
Community Dev: Sport and Recreation
60 Renewal
33371 Rec - Upgrading of Braamfontein Conference and Recreational Centre Renewal Community Centre JOHANNESBURG F City Wide
Upgrading of the Braamfontein Conference and Recreational Centre
Community Recreational facilities
2 000 000.00
-
2 000 000.00
Community Dev: Sport and Recreation
60 Renewal
33726 Johannesburg Central: Langlaagte water upgrade Renewal LANGLAAGTE D
Water upgrade Infrastructure Sewerage Purification & Reticulation
2 600 000.00
-
-
JHB Water: Sewer
60 Renewal
33725 Johannesburg central: Northcliff pipe replacement Renewal NORTHCLIFF EXT.1 D
Water Pipe replacement Infrastructure Sewerage Purification & Reticulation
4 028 000.00
-
-
JHB Water: Sewer
60 Renewal
33241 Johannesburg Central: Planned replacement sewer mains Renewal Bulk Waste Water JOHANNESBURG D
sewer upgrade Infrastructure Sewerage Purification & Reticulation
-
-
10 000 000.00
JHB Water: Sewer
60 Renewal
33719 Midrand Water upgrade Renewal RANDJESFONTEIN A
Water upgrade Infrastructure Water, Reservoirs & Reticulation
1 650 000.00
-
-
JHB Water: Sewer
60 Renewal
33240 Johannesburg Central: RW Meyers Hill water upgrade New Water Mains JOHANNESBURG D Regional
Water upgrade Infrastructure Water, Reservoirs & Reticulation
-
-
-
JHB Water: Water
60 New
33086 Roodepoort/ Diepsloot: Main Reef 20Ml, 30Ml, Tower 2Ml New Reservoirs JOHANNESBURG C Regional
Main Reef Tower Infrastructure Water, Reservoirs & Reticulation
12 000 000.00
5 000 000.00
-
JHB Water: Water
60 New
305
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
30889 Joburg Theatre - Building Renovations and upgrades New Building Alterations JOHANNESBURG F Ward
Renovation of existing public bathrooms; building of scenery door to the Fringe Theatre; replacement of building management system; renovation of backstage dressing rooms; extended 28 bay parking facility; upgrade of two public lifts; wrapping and insulating the stage tower; water proofing of all roofs; replacement of Gamma Zenith on exterior.
Community Recreational facilities
5 150 000.00
4 300 000.00
1 442 000.00
Johannesburg Theatre Management Company
60 New
32879 Joburg Theatre - Information Technology Upgrades Renewal Computer Upgrades JOHANNESBURG F City Wide
Replace existing IT systems in the Joburg Theatre
Intangibles Computers - software and programming
1 000 000.00
500 000.00
250 000.00
Johannesburg Theatre Management Company
60 Renewal
33817 Joburg Theatre - Technical Equipment New Operational Capex JOHANNESBURG F Regional
Purchasing of Technical Equipment
Other Assets Furniture and other office equipment
-
-
750 000.00
Johannesburg Theatre Management Company
60 New
32502 Joburg Theatre - Upgrade of stage machinery Renewal Plant and Equipment JOHANNESBURG F Ward
UPS Protection for Mandela and Fringe Theatres; Drives on wagons and lifts of the Mandela Theatre; Steel cables for the Mandela front tabs.
Community Recreational facilities
1 000 000.00
400 000.00
1 155 000.00
Johannesburg Theatre Management Company
60 Renewal
33810 11 Elloff Street Renewal Operational Capex JOHANNESBURG F Regional
Upgrading of existing social housing unit
Community Social Renting Housing
38 000 000.00
-
-
JOSHCO 60 Renewal
33818 195 Commissioner Street New Building Alterations JOHANNESBURG F Ward
Purchase of building for upgrade into social housing
Community Social Renting Housing
32 000 000.00
-
-
JOSHCO 60 New
33811 72276 Sieveright Building Renewal Building Alterations JOHANNESBURG F Regional
Upgrading existing building as social housing stock
Community Social Renting Housing
2 000 000.00
40 000 000.00
22 000 000.00
JOSHCO 60 Renewal
33813 Anthea Renewal Building Alterations JOHANNESBURG F Regional
Upgrading of existing social housing stock
Community Social Renting Housing
-
1 000 000.00
100 000.00
JOSHCO 60 Renewal
306
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33814 Casamia Renewal Building Alterations JOHANNESBURG F Regional
Upgrading to existing social housing stock
Community Social Renting Housing
-
5 000 000.00
5 000 000.00
JOSHCO 60 Renewal
33697 Chelsea Residential Building Renewal Operational Capex JOHANNESBURG F Regional
Upgrading of the residential property, Major repairs on plumbing, plastering and painting
Investment Properties
Housing development
3 000 000.00
2 000 000.00
-
JOSHCO 60 Renewal
30417 EUROPA HOUSE Renewal Housing Development JOHANNESBURG F Ward
Emergency housing Investment Properties
Housing development
1 000 000.00
-
-
JOSHCO 60 Renewal
33812 Gezina Renewal Building Alterations JOHANNESBURG F Regional
Upgrading of existing social housing stock
Community Social Renting Housing
-
5 000 000.00
15 000 000.00
JOSHCO 60 Renewal
28146 Inner City Rental Development Renewal Housing Development JOHANNESBURG F City Wide
Development of residential about 150 units. Refurbishment, conversion and upgrading of units in the building
Investment Properties
Housing development
6 000 000.00
40 000 000.00
50 000 000.00
JOSHCO 60 Renewal
33815 La Rosabel Renewal Building Alterations JOHANNESBURG F Regional
Upgrading of existing social housing stock
Community Social Renting Housing
-
500 000.00
-
JOSHCO 60 Renewal
33821 Rachers Social Housing New Building Alterations JOHANNESBURG F Ward
Upgrade to existing social housing stock
Community Social Renting Housing
-
900 000.00
500 000.00
JOSHCO 60 New
30364 Computer Equipment New Computer Upgrades BRAAMFONTEIN WERF EXT.1 F City Wide
Purchasing computers, furniture and leasehold
Other Assets Computers - hardware/equipment
-
-
4 000 000.00
JPC 60 New
33691 Office Space Optimisation New Building Alterations JOHANNESBURG F City Wide
Construction and centralisation of new council office which accommodates all CoJ department and entities.
Other Assets Civic Land & Buildings
-
-
10 000 000.00
JPC 60 New
26220 Revamping of the Informal Trading Stalls within the Inner City Renewal Operational Capex JOHANNESBURG F Ward
Revamping of the Informal Trading Stalls within the Inner City
Other Assets Markets 1 300 000.00
11 300 000.00
15 000 000.00
JPC 60 Renewal
307
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
29183 CATCH 200 - Braamfontein Spruit Catchment: Erosion Protection, East of George Lea Park to Marie Str(173 m length) New Stormwater Catchments BRAAMFONTEIN WERF EXT.1 E Ward
Braamfontein Spruit Catchment: Erosion Protection,East of George Lea Park to Marie Str (173 m length).
Infrastructure Roads, Pavements, Bridges & Storm Water
3 000 000.00
3 000 000.00
-
JRA 60 New
29184 CATCH 200 - Braamfontein Spruit Catchment: Upgrade to Culvert, Millpark Renewal Roads: Construction and Upgrades BRAAMFONTEIN WERF EXT.1 B Ward
Upgrade to Culvert between Owl St and Gas Works on Annet Rd.
Infrastructure Roads, Pavements, Bridges & Storm Water
5 000 000.00
5 000 000.00
-
JRA 60 Renewal
22299 12 (c) New garden Sites Cosmo City New waste collection COSMO CITY EXT.2 B City Wide
Build garden sites for the collection of garden waste to send to composting plant and increase life of landfills
Infrastructure Refuse 700 000.00
1 700 000.00
700 000.00
Pikitup 60 New
33642 13 Garden Side Recycling New waste collection JOHANNESBURG F City Wide
Implementation of recyclable waste facilities and various side
Infrastructure Refuse 4 000 000.00
4 000 000.00
8 000 000.00
Pikitup 60 New
33379 Fire Stations - Central Refurbishment Renewal Building Alterations JOHANNESBURG A Regional
Refurbishment Community Fire, safety & emergency
-
5 950 000.00
-
Public Safety: EMS
60 Renewal
33339 Establishment of Agriculture Resource Centre and associated packaging houses New Skills Development Center JOHANNESBURG F City Wide
The construction of a training facility in Regions A, G and E for agriculture training in terms of the No Children must go Hungry Programme (2013/14). Project includes purchase of specialised farm equipment and tractors (7)
Other Assets Agricultural 2 000 000.00
2 000 000.00
2 000 000.00
Social Development
60 New
33572 Council Chamber Building Programme Renewal Building Alterations JOHANNESBURG F Ward
Investigation to establish the upgrade needs for the council chambers
Heritage Assets
Buildings 30 000 000.00
70 000 000.00
-
Speaker: Legislative Arm of the Council
60 Renewal
308
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32503 COMPL: Parking Solutions for small nodes New Complete Streets JOHANNESBURG F Ward
Improvements to address parking issues at problematic small nodes. Involves creation of loading bays and other parking facilities for private / freight vehicles
Infrastructure Transportation 1 000 000.00
-
-
Transportation 60 New
32511 MAN: Dedicated Public Transport Lanes: Johannesburg CBD: New Managed Lanes JOHANNESBURG F City Wide
Extension of dedicated public transport lanes in the Johannesburg CBD
Infrastructure Transportation -
4 490 000.00
3 825 000.00
Transportation 60 New
30451 PTF: Holding Facilities: Kazerne Redevelopment New Public Transport Facility JOHANNESBURG F Ward
Redevelopment of Kazerne Public Transport Holding Facility, including securing of the existing site, creation of temporary facilities and demolition
Infrastructure Transportation 50 000 000.00
100 000 000.00
100 000 000.00
Transportation 60 New
24930 Prepare mini subs and load centres for 11 kV conversion Renewal Township Reticulation JEPPESTOWN SOUTH F Regional
11 kV Conversion Infrastructure Electricity Reticulation
10 000 000.00
10 000 000.00
15 000 000.00
City Power 61 Renewal
30558 Aqua - Murray Park Public Swimming Pool Renewal Community Centre JEPPESTOWN F Ward
Upgrading of the swimming pool
Community Community halls 2 000 000.00
1 000 000.00
1 500 000.00
Community Dev: Sport and Recreation
61 Renewal
33494 Salisbury House Erf 1052 and 1053 Renewal Heritage JEPPESTOWN F Ward
The upgrade of Heritage Precinct Area
Other Assets Civic Land & Buildings
-
500 000.00
-
JPC 61 Renewal
22490 New service connections New Service Connections BEREA F Regional
New service connections in the Siemert Road area
Infrastructure Electricity Reticulation
18 750 000.00
18 750 000.00
18 750 000.00
City Power 64 New
33321 Lib - Hillbrow Public Library BEREA F
Upgrading of Library Community Libraries -
500 000.00
-
Community Dev: Libraries
64 Renewal
309
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
30767 Cleveland Substation, Reconfigure busbar, replace high risk transformer, add additional 45 MVA transformer and feeder board. Renewal Bulk Infrastructure HERIOTDALE EXT.10 F Regional
Reconfigure busbar, replace high risk transformer, add 45 MVA transformer and feeder board.
Infrastructure Electricity Reticulation
20 500 000.00
20 000 000.00
44 500 000.00
City Power 65 Renewal
32998 Lib. Murray Park Library New Library JEPPESTOWN SOUTH F
Upgrading of the facility Community Libraries 100 000.00
4 500 000.00
-
Community Dev: Libraries
65 New
24623 Aqua - Malvern Public Swimming Pool Renewal Community Centre MALVERN F Ward
Upgrading of the swimming pool
Community Swimming pools 600 000.00
600 000.00
400 000.00
Community Dev: Sport and Recreation
65 Renewal
32819 Observatory Substation. Extend 11 kV switch room and replace damaged feeder board Renewal Bulk Infrastructure OBSERVATORY E Regional
Extend 11 kV switch room and replace damaged feeder board
Infrastructure Electricity Reticulation
10 000 000.00
-
-
City Power 66 Renewal
33723 Bertrams Social Housing Units New Housing Development BERTRAMS F Regional
Development of social housing projects on different infill council sites in Bertrams
Investment Properties
Housing development
2 000 000.00
30 000 000.00
30 000 000.00
JOSHCO 66 New
33441 Aqua -Yeoville Swimming pool Renewal Building Alterations YEOVILLE F Ward
Upgrading of pool Community Recreational facilities
-
-
1 000 000.00
Community Dev: Sport and Recreation
67 Renewal
28767 Rehabilitation of Bruma Lake Renewal Ecological Infrastructure BRUMA E Ward
Phase 3 - Closing of Lake Infrastructure Roads, Pavements, Bridges & Storm Water
25 000 000.00
-
-
Environment and Infrastructure
118 Renewal
30547 Johannesburg Central: Bruma Upgrade sewers New Sewer Mains BRUMA E Ward
Upgrade sewers Infrastructure Sewerage Purification & Reticulation
10 000 000.00
10 000 000.00
10 000 000.00
JHB Water: Sewer
118 New
310
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
30088 CATCH 212 - Bez Valley Catchment: Recon Sub 6; Rehab Main, Sub 1&4. Renewal Stormwater Catchments BEZUIDENHOUT VALLEY F Ward
This is a combination of stormwater structures that are in urgent need of rehabilitation, open channels, culverts and natural river.
Infrastructure Roads, Pavements, Bridges & Storm Water
2 000 000.00
5 000 000.00
5 000 000.00
JRA 118 Renewal
33438 Aqua - Ellis Park Swimming Pool Renewal Building Alterations DOORNFONTEIN F Ward
Upgrading of the pool Community Recreational facilities
700 000.00
2 000 000.00
3 968 000.00
Community Dev: Sport and Recreation
123 Renewal
31108 DED Inner City Property Scheme New Operational Capex JOHANNESBURG F Regional
legal fees for property acquisition
Other Assets Civic Land & Buildings
11 000 000.00
10 000 000.00
7 966 000.00
Economic Development
123 New
33486 NEDERBURG RENTAL HOUSING Renewal Building Alterations JOHANNESBURG F City Wide
Upgrading of the Nederburg building acquired from JPC as part of the Inner City regeneration
Investment Properties
Housing development
15 000 000.00
-
-
JOSHCO 123 Renewal
30702 Emergency work Renewal SCADA REUVEN F City Wide
Telecommunications Emergency work plant out of service
Other Assets Plant & equipment 10 000 000.00
10 000 000.00
10 000 000.00
City Power 124 Renewal
30998 Establish Control and Outage Management Centre New SCADA REUVEN F City Wide
Establish outage Management Centre
Infrastructure Other -
30 000 000.00
40 000 000.00
City Power 124 New
33633 Establish Outage Management System New Computer Software REUVEN F City Wide
ICT: Establish outage Management System
Intangibles Computers - software and programming
-
10 000 000.00
5 000 000.00
City Power 124 New
32927 Information Technology management tools. New Computer Software REUVEN F City Wide
Information Technology management tools.
Infrastructure Other 5 000 000.00
-
-
City Power 124 New
27025 Integrated security, fire detection & suppression systems for major substations. Including fibre optic links (+- 50 % of budget). New Security Equipment REUVEN F City Wide
Integrated security, fire detection & suppression system for major sub stations
Infrastructure Electricity Reticulation
20 000 000.00
20 000 000.00
20 000 000.00
City Power 124 New
311
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33643 IT Business Continuity New Computer Software REUVEN F City Wide
Mandatory requirements as per policy
Intangibles Computers - software and programming
5 000 000.00
5 000 000.00
8 000 000.00
City Power 124 New
26940 Load Management: Receiver audit and replacement Renewal Load Management REUVEN F
Load management receivers excluding expansion areas
Infrastructure Other 10 000 000.00
5 000 000.00
5 000 000.00
City Power 124 Renewal
33619 Manhole covers security New Security Equipment REUVEN F City Wide
Securing of manhole covers to underground installations
Infrastructure Electricity Reticulation
2 000 000.00
-
-
City Power 124 New
32535 New 88/11 kV substation near Westgate. New Bulk Infrastructure FERREIRAS DORP F Regional
New 88/11 kV substation near Westgate.
Infrastructure Electricity Reticulation
-
30 000 000.00
29 543 100.00
City Power 124 New
25069 New service connections New Service Connections REUVEN F Regional
Provision of new service connections
Infrastructure Electricity Reticulation
19 000 000.00
19 000 000.00
19 000 000.00
City Power 124 New
33635 Procurement of IT hardware New Computer Hardware REUVEN F City Wide
Procurement of IT hardware Intangibles Computers - software and programming
5 000 000.00
5 000 000.00
5 000 000.00
City Power 124 New
28360 Removal and Replacement of 20.5kV Equipment, Van Beek, Central & Selby SS. Inner City Renewal Medium Voltage Network SELBY F Regional
Deload Kazerne and Selby network development.
Infrastructure Electricity Reticulation
26 000 000.00
-
-
City Power 124 Renewal
33621 Telecommunications, Multiplexer and network management system Renewal Plant and Equipment REUVEN F City Wide
Upgrade Multiplexers at substations
Infrastructure Electricity Reticulation
5 000 000.00
5 000 000.00
5 000 000.00
City Power 124 Renewal
31118 Upgrade Training Centre Renewal Building Alterations REUVEN F City Wide
Upgrade Basic Training Centre
Other Assets Other Buildings 5 000 000.00
-
5 000 000.00
City Power 124 Renewal
33331 Rec - Karzene Soccer Fields Renewal Community Centre CITY AND SUBURBAN EXT.10 F Ward
Upgrading of Karzene soccer fields
Community Recreational facilities
-
-
1 500 000.00
Community Dev: Sport and Recreation
124 Renewal
312
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33469 Upgrading of Wembly Sports Centre Renewal Community Centre TURFFONTEIN F Ward
Upgrading of the facility Community Recreational facilities
-
-
2 000 000.00
Community Dev: Sport and Recreation
124 Renewal
27736 BPO Inner City Zone Renewal Skills Development Center JOHANNESBURG F
Business Process Services Unit
Investment Property
Other 10 000 000.00
5 000 000.00
5 000 000.00
Economic Development
124 Renewal
33540 Rehabilitation of Princess Mine Dump Renewal Resource Rehabilitation STAFFORD EXT.4 F Ward
Stabilise Mine Dump through erosion control measures to address dust pollution and seepage on City owned land.
Infrastructure Other 7 500 000.00
5 000 000.00
-
Environment and Infrastructure
124 Renewal
32619 Glenesk IR Portion 7of Erf 1 (1320 Unit) New Bulk Infrastructure GLENESK F Ward
Formalisation, Construction of Bulk Services and Low Cost Houses
Investment Properties
Housing development
2 000 000.00
3 000 000.00
-
Housing 124 New
30321 Information Technology New Customer Service Assets MARSHALLS TOWN F City Wide
Information Technology Other Assets Computers - hardware/equipment
10 500 000.00
11 000 000.00
16 880 000.00
JHB Water: Water
124 New
27582 Selby Staff Hostel Redevelopment/Conversion Renewal Building Alterations SELBY F Ward
Redevelopment and conversion of Councils Staff hostel into rental family units
Heritage Assets
Buildings 5 000 000.00
-
-
JOSHCO 124 Renewal
33741 CS - Upgrade of Head Office Facilities. Renewal Building Alterations JOHANNESBURG F City Wide
Upgrading of JRA's Head Office: electrical; plumbing; air conditioning; generator, etc.
Other Assets Other Buildings 20 000 000.00
30 000 000.00
10 000 000.00
JRA 124 Renewal
33740 MOB - M2 Motorway at Main Reef Road Intersection. New Roads: Construction and Upgrades CROWN EXT.2 E Regional
Congestion relief. Infrastructure Roads, Pavements, Bridges & Storm Water
20 000 000.00
13 000 000.00
10 000 000.00
JRA 124 New
32075 MOB - Traffic Management Centre. Renewal Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
Upgrading and increase capacity in the operations of the existing JRA's Traffic Management Centre.
Infrastructure Roads, Pavements, Bridges & Storm Water
2 500 000.00
2 300 000.00
2 300 000.00
JRA 124 Renewal
313
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32313 MOB - Traffic Signal Adaptive Control. New Mobility: Intelligent Transportation System & Networks JOHANNESBURG F City Wide
The Project is about: Comply with legal requirements; enhance visibility; decrease accidents; reduce traffic congestion; enhance mobility.
Infrastructure Other 10 000 000.00
15 000 000.00
15 000 000.00
JRA 124 New
33743 REHAB - Rehabilitation of Open Channels City Wide. Renewal Stormwater Management Projects JOHANNESBURG F City Wide
This project is exclusive of the Conversion of Open Drains programme; and entails the rehabilitation of stormwater open channels City Wide (in former old stormwater structures).
Infrastructure Roads, Pavements, Bridges & Storm Water
10 000 000.00
10 000 000.00
10 000 000.00
JRA 124 Renewal
33512 RESUR - Resurfacing of M2 Motorway. Renewal Roads: Rehabilitation JOHANNESBURG F City Wide
Resurfacing work is required to prolong the life of the road and to improve the VCI (Visual Conditions Index).
Infrastructure Roads, Pavements, Bridges & Storm Water
30 000 000.00
150 000 000.00
60 000 000.00
JRA 124 Renewal
27488 21 Bins Underground and 240l New Plant and Equipment JOHANNESBURG F City Wide
Underground waste receptacles for the Inner City and high pedestrian volume areas such as taxi ranks. The bins also has the advantage for waste separation at source
Infrastructure Refuse 20 000 000.00
10 476 000.00
5 000 000.00
Pikitup 124 New
22315 9 Incinerator Health Care Renewal Building Alterations SPRINGFIELD F City Wide
Refurbishment of the incinerator plant in phases.
Other Assets Civic Land & Buildings
1 000 000.00
17 000 000.00
1 000 000.00
Pikitup 124 Renewal
30396 Fire Station - Central Fire Station Renewal Building Alterations MARSHALLS TOWN F Ward
New Central Fire Station for the central business district to facilitate emergency response in the inner city
Community Fire, safety & emergency
20 000 000.00
-
9 000 000.00
Public Safety: EMS
124 Renewal
26821 Dog Kennel Hospital New Building Alterations GLENESK F Ward
Hospital for the JMPD dogs that take ill
Other Assets Other Buildings 75 000.00
85 000.00
90 000.00
Public Safety: JMPD
124 New
28533 BY - LAW MANAGEMENT UNIT UPGRADE OF WEMMER POUND New Building Alterations SELBY EXT.11 F Ward
UPGRADE OF BUILDING FOR THE STORAGE OF IMPOUNDED GOODS AT WEMMER COPLEX.
Other Assets Other Buildings 2 400 000.00
2 600 000.00
2 800 000.00
Public Safety: JMPD
124 New
314
Region F
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
29969 Cold Storage for Wemmer Pound New Building Alterations GLENESK F Ward
Install Cold Storage at the Wemmer pound
Other Assets Other Buildings 1 700 000.00
2 100 000.00
2 100 000.00
Public Safety: JMPD
124 New
30008 Install Strong Rooms at Wemmer, Fennel Road, Von Wieligh New Building Alterations WEMMER F Ward
install strong room at the above sites
Other Assets Other 1 900 000.00
2 100 000.00
-
Public Safety: JMPD
124 New
26816 Upgrading Shooting Range with new obstacle Course Renewal Plant and Equipment ROODEPOORT C City Wide
Upgrading Shooting Ranage with new obstacle course.
Other Assets Plant & equipment 2 900 000.00
3 200 000.00
-
Public Safety: JMPD
124 Renewal
30543 Johannesburg Central: Aeroton/Noordgesig/Nasrec water district: Upgrade water Infrastructure New Water Mains NASREC F Regional
Upgrade water infrastructure Infrastructure Sewerage Purification & Reticulation
-
-
-
JHB Water: Water
125 New
28993 Johannesburg Central: Eagles Nest water district: Upgrade water infrastructure Renewal Water Mains EAGLES NEST D Regional
Eagles Nest water district: Upgrade water infrastructure Phase 1_Reg D
Infrastructure Water, Reservoirs & Reticulation
-
-
-
JHB Water: Water
125 Renewal
28788 Johannesburg Central: Glenvista, Glenanda, Winchester Hills & Bassonia Districts: Upgrade water infrastructure Renewal Water Mains ALAN MANOR F Regional
Glenvista, Glenanda, Winchester Hills & Bassonia Districts: Upgrade water infrastructure Phase 1
Infrastructure Water, Reservoirs & Reticulation
-
-
-
JHB Water: Water
125 Renewal
30544 Johannesburg Central: Kibler Park water district: Upgrade water infrastructure New Water Mains KIBLER PARK D Regional
Upgrade water infrastructure Infrastructure Water, Reservoirs & Reticulation
-
-
-
JHB Water: Water
125 New
33090 Southdale/ Langlaagte: Aeroton Direct/ Tower New Reserviors AEROTON D Regional
Tower 1.1Ml Infrastructure Water, Reservoirs & Reticulation
4 000 000.00
5 000 000.00
-
JHB Water: Water
125 New
315
Region G
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32983 Aqua - Upgrading of the Orange Farm Public Swimming Pool Renewal Community Centre STRETFORD EXT.4 G Ward
upgrading of the swimming pool facilities
Community Recreational facilities
800 000.00
-
-
Community Dev: Sport and Recreation
1 Renewal
33458 Lib - Stretford Library New Incineration STRETFORD EXT.3 G
Construction of the new Library Community Libraries 1 500 000.00
7 500 000.00
6 000 000.00
Community Dev: Libraries
2 New
30641 Lakeside Ext 1,2,3 & 5: Roads and Bulk Stormwater Systems New Bulk Infrastructure LAKESIDE EXT.1 G Regional
The project scope entails the construction of collectors and distributors within 20m, 16m, 13m and 10m road reserves. The roads will be tarred 20mm asphalt. Bulk stormwater system will consist of 6 attenuation ponds and pipe stormwater drains.
Infrastructure Roads, Pavements, Bridges & Storm Water
27 000 000.00
25 000 000.00
15 000 000.00
Housing 2 New
33146 Orange Farm/ Deep south: Lakeside Sewer upgrade Renewal Bulk Waste Water LAKESIDE EXT.1 G
Sewer upgrade Infrastructure Sewerage Purification & Reticulation
2 400 000.00
-
-
JHB Water: Sewer
2 Renewal
30322 Orange Farm/Deep South: Lenasia South East Basin: Upgrade sewer Infrastructure Renewal ORANGE FARM EXT.6 G
Upgrade sewer infrastructure Infrastructure Street Lighting 1 244 000.00
-
-
JHB Water: Sewer
2 Renewal
33475 CONV - Conversion of Open Drains to Underground/Covered Drains in Orange Farm. Renewal Stormwater Management Projects ORANGE FARM G Ward
Conversion of open drains to underground/covered drains in Orange Farm.
Infrastructure Roads, Pavements, Bridges & Storm Water
15 000 000.00
15 000 000.00
15 000 000.00
JRA 2 Renewal
33149 Orange Farm/ Deep South: Orange farm sewer upgrade Renewal Bulk Waste Water ORANGE FARM G
Sewer Upgrade Infrastructure Sewerage Purification & Reticulation
20 000 000.00
-
-
JHB Water: Sewer
3 Renewal
33142 Orange Farm/ Deep south: Planned replacement sewermains Renewal Bulk Waste Water ORANGE FARM G
Sewer Replacement Infrastructure Water, Reservoirs & Reticulation
-
60 000 000.00
65 000 000.00
JHB Water: Sewer
3 Renewal
316
Region G
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33148 Orange Farm/ Deep South: Stretford Sewer upgrade Renewal Bulk Waste Water STRETFORD EXT.9 G
Sewer upgrade Infrastructure Sewerage Purification & Reticulation
4 800 000.00
-
-
JHB Water: Sewer
3 Renewal
33091 Ennerdale: Orange Farm high level reservior New Reserviors ORANGE FARM F Regional
Reservoir 35Ml Infrastructure Water, Reservoirs & Reticulation
20 000 000.00
5 000 000.00
10 000 000.00
JHB Water: Water
3 New
30550 Orange farm/Deep south: Ennerdale Disctict: Upgrade water infrastructure New Water Mains ORANGE FARM G Regional
Upgrade water infrastructure Infrastructure Water, Reservoirs & Reticulation
-
10 000 000.00
21 000 000.00
JHB Water: Water
3 New
29005 Orange Farm/Deep south: Orange Farm District: Upgrade water infrastructure and high level reservoir 35Ml Renewal Water Mains ORANGE FARM EXT.1 G Regional
Upgrade water infrastructure and 35Ml Reservoir
Infrastructure Water, Reservoirs & Reticulation
-
10 000 000.00
20 000 000.00
JHB Water: Water
3 Renewal
33138 Orange Farn/ Deep south: Planned replacement Watermains Renewal Water Mains ORANGE FARM G Regional
Watermains replacement Infrastructure Water, Reservoirs & Reticulation
3 956 000.00
30 000 000.00
30 000 000.00
JHB Water: Water
3 Renewal
27903 MISCL - Gravel Roads: Orange Farm. New Roads: Construction and Upgrades ORANGE FARM G Ward
Gravel roads upgrade as per IDP priority.
Infrastructure Roads, Pavements, Bridges & Storm Water
57 340 000.00
68 340 000.00
34 000 000.00
JRA 3 New
30348 24 Depot Orange Farm New Depots ORANGE FARM EXT.8 G Regional
Construction of a Depot in Orange Farm to service Driezeik, Orange Farm, Finetown, Zakkariya Park
Infrastructure Refuse 500 000.00
-
-
Pikitup 3 New
32519 COMPL: Cycling Lanes: Orange Farm: Priority Schools Zones New Complete Streets ORANGE FARM EXT.4 G Ward
Non Motorised Transport Orange Farm to provide access to, inter alia, large schools
Infrastructure Transportation -
20 000 000.00
-
Transportation 3 New
32716 Orange Farm Ext. 9 (935) New Bulk Infrastructure ORANGE FARM EXT.9 G Ward
Construction Engineering Services (R&SW)
Investment Properties
Housing development
10 000 000.00
10 000 000.00
12 000 000.00
Housing 4 New
317
Region G
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32714 Drieziek Ext.3 (2989) New Bulk Infrastructure DRIEZIEK EXT.3 G Ward
Formalisation Investment Properties
Housing development
10 523 000.00
18 000 000.00
30 000 000.00
Housing 5 New
32715 Drieziek Ext.5 (1540) New Bulk Infrastructure DRIEZIEK EXT.5 G Ward
Formalisation Investment Properties
Housing development
9 000 000.00
10 000 000.00
40 000 000.00
Housing 5 New
32713 Poortjie (2204) New Bulk Infrastructure POORTJIE G Ward
Preliminary Design Report Formalisation
Investment Properties
Housing development
-
-
27 000 000.00
Housing 5 New
32748 Poortjie Dark City (3000) New Bulk Infrastructure POORTJIE G Ward
Formalisation and Land Portions
Infrastructure Other -
6 200 000.00
-
Housing 5 New
33143 Orange Farm/ Deep South: Driezek sewer upgrade Renewal Bulk Waste Water DRIEZIEK G
Sewer upgrade Infrastructure Sewerage Purification & Reticulation
300 000.00
-
-
JHB Water: Sewer
5 Renewal
33745 MISCL - Gravel Roads: Drieziek. New Roads: Construction and Upgrades DRIEZIEK G Ward
Gravel roads upgrade. Infrastructure Roads, Pavements, Bridges & Storm Water
2 000 000.00
45 000 000.00
45 000 000.00
JRA 5 New
32409 Mountainview Clinic New Clinic FINETOWN G Ward
upgrade / renewal Community Clinics 3 000 000.00
-
-
Health 6 New
33063 Ennerdale Extension 15(Mountain View) New Bulk Infrastructure ENNERDALE EXT.15 G Regional
Construction of Engineering services
Investment Properties
Housing development
-
15 000 000.00
18 000 000.00
Housing 6 New
32699 Kanana Park Ext 1 (788) New Bulk Infrastructure KANANA PARK EXT.1 G Ward
Preliminary Design Reports Roads and Stormwater
Investment Properties
Housing development
-
6 000 000.00
10 000 000.00
Housing 6 New
32711 Kanana Park Ext 3,4 & 5 New Bulk Infrastructure KANANA PARK EXT.3 G Ward
Formalisation Investment Properties
Housing development
-
10 000 000.00
12 000 000.00
Housing 6 New
27725 Upgrade Finetown Park Renewal Park FINETOWN G
Park development Community Parks & gardens
-
500 000.00
-
City Parks and Zoo
7 Renewal
32718 Ennerdale South (1902 stands) (Formerly Finetown Proper) New Bulk Infrastructure
Preliminary Design Report Investment Properties
Housing development
-
10 000 000.00
10 000 000.00
Housing 7 New
318
Region G
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
ENNERDALE G Ward
32743 Finetown North 495 New Bulk Infrastructure FINETOWN G Ward
Formalisation and Land Portions
Infrastructure Other -
6 000 000.00
21 000 000.00
Housing 7 New
32710 Finetown Proper (1878 stands) New Bulk Infrastructure FINETOWN G Ward
Preliminary Design Report Formalisation
Investment Properties
Housing development
-
12 000 000.00
1 000 000.00
Housing 7 New
31005 DEEP SOUTH: Lenasia Sewers Upgrade New ENNERDALE G
Upgrade Sewers Infrastructure Sewerage Purification & Reticulation
-
7 000 000.00
7 000 000.00
JHB Water: Sewer
7 New
33120 Ennerdale Works: Infrastructure renewal plan Renewal Bulk Waste Water ENNERDALE G
Infrastructure renewal plan Infrastructure Sewerage Purification & Reticulation
-
6 030 000.00
10 000 000.00
JHB Water: Sewer
7 Renewal
33144 Orange Farm/ Deep south: Ennerdale sewer upgrade Renewal Bulk Waste Water ENNERDALE G
Sewer upgrade Infrastructure Sewerage Purification & Reticulation
1 200 000.00
-
-
JHB Water: Sewer
7 Renewal
33095 Ennerdale Tower New Reserviors ENNERDALE F Regional
Ennerdale tower Infrastructure Water, Reservoirs & Reticulation
-
7 000 000.00
-
JHB Water: Water
7 New
31045 RNP004_James Street Extension. New Roads: Construction and Upgrades ENNERDALE G Regional
Extension of James Street to connect into Broad Street in South Ennerdale en-route to the underpass at N1. Two lanes per direction.
Infrastructure Roads, Pavements, Bridges & Storm Water
1 000 000.00
20 000 000.00
-
JRA 7 New
30758 14 Landfill - Ennerdale New waste collection ENNERDALE EXT.6 D City Wide
To maintain and upgrade facilities to conform to standard and regulations-(Compliance, cell developments and landfill recycling)
Infrastructure Refuse 13 200 000.00
1 000 000.00
1 000 000.00
Pikitup 8 New
32593 Refurbishment of Zakheni Renewal Skills Development Center LENASIA EXT.6 G Ward
Upgrading of the facility (phase 2)and fencing
Community Community halls
6 000 000.00
-
-
Social Development
8 Renewal
25068 New service connections New Service Connections LENASIA
Provision of new service connections
Infrastructure Electricity Reticulation
16 000 000.00
16 000 000.00
16 000 000.00
City Power 9 New
319
Region G
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
EXT.1 G Regional
33614 Upgrade Nirvana Substation Renewal Bulk Infrastructure LENASIA G Regional
Lenasia substation, new HV busbar, new transformers and MV switchboards
Infrastructure Electricity Reticulation
40 000 000.00
40 000 000.00
-
City Power 9 Renewal
33617 Upgrade Eldorado Substation Renewal Bulk Infrastructure ELDORADO PARK G Regional
Upgrade Eldorado substation, HV busbar, transformers and feeder boards
Infrastructure Electricity Reticulation
-
40 000 000.00
40 000 000.00
City Power 17 Renewal
32374 Bushkoppies Works: Replacement of Aerotion System Renewal Bulk Waste Water DEVLAND G Ward
Replacement of Aerotion System
Infrastructure Sewerage Purification & Reticulation
38 569 000.00
-
-
JHB Water: Sewer
17 Renewal
27884 CATCH 215 - Kliptown Stormwater Upgrade (Phase 10): Low Level Bridge. Renewal Stormwater Management Projects KLIPSPRUIT WEST EXT.1 D Ward
Raise the low level Bridge Road above the 100 year flood level.
Infrastructure Roads, Pavements, Bridges & Storm Water
15 000 000.00
15 000 000.00
-
JRA 17 Renewal
32986 Aqua - Eldorado Park Ext. 4 Public Swimming Pool Renewal Community Centre ELDORADO PARK EXT.4 G Ward
Upgrading of the swimming pool
Community Swimming pools
400 000.00
-
-
Community Dev: Sport and Recreation
18 Renewal
32750 Eldorado Park Infills(1350) New Bulk Infrastructure ELDORADO PARK G Ward
Formalisation and Land Portions
Investment Properties
Housing development
7 000 000.00
7 000 000.00
17 000 000.00
Housing 18 New
29900 Olifantsvlei Cemetery Renewal Cemetery NATURENA EXT.15 D Ward
Development of the New Olifantsvlei Cemetery for the far South Areas of Johannesburg
Community Cemeteries 30 000 000.00
9 882 685.00
9 117 315.00
City Parks and Zoo
119 Renewal
33616 Upgrade Nancefield Substation Renewal Bulk Infrastructure NANCEFIELD EXT.1 G Regional
Upgrade Nancefield substation, new HV busbar, transformer and MV feeder board.
Infrastructure Electricity Reticulation
20 000 000.00
20 000 000.00
15 000 000.00
City Power 119 Renewal
32660 Devland Ext 1,27,30,31&33 Roads and Related Stormwater New Bulk Infrastructure DEVLAND EXT.1 D Ward
The Upgrading of Roads and Related Stormwater System
Investment Properties
Housing development
66 000 000.00
30 000 000.00
35 000 000.00
Housing 119 New
320
Region G
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
33099 Olifantsvlei Works: Infrastructure Renewal Plan Renewal Bulk Waste Water KLIPRIVIERSOOG ESTATE D
Infrastructure renewal Infrastructure Sewerage Purification & Reticulation
-
141 700 000.00
47 930 000.00
JHB Water: Sewer
119 Renewal
33239 Johannesburg Central: Naturena Nasrec water upgrade New Water Mains NATURENA D Regional
water sewer Infrastructure Water, Reservoirs & Reticulation
3 000 000.00
-
-
JHB Water: Water
119 New
33459 Lenasia South Public Library Renewal LENASIA SOUTH EXT.20 G
Upgrading of the Library Community Libraries 800 000.00
-
-
Community Dev: Libraries
120 Renewal
29358 Ennerdale Clinic, Furniture and Medical Equipment New Clinic ENNERDALE EXT.8 G Regional
Design and layout of clinic, construction of buildings and carports, furniture and equipment, landscaping, paving and signage.
Community Clinics 8 000 000.00
-
-
Health 121 New
33093 Ennerdale: Ennerdale lawley Reservoir New Reservoirs LAWLEY EXT.1 F Regional
Lawley reservoir Infrastructure Water, Reservoirs & Reticulation
-
15 000 000.00
45 000 000.00
JHB Water: Water
121 New
33092 Ennerdale: Lawley High level Reservoir New Reservoirs LAWLEY EXT.1 F Regional
Reservoir 10MI Infrastructure Water, Reservoirs & Reticulation
-
5 000 000.00
10 000 000.00
JHB Water: Water
121 New
33606 Orange Farm: deep south - Lawley water infrastructure upgrade Renewal LAWLEY EXT.1 G
Upgrade of existing water infrastructure
Infrastructure Sewerage Purification & Reticulation
-
16 000 000.00
21 000 000.00
JHB Water: Water
121 Renewal
31548 MISCL - Gravel Roads: Lawley. New Roads: Construction and Upgrades LAWLEY EXT.1 G Ward
Gravel Roads in Lawley as per Office of the Speaker
Infrastructure Other 13 760 400.00
23 000 000.00
-
JRA 121 New
31142 Electrification of Lehae phase 2 New Electrification LEHAE G Ward
Electrification of Lehae phase 2 Infrastructure Electricity Reticulation
11 000 000.00
10 000 000.00
10 000 000.00
City Power 122 New
33302 Lib- Construction of a new Library in Lehae New Library LEHAE G
Construction of a new Library in Lehae
Community Libraries 1 500 000.00
3 451 000.00
7 656 000.00
Community Dev: Libraries
122 New
32719 Lehae Ext 2 (Expansion Area) (4337) New Bulk Infrastructure LEHAE G Ward
Formalisation Investment Properties
Housing development
-
2 000 000.00
-
Housing 122 New
321
Region G
CIMS Number
Project Name Description Assets Class
Asset Sub-Class
2014/15 Medium Term Expenditure Framework
Project Information
Total Total Total Division Ward Location
New Or Renewal
32739 Unaville(Vlakf ontein Ext 4) 2402 New Bulk Infrastructure VLAKFONTEIN G Ward
Formalisation Infrastructure Other -
-
4 000 000.00
Housing 122 New
32703 Vlakfontein Ext 1 (935) New Bulk Infrastructure VLAKFONTEIN EXT.1 G Ward
Preliminary Design Report Roads and Stormwater
Investment Properties
Housing development
-
-
17 000 000.00
Housing 122 New
32705 Vlakfontein Ext 2 (872) New Bulk Infrastructure VLAKFONTEIN EXT.2 G Ward
Formalisation Investment Properties
Housing development
-
-
13 000 000.00
Housing 122 New
32707 Vlakfontein Ext 3 (2045) New Bulk Infrastructure VLAKFONTEIN EXT.3 G Ward
Preliminary Design Report Formalisation
Investment Properties
Housing development
-
9 000 000.00
-
Housing 122 New
32701 Vlakfontein Proper (1519) New Bulk Infrastructure VLAKFONTEIN G Ward
Roads and Stormwater Investment Properties
Housing development
-
15 000 000.00
15 999 120.00
Housing 122 New
33100 Bushkoppies Works: Infrastructure renewal plan Renewal Bulk Waste Water ELDORADO ESTATE F
Infrastructure renewal Infrastructure Sewerage Purification & Reticulation
-
53 970 000.00
25 000 000.00
JHB Water: Sewer
122 Renewal
28707 Bushkoppies Works:Balancing Tank New Bulk Waste Water DEVLAND EXT.27 F Regional
Bulk Wastewater Infrastructure Sewerage Purification & Reticulation
49 909 000.00
-
-
JHB Water: Sewer
122 New
33147 Orange Farm/ Deep South: Lehae Sewer Upgrade Renewal Bulk Waste Water LEHAE G
Sewer Upgrade Infrastructure Sewerage Purification & Reticulation
-
-
1 000 000.00
JHB Water: Sewer
122 Renewal
32897 Lehae Social Housing Project New Housing Development LEHAE D City Wide
Social Housing development Community Social Renting Housing
-
2 000 000.00
-
JOSHCO 122 New
32493 PTF: Small Public Transport Facilities: Lehae New Public Transport Facility LEHAE G City Wide
Lehae Public transport facility Infrastructure Transportation 25 000 000.00
10 000 000.00
-
Transportation 122 New
322
12. Monitoring and evaluation
Introduction The Performance Management System (PMS) is one of the mechanisms through which the City aims to improve organisational and individual performance to enhance service delivery. The City’s PMS was originally designed in June 2001 but is regularly reviewed to respond to the experience of implementation, legislative requirements and other imperatives. This Chapter explains how the City’s PMS responds and complies with the legislative environment, addresses identified challenges and plans to improve the performance culture in the future. The City’s process of establishing and developing the PMS ensures integration between strategic planning, performance monitoring and evaluation, by linking the planned IDP priorities and objectives to the indicators and targets used to measure performance. In addition, the process promotes alignment between planned organisational performance, as reflected in the IDP and organisational scorecard (Institutional SDBIP) and executive management performance as contained in the individual scorecards of Section 57 employees.
Legislative Framework on Performance Management The City’s PMS conforms to various pieces of legislation that exist to govern the performance management of local government. These include:
Municipal Systems Act, (Act 32 of 2000) The MSA requires all municipalities to promote a culture of performance through the establishment of a PMS, which must set Key Performance Indicators (KPI) and targets, as well as monitor, review and report on municipal performance, based on indicators linked to the Integrated Development Plan (IDP), including the national indicators prescribed by the Minister responsible for Local Government.
Municipal Planning and Performance Management Regulations (MPPMR) 2001 MPPR (2001) require that a municipality’s Integrated Development Plan (IDP) identifies all Key Performance Indicators (KPIs) set by the municipality. The 2001 Regulations, also defines a municipality’s performance management system as a framework that describes and represents how the municipality’s cycle and processes of performance planning, monitoring, measurement, review and reporting and improvement will be conducted including determining the roles of different role-players in the PMS process. The regulations require that in developing a PMS a municipality must ensure that it PMS complies with the requirements of the MSA by demonstrating the operation and management of the PMS clarify roles and responsibilities, determines frequency of reporting and accountability lines for performance as well as ensuring alignment of IDP processes with employee performance management.
Municipal Finance Management Act, (Act 56 of 2003) (MFMA) The MFMA sets out reporting obligations of the municipality on the budget and IDP implementation, to promote sound financial management.
Local Government Municipal Performance Regulations for municipal managers and managers directly accountable to municipal managers, 2006 Municipal Performance Regulations for Municipal Managers and Managers Directly Accountable to Municipal Managers (2006) set out how the performance of municipal managers will be directed, monitored and improved
323
Organisational Performance Management
Integrated Development Planning (IDP) and Service Delivery Budget Implementation Plan (SDBIP) In line with Municipal Planning and Performance Management Regulations (2001), the City’s IDP contains five-year strategic objectives, programmes, key performance indicators (KPIs), baselines and targets to measure progress over the medium. The IDP contains an annual delivery agenda of annual performance targets to assess implementation progress on a year-to-year basis. This determines the KPI and targets to assess implementation progress on a year-to-year basis. These KPI and targets, which include the prescribed national indicators, are translated into the annual organisational performance plan (or organisational scorecard/SDBIP), as well as the Municipal Entity (ME) and departmental-specific business plans to inform expected city-wide, departmental and individual performance outputs. The expected individual performance output is reflected in the annual individual performance agreements and plans (scorecards), used to assess individual performance. The City’s performance is monitored and reviewed on a quarterly and annual basis, informed by the achievement reports on the identified organisational, departmental and individual performance plans.
Monitoring, Measurement and Review of Performance
Quarterly Performance Reporting on Progress against SDBIP The City’s Performance Management System (PMS) allows for monitoring of organisational performance on a quarterly basis. This monitoring process culminates in performance assessment and reporting of progress of performance against the Institutional SDBIP to Council. The quarterly reports are prepared to identify performance achievements and gaps, based on set IDP indicators.
Mid-Year Budget and Performance assessment Report As part of the performance monitoring and reporting processes and in addition to quarterly performance reports, each year the City compiles a mid-year performance report which presents budget and performance assessment at mid-year. The report documents any amendments to performance that may be required as a result of budget adjustments as required by Section 72 of the Municipal finance Management Act (MFMA). All the quarterly Service Delivery and Budget Implementation Plan reports are prepared and submitted to the Council, Gauteng Provincial and National Treasuries and the Department of Local Government and Housing.
Integrated Annual Report To promote accountability and oversight and for audit purposes, the city also compiles each year, an evaluative Integrated Annual Report on financial and non-financial service delivery performance. This sets out achievement of set targets and indicators in a given financial year. The Annual Report content assists the municipalities, its Councillors, entities, residents, oversight institutions and other users with information and progress made on service delivery. It is aligned to the Integrated Development Plan (IDP), Budget, Service Delivery and Budget Implementation Plan (SDBIP), and in year reports. In line with MSA (2000) and MFMA (2003)(121) and the relevant National Treasury, Circular 63 on the MFMA 56 of 2003, the city of Johannesburg and its municipal entities prepare an Integrated Annual Report containing both financial and non-financial performance for each financial year. The Integrated Annual Report provides a record of the activities of the municipality or entity during the financial year to which the report relates; provides a report on performance in service delivery and budget implementation for the financial year; promotes accountability to the local community for the decisions made throughout the year by the municipality or municipal entity.
324
The quarterly performance reports, mid-year performance reports and Integrated Annual Report are used as decision making tools by the City and they inform planning for the following year. The contents are also used to assist with the annual audits conducted by the Auditor General.
Performance Management of Municipal Manager and Senior Managers
Performance Agreements and Scorecards In accordance with the 2006 regulations, the appointment of all Section 57 employees is in terms of written employment contracts and subject to the signing of performance agreements and scorecards, which are submitted to the MEC for local government, as well as the national minister. Performance agreements in the City comply with provisions of Section 57(1)b,(4A),(4B) and (5) of the Act. They specify the objectives and targets defined and agreed with the employee and communicate the city’s expectations of the employee. These agreements are aligned with the City’s IDP, SDBIP and budget of the City. The City uses the scorecard to monitor and measure performance against set targeted outputs and to measure whether the employee is meeting expectations of their position. The scorecard is the city’s tool to regulate the performance-oriented tool between the City and its employees. The review of progress on implementation of individual scorecards is assessed and monitored on a quarterly basis and a five-point rating scale ranging from ‘unacceptable’ to ‘outstanding’ is used to assess individual performance. In accordance with regulation 32, the City considers performance related payments after the annual report for the financial year under review has been tabled and adopted by the municipal council. The City’s PMS allows for an evaluation of performance and approval of such evaluation by Council. In the city of Johannesburg, the past financial years, the City Manager conducted one-on-one performance assessment sessions with the executive directors. The assessment results were moderated by the JPAC and recommended to the Mayoral Committee for approval. In this regard, in addition to its mandated role, the JPAC also assumed the role of the Performance Evaluation Panel to evaluate individual performance.
Organisational structures managing performance in City of Johannesburg Regulation 7(2c) of the MPPMR requires municipalities to clarify the roles and responsibilities of each role player, including the local community, in the implementation of the PMS. The City established the necessary structures to manage and operationalise the system. The roles and responsibilities of the different structures are defined as follows:
Independent Oversight Committees In line with MPPMR (2001) a municipality must appoint and budget for a performance audit committee consisting of at least three members the majority of which may not be involved in the municipality as a councillor or employee. To enhance performance monitoring, measurement and review, the City established Johannesburg Performance Audit Committee (JPAC) that considers the quarterly performance audit reports and reviews the City’s PMS to recommend improvements. The Johannesburg Performance Audit Committee (JPAC) is expected to convene and prepare at least two reports to Council annually and has been provided with a secreatariat to support its work. JPAC also reviews quarterly progress reports against SDBIP. The active participation of the JPAC is useful in enhancing performance management within the City. In carrying out its responsibilities, the JPAC
325
closely interacts with the City’s top management to ascertain the level of, as well as alignment between, individual and organisational performance. Johannesburg Risk Audit Services play an internal performance auditing role, which includes monitoring the functioning of the PMS and compliance to legislative requirements. The internal audit role also involves assistance in validating the evidence provided by executive directors in support of their performance achievements.
Executive Mayor and members of the Mayoral Committee The Executive Mayor and members of the Mayoral Committee manage the development of the municipal PMS and oversee the performance of the City Manager and heads of department.
Council and Section 79 Committees Council and Section 79 Committees play an oversight role and consider reports from the Mayoral Committee pertaining to the functions in different portfolios. The role extends to the impact on the overall objectives and performance of the municipality. In particular they consider the quarterly performance on Departmental and municipal entities and they undertake oversight visits to verify reported performance.
Communities Communities also play a role in the PMS through the annual IDP and reporting consultation processes, which are managed by the Office of the Speaker, in close collaboration with the Group Strategy Policy Coordination and Relations (GSPCR). Ward councillors are agents facilitating community participation in the PMS, mainly through ward committees and regional people centres.
Integrating Performance Monitoring, Evaluation and Reporting to City’s Planning Processes The link between the City’s service delivery imperatives and performance monitoring and reporting is critical to ensuring dedicated tracking of performance, in line with set operational outputs and indicators derived from strategic and operational plans. This includes the IDP whose strategic programmes cascade to the Institutional Service Delivery and Budget Implementation Plan, and departmental plans. Performance monitoring, evaluation and reporting are critical elements utilised by the City to improve organisational performance and to ensure compliance with various legislative requirements on the municipality. An effective monitoring, evaluation and reporting process contributes to enhanced service delivery. The establishment of organisational performance monitoring, evaluation and reporting system ensures integration between strategic planning and performance management by linking IDP programmes to indicators and targets that can be used to measure organisational performance through the Institutional Service Delivery budget and Implementation Plan (SDBIP). In addition, the process of performance monitoring, evaluation and reporting promotes alignment between planned organisational performance, as reflected in the IDP and SDBIP and organisational scorecard and individual performance as contained in the individual scorecards of senior management in the City. The Monitoring and Evaluation Framework enables the City to respond to new challenges and experiences brought about by changes in the structured monitoring and evaluation practices across
326
all spheres of government. It builds on related frameworks developed by the City to date, including the current Group Performance Management Framework. Key aims of the Monitoring, Evaluation and Reporting Framework include:
Fostering a greater understanding of Monitoring and Evaluation (M&E);
A common, standardised language and approach for the application of M&E principles across the entire City;
Enhanced Monitoring and Evaluation practices – with regards to monitoring and evaluation methodology and tools, and the quality, frequency and application of findings;
Clarity on the roles and responsibilities of all those who are directly or indirectly involved in monitoring and evaluation activities;
A means through which monitoring and evaluation practices are institutionalised across the City;
A mechanism for greater integration of M&E practices within the City’s public participation, planning, budgeting, delivery, policy development, oversight, reporting and governance-related processes; and
Providing greater transparency and accountability, through the generation of sound information – to be used in reporting, communication and the improvement of delivery.
In the City of Johannesburg, the monitoring framework sets a foundation for a common understanding of key M&E principles and elements that are applicable to the City as a Group. The M&E principles and elements as contained in the City’s Monitoring and Evaluation Framework are equally applicable to the domain of individual performance management and to group-wide, cluster and/or departmental performance management.
Institutionalising the City’s Monitoring and Evaluation Framework The immediate focus for the City is to ensure the successful entrenchment of the City’s Monitoring and Evaluation Framework through institutionalising an integrated monitoring and evaluation system. The key objective of the City’s monitoring and evaluation system is to integrate organisational planning, performance monitoring, evaluation and reporting into the City’s planning processes. The system allows for the tracking of strategic objectives deriving from the City’s Joburg 2040 Strategy, the Integrated Development Plans (IDP) and the Service Delivery and Budget Implementation Plan (SDBIP). An overview of this process is provided in the figure below.
327
Figure: Monitoring and Evaluation Framework
A fundamental aspect of the City’s integrated monitoring evaluation and reporting system is that it allows for an integrated monitoring of programme performance across all clusters in the City’s core department’s as well as municipal entities. It further provides for dashboard reporting to enable strategic decision makers to be able to obtain the required information as and when needed for accounting as well as decision making purposes.
Integrating Monitoring, Evaluation and Reporting Principles The link between the Monitoring Evaluation and Reporting System and the City’s Monitoring Evaluation and Reporting Framework is achieved through the principles contained in the City’s M&E framework which have been adopted from those outlined by the National department of Performance Monitoring and Evaluation (2011:5), as follows:
Be development-orientated and address key development priorities of government and of citizens;
Be undertaken ethically and with integrity;
Be utilisation-orientated;
Be sound;
Advance governments transparency and accountability;
Be undertaken in a way which is inclusive and participatory; and
Promote learning.
Aligning CoJ M&E Framework with Business Planning and Performance Monitoring Processes The success of M&E within the City hinges on the establishment of a shared sense of purpose amongst all players within the City, and a commonly held view of the applicable ‘theory of change’ – that is, “the causal mechanisms between the activities, outputs, outcomes and impacts”, i.e. how IDP programmes and SDBIP targets will lead to the attainment of the Growth and Development Strategy. Establishing a shared theory of change requires a clear and consistent view of the following – phrased as steps within the operational planning cycle
The desired long-term impacts the City hopes to achieve (Step 1)
Appropriate outcomes aligned to the identified impacts – i.e. those outcomes that will support achievement of the impacts (Step 2)
Outputs identified as necessary to deliver on the desired outcomes (Step 3)
Those activities that will lead to the defined outputs (Step 4)
The various inputs required, for delivery on the defined activities (Step 5) Steps 1 and 2 generally relate to strategic planning (as reflected within the GDS, and the various IDPs through which this is operationalized), while steps 3, 4 and 5 tend to align more with the City’s ‘business planning’ and annual planning processes. Step 1: Identify the envisaged long-term impact [‘what we aim to change’] Step 1 – identification of the envisaged long-term impact – falls within the domain of organisational delivery. This is the starting point of all organisational planning, including – ultimately – the planning for M&E activities. As illustrated alongside, ‘impacts’ link strongly with planning at the level of the Joburg 2040
GDS – with achievement only likely in the long term. Step 2: Identify outcomes for desired impacts [‘what we wish to achieve’] Step 2 of operational planning process relates to the identification of those outcomes that will contribute to the achievement of the goals or desired impacts identified in Step 1. While goals or ‘impacts’ tend to be long-term in nature, ‘outcomes’ are often focused on the long to medium-term period, aligning with the planning period associated with the City’s GDS, five-year IDP or Cluster plans. Step 3: Identify outputs linked to outcomes [‘what we produce or deliver’] This step involves the identification of those outputs that will contribute to the achievement of the defined outcomes. As reflected alongside, outputs tend to be framed within the context of short to medium-term delivery – reflected in planning mechanisms such as the SDBIP, business plans, one-year cluster plans, or within individual scorecards. Step 4: Identify activities linked to outputs [‘what we do’] Activities are “a collection of functions (actions, jobs, tasks) that consume inputs and deliver benefits and impacts” (The Presidency, 2010, p.11). While some individual scorecards and annual business plans may focus on outputs (and potentially outcomes), many will only cater for activities in the context of a year-long planning period. In these cases, outputs may require more than a year of action, before they can be achieved. Step 5: Identify inputs required [‘what we use to do the work’] Step 5 involves identification of those resources required to carry out a particular activity to the defined level. Inputs are generally considered in the context of a short to medium-term planning period – e.g. within the annual planning cycle. It should however be noted that they may also need to be planned in the context of multi-year projects, with learnings in one cycle in respect of outcomes, outputs, activities or inputs applied back to forecasts relating to inputs. Inputs may vary significantly from one activity to the next – and may include a wide variety of elements such as funding, people, information technology, materials, infrastructure or tools.
The City of Johannesburg’s Monitoring and Evaluation Framework, Integrated Development Plan, 2012/13 Integrated Annual Report and Performance Management Policy are available on the City of Johannesburg Website, www.joburg.org.za Annexures 1 to 4 provide the planning reporting templates to assist the city in planning, monitoring and evaluating performance on a quarterly and annual basis
Reporting Templates to be used in City of Johannesburg Organisational, Cluster, Departmental or project planning, in the context of the outcomes approach
Annexure 1: An outcomes chain, integrating steps 1 to 5 above
Impact
(What we aim to change)
Outcomes
(What we wish to achieve)
Outputs
(What we produce or deliver)
Activities
(What we do)
Inputs
(What we use to do the work)
The City of Johannesburg’s Monitoring and Evaluation Framework
Annexure 2: Indicator Planning Framework
Indicator Data source
Data collection method
Who will collect the data?
Frequency of collection
Cost and difficulty to collect
Who will analyse the data?
Who will report data? How often?
Report / feedback format?
Who will use the data? (Audience and interests)
Description of Indicator 1
Description of Indicator 2
Description of Indicator 3
Description of Indicator 4
Description of Indicator 5
The City of Johannesburg’s Monitoring and Evaluation Framework
Annexure 3: City-wide Annual M&E Plan
Impact: [Description of impact/ goal at a City]
Institutional metric
Institutional annual targets
Implementing Cluster
Institutional Budget Planning cycle: E.g. 2020
– 2025 Key outputs
Indicator/s Means of Verification
5-year IDP Target
Baseline
Key outcomes Yr
-3
Yr
-2
Yr
-1 Current year target
Yr
1
Yr
2
Yr
3
Yr
4
Yr
5
Yr
1
Yr
2
Yr
3
Annexure 2014/15 City-wide Quarterly Performance Reporting Template
Impact: [Description of impact/ goal at a City level]
City-wide metric Progress Report Budget Utilisation
Comments
Planning cycle: E.g. 2020 – 2025
Key outputs
Indicator/s
MoV 5-year IDP Target
Baseline Annual target
Quarterly targets
Quarterly Target Achieved (Yes/ No)
If ‘Yes’, provide evidence
If ‘No’, state intended mitigation
Estimate Actual Variance Key outcomes
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q4
335
13. Disaster and risk management
The City of Johannesburg is aware of the potential impact of disasters and other risks on its
service delivery mandate. It has developed extensive risk mitigation measures for both
strategic and operational risks that were identified, as well as having a Disaster Management
Plan in place to deal with potential disasters and other extreme shocks. This chapter
provides a high level overview of these proactive and reactive plans.
Risk Management
South Africa’s codes on corporate governance have consistently identified Risk
Management as one of the key pillars for good governance practices; and this, as a
continuous process, enables constant improvements in strategy design and strategy
implementation as well as an organisation’s systems and operations. The King III report on
corporate governance has identified risk governance as one of the cornerstones that can
create and sustain stakeholder value.
The City identified some key developmental challenges that confront its metropolitan area,
its citizens and other stakeholders. In response, Johannesburg framed its strategic choices
and interventions towards becoming a liveable, resilient and sustainable city with good
governance as one of the four envisaged strategic outcomes. To achieve this outcome, the
City will invest its efforts and resources to become “a high performing metropolitan
government that pro-actively contributes to and builds a sustainable, socially
inclusive, locally integrated and globally competitive Gauteng City Region”.
The City adopted an integrated approach to risk management with the primary aim of
embedding a culture of making the right and timely decisions after taking into consideration
associated risk exposures and opportunities. In the City, therefore, risk management goes
beyond compliance with legislation, policies, procedures and frameworks. In recognition of
the substantial value-add of risk management, the City adopted a formal Enterprise Risk
Management (ERM) Framework and policy that were approved by Council; and established
an independent risk governance oversight structure.
336
Risk Governance in the City
The City constituted independent governance oversight and advisory committees, namely:
the Group Risk Management Committee (GRMC) and the Group Audit Committee (GAC);
which operate in accordance with Council-approved terms of reference, corporate
governance guidelines and practices (King III), and professional practice standards and
codes. The GRMC is responsible for independent oversight on the governance of risk, the
risk management processes in the City, the mitigation of key risk exposures and advisories
on emerging risks that may have an impact on the City. Similar independent oversight
structures have been set up as sub-committees of Boards of the Municipal Entities.
While the City has established the independent oversight committees in line with good
corporate governance practices, the accountability and responsibility for ensuring effective
governance and management of risk remains with the City’s administrative and political
leadership structures. The management of risk is the responsibility of executive, senior and
junior officials employed by the City, and the Accounting Officer is accountable for effective
risk management systems as per regulatory requirements.
One of the key developments in this mayoral term has been the establishment of an
Executive Management Risk Committee comprising some members of the executive
management team. The City Manager has delegated the Chief Operations Officer to chair
this Committee, and alternately, the Executive Director: Group Assurance Services. The
Committee carries out its work in accordance with terms of reference that have been
approved by the City Manager.
The various roles and responsibilities are summarised in the table below.
337
Table: CoJ Governance, Summary Roles & Accountability
Committee / structure Chairperson Role & Scope Authority and Accountability
Council and Legislature Speaker of Council City-wide Political Oversight Municipal Finance Management Act (MFMA) and Municipal Systems Act (MSA)
Council section 79 Committees
Chairperson: Councillor appointed by Council
Political oversight over each assigned administrative Portfolio
MSA
Municipal Public Accounts Committee
Councillor appointed by Council
Oversight over City’s financial performance and financial statements
MFMA, MSA
Mayoral Committee Executive Mayor City-wide Executive Oversight, Tone at the Top for Risk Governance and City-wide governance practices
MFMA, MSA and King III corporate governance
Sub-Mayoral Committees (Governance, Economic Growth, Human & Social Development, and Sustainable Services
Member of Mayoral Committee (MMC) for each cluster
Oversight over strategies and outputs towards attainment of GDS Outcomes (Governance, Economic Growth, Human and Social Development and Sustainable Services)
MFMA MSA King III
Group Risk Management Committee (GRMC)
Independent and non-executive member appointed by Council
Risk governance, independent risk management advisories and oversight
MSA, Council approved Terms of Reference, King III
Performance Audit Committee
Independent and non-executive member appointed by Council
Organisational performance management oversight and advisories
Municipal Systems Act
Group Audit Committee (GAC)
Independent and non-executive member appointed by Council
Independent risk, control & governance assurance & oversight
MFMA, Council approved Terms of reference, King III corporate governance
Accounting Officer / ( City Manager)
n/a City-wide Administrative leadership, oversight; responsibility and accountability
MFMA, MSA and King III; Council Delegated authority
Executive Risk Management Committee
Accounting Officer, but delegated to Chief Operations Officer (COO)
City-wide monitoring & management of significant risks
Delegated authority/Terms of reference, King III
Boards of Directors for each Municipal Entity (ME)
Independent and non-executive member appointed by Council
Non-Executive Leadership and Oversight, accountable to Mayoral Committee and Council
MFMA, MSA, Companies’ Act, King III
ME Sub-Committees (as applicable):
ME Risk and/or Audit Committee
Independent and non-executive member appointed by Council
Accountability to GRMC, GAC, City Manager & Mayoral Committee
MFMA, MSA, Companies’ Act, King III corporate governance
Executive Management Including Executive Directors and MEs’ Managing Directors
City Manager Executive responsibility and accountability; risk ownership; strategic & operational risk management implementation
MFMA, MSA, Delegated authority, King III corporate governance
Group Combined Assurance Forum (to be established)
Executive Director Group Assurance Services
Combined and integrated assurance services on risk, compliance, controls, performance and ethics; co-ordination of assurance functions; integrated and sustainability reporting
Delegated Authority King III corporate governance
Group Risk Services and Chief Risk Officers’ (CRO) Forum
Group Head: Risk Management Services
Risk governance leadership, advisories, risk management process, risk assessment & methodologies, CoJ risk profile
Council approved Risk Governance Framework, delegated authority, Risk Standards
Group Governance Group Head: Group Governance
Governance practices in Municipal Entities, corporate secretarial role
Delegated Authority, King III
Group Internal Audit Group Head: Internal Audit Services
Internal audit assurance and consulting role MFMA, Audit Standards, King III
Strategy and Operations management (Management and Staff)
Departmental Heads/ Executive Directors
Design and /or Implementation of strategic plans, strategies, policies and procedures, and internal control systems.
Delegated authority; City approved Risk Governance Framework & policy
338
Enterprise Risk Management (ERM)
The management of risks has evolved from the management of financial risks and transfer
of risks through insurance, to business risk management and, lately, to enterprise-wide risk
management which includes the management of risks at all levels of the organisation. The
ERM process creates consciousness at both political and administrative levels of the City’s
risk appetite and profile. The benefits which the City strives to achieve include: aligning risk
appetite to its strategies; enhancing management’s risk response decisions; seizing
opportunities and reducing operational surprises and losses through continuous identification
of potential events; identifying and managing multiple and cross-enterprise risks; improving
deployment of capital and allocation of resources through the use of reliable, relevant and
timeous risk information.
The institutional redesign led to the re-positioning of risk management and assurance
functions into group functions, thereby enabling a city-wide and holistic view to the risk and
controls environment. The overall strategic objective is to embed a culture of risk
management across the City and its entities at strategic and operational levels as well as in
the management of projects. Accordingly, the Group ERM programme has been based on
Outcome 4 of the Joburg 2040 Strategy.
The priorities identified in the City’s ERM programme for the first year of the Integrated
Development Plan are on-going, as these should be reviewed and benchmarked against
best practice; and will therefore be carried forward on a yearly basis. These priorities are as
follows:
Combined assurance strategies through collaborative and integrated approach to
risk, control, ethics and compliance advisories;
Identification, documentation and communication of the Group Wide Risk Universe;
Group Risk threshold levels / appetite and tolerance levels;
Strategic & Operational Risk Profiles;
Standardised City risk assessment methodology;
IT, Fraud, Compliance risk assessments, management and profiles;
Risk Monitoring and Risk response plans advisories;
Cluster, Sector & Departmental risk profiles & registers, risk monitoring and risk
reporting;
Management consulting and advising on risk responses and risk mitigating internal
controls that are in line with best practices; and
339
Business Continuity Management (BCM) plans & advisories.
Enterprise Risk Management Projects
Projects in the ERM programme are advisory and management consulting services are long
term in nature, straddling the entire current 5-year IDP, and even go beyond this term though
the focus in each year may vary:
Group Risk Governance (Core Administration and Municipal Entities);
Integrated Group Risk Management Strategy and Implementation Plans;
Priorities and Flagship risk assessments, monitoring and risk profiles
Risk assessment and advisories on management of risks
o Strategic Risk Management,
o Compliance Risk Management,
o Operational Risk management,
o Financial Risk Management,
o Financial Reporting Risk Management,
o Fraud Risk Management
o Project Risk Management advisories, and
o Contracting and contract risk management;
Business Continuity Management;
Risk Finance (Insurance) Strategy, optimisation of covers and insurance portfolio
evaluation;
Risk management application software;
ERM competency building – Core administration and Municipal Entities; and
Integrated reporting capabilities (interactive dashboard).
Integrated approach to Risk Management and GRC functions
There is a high co-dependence between Group Risk Services and the other assurance
functions within Group Assurance Services. Each of the assurance functions is at risk of
duplication of efforts and overlaps without the proper overall strategic leadership and
management. The impact of duplication of efforts between the Governance, Risk and
Compliance (GRC) functions would be assurance fatigue, ineffective and inefficient
management of the risk and internal control environment. The City has adopted an
integrated approach to the management of risk, risk advisory, and assurance processes and
systems, which should enable collaboration and co-operation between all the internal
assurance role players.
340
Risk leadership, ownership and accountability
The embedding of a risk management culture is one of the priorities that have been agreed
to by the leadership of the City.
One of the key strategies that have been designed is to ensure that there is convergence
in the management of risks and performance;
The city’s organisational scorecard and performance scorecards of executive and senior
management now include risk management as one of the key performance areas; and
Further, each of the top strategic risks is assigned a risk owner at Executive or Managing
Director level and action ownership. Risk owners must ensure that risk response plans
and mitigation actions are designed and implemented by responsible officials.
Continuous Risk Assessment
The assessment of risks requires the identification of organisational objectives and
strategies, and an analysis of inherent events that may impact on the achievement of
objectives and strategies. While Group Risk services facilitates the assessments of risks
through workshops or reviews of existing risks, the primary responsibility for the
management of identified and emerging risks lies with the respective executive
management.
The City continuously assesses its risk exposures and measures and prioritises these risks
using its risk assessment methodology. Priority is given to the potential uncertainties that
have been measured to have extreme and high inherent risk exposures. Similar priority is
given to those risks that have high residual risk exposure, alternatively, where the respective
risk response plans are inadequate and/or ineffective.
341
Table: Risk Assessments, Outputs and Outcomes
ACTIVITY TIMING OUTPUT OUTCOME
Mayoral Priorities risk assessments (focus on 5-4-1)
Annually and quarterly
Inherent and residual Risk register for each Mayoral Priority
Awareness, defined and agreed risk ownership, accountability and responsibility for managing risk profiles to within risk tolerance levels to enable attainment of goal(s)
Mapping of major projects & project risk profiles to Mayoral Priorities
Strategic Risk Assessments
Annually City-wide strategic risk register Management of City-wide Strategic risk profile
Strategic risk profiles of Departments and Municipal Entities (MEs)
Management of significant strategic risks/risk profile of the Departments and MEs
Operational Risk Assessment
Annually and Ongoing
Departmental and Municipal Entities operational risk registers
Awareness, risk ownership, accountability, responsibility for management of risks
IT Risk Assessments
Annually IT governance risks Awareness, risk ownership and management of IT risks; City-wide IT risk profile IT operational risk registers in the IT Department(s)
/ Office of Chief Information Officer (OCIO)
IT operational risk registers and exposures in Departments in the Core Admin & Municipal Entities
Fraud Risk Assessments
Ongoing City-wide fraud risk register City-wide fraud appetite and fraud risk profile; Awareness and management of the risk of fraud, corruption, poor ethical conduct
Risk Registers of Operations in the City highly susceptible to risk of fraud and corruption
All Risk assessments
At least annually
Risk registers and profiles inform risk-based internal audit plans, forensics planning and compliance; as well as management focus on key risk exposures
Optimal management of risk and control environment; and therefore improved risk profile; Performance improvements
Strategic Risk Management
Strategic risk assessments are conducted at least annually. The top 15 city-wide strategic
risks are identified and agreed to by Executive Management. The departmental and
municipal entities’ strategic risks have been mapped to the City-wide top strategic risks; and
gap analyses conducted. The mapping enables effective monitoring of the risk response
plans, and key attributes to the significant inherent and residual risk exposures. In addition
to the risk analysis of the ten priorities conducted to date, Group Assurance Services has
mapped the top 15 strategic risks to these priorities. The table below lists the top 15
strategic risks, the measurement and ranking of each risk area; and a risk heat map is also
illustrated.
342
Figure: Heat Map of Top 15 City Strategic Risks identified in 2011/12
HEAT MAP: 5 x 5 RISK MATRIX COJ TOP 15 STRATEGIC RISKS - INHERENT RISK RANKING
Risk
RankingRisk Landscape / Risk Name
Inherent Risk
Measurement
R1Service Delivery Failure / Inability to meet community
expectations and demands25
R2 Financial sustainability of the City 25
R3 Administrative Leadership and governance risks 25
R4 Poor asset management and ageing infrastructure 25
R5 Inadequate IT governance and IT delivery (ICT Risks) 20
R6 Theft, fraud, bribery and corruption 20
R7Inadequate contracting and contract management
20
R8inadequate skills set due to inability to attract and manage
talent20
R9 Increase in incidents of crime, health and security risks 16
R10 Non-Compliance to legislation, policies and procedures 16
1 2 3 4 5 R11 Lack of competitiveness to ensure City’s economic growth 16
insignificant minor moderate major severe R12 Environmental risks-acid mine drainage, toxic waste, floods 16
R13Inadequate stakeholder engagement and relations
management16
Inherent Risk measurements (key): R14 Ineffective spatial planning 16
Very High > or = 16 High = Below 16, greater than or equal to 12 R15 Risk management and internal control failure 16
Moderate = Below 12, greater than or equal to 9
Low = less than 9
lik
elih
oo
d o
f o
cc
urre
nc
e
alm
ost
certa
in
5
Low Moderate
possib
le
3
Low Low
Very
High
Very
High
like
ly
4
Low ModerateHigh High
Very
High
High
ModerateHigh
High
unlike
ly
2
Low Low Low ModerateModerate
Low
potential impact / consequences
re
mo
te
1
Low Low Low Low
Operational Risk Management
Operational risk assessments are conducted at the level of each Unit and/or Directorate in
the Departments and at the level of business units or directorates in the entities. The outputs
hereof are departmental risk profiles, and directorate risk profiles. Both Internal Audit and
the Auditor General usually focus on the risk, control and audit universe at operational levels
to evaluate the design and effectiveness of the internal control environment, which is a
bottom-up approach. Therefore it is critical that management, assisted by Group Risk
Services, should consistently analyse operational risk exposures and implement adequate
systems of internal controls. Operational risk profiles must be communicated to the
management and staff of the department or directorate to ensure that all role players are
aware of the risk environment and the responsibilities for the management of identified and
emerging risks.
343
Financial Reporting Risk Management
Financial Management and Financial Reporting have associated key risks that require pro-
active management or require that risk response plans are in place should these
uncertainties occur. Group Risk Services and Group Finance have assessed the associated
inherent risk exposures, to advise management on significant gaps and risk treatment plans
and monitor progress in the implementation of the risk mitigation actions. The approach to
the development of the Operation Clean Audit (OPCA) strategy and plan of the City has
been risk-based and is, therefore, informed by the significant financial management,
financial reporting and compliance risk exposures.
Financial reporting risk assessment and risk monitoring also entail the analysis of internal
and external audit findings for associated risk exposures, gaps in the mitigation of the
identified risks as well as impact of control weaknesses on the City’s risk profile. This
analysis is to be undertaken by two units within Group Assurance Services, namely, the
Group Risk Services and the Group Combined Assurance Units.
Compliance Risk Management
The Group Compliance Unit within Group Assurance Services will have finalised the City’s
Group Compliance Framework, and developed the group compliance universe during the
2012/13 financial period. The Compliance risk assessments will be preceded by the
development of the City’s compliance universe. The risks of non-compliance are normally
identified during the on-going strategic and operational risk assessments and categorised
accordingly. However, particular assessments of the key compliance requirements,
associated impact of non-compliance and potential penalties are to be conducted and
compliance matrices developed to ensure that management is empowered to monitor their
respective regulatory environments.
Contract and Project Risk Management
Finalisation of the City’s project risk management framework and methodology by Group
Assurance Services is due by the end of financial year 2012/13. Some of the major projects
have been identified from the City’s IDP, Departmental and Municipal Entities’ Strategic and
Business Plans; Cluster Programmes and Projects and the City’s Capital Projects Monitoring
Unit. Projects that qualify as major include both capital and operational expenditure projects
that have either high financial outlay and/or the implementation thereof will have major
344
impact on the rendering of public and municipal services by the City. Some of the major
projects that are being monitored include: the Bus Rapid Transit (BRT) project; Broadband
project; Institutional Re-design project; USDG Grant; Lanseria Airport Development co-
operation; Revenue Step Change project.
The risk assessment of projects will go through the following stages:
Initiation phase: fitting of concept with City's/ department’s/entity's strategic plan;
Planning phase: Identification of project team and affected parties;
Execution phase: Execution carried out within budget and schedule;
Closure phase: Risks to operations once commissioned; and
Monitoring and control: On-going monitoring of the return on investment
The monitoring of the management of risks in major projects of the City will include:
Reviewing the results of the project risk assessments;
Monitoring adherence to project risk management methodology;
Ensuring that Management, with the support of Group Risks Services where
appropriate, conducts risk assessments at all stages of a project life cycle,
Ensuring that there is adequate risk information on the project and a risk profile prior
to submission for approval;
Reviewing updated project risk registers, changes or movements in the risk profiles
Risk Response Plans Advisories on Risk Management Strategies
The risk matrix enables the prioritisation of risks. The risk mitigation strategies, i.e. whether
to accept, avoid, transfer or control risks, will be evaluated to ensure they appropriately
respond to the identified risks, and the cost vs. benefit analysis conducted. While Risk
Services will monitor the design of risk mitigation strategies / responses in respect of all
identified risks, focus will be placed on those inherent risks that have been identified as ‘Very
High’ (measurement greater than or equal to 16) or ‘High’ (measurement less than 16 but
greater than or equal to 12) according to the risk matrix.
345
Figure: City-Wide Top 15 Strategic Risks and Risk Ownership
346
Risk Monitoring and Risk Reporting/ Communication
Subsequent to the risk assessments and identification of risk management strategies by
respective management, Group Risk Services analyses the adequacy of the risk strategies
in bringing the risks to acceptable tolerance levels. The Internal Audit Directorate prepares
risk-based audits having assessed the risk environment and determined the risk and audit
universe. The risk-based auditing approach ensures that internal audit effort is focused on
extreme and high risk areas, and internal audit projects are therefore derived from the
strategic and operational risk registers. Internal audit also provides independent assurance
on the effectiveness and efficiency of risk mitigation plans.
RISK & RISK BACKGROUND PROGRESS TO DATE Inherent Risk Ranking
RISK 1: SERVICE DELIVERY FAILURES Very High
Inadequate strategic & operational planning not aligned to community expectations or national programmes
Citizenry expectation gaps Community expectations increasing Inefficiencies and service disruptions Ageing infrastructure Rapid urbanization and migration (rural to urban
migration) Proliferation of informal settlements Unavailability of land and inadequate funds and capacity Unemployment and economic Inequalities Social Inequalities
CoJ Growth Development Strategy 2040 programme, Flagship programmes
Ten Mayoral Priorities aimed at repositioning CoJ and focusing on service delivery
Cluster and collaborative approach implementation Alignment of Cluster plans and Departmental business plans to
Joburg 2040 Strategy Establishment of Customer Relations & Urban Management
(CRUM) Department within OCM Joburg 10 Plus programme Enhanced pro-active communication in case of disruptions Community engagements, timing and structured feedback
sessions Expanded Social Package Programme (Community
Development Department) Socio-economic: Procurement and Contracting with (use of) local
communities is receiving strategic focus LED strategy implementation and procurement from local
communities Planning Department - informal settlements programme
RISK 2: FINANCIAL SUSTAINABILITY Very High
347
RISK & RISK BACKGROUND PROGRESS TO DATE Inherent Risk Ranking
Compliance with MSA Performance Regulations (financial plan)
Inadequate strategies for financial sustainability Inadequate financial management & over-expenditure Lack of management accounting processes/ function Incorrect or non-billing of customers for services and
rates Consumption of services - water, electricity meter
readings not done timeously Declining revenue collections & rising customer debt
levels (Debt management) Qualified Auditor General opinion and financial reporting
processes Failure to leverage on City-owned assets Property Lease vs. Buy decisions Exposure to penalties due to non-compliance Potential operational inefficiencies & losses, theft,
misappropriation Unaccounted for losses of water and electricity Contingent liabilities e.g. cost of litigation, contractual
obligations (Impact of litigation and associated financial losses)
Inability to fund budget due to: Current macro-economic environment Inadequate sources of revenue Slow-recovery from the economic recession Increases in the cost of capital Rising inflation and high gearing (debt) Increase in consumer prices Global economic decline and impact of imported inflation
on municipal debt
City’s Financial Development Strategy & Plan Revenue Management Strategy / Revenue Step Change
Programme and reported improvements in revenue billing and collections
Change Management programme Cost control procedures implemented Financial ratio analysis and monitoring by Group Treasury
function: Cash flow and liquidity risk; Debt Coverage, Debt to Revenue, Current and Quick ratios as well as investments risk, interest rate risk exposures
Cash-flow management and continuous monitoring Joburg Property Company revenue generating strategies
(‘sweating the asset’) The City’s Finance Department has a Treasury risk management
function responsible for managing financial risk exposures, and monitors borrowings and cost of borrowings; and investments.
The City has been able to maintain a good credit rating; Impact of sovereign credit rating
Joburg Water allocated funding to invest in infrastructure upgrade & maintenance to mitigate unaccounted for water losses
City Power smart metering programme Operation Clean Audit plan based on financial and compliance
reporting risks Draft Contract management framework to mitigate risk of
contractual litigation and financial losses Mayoral Priorities: Financial Sustainability and resilience; Smart
City; Investment attraction, retention & expansion - opportunities
RISK 3: LEADERSHIP & GOVERNANCE RISKS Very High
Negative perceptions about the administrative leadership Loss of credibility and allegations of misconduct Perceptions of failure to articulate the short, medium,
and long-term strategic direction or strategy formulation; and evidence implementation.
Lack of buy-in into formulated strategic objectives Poor Planning and alignment of operational plans to
overall strategies Negative Auditor General audit outcomes on the audit of
pre-determined objectives Information leakages Inadequate and ineffective customer relations
management
Strong leadership and governance practices to mitigate political pressures
Strong leadership of the Joburg 2040 Strategy Institutional redesign and introduction of customer relations and
group strategy functions Institutional strategies to improve whistle-blowing mechanisms King III Code on Corporate Governance – analysis of CoJ
Alignment Formalisation and implementation of City’s Performance
Management Framework and Monitoring and evaluation function(s)
Appointment of Group Performance Audit Committee Operational Plan to enhance performance management AGSA reliance on Group Internal Audit Services’ audit of
performance information
RISK 4: AGEING & AGED INFRASTRUCTURE Very High
Failure to perform preventative maintenance of infrastructure
Aged water network infrastructure and sewerage system Roads infrastructure requirements City’s IT infrastructure is ageing Inadequate funding Maintenance vs. investment in new infrastructure Flood damages Malicious damage Damage to infrastructure due to accidents
City’s Infrastructure Investments – 10 year plan Opportunities for infrastructure upgrade and new developments
through Transit-Oriented Development and other Mayoral priority programmes & projects
Asset management plans by ISD Joburg Water allocated funding to invest in infrastructure upgrade
& maintenance to mitigate unaccounted for water losses ICT infrastructure upgrade mid-year funding CoJ currently rolling out ICT infrastructure – Broadband Joburg Roads Agency – strategy for infrastructure investments
348
RISK & RISK BACKGROUND PROGRESS TO DATE Inherent Risk Ranking
and maintenance Mayoral Priorities and programmes: Resource Resilience, Smart
City, engaged citizenry – opportunities & knock-on effect
RISK 5: INADEQUATE IT GOVERNANCE & IT DELIVERY RISKS Very High
Unstable/unavailable network Lack of an IT strategy Mismanagement of IT projects Ageing IT infrastructure and an under-utilized
Disaster Recovery Plan & Non-credible information Connectivity (e.g. USB, smart phones, social
networking); and mobility (e.g. 3G cards, GPS devices) are increasing.
Failure to maintain proper accounting and management records
Inability to access timely, correct and reliable information
Lack of appropriate information for decision-making purposes
Inadequate IT Disaster Recovery Plan
Approval of ICT Governance Framework and City-wide ICT strategy
Opportunities for leveraging on connectivity and mobile devices for efficient and effective communication and information sharing
The IT Disaster Site set up, reviewed and tested Assurance on IT Disaster Recovery plans Outsourced IT services to a number of IT service providers to
mitigate reliance on a single service provider IT contracts management & monitoring Centralised development and/or acquisition of application
software solutions to ensure compatibilities Revenue application system & LIS interventions Mayoral Priority: Smart City programme
RISK 6: FRAUD, THEFT, CORRUPTION Very High
Inadequate detection techniques Conflict of interest & SCM related fraud; corruption and
bribes Cash, cheque, credit and debit card fraud Inadequate or no supervision, weak internal control
environment Lack of or inadequate risk ownership, poor
organizational culture Low honesty scale and poorly motivated staff Failure to establish and maintain strong internal
control system Inadequate staff and IT resources to respond to
fraud and corruption
Establishment of Group-wide forensic investigation function Development of a combined assurance strategy Anti-fraud & anti-corruption strategy & whistle-blowing channels Centralised and 24-hour city-wide fraud hotline Annual declaration of interest by Councillors & all City officials Declaration in formal / official meetings where business
decisions are taken, and recusals Regular compliance reviews of conflict of interest transactions
and declaration of interest Outsourcing of forensic investigations - complexity,
independence and objectivity Fraud risk assessments and development of group-wide
fraud prevention plan
RISK 7: INADEQUATE CONTRACTING & CONTRACT MANAGEMENT Very High
City-wide contract management framework Poor contracting procedures Poor quality of services/ workmanship Contract failure or misalignment causes financial loss Inadequate supervision of contractors Inadequate provisions in SLAs & tender documents Delegations of Authority Inadequate performance monitoring and evaluation
Draft City-wide contract management framework Each contractor / service provider payment is only processed
on the submission of a service level agreement as supporting documentation.
Some departments and municipal entities use certificates of completion.
Establishment of Group Legal & Contracts Department
RISK 8: INADEQUATE SKILLS SET & INABILITY TO ATTRACT & MANAGE TALENT Very High
Poor succession and retention planning Inadequate remuneration policy Uncompetitive remuneration packages & salary
disparities Lengthy recruitment processes and terms of employment
contracts. Pending retirement age of baby boomers Fixed term contracts Labour unrest / industrial actions Inflexible remuneration structure and policy lack of
parity Core vs. MOEs
A City-wide climate survey that includes MEs has been finalized and is currently being rolled out for completion by June 2012.
Continuous engagement with organized labour & SALGBC as appropriate
Training interventions on Labour Relations and Leadership by Wits Business School (130 enrolled).
Establishment of remuneration & skills retention Committee in progress
Conversion of Fixed term employment contracts into permanent contracts (900 employees)
RISK 9: INCREASE IN INCIDENTS OF CRIME, HEALTH AND SECURITY RISKS High
Service delivery failure increasing incidents of crime Impact of HIV/Aids, other serious and communicable
There is continuous surveillance of communicable diseases by Health department.
Targeted Outreach and Health promotion campaigns at
349
RISK & RISK BACKGROUND PROGRESS TO DATE Inherent Risk Ranking
diseases Influx of immigrants which in turn could lead to
Xenophobic attacks
migrants are conducted. Joburg 10 Plus Mayoral priorities and development of strategies to ensure:
Engaged active citizenry, Agriculture and food security; Sustainable human settlements
Safer Cities programme a Mayoral priority; and leveraging on EM participation in global safer cities programme
RISK 10: NON-COMPLIANCE TO LEGISLATION High
Lack of awareness of applicable laws, regulations, policies and industry standards
Compliance not integrated in operations Lack of a City-wide compliance framework Poor supervision and monitoring Absence of compliance checklist Ignorance of the law, regulations, policies and industry
standards Compliance not integrated in operations Partial compliance Poor supervision and monitoring
Group Compliance function being set-up within Group Assurance Services
Development of a group compliance framework/ compliance risk governance framework
MFMA compliance questionnaire completed by entities and departments
Risk Services has taken the initiative to include compliance risks profile workshops as part of operational risks assessment
RISK 11: LACK OF COMPETITIVENESS TOWARDS ECONOMIC GROWTH High
Globalization & emergence of other cities Poor road maintenance, waste removal and other basic
services Failure of major capital investments in infrastructure or
long-term investments Inability to meet the demand for an integrated and
efficient transport network Failure of the Broadband network project Introduction of toll road fees on National and Provincial
roads in the Gauteng & bad buildings Economic inequalities
The City’s Department of Economic Development tracks the key economic indicators, and reports on the national and local economic environment
A number of projects and cooperation agreements with private sector at exploratory phase
One stop shop option being considered Reduction of red tape Simplifying investment processes Incentives being considered Bus Rapid Transit System / programme an enabler to economic
participation Mayoral Priorities and opportunities from development of
strategies: Smart City initiatives, SMME and Entrepreneurial support; Investment attraction, retention & expansion; green economy
RISK 12: ENVIRONMENTAL RISKS High
Water and air pollution, carbon emissions Inclement weather, and changes in weather patterns Lack of water and sanitation facilities especially in
informal settlements threaten the quality and supply of clean water to communities
Increasing water levels of the acid mine drainage Discharge of toxic waste into source of water, Bruma
Lake Projections of decrease in water levels
CoJ GDS2040 Green economy Water & Air Pollution monitoring Chemical dosing & litter control Waste management & minimization
Bruma Lake rehabilitation programme (funding required approximately R36 million vs. available)
RISK 13: STAKEHOLDER RELATIONS MANAGEMENT High
Strategic stakeholders may not be pro-actively engaged and segmented for targeted and effective communication
Communication & marketing strategy and plan City may not be leveraging on information
communication technologies (ICTs) CoJ IT Security policy has not allowed for access to
social media. However, this platform has since been opened for at least the marketing & communications people with effect from September 2011.
Less focus on marketing the brand “Joburg” Use of different branding or identities that do not
GDS2040 public engagement for input into this strategy. Development & annual reviews of IDP of the City ensures
intensive engagement with communities. Continuous engagement with Provincial Government at the
levels of both political and administrative leadership. The CoJ communication and marketing strategy is currently
under development Establishment of Group Communications Dept & appointment
of Exec Director Growth Development Strategy - Gauteng City Region
strategies, model and process to be developed in collaboration with Province
350
RISK & RISK BACKGROUND PROGRESS TO DATE Inherent Risk Ranking
necessarily embrace the brand of its parent municipality or its shareholder.
Gauteng City Region – collaboration with Provincial Government and neighbouring metros / municipalities
RISK 14: INEFFECTIVE SPATIAL PLANNING High
Ineffective spatial planning and interventions to address inequalities in society (disproportionate amount spent on transport and food by the poor)
Continuous regularisation of informal traders Spatial planning inequalities
New Mayoral Priorities – e.g. Transit-Oriented Development & Sustainable Human Settlements
Regularisation of informal settlements City Department of Planning and Urban Management strategies Economic Development framework and industrial notes
RISK 15: INADEQUATE MANAGEMENT OF RISKS & INTERNAL CONTROL FAILURES High
Inadequate risk culture & duplication of effort
Re-active approach to risk management
Lack of co-ordination in implementing risk strategies and risk monitoring
Accountability and responsibility for managing risk & control environment is not defined and assigned to senior management.
Poor co-ordination, overlapping mandates, a silo mentality, absence of service level agreements (Slaps) and poor communication.
Internal control systems key to the management of risk, and one of risk management strategies
Establishment of Group Risk Services function & RM business model
Council approved Risk governance framework and policy
City-wide dashboard of risk & controls – tool acquisition in progress
Risk management included as KPA & KPI (Cars); and performance measured
Executive Risk Management Comm
Group Risk Services participate in Municipal Entities’ Audit/Risk Committees
Actions addressing gaps identified in independent review of City-wide risk management process
Formalisation of City-wide Internal Control framework pending
Risk Finance
Risk Finance is a risk management strategy taken by the City to transfer the risks from loss,
theft, damages of assets as well as other perils to a third party. In its simplest form, risk
finance is taking out insurance on City-owned assets. The CoJ has over the past five years
experienced a gradual increase in the number of insurance claims, and therefore the cost of
insurance.
The City’s risk finance programme comprises of conventional insurance covers for its fleet
and non-fleet/ non-motor; and also has a contingency policy used to fund insurance excess.
Group Risk Management Services is assisted by certified insurance brokers in the
placement of maximum insurance covers.
351
Disaster Management
Legislative framework
Section 1 of the Disaster Management Act, No. 57 of 2002 defines “disaster management”
as “a continuous and integrated multi-sect oral, multi-disciplinary process of planning and
implementation of measures aimed at –
(a) Prevention or reducing the risks of disaster;
(b) Mitigation the severity or consequences of disasters;
(c) Emergency preparedness;
(d) A rapid response and effective response to disasters; and
(e) Post-disaster recovery, and rehabilitation”.
The purpose of the City of Johannesburg’s Disaster Management Plan is to document the
institutional arrangements, both for departmental and Municipal Entities, for disaster
management planning which includes the assignment of primary and secondary
responsibilities for priority disasters posing a threat to the City.
In terms of section 41(1) (b) of the Constitution, all spheres of Government are required to
“secure the well-being of the people of the Republic”. Section 152(1)(d) specifically requires
local government to “promote a safe and healthy environment”. Section 26(g) of the
Municipal Systems Act, No. 32 of 2000 stipulates that a disaster management plan must be
reflected in the Municipality’s Integrated Development Plan (IDP). Sections 52 and 53 of the
Disaster Management Act, No. 57 of 2002 also requires of each municipality and municipal
entity to prepare a Disaster Management Plan.
The CoJ Disaster Management Plan aims to facilitate an integrated and coordinated
approach to disaster management in the City which will ensure that the City achieves its
vision for disaster management embedded in the Joburg 2040 strategy which is to build
resilient, sustainable and liveable communities.
In summary, the Joburg 2040 Strategy highlighted the following potential disasters facing the
City, namely:
Increasing urbanisation
Climate change
352
A review of information from the 2011 Census shows an increase in population of the City by
37% over a 10 year period. This puts additional pressure on the City’s resources and
planning and includes an increase in the number of vulnerable people as many live in
squalor areas without proper amenities. The level of social degradation is very high in these
communities leading to social problems such as child abuse and crime.
Census 2011 also showed a marginal increase in the number of households with most
people still living in informal dwellings. There has however been a decrease in the number of
people who live in informal dwellings. Households using electricity for lighting has increased
by 5.8%, using electricity for cooking increased by 8.6% and using electricity for heating
increased by 5.2 % between 2001 and 2011. This is a critical indicator as most of the fires
the City responds to is caused by the lack of energy sources or safer alternatives.
There is a decrease of 5% in the number of people that own homes and a 9% increase in
the number of people who rent. A 3.1% decrease was found in the number of people who
occupy rent free houses. 6.4% of households have access to piped water. The number of
households with access to piped water has increased tremendously however some informal
settlements still lag behind. There is a great improvement in the number of people that use
proper sanitation system.
In conclusion, Census 2011 shows improvement in all categories but there are specific areas
that are still vulnerable to fires, flooding and health related risks given the lack of amenities.
National Disaster Management Framework
The CoJ Disaster Management Plan is in line with the National Disaster Management
Framework and addresses disaster management through four key performance areas,
namely:
Integrated Institutional Capacity for Disaster Risk Management
Disaster Risk Assessment
Disaster Risk Reduction
Response and Recovery
Each of the performance areas as listed above are detailed further on in this chapter.
353
Brief overview of Risk Profile of the City of Johannesburg
The City’s current disaster risk profile is based on an initial high-level risk identification
process, conducted by the Disaster Management Centre and the process included the
following steps:
Identification of the hazards with respect to its frequency, magnitude, speed of onset,
affected area and duration
Vulnerability of communities, This was done by describing, where possible, the
vulnerability of people, infrastructure (including homes and dwellings), services,
economic activities and natural resources exposed to the hazard
Estimation of losses resulting from the action of the hazard on those that are
vulnerable, to evaluate likely consequences or impacts
Identification of capacities, methods and resources readily available to manage the
risk
Estimation of the level of risk associated with a specific threat to determine whether
the resulting risk is a priority or not. Estimation of the level of risk is done by matching
the likelihood of a hazard or disaster with its expected impact or consequences. This
process allowed for different threats to be compared for the purpose of priority
setting.
Based on the above, the following have been identified as the top ten prevalent disaster
hazards for the CoJ:
Fires
Floods
Crime
Illegal electricity connection
Service delivery protests
Building hijacking
Poverty
Lack of information and awareness
Poor drainage system
Urban degradation
The most prevalent hazards, affecting most of the City’s areas and with the highest potential
probability for escalating to a state of disaster, are:
354
Fires
Floods
Crime
Service delivery protests
Integrated Institutional Capacity for Disaster Risk Management
Disaster Risk Management Structure
The Disaster Risk Management structure of the City of Johannesburg is based on the
current Administrative structure of the City, which is headed by the City Manager and his
Executive Management Team, including the Group Heads, Executive Directors of different
City Departments and MDs /CEOs of Municipal Entities.
The various levels making up the management structures for Disaster Risk Management in
the City endeavour to maintain existing services and adapt to deal with the changed
circumstances during major incidents or disasters.
Roles and responsibilities
It is important that this plan highlights the roles and responsibilities of all stakeholders to
ensure that there is no confusion during a disaster and that lines of communications are
adhered to.
Executive Mayor
The Executive Mayor will declare a local disaster without assistance of Provincial
Government and take overall responsibility for the execution of the Disaster Management
Plan in the City. He will also ensure that response and relief is conducted and if needed
liaise with the Premier on the impact of a disaster and measures taken to lessen the burden
on communities.
Member of the Mayoral Committee for Public Safety
The MMC for Public Safety will report to the Executive Mayor on the impact of a disaster and
measures taken to minimise the burden on communities. He or she will liaise with other
MMC’s on issues requiring collaboration with other City Departments and MEs and facilitate
the release of the disaster relief fund by the Council.
355
City Manager
The City Manager will avail City resources to deal with consequences of a disaster and
report on impact of the disaster. He will also facilitate recognition of organizations who
contributed to reducing the impact of disasters.
Executive Head: EMS
The Executive Head will chair a high-level coordinating committee made up of the MMC for
Public Safety, the City Manager, Executive Directors and Heads of other City Departments
and Municipal Entities. The Executive Head will also authorize the funds needed for disaster
relief and ensure that there are adequate resources to reduce the impact of the disaster
Director: Disaster Management
The Director: Disaster Management will advise the Executive Mayor on steps needed to be
followed in declaring a state of local disaster. The Director will also ensure that the disaster
plan is activated and implemented as per risk reduction measures in the disaster plans,
mutual aid and service level agreements are activated and that stakeholders take necessary
actions to respond to the disaster
Heads of Departments and Municipal Entities
Heads of Departments should report to their respective Political heads on response,
recovery and rehabilitation measures undertaken by their respective Departments.
Political Intervention
Disasters affect communities who voted for political representatives. It is therefore
imperative that all MMC’s and Ward Councillors are involved in assisting Disaster
Management personnel during a disaster.
Disaster Risk Assessment
The Disaster Management Plan contains risk assessment based on field studies,
observations and primary- and secondary data sources. The City’s Disaster Management
Plan has as far as possible been embedded in the current reality of the municipality.
The City is committed to implement measures to conduct comprehensive and progressive
assessments which will contribute to the development of disaster risk profiles which are
356
current and relevant and which will inform planning and the implementation of risk reduction
strategies.
The City does regular disaster risk assessments in assessing its top ten risks as well as its
capacity on a regular basis to ensure that it’s ready and prepared for any kind of disaster.
Disaster Risk Reduction
In order to reduce risk, the City has embarked on a number of initiatives, namely:
City By-laws: The Disaster Management Centre will monitor and educate
communities on existing by-laws and engage stakeholders in enforcement and
compliance
EMS will oversee the formulation of plans and projects to reduce disaster risk,
including the integration with CoJ IDP initiatives
Individual City Departments and ME’s will be responsible for the development and
maintenance of their own Department / ME’s Disaster Management Plans. In terms
of Section 52 of the Act, each municipal organ of state and any other municipal entity
operating within the municipality is responsible for the development and maintenance
of the disaster management plan for its functional area. Departmental and municipal
entity plans are an integral part of City’s Disaster Management Plan and therefore
the head of each Department and of each ME must ensure that copies of the plan
and any amendments to the plan are submitted to the Head of the City of
Johannesburg Disaster Management Centre
Community awareness programmes: Risk awareness is critical to all communities to
ensure risk avoidance. The communities and schools are therefore prepared to
compile their ward-based Disaster Plans. Non-governmental organizations, business,
security services and all other parties must be part of the ward-based disaster plan
Communication is an essential ingredient of Disaster Risk Management. In a disaster
situation the communication office in the City will lead and assist to disseminate
information and update the situation as it prevails. A communication strategy for
Disaster Risk Management forms part of the City’s Disaster Management Plan
Facilitate the development, implementation and maintenance of disaster
management plans, programmes and practices for strategic disaster risk reduction
which will ensure that individuals, households, communities, infrastructure and the
environment within the boundaries of the City are resilient to disaster risk
357
Develop, establish and maintain a comprehensive information management system,
an effective communication system and an accessible public awareness and
information service
Provide for accessible training, education and research opportunities for disaster risk
management stakeholders in the municipality
Facilitate the establishment of a disaster fund for disaster risk management in the
City
Develop, implement and maintain dynamic mechanisms for monitoring, evaluating
and continuously improving disaster risk management practice, projects and
programmes
Ensure the development and maintenance of a current and relevant disaster risk
profile
Ensure the development, implementation and maintenance of comprehensive
disaster risk reduction planning and implementation by the City’s departments and
Municipal Entities
Identify cross-boundary disaster risks which pose a threat to the City or to
neighbouring jurisdictions and facilitate the development, implementation and
maintenance of plans to manage such risks
Establish and maintain an information management system which includes the
development and maintenance of a database linked to a Geographical Information
System (GIS); hazard maps and risk maps informed by the disaster risk profile; a
register of volunteers; a communication directory and a record of available resources
Serve as a conduit and repository for information concerning disasters, impending
disasters and disaster risk management in general
Act in an advisory and consultative capacity on issues concerning disasters and
disaster risk management in the area by the establishment of the City of
Johannesburg Disaster Management Advisory Forum
Establish and maintain ward disaster risk management structures to deliver services
in terms of all of the activities associated with disaster risk management to the 130
wards within the boundaries of the City; and to integrate them into the disaster risk
management arrangements for the municipality
Establish and maintain co-operative partnerships with multi-sectoral role players
including the private sector in accordance with Chapter 3 of the Constitution and the
Integrated Development Plan objectives
The establishment, management and maintenance of a unit of volunteers
358
Ensure adequate capacity to deal with rapid, coordinated and effective disaster
response and recovery by:
o Facilitating the development, implementation and maintenance of contingency
plans for disasters which have been identified in the risk profile as priority risks
for the City;
o Facilitating the development and implementation of standard operating protocols
and field operations guides for the various activities associated with disaster
response and recovery based on joint standards of practice amongst all relevant
role players to ensure rapid and effective responses;
o Developing and maintaining a disaster response and recovery plan incorporating
the contingency plans, response and recovery protocols and field operations
guides;
o Developing guidelines and the capacity to assess the magnitude and severity or
the potential magnitude and severity when a disaster occurs or threatens to occur
and determining whether the event should be classified as a local disaster;
o Developing guidelines and the capacity (including in communities known to be at
risk to disasters) for conducting initial assessments of damage and adverse
effects and the immediate humanitarian needs of those affected;
o Mobilising the necessary resources to provide immediate humanitarian
assistance and to restore or make temporary arrangements to maintain critical
lifeline services, mission critical systems and business continuity during and
immediately after a disaster occurs or when a disaster is threatening to occur;
and
o Providing and co-ordinating physical support to communities and the critical
systems on which they depend, in the event of those disasters which are
classified as local disasters.
Maintain comprehensive records, documentation and reports of disaster response
and recovery operations.
Response and Recovery
The City is committed to facilitating the development and implementation of contingency
plans to ensure rapid, appropriate and effective disaster response and recovery to disasters
which occur or are threatening to occur within the boundaries of the City. The City will also
ensure that it assesses the effect of any disaster which may occur in the City as well as to
examine any further consequences and disaster risk in the emergency areas.
359
The City will assess all response actions by the Departments and ME’s contributing in this
Plan, and advice and formulate recommendations on the response actions, including the
mitigation of any further disaster risk, as required. The City will also ensure that affected
communities are returned to normal as soon as possible.
The Disaster Management Directorate will continuously engage with research and
development institutions to ensure that new developments are disseminated and
implemented to the benefit of the City. Disaster Risk Management will continuously engage
and plan with various security services within National Department structures i.e. the South
African Police Services and the South African National Defence Force.