REQUEST FOR REVIEWTo be submitted to the Civic Design Review
Program Manager prior to review.
PROJECT INFORMATION
PROJECT TITLE ____________________________________________________________ DATE ______________
CLIENT DEPARTMENT & DIVISION: __________________________________________________________________
PROJECT LOCATION _____________________________________________________________________________
NAME, TITLE AND AFFILIATION OF INDIVIDUALS PRESENTING THE PROJECT:__________________________________________________________________________________________________________________________________________________________________________________________________
PROJECTED SCHEDULEInformational presentation: _______________Phase 1: _____________________________Phase 2: _____________________________Phase 3: _____________________________Construction Commencement: ____________Construction Completion: _______________
PROJECT DELIVERY METHOD: Design, Bid Build (traditional) Fast Track Design-Build Bridging Other
Total Construction Cost: _____________________
Approximate Structure size: ______________ sq fREVIEWTYPE OF REVIEW REQUESTED:
Informational presentation PHASE 1: Conceptual design PHASE 2: Design Development PHASE 3: Construction Documents
DESIGNCONCEPT: Please provide a succinct description of the design concept or philosophy and influences that inform thedesign.__________________________________________________________________________________________________________________________________________________________________________________________________
IS THIS PROJECT PART OF A BOND OR CAPITAL IMPROVEMENT PROGRAM? YES NOIf yes, when was the bond overview presented to the Committee? ___________If the bond overview has not been previously presented to the Committee, please contact the Program Manager.
CHANGES: Please briefly list the changes to the design since the last review (if applicable).__________________________________________________________________________________________________________________________________________________________________________________________________
CONSTRUCTION MATERIALS: Please list the general materials proposed for construction._________________________________________________________________________________________________
COMMUNITY OUTREACH: Has the community been invited to participate in the Civic Design Review process? Yes NoIt is your obligation to notify the surrounding community (by mail or email) that there is opportunity for publiccomment at the meeting so that the Civic Design Committee may have the benefit of their input.
FEES2010/2011 Cost EstimatesFor each Phase 1, Phase 2, and Phase 3 meeting: $2,316(Informational presentations are exempt)Specially arranged consultations with staff andcommissioners: $848
Journal Entry should be paid to:Index code: 28ADM516Project: PAR516Detail: 60127Write checks to: San Francisco Arts Commission
BUILDING DESIGN & CONSTRUCTIONS.F. DEPARTMENT OF PUBLIC WORKSARCHITECTURE
SFMTA - OPERATOR CONVENIENCE FACILITIES Design DevelopmentFebruary 11, 2013 1
SFMTA - OPERATOR CONVENIENCE FACILITIESCIVIC DESIGN REVIEW
PHASE II & IIIFEBRUARY 11, 2013
BUILDING DESIGN & CONSTRUCTIONS.F. DEPARTMENT OF PUBLIC WORKSARCHITECTURE
SFMTA - OPERATOR CONVENIENCE FACILITIES Design DevelopmentFebruary 11, 2013
2PROJECT LOCATIONS
DESIGN CRITERIA:
TEMPORARY / PREFABRICATED FACILITIES
NEW LOCATION:
-ADA ACCESSIBLE
-DEPENDENT ON SERVICE VOLUME AT SPECIFIC LOCATIONS
-DIRECT CONNECTION TO CITY UTILITIES WITH THE POSSIBILITY OF RELOCATION IF TERMIAL LOCATION CHANGES
1. #1 CALIFORNIA GEARY & 32ND AVE
NORTH
GEARY & 32ND AVE
BUILDING DESIGN & CONSTRUCTIONS.F. DEPARTMENT OF PUBLIC WORKSARCHITECTURE
SFMTA - OPERATOR CONVENIENCE FACILITIES Design DevelopmentFebruary 11, 2013 3
METAL LOUVERSMETAL LOUVERSMETAL LOUVERS
scale=1/4"scale=1/4"
METAL LOUVERS
BACK ELEVATION
FLOOR PLAN - SINGLE OCCUPANCY- BASIC MODULE
MA
INE
NTR
Y
R =
20'
0"
11' 4"
2' 0" 6' 6" 1' 6"
8' 7
"
7' 4
"
scale=1/4"
UTILITY/PLUMBING CHASE
MATERIALS & COLOR SCHEMES
TUC
CO
WA
LL
MTL
. PA
NE
L W
ALL
MTL
. DO
OR
KA
LWA
LL
MTL
. PLA
TE
TEMPORARY/ PREFABRICATED FACILITIES
WALLS: C.M.U. WALLS WITH CEMENT PLASTER. PAINT & ANTIGRAFFITI COATING.INTERIOR FINISH: EXPOSED CMU W/ EPOXY PAINT.DOORS: GALVANIZED METAL DOORS, PAINTED.NATURAL ILUMINATION: KALWALL.VENTILATION: METAL LOUVERS & MECHANICAL EXHAUST FAN.LIGHTING: INTERIOR - MOTION ACTIVATED LIGHT, EXTERIOR - RECESSED CEILING LIGHT.FLOOR: EXPOSED CONCRETE.
DESIGN CRITERIA
EQ
.E
Q.
EQ
.E
Q.
8' 7
"
2"
1' 0
"7'
7"
FRONT ELEVATION
SINGLE OCCUPANCY - BASIC MODULE
LEFT ELEVATION
9' 1
"
8' 7
"
RIGHT ELEVATION
BASIC MODULE DESIGN
BUILDING DESIGN & CONSTRUCTIONS.F. DEPARTMENT OF PUBLIC WORKSARCHITECTURE
SFMTA - OPERATOR CONVENIENCE FACILITIES Design DevelopmentFebruary 11, 2013
4
NORTH
CONTEXT PHOTOS
SITE PHOTO
GEARY BLVD.
31S
T A
VE
NU
E
32N
D A
VE
NU
E
#1 CALIFORNIA TERMINALGEARY BOULEVARD AND 32ND AVENUE
BUILDING DESIGN & CONSTRUCTIONS.F. DEPARTMENT OF PUBLIC WORKSARCHITECTURE
SFMTA - OPERATOR CONVENIENCE FACILITIES Design DevelopmentFebruary 11, 2013 5
BUS LANE PARKING
LINE OF EXISTING CURB
PROPERTY LINE
RETAINING WALL
EXISTING TREEWELLS
RECLOATE (E) BUS SHELTER EAST ON GEARY
GEARY BOULEVARD
GEORGE WASHINGTON HIGH SCHOOL
32ND AVENUE
EXISTING SIDEWALK MAINTAINED
#1 CALIFORNIA TERMINALSITE PLAN
SITE PLAN - N.T.S.
BUILDING DESIGN & CONSTRUCTIONS.F. DEPARTMENT OF PUBLIC WORKSARCHITECTURE
SFMTA - OPERATOR CONVENIENCE FACILITIES Design DevelopmentFebruary 11, 2013
6#1 CALIFORNIA TERMINAL
PLANTING PLAN
SYMBOL LATIN NAME
LEUCADENDRON DISCOLOR
LEUCADENDRON DISCOLOR
WILSONS 5’ WIDE X 5’ TALL
3’ WIDE X 5’ TALL
3’ WIDE X 3’ TALL
3’ WIDE X 2’ TALL
5 GALLON
5 GALLON
5 GALLON
1 GALLON
2
3
4
8
ANIGOZANTHOS SPP. KANGAROO PAW
KANGAROO PAW
FLAX
FLAX
YELLOW GEM
BRONZE BABYPHORMIUM TENEX
EUPHORBIA X MARTINI
EUPHORBIA X MARTINI
COMMON NAME VARIETY/COLOR HEIGHT/SPREAD SIZE QUANTITY
BUILDING DESIGN & CONSTRUCTIONS.F. DEPARTMENT OF PUBLIC WORKSARCHITECTURE
SFMTA - OPERATOR CONVENIENCE FACILITIES Design DevelopmentFebruary 11, 2013 7#1 CALIFORNIA TERMINAL