Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Embed Size (px)

Citation preview

Page 1: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Climate Change Enabling Climate Change Enabling ActivitiyActivitiy

Page 2: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

PROJECT STRATEGYPROJECT STRATEGY

The immediate objective of the project is to The immediate objective of the project is to assist the Republic of Turkey in assist the Republic of Turkey in implementation of obligations under implementation of obligations under UNFCCCUNFCCC by preparation of by preparation of InitialInitial National National CommunicationCommunication( INC)( INC)

strengthen technical and institutional strengthen technical and institutional capacitiescapacities

mainstream climate change concerns into mainstream climate change concerns into sectoral and national development sectoral and national development priorities.priorities.

INC will include research made during INC will include research made during preparation of this preparation of this proposal and the results proposal and the results of new research.of new research.

Page 3: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

PROJECT STRATEGYPROJECT STRATEGY

Strategies, programs and plans of Strategies, programs and plans of iimplementationmplementation will be developed, and will be developed, and projects on projects on adaptation to climate adaptation to climate changechange and and strategy of GHG strategy of GHG emissions reductionemissions reduction will be prepared will be prepared on the basis on the basis of the planned activitiesof the planned activities..

This will provide to bring the climate This will provide to bring the climate change issue onto the level of change issue onto the level of political political decision-making and integrating the decision-making and integrating the outputsoutputs

Page 4: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

before the ratification

Turkey’s Turkey’s RatificationRatification PeriodPeriod

Raising public awareness and development of national capacity

to fulfill the commitments of UNFCCC

A brief report on the emissions of the

country had been communicated with

the Secretariat through the document

FCCC/CP/1997/ MISC.3.

The inter-ministerial National Coordination Board on Climate Change, initially established in 2001, was revised in early 2004

decision 26/CP.7 of COP7 in 2001, which placed Turkey after becoming a Party, in a situation different from that of other

Parties included in Annex I to the Convention.

Page 5: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Ratification of UNFCCCRatification of UNFCCC

Republic of Turkey ratifiedRepublic of Turkey ratified UNFCCC on UNFCCC on 24 May 200424 May 2004..

benefiting from GEF benefiting from GEF fundingfunding

Turkey startedTurkey started initiationsinitiations forfor benefiting benefiting from the GEF funding for the from the GEF funding for the preparation of the national preparation of the national communication since the country communication since the country eligible for climate change related GEF eligible for climate change related GEF funding pursuant to Article 9.b of GEF funding pursuant to Article 9.b of GEF Instrument.Instrument.

Page 6: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Climate Change Enabling Climate Change Enabling ActivityActivity

sself-assessment exerciseelf-assessment exerciseImplementing Agency: UNDPUNDP

Executing AgencExecuting Agencyy:: Turkish Turkish Ministry ofMinistry of

EEnvironment and Forestrynvironment and Forestry

Duration Duration : 3 months: 3 months

Started onStarted on : 3 January 2005 : 3 January 2005

Page 7: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

StakeholdersStakeholders

Ministry of Foreign AffairsMinistry of Foreign Affairs Ministry of Environment and ForestryMinistry of Environment and Forestry Ministry of Energy and Natural ResourcesMinistry of Energy and Natural Resources Ministry of Public Works and SettlementMinistry of Public Works and Settlement Ministry of Agriculture and Rural AffairsMinistry of Agriculture and Rural Affairs Ministry of Industry and Trade Ministry of Industry and Trade Ministry of TransportMinistry of Transport Ministry of HealthMinistry of Health State Planning OrganisationState Planning Organisation State InstState Instititute of Statisticsute of Statistics Environmental NGOsEnvironmental NGOs Associations of private sectorAssociations of private sector MunicipalitiesMunicipalities

Page 8: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

What were theWhat were the project project targets?targets?

research and collection of research and collection of available dataavailable data preliminary assessment of the preliminary assessment of the reliability reliability of of

available dataavailable data identification identification bottlenecks and priority areasbottlenecks and priority areas consultations with key consultations with key stakeholdersstakeholders prioritization of the human and institutional prioritization of the human and institutional

capacity capacity needs and identification of specific areas in all needs and identification of specific areas in all

relevant relevant sectors that sectors that research/modeling studies requiredresearch/modeling studies required synergizingsynergizing with relevant completed and on- with relevant completed and on-

going going programs or projects programs or projects

Page 9: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Date Institution/Organization Meeting Type/Theme Number of

Participants

6 January All stakeholders Inception co-ordination meeting 27277 January METU Information exchange meeting 88

11 January Istanbul Technical and Bosporus Universities,

Turkish Cinema and Audiovisual Cultural

Association (TÜRSAK)

Information exchange meeting 77

13 January MoT, SIS, MENR, EIE Stock-taking exercise for identification

gaps and constraints

1111

14 January Ministries of Transport and Energy and Natural Resources, Ministry of

Environment and Forestry, DIE

Co-ordination meeting 2121

28 January MoEF-Research and Development Department (AR-GE), Ministry of

Agriculture-Research and Planning Council

Stock-taking exercise for identification

gaps and constraints

1212

31 January TUBITAK-Marmara Research Center (MAM)

Possibilities of Cooperative Works 15151 February Istanbul Metropolitan Municipality Stock-taking exercise for

identification gaps and constraints

1515

4 February All stakeholders Co-ordination meeting with stakeholders 3535

16 February CDM (3 days) Round table between GEF director, UN

Country Res.Rep., MoEF undersecretary,

UNDP Programme Manager and the

Project Manager

55

11 March All stakeholders Close up meeting with stakeholders 2727

21 March Istanbul Technical University Possibilities of Cooperative Works in

terms of expertise work

55

Page 10: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

What are the What are the achievements?achievements?

Synergies with TUBITAK-MRC and Synergies with TUBITAK-MRC and UniversitiesUniversities, NGOs, NGOs and and private private sector sector (ongoing)(ongoing)

Archived portfolio of Archived portfolio of more than a 100 more than a 100 expertexpertss (ongoing)(ongoing)

Project Proposal Document for Project Proposal Document for “Enabling Activities for the “Enabling Activities for the Preparation of Preparation of Turkey's Initial Turkey's Initial National Communication” National Communication”

ImprovedImproved interactive communications interactive communications and info-sharingand info-sharing

Page 11: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Relevant ProjectsRelevant Projects The National Environmental Action Plan (NEAP) The National Environmental Action Plan (NEAP) Turkey’s Commitments at the International Level-(Treaties and Turkey’s Commitments at the International Level-(Treaties and

Conventions)Conventions) Agenda 21Agenda 21 UNDP Initiative for Sustainable Energy (UNISE)UNDP Initiative for Sustainable Energy (UNISE) Mediterranean Action Plan Mediterranean Action Plan Declaration of the Euro-Mediterranean Ministerial Conference on Declaration of the Euro-Mediterranean Ministerial Conference on

the Environment the Environment Strategic Action Plan for the Rehabilitation and Protection of the Strategic Action Plan for the Rehabilitation and Protection of the

Black SeaBlack Sea National Sustainable Energy and Atmospheric Protection InitiativeNational Sustainable Energy and Atmospheric Protection Initiative National Action Programming (NAP) Process for Combating National Action Programming (NAP) Process for Combating

DesertificationDesertification National Desertification Fund (NDF)National Desertification Fund (NDF) Forestry Master Plan (OAP)Forestry Master Plan (OAP) National Plan for in-situ conservation of plant Genetic ResourcesNational Plan for in-situ conservation of plant Genetic Resources Combating Desertification National Action Plan (Under Combating Desertification National Action Plan (Under

preparation) preparation) South Eastern Anatolia Development Plan (GAP)South Eastern Anatolia Development Plan (GAP) Eastern Anatolia Development Plan (DAD)Eastern Anatolia Development Plan (DAD) Eastern Black Sea Development Plan (DOKAP)Eastern Black Sea Development Plan (DOKAP)

Page 12: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

ParallelParallel ActivitiesActivities

Relevant EU projectsRelevant EU projects 9th. Five Year Plan 9th. Five Year Plan

Preparation by State Preparation by State Planning OrganizationPlanning Organization

Regional Environmental Regional Environmental Center activitiesCenter activities

Page 13: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

National Programmer on Adaptation to European Union LegislationNational Programmer on Adaptation to European Union Legislation Ozone (Montreal)Ozone (Montreal) Protocol (1990)Protocol (1990) OECD Environment Ministers Declaration (1996)OECD Environment Ministers Declaration (1996) OECD Environment Ministers Declaration (1998)OECD Environment Ministers Declaration (1998) Internationally important Wetlands Convention (RAMSAR)Internationally important Wetlands Convention (RAMSAR) World Cultural and Natural Heritage Conservation Convention (PARWorld Cultural and Natural Heritage Conservation Convention (PARIIS)S) Natural Landscape Conservation ConventionNatural Landscape Conservation Convention Convention on international Trade for Endangered Wild Flora and Fauna Convention on international Trade for Endangered Wild Flora and Fauna

Species (CSpecies (CIITES)TES) Intergovernmental Forestry Panel (IPF), intergovernmental Forestry Forum Intergovernmental Forestry Panel (IPF), intergovernmental Forestry Forum

(IFF), United Nations Forestry Forum (UNFF) (IFF), United Nations Forestry Forum (UNFF) Policies and Regulations in Turkey Policies and Regulations in Turkey Air Quality Control Regulation (1986)Air Quality Control Regulation (1986) Water Pollution Control Regulation (1988)Water Pollution Control Regulation (1988) Noise Control Regulation ( I986)Noise Control Regulation ( I986) Control of Solid Waste Regulation ( 1991)Control of Solid Waste Regulation ( 1991) Environmental Impact Assessment Regulation (1992)Environmental Impact Assessment Regulation (1992) Regulation on Control of Medical Waste ( 1993)Regulation on Control of Medical Waste ( 1993) Control of Hazardous Chemical Substances and Products Regulation ( 1993)Control of Hazardous Chemical Substances and Products Regulation ( 1993) Control of Dangerous Wastes Regulation ( 1993)Control of Dangerous Wastes Regulation ( 1993) Regulation of Air Pollution Control due to heating. 13 th January 2005 Regulation of Air Pollution Control due to heating. 13 th January 2005 Regulation on air quality control due to industrial processes. 7 th Oct 2004Regulation on air quality control due to industrial processes. 7 th Oct 2004

Related Related RegulationsRegulations

Page 14: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Identified priorities-1Identified priorities-1

I. I. Minimization of GHG from Energy Minimization of GHG from Energy SectorSectorDDetermination of energy etermination of energy scenarios by integrated system scenarios by integrated system analysis of the multiple options analysis of the multiple options with the assessment of costs and with the assessment of costs and benefits of various energy policy benefits of various energy policy alternatives shall be the main alternatives shall be the main target project.target project.

Page 15: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Identified priorities-2Identified priorities-2

II. II. Vulnerability and AdaptationVulnerability and Adaptation

Assessing national vulnerability and Assessing national vulnerability and mitigation measures on the basis of mitigation measures on the basis of regional impacts in socio-economic regional impacts in socio-economic area (economical growth, area (economical growth, technology, population and technology, population and governance) and searching for governance) and searching for appropriate climate change appropriate climate change adaptation measures shall be adaptation measures shall be investigated.investigated.

Page 16: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Identified priorities-3Identified priorities-3

III. III. Land use, Land Use Change Land use, Land Use Change and Forestryand Forestry

AAssessment of physical and ssessment of physical and economic impacts of climate economic impacts of climate change on LULUCF, change on LULUCF, development and strengthening development and strengthening of existing modelsof existing models

Page 17: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Identified priorities-4Identified priorities-4

IV. IV. Capacity BuildingCapacity Building

Capacity building in the areas of scientific Capacity building in the areas of scientific and and

technical potential andtechnical potential and institutional relations institutional relations ((identification and removal of jurisdictional, identification and removal of jurisdictional, organizational and informational obstacles organizational and informational obstacles

and and conducting streamline among the conducting streamline among the

institutionsinstitutions). ).

Infrastructure and Infrastructure and data networkdata network for for information information

and and data acquisition needs to be data acquisition needs to be strengthened.strengthened.

Page 18: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

IV. IV. Capacity BuildingCapacity Building-2-2

Mobilization of scientific and technical Mobilization of scientific and technical creation of creation of institutional arrangementsinstitutional arrangements to to test the effectiveness, reliability, test the effectiveness, reliability, availability and competence of the availability and competence of the experts. experts.

Capacity enhancement by providing short-Capacity enhancement by providing short-term term courses, workshops, seminarscourses, workshops, seminars and and other training services will be arranged other training services will be arranged where necessary.where necessary.

Continuous utilization of existing Continuous utilization of existing capacity, which is associated with thecapacity, which is associated with the accumulation of experience by accumulation of experience by Training of Training of trainees,trainees, will be the key issue for will be the key issue for sustainability of national communications.sustainability of national communications.

Page 19: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

What are the expected What are the expected outcomes of the proposed outcomes of the proposed

INC project ?INC project ? an inventory of greenhouse an inventory of greenhouse gases for the year 1990-2003 gases for the year 1990-2003

analysis of potential measures analysis of potential measures to abate the increase in to abate the increase in greenhouse gas emissions in greenhouse gas emissions in TurkeyTurkey

an assessment of potential an assessment of potential impacts of climate change in impacts of climate change in Turkey and adaptation measuresTurkey and adaptation measures

Page 20: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

What are the expected What are the expected outcomes of the proposed outcomes of the proposed

INC project ?INC project ? assessment of cost and benefits of assessment of cost and benefits of various various

energyenergy

policypolicy alternatives on climate change alternatives on climate change capacity building in the areas of capacity building in the areas of scientific and scientific and

technical potential and institutional relations technical potential and institutional relations

infrastructureinfrastructure and data network for information and data network for information and and

data acquisition to enable the development of data acquisition to enable the development of

national communications in Turkey on anational communications in Turkey on a continuouscontinuous

basisbasis

Page 21: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

What are the expected What are the expected outcomes of the proposed outcomes of the proposed

INC project ?INC project ? PPreparation of the INC of Turkey and reparation of the INC of Turkey and

submission submission

to the COPto the COP

PPublic awareness activities and stakeholder ublic awareness activities and stakeholder

ccconsultations to enhance general awareness consultations to enhance general awareness and and

knowledge on climate change-related issues in knowledge on climate change-related issues in

Turkey and help into taking them into account Turkey and help into taking them into account in in

the process of national planning and policy.the process of national planning and policy.

Page 22: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Work PlanWork Plan

INCINCStart date:Start date: expected byexpected by mid mid MayMay

Project durationProject duration : 1 year : 1 year

((10 months 10 months implementation + 2 implementation + 2 months months GEF GEF reviewingreviewing))

Page 23: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Work PlanWork Plan

Output 4.0.Output 4.0. Preparation of Preparation of self assessment self assessment

activity activity

planplan for Technical Coordination Committee and for Technical Coordination Committee and

TechnicalTechnical Expert Group (TEG) Expert Group (TEG)

Output 4.1.1.Output 4.1.1. Identification and Identification and

evaluation of evaluation of

the “special circumstances” of Turkey in the “special circumstances” of Turkey in

accordance with social, economic and accordance with social, economic and

geopolitical indicators, i.e.geopolitical indicators, i.e.

Page 24: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Work PlanWork PlanOutput 4.1.2.Output 4.1.2. Identification of policy making tools Identification of policy making tools

and modeling various scenarios inand modeling various scenarios in t terms of erms of

potential potential

adaptation programs with outputs of cost-benefit adaptation programs with outputs of cost-benefit

analysisanalysis

Output 4.2.5.Output 4.2.5. Building IT capacities of the Building IT capacities of the

emission emission

inventory working groupinventory working group

Page 25: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.2.6.Output 4.2.6. Collection and estimation Collection and estimation of the of the

inventoryinventory data related to the gases ofdata related to the gases of HHFCs, FCs,

PFCs, SF6 , CO, NOx,PFCs, SF6 , CO, NOx, NMVOCs and SoxNMVOCs and Sox

Output 4.2.7Output 4.2.7. Enabling studies for . Enabling studies for ememissionission

estimation in the areas where estimation in the areas where bottlenecksbottlenecks

EEncounteredncountered::

Uncontrolled solid waste-waste water-Uncontrolled solid waste-waste water-Fugitive emision-enteric fermentation –Fugitive emision-enteric fermentation –LULUCF for cLULUCF for continuous data collectionontinuous data collection,,

Page 26: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.2.8.Output 4.2.8. Enabling inventory studies in Enabling inventory studies in terms ofterms of

producing reliable database used as basis in producing reliable database used as basis in the the

course of estimations of energy efficiency course of estimations of energy efficiency projections projections

of industry of industry and building sectorsand building sectors

Output 4.2.9.Output 4.2.9. Improvement of present Improvement of present emission emission

calculation techniques and methodology, and calculation techniques and methodology, and

conducting evaluation studies in order to conducting evaluation studies in order to define define

qualityquality and and uncertaintyuncertainty status of data values status of data values

producedproduced

Page 27: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.2.10.Output 4.2.10. Perform a model in Perform a model in order to ensure necessary order to ensure necessary modifications and adjustments in modifications and adjustments in accordance with Turkey conditions accordance with Turkey conditions ((specifically include energy specifically include energy efficiencyefficiency) for making use of the ) for making use of the most recent industrial energy and most recent industrial energy and production data available from the production data available from the Manufacturing Energy Manufacturing Energy Consumption Survey and the Consumption Survey and the Annual Annual

Survey of ManufacturingSurvey of Manufacturing

Page 28: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.2.11.Output 4.2.11. Process a model for Process a model for estimation of energy demand in estimation of energy demand in households households

Output 4.2.12.Output 4.2.12. Use available model Use available model producing producing

inventory outputs for fuel, vehicleinventory outputs for fuel, vehicle type, sizetype, size,,

class and technologyclass and technology..

Page 29: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.3.1.Output 4.3.1. Investigation of future Investigation of future energy energy

types of GHG and determination of types of GHG and determination of technical technical

implementation on implementation on energy scenariosenergy scenarios

under an integrated system analyzing under an integrated system analyzing model model

Output 4.3.2.Output 4.3.2. Energy sector Energy sector development development

scenarios for GHG reduction scenarios for GHG reduction

Page 30: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.3.3.Output 4.3.3. Developing Developing national energy national energy policiespolicies

based on based on costcost benefit evaluationbenefit evaluation of energy of energy alternatives alternatives

Output 4.3.5.Output 4.3.5. Policy identification in terms of Policy identification in terms of GHG abatement measuresGHG abatement measures and preparation and preparation of an activity schedule including monitoring of an activity schedule including monitoring phase for policy implementations and phase for policy implementations and estimation of potential GHG reduction estimation of potential GHG reduction values based on current policies and values based on current policies and

alternative scenarios on the Industry, alternative scenarios on the Industry, Building, Waste Management and ServiceBuilding, Waste Management and Service sectorssectors

Page 31: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.3.7.Output 4.3.7. Determination of a method for Determination of a method for

estimation of emission reduction rates for an estimation of emission reduction rates for an

average railway and highway construction andaverage railway and highway construction and

rehabilitation project in order to identify rehabilitation project in order to identify

national transport policiesnational transport policies

Output 4.3.6.Output 4.3.6. Conduct the model analyses Conduct the model analyses

‘‘total energy cycle’total energy cycle’ in order to estimate per in order to estimate per

mile energy cycle emission and energy use of mile energy cycle emission and energy use of

both near and long-term transportation both near and long-term transportation

technologiestechnologies

Page 32: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.3.8.Output 4.3.8. Assessment of physical and Assessment of physical and economic economic

impacts of climate change on LULUCF and also impacts of climate change on LULUCF and also

adverse effects of LULUCF to climate change,adverse effects of LULUCF to climate change,

development and strengthening of existing development and strengthening of existing ModelsModels

Output 4.3.9.Output 4.3.9. Establishment of bio-physiologic Establishment of bio-physiologic and and

economic models for improvement of economic models for improvement of agriculture, agriculture,

forestry and water management, expansion offorestry and water management, expansion of

applications of the existing modelsapplications of the existing models

Page 33: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.4.1.Output 4.4.1. Identification of impacts Identification of impacts on on

human and natural systems based on human and natural systems based on

three global climate scenariosthree global climate scenarios

Output 4.4.2.Output 4.4.2. Assessing national Assessing national vulnerability vulnerability

and abatement measures on the basis and abatement measures on the basis of local of local

and global impacts in socio- economic and global impacts in socio- economic area area

Page 34: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.4.3.Output 4.4.3. Formulate and promote an Formulate and promote an

overall system to provide long-term overall system to provide long-term

systematic systematic

data and information data and information

Output 4.5.2.Output 4.5.2. Designing an active Designing an active

climate climate

change web page and enabling change web page and enabling

sustainability sustainability

of info-flow for continuous updatingof info-flow for continuous updating

Output 4.5.4.Output 4.5.4. Establishment of Climate Establishment of Climate

Change Library RoomChange Library Room

Page 35: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.5.5Output 4.5.5.. Organization of a workshop Organization of a workshop

between between

institutions and industrial unions as to ensure institutions and industrial unions as to ensure

capacity building in the areas of scientific and capacity building in the areas of scientific and

technical potential and institutional relations technical potential and institutional relations

Output 4.6.1.Output 4.6.1. Prepare a project proposal for Prepare a project proposal for

‘National ‘National

Climate PlanClimate Plan’ and activate the project on ’ and activate the project on

national national

scalescale

Page 36: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.6.7.Output 4.6.7. Organization of Organization of informative informative

meeting seriesmeeting series and updating for the and updating for the

responsibilities and obligations of Turkey and responsibilities and obligations of Turkey and

targeted for members of decisiontargeted for members of decision making making

bodies bodies

Output 4.6.8Output 4.6.8. . Organization of a contest with a Organization of a contest with a

theme of Contest with a theme of theme of Contest with a theme of “Methods “Methods for for

Building Public Awareness in Climate ChangeBuilding Public Awareness in Climate Change” ”

among students ofamong students of Faculty of Communication Faculty of Communication

and awarding 3 top applicable projectsand awarding 3 top applicable projects

Page 37: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.6.Output 4.6.1212.. Maintaining synergy Maintaining synergy with other with other

relevant projects and programs on relevant projects and programs on combating combating

desertification, preservation of desertification, preservation of biodiversity, biodiversity,

energy efficiency, and energy saving, energy efficiency, and energy saving,

expanding use of renewable energy expanding use of renewable energy sourcessources

Page 38: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.6.Output 4.6.11.. Preparation of project progress Preparation of project progress

reports and final project reports presenting reports and final project reports presenting

progress of the activitiesprogress of the activities (lessons learned, (lessons learned,

action plans to prepare action plans to prepare nnationalational

communications continuously communications continuously

Output 4.6.2.Output 4.6.2. Economical evaluation and Economical evaluation and

reviewing of the past indicative years reviewing of the past indicative years varying varying

with increasing and decreasing emission with increasing and decreasing emission

vvaluesalues

Page 39: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Output 4.6.3.Output 4.6.3. Development of an Development of an integrated integrated

calculation model for overall projections calculation model for overall projections

synthesizes all sectors under same modelsynthesizes all sectors under same model

sstructuretructure

Output 4.6.6.Output 4.6.6. Development of public Development of public

awareness and respective educational awareness and respective educational program program

methods and methods and ddetermination of activity etermination of activity

sschedules in short and long term periodschedules in short and long term periods

Page 40: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

Coordination Board on Climate Change

MoEF

Project Coordinator Undersecretary of MoEF

Steering Committee

MoEF Secretaria

t

National Project Team

I. Researching the Effects of Climate Change (TSMS)

II. Emission Inventory of GHG (SIS)

III. Mitigation of GHG from Industry, Building, Waste Management & Service Sector(EIE)

IV. Mitigation of GHG from Energy Sector (MENR)

V. Mitigation of GHG from Transportation (MoT)

VI. Land use, Land Use Change and Forestry (MoEF-R&D department)

VII. Development of Policies and Strategies (MoEF)

VIII. Education and Public Awareness (MoEF)

Technical Coordination Committee

International Experts

National Experts

ACADEMIA

TUBITAK-MRC

INDUSTRY

UNIONS*

MUNICIPALITIES

EU *

UNDP

TOBB

MINISTRIES

Technical Activity Group

LOCAL

AGENDA 21s*

Revised Revised InstitutioInstitutio

nal nal FrameworFramewor

kk

WB *

Page 41: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

İKLİM DEĞİŞİKLİĞİ ULUSAL BİLDİRİMİKLİM DEĞİŞİKLİĞİ ULUSAL BİLDİRİMİŞBİRLİĞİİŞBİRLİĞİ

ÜNİVERSİTELER ve Araştırma Kurumları ÜNİVERSİTELER ve Araştırma Kurumları

Uzmanlık alanlarına göre işbirliğiUzmanlık alanlarına göre işbirliği Ulusal Bildiri çalışmalarının sürekliliğini Ulusal Bildiri çalışmalarının sürekliliğini

sağlamak için işbirliliğinin sürekliliğinin sağlamak için işbirliliğinin sürekliliğinin sağlanması almada geçerli kılınmasısağlanması almada geçerli kılınması

Uluslar arası Platformda IPCC/UNFCCC /COP Uluslar arası Platformda IPCC/UNFCCC /COP tebliğler sunmaktebliğler sunmak

Araştırmacıların mevcut olan veri ihtiyacını Araştırmacıların mevcut olan veri ihtiyacını karşılayacak mekanizmalar oluşturmak karşılayacak mekanizmalar oluşturmak

Page 42: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations

FINANSMAN İMKANLARI FINANSMAN İMKANLARI

Eğitim, kapasitelerin geliştirilmesi konularında Ulusal Eğitim, kapasitelerin geliştirilmesi konularında Ulusal Bildirim çalışmalarına finansal destek alınması için Bildirim çalışmalarına finansal destek alınması için EU uyum çalışmalarından kaynak yaratma EU uyum çalışmalarından kaynak yaratma

TÜBİTAK KAMU KURUMLARI AR-GE Destekleme TÜBİTAK KAMU KURUMLARI AR-GE Destekleme Propramına KAMU-ÜNİVERSİTE işbirliği ile müracaat Propramına KAMU-ÜNİVERSİTE işbirliği ile müracaat

Çalışmaları sürekli kılmak için 9. Kalkınma Planında Çalışmaları sürekli kılmak için 9. Kalkınma Planında İklim Değişikliği Politika ve Stratejilerine destek İklim Değişikliği Politika ve Stratejilerine destek sağlamak için işbirliği sağlamak için işbirliği

GEF projeleri oluşturmak ( Özel GEF projeleri oluşturmak ( Özel Sektör+üniversite+Kamu)Sektör+üniversite+Kamu)

Page 43: Climate Change Enabling Activitiy. PROJECT STRATEGY The immediate objective of the project is to assist the Republic of Turkey in implementation of obligations