CİNNAH CAD. 78/7, ÇANKAYA, TR06690, ANKARA, TURKEY
www.akongrup.com.tr
ABOUT US
Founded in 2009, AKON executes turn key construction and installation of:
• Petrochemical Plants
• Mine Beneficiation Plants
• Power Plants
• Cement Factories
• Water Treatment / Desalination Plants
• Steel Smelters
• Pipelines
• Buildings, Shopping Centers
www.akongrup.com.tr
Our mission is to use our experience in the construction industry for unconditional customer satisfaction and highest quality, while respecting human health and environment at every stage of our operation.
Our vision is to successfully finish each Akon Grup Project with the power of our professional experience and commitment.
www.akongrup.com.tr
MISSION and VISION
2009
• AKON Yapı Ltd. founded in Ankara, Turkey
• Princess Noura University Family and Consumer Sciences Building Project civil works contract signed
• King Saud University Agricultural Faculty Building Project civil works contract signed
2010
• Aksut Milk Production Facility Project civil works contract signed
2011
• AKON International LLC founded in Jeddah, Kingdom of Saudi Arabia
• AKON Yapı Ltd. reestablished as AKON Grup Uluslararası İnşaat A.Ş.
• King Khalid University Project civil works contract signed
• Jabal Omar Project H8 and H9 Towers Project civil works contract signed
• Haramain Railway Station Project platform civil works contract signed
2012
• Jabal Omar Project - Phase II civil works contract signed
• Petrorabigh NPB Project civil and electromechanical works contract signed
www.akongrup.com.tr
MILESTONES
2013
• AKON International OOO founded in Moscow, Russian Federation
• Enerjisa Bandırma HEPP Project EPC works contract signed
• In Moscow, various fit-out project contracts signed
• In Algeria, Jadida-Safi Highway Project civil works contract signed
2014
• AKON Grup Erbil Branch founded in Erbil, Iraq
• ISO 9001:2008 Quality Management System Certificate obtained
• ISO 14001:2004 Environmental Management System Certificate obtained
• OHSAS 18001:2007 Occupational Health and Safety Management System Certificateobtained
• Khabat Thermal Power Plant Project civil works contract signed
2015
• Petrorabigh II – Initial Start Up Team Accommodation Project civil works contract signed
• Petrorabigh II – Blast Proof Manufacturing Buildings Project civil and electromechanical works contract signed
• Yanbu Power and Desalination Plant Project Aeration Basin and Building civil works contract signed
• East Dammam Aramco Housing Projects civil, architectural, electrical and mechanical works contract signed
www.akongrup.com.tr
MILESTONES
2016
• Lapseki Gold Beneficiation Plant Project civil and mechanical works contract signed
• Rabigh II Refining and Petrochemical Project Naphtha and Aromatics Package (RP2) - Area R410 & R420 Project civil works contract signed
• Safety Achievement Award for 3,000,000 Manhours without Lost time Injury received from Petrorabigh
2017
• Petrorabigh Clean Fuel Project/ Sulphur Recovery Unit Project civil and building works contract signed
• ISO 9001:2008 Quality Management System certificate renewed to ISO 9001:2015
• ISO 14001:2004 Environmental Management System Certificate renewed to ISO 14001:2015
• AKON payroll reached to 2107 direct personnel and 513 indirect personnel, all time high
2018
• İvrindi Gold Beneficiation Plant project civil and mechanical works contract signed
• Metito KAEC SOLAR Water Desalination Plant Project civil and building works contract signed
2019
• Metito Dhuba Water Desalination Plant Project civil and building works contract signed
www.akongrup.com.tr
MILESTONES
KINGDOM OF SAUDI ARABIA
AKON INTERNATIONAL LLC
Al Ruwais Dist. Qadat Al Fekr StreetP.O Box: 55795, - 21544 Jeddah / Kingdom of Saudi ArabiaT: + 966 2 664 76 41
RUSSIAN FEDERATION
AKON INTERNATIONAL OOO
Leninsky Avenue 111/1 No.414Moscow / Russian FederationT: +7 901 711 67 82
IRAQ
AKON GRUP ULUSLARARASI A.Ş. Erbil Branch
Mantkawa, Nzek Filka ZiraaArbil / IraqT: +964 750 395 31 92
www.akongrup.com.tr
TURKEY
AKON GRUP ULUSLARARASI A.Ş.
Cinnah Cad.78/7Ankara / TurkeyT: + 90 312 426 85 60
OFFICES
www.akongrup.com.tr
AKON GRUP
Head Office Organization Chart
Account
Department
Personnel
Department
Administration
Department
Business Development
Department
Country Office
Projects
Assistant G. Manager
Saudi Arabia
Account
Department
Personnel
Department
Administration
Department
Business Development
Department
Country Office
Projects
Assistant G. Manager
Domestic and Branch Offices
Proposal
Department
Budget and Planning
Department
Technical Manager QHSE Manager
Account
Department
Personnel and Admin
Department
Auditing Services
Procurement
Department
Assistant G. Manager
Finance
Legal Councel
General Manager
ORGANIZATION CHART
Intercorporate Quality Control system established to provide and maintain high quality services for our customers
www.akongrup.com.tr
QUALITY MANAGEMENT
HSE practices at highest standards are adopted and exercised in our job site to reduce occupational risks
www.akongrup.com.tr
HEALTH AND SAFETY MANAGEMENT
www.akongrup.com.tr
MANHOUR
www.akongrup.com.tr
TURNOVER (USD)
131
116
KSD023 DSD024
16
13
557
9
20
Management Site Engineers Site Supervisors HSE Officers
QA/QC Finance&Admin Support
DIRECT PERSONNEL INDIRECT PERSONNEL
Direct Indirect Total
KSD023 131 40 171
DSD024 116 35 151
TOTALS 247 75 322
Direct Indirect Total
Turkish 121 27 148
Pakistani 31 10 41
Indian 26 7 33
Bangladesh 41 14 55
Others 28 17 45
TOTALS 247 75 322
www.akongrup.com.tr
PERSONNEL
ONGOING PROJECTS
www.akongrup.com.tr
DHUBA WATER DESALINATION PLANT
Turnkey civil and architectural works for the Dhuba Water Desalination Plant Project.
Works included Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake PumpStation, Product Water Storage, Neutralization Tank and Guard House, total area of 45,468 m2.
Scope included o17,558 m3 Concrete, 2,016 ton Reinforcing Bar work.
Project No: DSD024
Client: Metito Saudi Limited
Location: Dhuba, KSA
Project Start: Feb 2019
Project Duration: 12 Months
Expected Completion: Jan 2020
Peak Manpower: 153 people
Average Manpower: 109 people
Contract Value: 11,066,667 USD
www.akongrup.com.tr
ONGOING PROJECTS
KAEC SOLAR WATER DESALINATION PLANT
Turnkey civil and architectural works for King Abdullah Economic City sea water RO Project.
Works included General Site Works, Machine Foundations, RO Building, Admin Building, Electrical Building, Intake Electrical Building, Intake Pump Station, Product Water Storage, Neutralization Tank and Guard House, total area of 68,400 m2.
Scope included 15,227 m3 Concrete, 1,531 ton Reinforcing Bar work.
Project No: KSD023
Client: Metito Saudi Limited
Location: Jeddah, KSA
Project Start: Dec 2019
Project Duration: 12 Months
Expected Completion: Dec 2019
Peak Manpower: 197 people
Average Manpower: 141 people
Contract Value: 9,466,607 USD
www.akongrup.com.tr
ONGOING PROJECTS
COMPLETED PROJECTS
www.akongrup.com.tr
IVRINDI GOLD BENEFICIATION PLANT
Turnkey fabrication and construction works for the İvrindi Gold Beneficiation Plant Project.
Works included Crushing, Screening, HPGR, Storage units and conveyors.
Scope included 20,000 m3 concrete, 3,400 ton structural steel, 1380 ton platework, 2917 ton equipment erection, 800 ton piping and 4,800 m conveyor works.
Project No: IGM022
Client: TÜMAD Madencilik A.Ş.
Location: Balıkesir, TURKEY
Project Start: Jan 2018
Project Duration: 15 Months
Date of Completion: June 2019
Peak Manpower: 326 people
Average Manpower: 233 people
Contract Value: 44,100,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
PETRORABIGH CLEAN FUEL / SULPHUR RECOVERY UNIT
Turnkey construction works for the PETRO RABIGH CFP/ SRU project.
Works included R225 - CFP (Clean Fuel Unit), R311 - SRU 3 (Sulphur Recovery Unit), SS27 (Electrical substation) and PIB27 (Process Interface Room) packages.
Scope included 22,000 m3 structural concrete, 3 km U/G FRP Piping Works and 3 buildings works.
Project No: PCF021
Client: Kinetics Technology
Location: Rabigh, KSA
Project Start: July 2017
Project Duration: 21 months
Date of Completion: May 2019
Peak Manpower: 240 people
Average Manpower: 120 people
Contract Value: 14,425,788 USD
www.akongrup.com.tr
COMPLETED PROJECTS
PETRORABIGH II BLAST PROOF MANUFACTURING BDG.S PROJECT
Works included construction of blast proof buildings, including all work civil, structural, MEP works and external utilities tie-ins.
Scope included Polymer Satellite Maintenance Office Building (828 m2), U&OM Satellite Maintenance Office Building (828 m2), Refinery Satellite Maintenance Office Building (828 m2) and Monomer Satellite Maintenance Office Building (996 m2).
Project No: PRB008B
Client: Saudi ARAMCO / SUMITOMO
Location: Rabigh, KSA
Project Start: Oct 2015
Project Duration:546 days
Date of Completion: May 2019
Peak Manpower: 216 people
Average Manpower: 83 people
Contract Value: 20,000,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
LAPSEKİ GOLD BENEFICIATION PLANT
Turnkey construction works for the Lapseki Gold Beneficiation Plant Project.
Works included Crushing and Screening, Fine Ore Storage, Grinding, Thickening, CIP Leach, Chemical Preparation, Filtration units and conveyors.
Scope included 13,708 m3 concrete, 2,500 ton structural steel, 151 ton tank fabrication, 488.8 ton platework, 120 ton piping, 1,800 ton equipment erection and 800 m conveyor works.
Project No: LGM020
Client: TÜMAD Madencilik A.Ş.
Location: Çanakkale, TURKEY
Project Start: Nov 2016
Project Duration: 240 days
Date of Completion : Jan 2018
Peak Manpower: 450 people
Average Manpower: 80 people
Contract Value: 18,500,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
PETRORABIGH II NON-PROCESS BDG.S CONSTRUCTION PROJECT
Turnkey construction and facility maintenance works for the Petrorabigh II Non Process Buildings facilities, total OF 76,000 m2
Scope included supply and construction of Administration Building, Product Warehouse Building, client camp and catering facilities for further construction of Petrorabigh II, client offices, additional buildings for maintenance, laboratory and canteen buildings inside the existing PRB facilities, renovation of main mess hall facilities for Petrorabigh, operation and maintenance of all facilities for 1500 days.
Project No: PRB008
Client: Saudi ARAMCO / SUMITOMO
Location: Rabigh , KSA
Project Start: Jan 2012
Project Duration: 1500 days
Date of Completion : Dec 2018
Peak Manpower: 1300 people
Average Manpower: 800 people
Contract Value: 79,000,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
RABIGH II REFINING AND PETROCHEMICAL PROJECT - NAPHTHA AND AROMATICS PACKAGE (RP2) - AREA R410 & R420
Miscellaneous excavation, backfilling, reinforced concrete, steel, equipment installation, process piping and instrumentation works.
Scope included 10.000 m3 excavation, 985 m³ concrete, 12 ton chequered plate cover, 12.570 m2 protective coating works.
Project No: SNA019
Client: Saudi ARAMCO / SAIPEM
Location: Rabigh, KSA
Project Start: Sep 2016
Project Duration: 6 months
Date of Completion : Mar 2017
Peak Manpower: 104 people
Average Manpower: 80 people
Contract Value: 2,786,787 USD
www.akongrup.com.tr
COMPLETED PROJECTS
EAST DAMMAM ARAMCO HOUSING PROJECT
Lump sum MEP, Finishing and Landscaping Works of 218 premium villas for Saudi Aramco management personnel.
Scope included 104,000 m2 closed area.
Project No: DMH018
Client: Saudi ARAMCO
Location: Dammam, KSA
Project Start: Nov 2015
Project Duration: 400 days
Date of Completion: Mar 2017
Peak Manpower: 750 people
Average Manpower: 400 people
Contract Value: 64,575,817 USD
www.akongrup.com.tr
COMPLETED PROJECTS
YANBU POWER AND DESALINATION PLANT
Civil works for Aeration Basin, Mixing Basin, Bypass Basin, Discharge Basin, pipe racks and buildings.
Scope included 350,000 m3 excavation, 93,000 m3 concrete, 10,000 ton rebar work.
Project No: YPR016
Client: Samsung Engineering
Location: Yanbu, KSA
Project Start: May 2015
Project Duration: 505 days
Date of Completion : Sep 2016
Peak Manpower: 760 people
Average Manpower: 580 people
Contract Value: 27,055,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
KHABAT THERMAL POWER PLANT PROJECT
Civil and buildings works packages of 2x150 MW Thermal Power Plant.
Works included civil works of turbine building, steam turbine foundation, boiler, electrostatic precipitator, cooling tower, auxiliary boiler, absorber, steam converter, f.o. heater, ash silo, unit auxiliary transformer, transformer, limestone unloading, electrical building, and control building.
Scope included 40,000 m3 concrete and 5,100 ton rebar works.
Project No: KHB015
Client: GAMA Power / POSCO
Project Start: May 2014
Location: Erbil, Iraq
Project Duration: 365 days
Date of Completion : Dec 2015
Peak Manpower:350 people
Average Manpower: 120 people
Contract Value: 16,138,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
ENERJISA BANDIRMA HEPP PROJECT
EPC works for Bandırma HEPP Project, in a consortium with GEPPERT AG.
Scope included installation of a new 3.5 MW hydro power turbine feeding from the cooling water discharge line of the 900MWCombined Cycle Power Plant in the area, modification of the existing cooling water discharge line .The project was designed as a green energy project and got an innovation award within client’s group of companies.
Project No: BHP010
Client: Enerjisa
Location: Bandırma, TURKEY
Project Start: Jun 2013
Project Duration: 13 months
Peak Manpower: 120 people
Average Manpower: 80 people
Date of Completion : 30.06.2014
Contract Value: 6,687,200 USD
www.akongrup.com.tr
COMPLETED PROJECTS
AUTOROUTE DU MAROC JADIDA-SAFI HIGHWAY
Civil works for 41 bridges, 2 flyovers and 39 underpasses on the route.
Project No: FOT009
Client: Nurol İnşaat A.Ş.
Location: Jadida-Safi, Morocco
Project Start: Jun 2013
Project Duration:20 months
Date of Completion : Feb 2015
Peak Manpower: 400 people
Average Manpower: 230 people
Contract Value: 3,350,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
HARAMAIN RAIL LINK PHASE 1 PACKAGE 2 MADINAH STATION STRUCTURAL WORKS
Civil works of the Madinah Station of the Haramain High Speed Railway.
Scope included 120,000 m3 concrete, 11,300 tons reinforcement,, 169,300 m2 formworks works with supply.
Project No: HHR006
Client: Saudi Railways / Yapı Merkezi
Location: Madinah, KSA.
Project Start: Dec 2011
Project Duration: 1 year
Date of Completion : Dec 2012
Peak Manpower: 450 people
Average Manpower: 250 people
Contract Value: 10,130,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
PETRORABIGH II INITIAL START-UP TEAM ACCOMODATION PROJECT
Construction of Camp Facilities, 200 Bachelor Accommodation Units and 48 Family Residence Units, including all MEP utilities and infrastructure works, total of 108,000 m2 covered area.
Scope included structural, mechanical, electrical, plumbing works and landscaping.
Project No: PRB008A
Client: Saudi ARAMCO / SUMITOMO
Location: Rabigh, KSA
Project Start: July 2015
Project Duration:243 days
Date of Completion: Mar 2017
Peak Manpower: 343 people
Average Manpower: 200 people
Contract Value: 26,666,667 USD
www.akongrup.com.tr
COMPLETED PROJECTS
KING SAUD UNIVERSITY AGRICULTURAL ENG. FACULTY BUILDING
Civil works of the 3 floors, 12,000 m2 faculty building.
Scope included 2,700 m3 concrete and 400 tons reinforcement works.
Project No: KSU002
Client: Renaissance Construction KSA
Location: Riyad, KSA
Project Start: Mar 2011
Project Duration: 6 months
Peak Manpower: 150 people
Average Manpower: 75 people
Date of Completion: 30.09.2010
Contract Value: 1,200,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
JABAL OMAR H12, H13A, H13B and H13C TOWERS PROJECT
Civil works of the 34 floors, 58,000 m2 hotel towers in Jabal Omar Project.
Scope included 36,000 m3 concrete and 5,200 tons reinforcement work.
Project No: JOD003
Client: Jabal Omar Development Co.
Location: Makkah, KSA
Project Start: Feb 2011
Project Duration: 26 months
Peak Manpower: 450 people
Average Manpower: 300 people
Date of Completion : 30.03.2012
Contract Value: 14,133,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
KING KHALID UNIVERSITY CONFERENCE HALL BUILDING
Civil works of the 28,000 m3 conference hall building in King Khalid University Project, Phase 3 Works.
Scope included 10,700 m3 concrete and 1,200 tons reinforcement works.
Project No: KKU004
Client: Ministry of Education / Baytur
Location: Abha, KSA
Project Start: Apr 2012
Peak Manpower: 130 people
Average Manpower: 100 people
Date of Completion : 15.08.2013
Contract Value: 2,800,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
KING KHALID UNIVERSITY GENERAL ADMINISTRATION BUILDING
Civil works of the 32,000 m2 General Administration Building in King Khalid University Project, Phase 3 Works.
Scope included 15,300 m3 concrete, 1,700 tons reinforcement and precast slabs installation works.
Project No: KKU004
Client: Ministry of Education / Baytur
Location: Abha, KSA
Project Start: Apr 2012
Project Duration: 26 months
Peak Manpower: 100 people
Average Manpower: 70 people
Date of Completion : 15.08.2013
Contract Value: 2,800,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
PRINCESS NOURA UNIVERSITY FAMILY and CONSUMER SCIENCES FACULTY BUILDING
Civil works of the 80,000 m2 faculty building.
Project No: PNU001
Client: Renaissance Construction KSA
Location: Riyad, KSA
Project Start: Jul 2010
Project Duration: 7 months
Peak Manpower: 400 people
Average Manpower: 150 people
Date of Completion : 30.09.2010
Contract Value: 3,533,000 USD
www.akongrup.com.tr
COMPLETED PROJECTS
PRODUCTION AND FABRICATION CAPABILITIES
www.akongrup.com.tr
www.akongrup.com.tr
CONSTRUCTION EQUIPMENT
www.akongrup.com.tr
ON SITE CONCRETE PRODUCTION FACILITY
On-site ready mix concrete production facility with a capacity of 150 tons/hr with necessary transport and pumping equipment. Laboratory facilities are established according to international requirements.
www.akongrup.com.tr
STRUCTURAL STEEL FABRICATION FACILITY
800 tons/month structural steel fabrication capacity through our exclusive partner Matris Çelik ve Makina Sanayi ve Ticaret A.Ş.
2000 m2 closed, 4000 m2 open fabrication yard Sand blasting and painting facilities Plasma cutting, bending, directional drilling and automated welding equipment Production according to international standards with fully Qualified welders and adequate QA/QC coverage
CERTIFICATES and AWARDS
www.akongrup.com.tr
www.akongrup.com.tr
CERTIFICATES and AWARDS
VENDOR APPROVAL
www.akongrup.com.tr
S.N ABBREVIATION ABBREVIATION CERTIFIER COMPANY TITLE
VENDOR CODEof
AKON INTERNATIONAL CO. LTD.
1 MA'ADEN SAUDI ARABIAN MINING COMPANY 12893
2 ARAMCO SAUDI ARAMCO 10054797
3 SABIC SAUDI BASIC INDUTRIES CORPORATION 507721
4 RCJY ROYAL COMMISSION FOR JUBAIL AND YANBU RCY000107
5 KAEC KING ABDULLAH ECONOMIC CITY 4331
6 SEC SAUDI ELECTRICITY CO. VD006816 & 5005096
7 PETRORABIGH PETRORABIGH - RABIGH REFINING & PETHROCHEMICAL COMPANY 103093
8 EnerjiSA Enerjisa Enerji A.Ş. 37420