CO2 Storage at In SalahIain Wright, CO2 Project Manager, BP Alternative Energy
2nd International CCS Symposium Paris, October 4th 2007
2
Agenda
• CCS Technology• Why Demonstrate CO2 Storage at Industrial-Scale?• Objectives of the In Salah CO2 Storage Project• Progress to Date• Lessons Learned• Next Steps• Questions
3
Source-sink matchingCO2CRC, EUGeocapacity, Coach, US Regionalpartnerships
Public policy supportCSLF, ECCP, EU-ZEPP, CDM
Assurance frameworkCO2CRC, CSLF, IMCO2, WRI
3rd Party DemonstrationsSleipner, Weyburn, CO2Remove
Research
Industry / Academic Initiatives
Technical Demonstrations
Industrial Scale Projects
DF1 DF2 DF3, 4, 5 . . .
BP CCS Technology Program
?
4
Technology Options for GHG Stabilization
The Stabilisation Wedge
Emission trajectory to achieve 500ppm
Emission trajectory BAU
1 GtC Slices of the Stabilisation Wedge
5
CCS is Now in the Technology “Valley of Death”
6
EU ZEP Deployment Roadmap
0
100
200
300
400
500
600
700
2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050Years
ZEP
CO
2 A
void
ed (m
illio
ns to
nnes
/yea
r)
0
20
40
60
80
New
Pro
ject
CO
2 A
void
ance
Cos
t (€
/tonn
e)
ZEFFPP Business as Usual25 New Policy ProjectsEarly Mover Project 10Early Mover Project 9Early Mover Project 8Early Mover Project 7Early Mover Project 6Early Mover Project 5Early Mover Project 4RWE GermanyMid-NorwayPeterhead UKZEFFPP CO2 Avoidance Cost
ZEPs Included in EU ETS
FP 6 R&D:GRACE, NGCASSACS, GESTCO
CASTOR, ENCAPCACHET, ReMoVe
DYNAMIS
European EarlyMover
FundingMechanisms
European ZEPPolicy &
Regulatory Framework
Enables
Enables
New ProjectCO2
Avoidance Cost
Enables
In Salah
7
A Business Model for CCS Deployment
H2Pre-combustion of natural gas (syngas
manufacture)Combined Cycle
Power Generation
CO2
CO2 Storage
e-
CH4
‘Carbon Free’Electricity
H2Provides optionality for future to
supply H2 into other sectors
Transportation
H2syngas manufacture
Combined Cycle Power Generation
CO2
CO2 Storage
e-
Hydro-Carbon
‘Carbon Free’Electricity
HH2Provides optionality for future to
supply H2 into other sectors
Transportation
H2Provides optionality for future to
supply H2 into other sectors
Transportation
8
How Does In Salah Contribute?
In Salah
H2
manufacture
Combined Cycle Power Generation
CO2
CO2 Storage
e-
CH4
‘Carbon Free’Electricity
H2Provides optionality for future to
supply H2 into other sectors
Transportation
H2
Combined Cycle Power Generation
CO2
CO2 Storage
e-
‘Carbon Free’Electricity
H2Provides optionality for future to
supply H2 into other sectors
Transportation
CH4
syngas
Hydro-Carbon
9
Three Projects at In Salah
• Joint Project of BP, Sonatrach and Statoil
• In Salah Project(s) Overview
− In Salah Gas Development (1bcf/d $2,000 million)− In Salah CO2 Storage (1mmtpa $ 100 million)− In Salah CO2 Assurance R&D (CSLF & EU $30 million)
− Part of EU FP-6 CO2ReMoVe ($3mm)
10
CO2 storage at Krechba
G a s
W a te r
C a r b o n if e r o u s R e s e r v o ir ~ 2 0 m e t r e s t h ic k
C a r b o n i fe r o u s M u d s t o n e s ~ 9 5 0 m e t r e s t h ic k
C r e t a c e o u s S a n d s t o n e s & M u d s t o n e s ~ 9 0 0 m e t r e s t h ic k ( R e g io n a l A q u i fe r ) 4 G a s
P r o d u c t io n W e l ls
3 C O 2In j e c t io n
W e l ls
P r o c e s s in g F a c i l i t ie s
A m in e C O 2 R e m o v a l
T h e C O 2 S t o r a g e S c h e m e a t K r e c h b a
G a s
W a te r
C a r b o n if e r o u s R e s e r v o ir ~ 2 0 m e t r e s t h ic k
C a r b o n i fe r o u s M u d s t o n e s ~ 9 5 0 m e t r e s t h ic k
C r e t a c e o u s S a n d s t o n e s & M u d s t o n e s ~ 9 0 0 m e t r e s t h ic k ( R e g io n a l A q u i fe r ) 4 G a s
P r o d u c t io n W e l ls
3 C O 2In j e c t io n
W e l ls
P r o c e s s in g F a c i l i t ie s
A m in e C O 2 R e m o v a l
T h e C O 2 S t o r a g e S c h e m e a t K r e c h b a
G a s
W a te r
C a r b o n if e r o u s R e s e r v o ir ~ 2 0 m e t r e s t h ic k
C a r b o n i fe r o u s M u d s t o n e s ~ 9 5 0 m e t r e s t h ic k
C r e t a c e o u s S a n d s t o n e s & M u d s t o n e s ~ 9 0 0 m e t r e s t h ic k ( R e g io n a l A q u i fe r ) 4 G a s
P r o d u c t io n W e l ls
3 C O 2In j e c t io n
W e l ls
P r o c e s s in g F a c i l i t ie s
A m in e C O 2 R e m o v a l
G a s
W a te r
C a r b o n if e r o u s R e s e r v o ir ~ 2 0 m e t r e s t h ic k
C a r b o n i fe r o u s M u d s t o n e s ~ 9 5 0 m e t r e s t h ic k
C r e t a c e o u s S a n d s t o n e s & M u d s t o n e s ~ 9 0 0 m e t r e s t h ic k ( R e g io n a l A q u i fe r ) 4 G a s
P r o d u c t io n W e l ls
3 C O 2In j e c t io n
W e l ls
P r o c e s s in g F a c i l i t ie s
A m in e C O 2 R e m o v a l
G a s
W a te r
C a r b o n if e r o u s R e s e r v o ir ~ 2 0 m e t r e s t h ic k
C a r b o n i fe r o u s M u d s t o n e s ~ 9 5 0 m e t r e s t h ic k
C r e t a c e o u s S a n d s t o n e s & M u d s t o n e s ~ 9 0 0 m e t r e s t h ic k ( R e g io n a l A q u i fe r ) 4 G a s
P r o d u c t io n W e l ls
3 C O 2In j e c t io n
W e l ls
P r o c e s s in g F a c i l i t ie s
A m in e C O 2 R e m o v a l
T h e C O 2 S t o r a g e S c h e m e a t K r e c h b a
In Salah CO2 Storage: Project Overview
Krechba
Teg
Reg
Garet elBefinat Hassi MoumeneIn Salah
Gour Mahmoud
Proposed ISG PipelineREB
Hassi BirRekaiz
Hassi Messaoud
Hassi R’Mel
Tiguentourine (BP)
02151093
Algiers
Tangiers
Lisbon
Cordoba
Cartagena
M O R O C C O
A L G E R I A
S P A I N
L I B Y A
MAURITANIA M A L I
SkikdaTunis
N I G E R
In Salah Gas Project
• Industrial Scale Demonstration of CO2 Geological Storage (Conventional Capture)• Storage Formation is very similar to the North Sea (USA & China)• Started Storage in August 2004• 1mmtpa CO2 Stored (17mm tonnes total)• $100mm Incremental Cost for Storage: No commercial benefit• Test-bed for CO2 Monitoring Technologies $30mm Research Project
Climate Change Milestones
11
In Salah Gas Processing Plant
Import Gas Pipeline from Teguentour and Reg
Export Gas Pipeline to Hassi R’Mel &
Europe (1 BCF/d)
CO2 Storage Pipeline to Krechba
12
CO2 Storage Project
50mmscf/d CO2(1mmtpa)CompressionTransportation InjectionStorage
Krechba 501
Pilot hole plus 1250 metres of horizontal section
13
In Salah Joint Industry R&D Project
1. Provide assurance that secure geological storage of CO2 can be cost-effectively verified and that long-term assurance can be provided by short-term monitoring.
2. Demonstrate to stakeholders that industrial-scale geological storage of CO2 is a viable GHG mitigation option.
3. Set precedents for the regulation and verification of the geological storage of CO2, allowing eligibility for GHG credits
Objectives (2004-10)
14
Kb-CB
Kb-CA
Spheroid: Clarke 1880Projection: UTM Zone 31NDatum: N Sahara 1959
First Gas Development Well LocationsProduction Well
0 5000Meters
Kb-7
Kb-10
Kb-CC
Kb-6
Kb-CE
Kb-501
Kb-1
Kb-503Kb-502
Kb-5
Kb-9z
Kb-8Kb-4
Kb-2
Gas-Water Contact
1330 metres below Mean Sea Level~1800 metres below Ground Level
Full Gas Column
420000 430000
3210000
3220000
3230000
Kb-503
Kb-501
Kb-11
Kb-14
Kb-12
Kb-13
Kb-502
Krechba Field
Injectors
Producers
Reservoir Surface
15
Relative Performance - Injectors
Injectors performance to end August 2007: 37.4 bscf
911924%
1408038%
1418838%
KB-501 Injection MMscf
KB-502 Injection MMscf
KB-503 Injection MMscf
16
Monitoring Technology: Lessons LearnedJI
P B
enef
it
JIP CostLow High
Low
High
SatelliteImaging
Geochemistry
Micro-seismic
Flowmeters
Wellheadmonitoring
4D gravityTracers
Dynamic Modelling
Wellbore sampling
Annulus Sampling
4D VSP
Cement CO2 work
4DSeismic
Tiltmeters
Cross-wellEM
Geomechanics
Logging
Surface EMAquifer studies
Microbiology
Soil gas
Surface fluxObservation
Wells
Airborne Flux
Park
Focussed ApplicationJust Do It
Consider Key
To be tested
Water Chemistry
17
Monitoring: Oil & Gas vs Saline Formations
EOR Project SalineDepleted O&G
Conventional/Waterflood
EOR
CO2 Storage
N/A
N/AN/A
18
Forward Plan: Next 12 Months
• 4Q 2007− Soil gas depth testing, lineament analysis, microseismic testing, tiltmeters,
surface flux monitoring, hydrogeology, microbiology, gravity test
• Early 2008− Full soil gas survey, microseismic array, gravity survey− Shallow observation well(s)− Further data acquisition from new production wells− Hydrogeology/microbiology
• Early to mid 2008− 3D seismic survey− surface flux− gravity measurements− logging
19
Summary
• BP is Taking Big Steps Towards CCS Deployment
• What’s required:− Regulatory Framework: Is it Legal?− Policy Framework: Will Investors be Paid?− How to deal with: Long-term Liability?
• In Salah helps to develop answers
• BP is ready to invest in CCS projects in locations where the three key questions are answered.
20
Thank You. Questions?
Useful Links:
• Check your carbon footprint at: www.bp.com• Princeton Wedges: www.princeton.edu/cmi• CCS Technology: www.co2captureproject.org• EU CCS Roadmap: www.zero-emissionplatform.org• Iain’s email: [email protected]