Peterhead CCGT Proposed CCS Demo Jeremy Carey Technology Manager, SSE Generation 14 th March 2011

Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

Peterhead CCGT Proposed CCS DemoJeremy CareyTechnology Manager, SSE Generation

14th March 2011

Page 2: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

SSE Background

Strategy“To deliver sustained real growth in the dividend payable to shareholders through the efficient operation of, and investment in, a balanced range of economically-regulated and market-based energy businesses.”

Generation

Customers

Networks

Services

Page 3: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

As of 8/3/10

• British Isles ‘pure play’Onshore gas storage 4900 MW of gas & oil4360 MW of coal2300 MW of renewables~1500 staff (SSE plc >20k)

SSE - Generation

SSE’s Carbon Reduction GoalTo reduce the carbon-intensityof electricity from SSE power stations by 50% between 2005/6 and 2020 (<300gCO2/kWh)

Page 4: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

Why a Gas CCS Demonstration?• Energy Security

Need flexible plant for dynamic security Attractive forward gas pricesNeed to add capacity soon

• Climate ChangeGas >50% of 2020 UK TWhrs? Gas+CCS <50g/kWhrCoal <20% of 2020 UK TWhrs? Coal+CCS <80g/kWhr

• Fuel PovertyGas+CCS has lower LCOE than Coal+CCS?

• Different Technology Development ChallengesDemonstrated on Coal = Proven on Gas

Page 5: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

Key Gas Capture Challenges

• CO2 Concentration and “85/90% Capture”• Gas <4%; Coal >12%• Taller, wider absorber tower• Capture Plant is more costly on gas

• O2 Concentration • Gas >10%; Coal~6%• O2 accelerates solvent degradation• Solvent management costs higher

• GT Backpressure• Must be avoided!

Page 6: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

Disused HC Field

Peterhead Project Location

Page 7: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

Peterhead Power Station

• 1970’s 2 x 660MW Rankine cycle, HFO fired• 1980’s HFO and gas • 1990’s Miller gas boiler conversion• 1990’s 2 x 120MW OCGTs• 1990’s NTS gas connection (3 gas supplies)• 2000 Repowering Project “Block 1”

• 3 x Siemens V94.3A GTs

• NTS gas fired

• Re-used existing ST

Page 8: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

NER Proposal: Key Parameters• Retrofit capture to a single GT (~385MWe in CC mode)

• Post Combustion (amine)

• Offshore storage in known HC field ~10 million te CO2 over 10 yearsShell, CO2DeepStore / Petrofac

• Re-use of existing pipelines

• Ultra clean fossil energy (< 50 g/kWhr)

• Baseload Operation

• Deliverable to NER timescales (2016)

Page 9: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

Process Overview

Steam Turbine

Gas Turbine HRSG

DCC Absorber Stripper Compression& Dehydration

CleanFlue Gas

Rich Solvent

CO2FlueGas

Steam

Electrical EnergyGenerator

Steam

Onshore Pipeline

St Fergus Compressor

Offshore Pipeline

Peterhead

St Fergus Gas Terminal

Goldeneye Platform

Lean Solvent

Shell / Offshore Store

Xmas Tree

Existing Equipment

New Equipment

Change of Use

Key

Onshore Pipeline

St Fergus Compressor

Offshore Pipeline

Lean Solvent

Shell / CO2DS

Existing Equipment

New Equipment

Change of Use

Key

GasSupply

Grid Connection

Pore Space

Injection Manifold

Well Completion

Pressure Control

CO2

Gas Turbine

Steam TurbineHRSG

DCC Absorber Stripper Compression& Dehydration

Generator

Xmas Tree

Page 10: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

A Deliverable Project…• Existing CCGT station

• Existing Grid Connection• Existing fuel supply• Existing work force• Existing utility capacity• Existing available land• Precedent Planning Consent (DF1)

• Existing Transport Infrastructure• Existing CO2 export infrastructure

• Existing HC storage site

• Station Manager Commitment• CEO Commitment

But DECC or NER+DECC funding required

Page 11: Peterhead CCGT th Proposed CCS Demo - Generation · 2014-01-06 · Offshore Pipeline Peterhead St Fergus Gas Terminal Goldeneye Platform Lean Solvent Shell / Offshore Store Xmas Tree

Questions?

“Peterhead is probably the best site in the country for a ~300MWe demo CCS retrofit project on a gas fired power station”

Prof Jon Gibbins