Peterhead CCGT Proposed CCS DemoJeremy CareyTechnology Manager, SSE Generation
14th March 2011
SSE Background
Strategy“To deliver sustained real growth in the dividend payable to shareholders through the efficient operation of, and investment in, a balanced range of economically-regulated and market-based energy businesses.”
Generation
Customers
Networks
Services
As of 8/3/10
• British Isles ‘pure play’Onshore gas storage 4900 MW of gas & oil4360 MW of coal2300 MW of renewables~1500 staff (SSE plc >20k)
SSE - Generation
SSE’s Carbon Reduction GoalTo reduce the carbon-intensityof electricity from SSE power stations by 50% between 2005/6 and 2020 (<300gCO2/kWh)
Why a Gas CCS Demonstration?• Energy Security
Need flexible plant for dynamic security Attractive forward gas pricesNeed to add capacity soon
• Climate ChangeGas >50% of 2020 UK TWhrs? Gas+CCS <50g/kWhrCoal <20% of 2020 UK TWhrs? Coal+CCS <80g/kWhr
• Fuel PovertyGas+CCS has lower LCOE than Coal+CCS?
• Different Technology Development ChallengesDemonstrated on Coal = Proven on Gas
Key Gas Capture Challenges
• CO2 Concentration and “85/90% Capture”• Gas <4%; Coal >12%• Taller, wider absorber tower• Capture Plant is more costly on gas
• O2 Concentration • Gas >10%; Coal~6%• O2 accelerates solvent degradation• Solvent management costs higher
• GT Backpressure• Must be avoided!
Disused HC Field
Peterhead Project Location
Peterhead Power Station
• 1970’s 2 x 660MW Rankine cycle, HFO fired• 1980’s HFO and gas • 1990’s Miller gas boiler conversion• 1990’s 2 x 120MW OCGTs• 1990’s NTS gas connection (3 gas supplies)• 2000 Repowering Project “Block 1”
• 3 x Siemens V94.3A GTs
• NTS gas fired
• Re-used existing ST
NER Proposal: Key Parameters• Retrofit capture to a single GT (~385MWe in CC mode)
• Post Combustion (amine)
• Offshore storage in known HC field ~10 million te CO2 over 10 yearsShell, CO2DeepStore / Petrofac
• Re-use of existing pipelines
• Ultra clean fossil energy (< 50 g/kWhr)
• Baseload Operation
• Deliverable to NER timescales (2016)
Process Overview
Steam Turbine
Gas Turbine HRSG
DCC Absorber Stripper Compression& Dehydration
CleanFlue Gas
Rich Solvent
CO2FlueGas
Steam
Electrical EnergyGenerator
Steam
Onshore Pipeline
St Fergus Compressor
Offshore Pipeline
Peterhead
St Fergus Gas Terminal
Goldeneye Platform
Lean Solvent
Shell / Offshore Store
Xmas Tree
Existing Equipment
New Equipment
Change of Use
Key
Onshore Pipeline
St Fergus Compressor
Offshore Pipeline
Lean Solvent
Shell / CO2DS
Existing Equipment
New Equipment
Change of Use
Key
GasSupply
Grid Connection
Pore Space
Injection Manifold
Well Completion
Pressure Control
CO2
Gas Turbine
Steam TurbineHRSG
DCC Absorber Stripper Compression& Dehydration
Generator
Xmas Tree
A Deliverable Project…• Existing CCGT station
• Existing Grid Connection• Existing fuel supply• Existing work force• Existing utility capacity• Existing available land• Precedent Planning Consent (DF1)
• Existing Transport Infrastructure• Existing CO2 export infrastructure
• Existing HC storage site
• Station Manager Commitment• CEO Commitment
But DECC or NER+DECC funding required
Questions?
“Peterhead is probably the best site in the country for a ~300MWe demo CCS retrofit project on a gas fired power station”
Prof Jon Gibbins