US Army Corps of EngineersBUILDING STRONG®

Coastal Structures Risk Communication of the Great Lakes Districts of the US Army Corps of Engineers

Page 2: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Purpose: Communicate the risk of breakwater and structure conditions to localstakeholders and navigation system users. With a focus on structurecondition, function, and economic consequences of coastal structureson the Great Lakes.

Focus Topics:

1. Coastal Structure Risk Communication

2. Condition Assessment of Coastal Structures

3. Harbor Infrastructure Inventory Process

4. Next Steps and Open Discussion

2

Introduction and Agenda

Page 3: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Lake Superior

MI

MI

NY

PA

IL

WI

IN

CANADA

OH

Oswego

Detroit River

Harbor Beach

Alpena

Cheboygan

Charlevoix

Frankfort

Manistee

Ludington

Muskegon

Holland

Grand Haven

South Haven

St. Joseph

Michigan City

Indiana HarborChicago River

Chicago Harbor

Waukegan

Kenosha

Milwaukee

Port Washington

Sheboygan

Manitowoc

Kewaunee

Algoma

Sturgeon Bay

Menominee

ManistiqueDetour

Grand Marais

Presque IsleMarquette

Keweenaw Waterway

Two HarborsKnife River

Duluth-Superior

Regional Risk Communication Meetings

Bolles Harbor

Au Sable

Hammond Bay

Harrisville

Lexington

Mackinac IslandMackinaw City

Point Lookout Port Austin

Port Sanilac

Tawas BayArcadia

Greilickville

Inland Route

Leland

New Buffalo

Pentwater

Petoskey

Portage Lake

Saugatuck

White Lake

Clinton River

Big Bay

Eagle Harbor

Grand TraverseLac La Belle

Little Lake Whitefish Point

Grand Marais

Port Ontario

Cape Vincent

Oconto

Two Rivers

Bayfield

Regional Meetings

#1 16 Aug#2 IN/IL#3 West MI#4 NE MI #5 SE MI#6 West Erie#7 East Erie#8 East Ont#9 MN

#10 UP MI

Cedar River

Page 4: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Lake Superior

MI

MINY

PAIL

WI

IN

CANADA

OH

CommercialRecreational

Ogdensburg

Morristown

Cape Vincent

Sackets Harbor

Port Ontario

Oswego

Monroe

Rouge River

Clinton RiverBelle River

Pine River

Lake St. Clair

St. Clair RiverBlack River (Port Huron)

Lexington

Port Austin

Harbor Beach

Port SanilacSaginaw River

Point Lookout

Tawas BayAu Sable Harbor

Harrisville

Alpena

Hammond Bay

CheboyganInland Route

Mackinaw CityMackinac Island

St. James

Petoskey

Charlevoix

Channels in Straits of Mackinac

Grays Reef

Leland

GreilickvilleFrankfort

Arcadia

Portage Lake

Manistee

Ludington

Pentwater

White Lake

Muskegon

Saugatuck

Grand River

Holland

Grand Haven

South Haven

St. JosephNew Buffalo

Michigan City

Burns Small Boat HarborBurns Waterway HarborCalumet Harbor

Indiana Harbor

Chicago RiverChicago Harbor

Waukegan

Kenosha

Milwaukee

Port Washington

Sheboygan

Manitowoc

Washington Island (2 harbors)

Green Bay

Big SuamicoKewaunee

Algoma

Sturgeon Bay

Two Rivers

PensaukeeOconto

MenomineeCedar River

Little Bay de Noc (Gladstone)

Manistique DetourLes Cheneaux Island

Soo Locks (part of St. Mary’s River project)

St. Marys River

Whitefish Point Harbor

Little LakeGrand Marais

Presque Isle

Marquette

Big Bay

Grand Traverse Bay

Lac La BelleEagle Harbor

Keweenaw Waterway

OntonagonBlack River

SaxonAshland

Chippewa Harbor

Grand Marais

Two Harbors

Knife River

Duluth-SuperiorBayfield

La PointeCornucopia

Port Wing

60 Commercial Projects, including 45 with structures

79 Recreational Projects, including 61 with structures

Great Lakes Navigation System (GLNS)

Niagara River

Detroit River

Bolles Harbor

4

Page 5: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Coastal StructuresGreat Lakes Navigation

- 104+ miles of navigational structures on the Great Lakes- Most built between 1860 and 1940 - Timber crib construction (typical)- Low Lake water levels since the 1990’s have accelerated

deterioration

5

Page 6: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Typical Coastal Structures

6

Steel Sheet Pile Structures

Rubble Mound/Laid-Up Stone Structures

Typical Wood Crib/ Concrete Cap Structures Cross-section

Other Components: safety (railings, walking surface, etc.)

Page 7: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Structure Function/Consequences

Calumet Harbor, IL&IN

7

Contain and reduce shoaling in navigation channel

St. Joseph Harbor, MI

Control wave climate within navigation channel and harbor

Milwaukee Harbor, WI

Protect navigation channel and shoreline infrastructure

Page 8: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Coastal Structure Risk Communication

Process:1. Conduct Condition Assessments

- Commercial Harbors- Use detailed Breakwater Assessment Team (BAT) Evaluation

- Recreational Harbors- Rely on expert elicitation

2. Conduct Harbor Infrastructure Inventory on all structures

3. Prepare summary document that conveys the current condition of the harbor infrastructure as well as the risk involved in the event of failure

4. Share with stakeholders in regional meetings

Program Objective: Communicate the risk of breakwater and structure conditions to local stakeholders and navigation system users

8

Page 9: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Harbor Structure Condition Assessments

Lake Superior

MI

MI

NY

PA

IL

WI

IN

CANADA

OH

Oswego

Detroit River

Harbor Beach

Alpena

Cheboygan

Charlevoix

Frankfort

Manistee

Ludington

Muskegon

Holland

Grand Haven

South Haven

St. Joseph

Michigan CityChicago River

Chicago Harbor

Waukegan

Kenosha

Milwaukee

Port Washington

Sheboygan

Manitowoc

Kewaunee

Algoma

Sturgeon Bay

Menominee

ManistiqueDetour

Grand Marais

Presque IsleMarquette

Keweenaw

Waterway

Two HarborsKnife River

Duluth-Superior

Bolles Harbor

Au Sable

Hammond Bay

Harrisville

Lexington

Mackinac IslandMackinaw City

Point Lookout Port Austin

Port Sanilac

Tawas BayArcadia

Greilickville

Inland Route

Leland

New Buffalo

Pentwater

Petoskey

Portage Lake

Saugatuck

White Lake

Clinton River

Big Bay

Eagle Harbor

Grand TraverseLac La Belle

Little Lake Whitefish Point

Grand Marais

Port Ontario

Cape Vincent

Oconto

Two Rivers

Bayfield

CommercialRecreational

A – Failure UnlikelyB – Low Risk of Failure

C – Medium Risk of FailureD – High Risk of Failure

F – Failed

9

Page 10: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Harbor Infrastructure Inventory Process Gather information on critical infrastructure protected by federally

maintained navigation structures► Review Documents:

• Project Drawings• Harbor Fact Sheet• Aerial/Satellite Photography; Photo document critical

infrastructure► Identify Critical Infrastructure to Visit► Research Identified Critical Infrastructure

Site Visit Tasks► Met with Local Officials, Port Authority, Harbor Master, when

available► Visit Identified Areas/Critical Infrastructure & Gather Information

Post Site Visit Tasks► Create Report Following the Standard Report Template

10

Page 11: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Harbor Infrastructure Inventory Report Content HARBOR LOCATION PROJECT DESCRIPTION

Authorization, harbor type (commercial or recreational), length of breakwater structures and channel

DATE OF SITE VISIT SUMMARY OF STRUCTURES

Lists all structures and facilities that are believed to be protected by the federal navigation structures; also identify any other potential stakeholders

SUMMARY OF IMPACTSummarizes any potential damage that could be experienced if the federal breakwater fails.

DESCRIPTION OF STRUCTURESAerial photo with all potential affected structures shown along with pictures and a brief description of each potentially affected structure

11

Page 12: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

High Level Display of Potential Impact Areas

Three potential impact areas were defined at 500 ft intervals

Shows potential value of land and infrastructure within each “potential impact area” based on tax assessment data

12

Page 13: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Harbor Structure Condition Assessments

Lake Superior

MI

MI

NY

PA

IL

WI

IN

CANADA

OH

Oswego

Detroit River

Harbor Beach

Alpena

Cheboygan

Charlevoix

Frankfort

Manistee

Ludington

Muskegon

Holland

Grand Haven

South Haven

St. Joseph

Michigan CityChicago River

Chicago Harbor

Waukegan

Kenosha

Milwaukee

Port Washington

Sheboygan

Manitowoc

Kewaunee

Algoma

Sturgeon Bay

Menominee

ManistiqueDetour

Grand Marais

Presque IsleMarquette

Keweenaw

Waterway

Two HarborsKnife River

Duluth-Superior

Bolles Harbor

Au Sable

Hammond Bay

Harrisville

Lexington

Mackinac IslandMackinaw City

Point Lookout Port Austin

Port Sanilac

Tawas BayArcadia

Greilickville

Inland Route

Leland

New Buffalo

Pentwater

Petoskey

Portage Lake

Saugatuck

White Lake

Clinton River

Big Bay

Eagle Harbor

Grand TraverseLac La Belle

Little Lake Whitefish Point

Grand Marais

Port Ontario

Cape Vincent

Oconto

Two Rivers

Bayfield

CommercialRecreational

A – Failure UnlikelyB – Low Risk of Failure

C – Medium Risk of FailureD – High Risk of Failure

F – Failed

13

Page 14: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

D

Waukegan Harbor:D: High Risk of Failure

Page 15: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®15

Waukegan Harbor:$6M estimated cost to upgrade D rated structures to an acceptable level of risk (Level B)

Infrastructure:1. Waukegan Harbor Marina2. Akzo Nobel R&D Facility3. Bait and Tackle Supplies4. US Coast Guard5. Harbor House6. Waukegan Yacht Club7. Cement factory (LaFarge)8. Lordahl Engineering Co9. St. Mary’s Cement10. National Gypsum Co.11. Larsen Marine12. Bombardier Motor Corp US13. Waukegan Water Plant14. Beach House

D

Page 16: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®16

Waukegan Harbor:Potential Impact Areas

Buffer Feet

LandValue

Improv.Value

Total Assessed

Value1,000 $29M $13M $42M

1,500 $32M $14M $46M

2,000 $35M $16M $51M

Page 17: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Kenosha Harbor:B – Low Risk of Failure

Page 18: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®18

Kenosha Harbor:

Infrastructure:1. Water Treatment Plant2. U.S. Coast Guard Station3. Civil War Museum4. Kenosha Public Museum5. Apartment Complex6. Kenosha Yacht Club7. Simmons Island Boat Harbor8. City Hall

No reaches at Kenosha are rated below A & B risk level

Page 19: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®19

Kenosha Harbor:Potential Impact Areas

Buffer Feet

LandValue

Improv.Value

Total Assessed

Value1,000 $40M $50M $90M

1,500 $51M $89M $146M

2,000 $64M $132M $196M

Page 20: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

D

D

D

Milwaukee HarborD- High Risk of Failure

Page 21: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®21

Milwaukee Harbor:$49M estimated cost to upgrade D rated structures to an acceptable level of risk (Level B)

Infrastructure:1. Beach Park2. McKinley Marina3. Milwaukee Yacht Club4. Milwaukee Sailing Center5. Veteran Park6. Art Museum and Memorial Complex7. Port Authority Pier8. Milwaukee Festival Grounds9. State Park10. Marcus Amphitheater11. I-794 Bridge and Causeway12. Milwaukee Municipal Sewer Department13. Milwaukee Port Authority Facilities14. Milwaukee Port Authority Hdq.15. Car Ferry Terminal16. Coast Guard Station/Sector Hdq.17. Navy Reserve Center

D

Page 22: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®22

Milwaukee Harbor:Potential Impact Areas

Buffer Feet

LandValue

Improv.Value

Total Assessed

Value1,000 $101M $128M $229M

1,500 $204M $766M $970M

2,000 $315M $1413M $1.73B

Page 23: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Port Washington Harbor:B- Low Risk of Failure

Page 24: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®24

Port Washington:

Infrastructure:1. Municipal Wastewater

Treatment Plant2. Water Treatment Plant3. Small Diner4. Port Washington Marina5. Downtown retail 6. Holiday Inn hotel7. Condos8. Townhouse Complex

No reaches at Port Washington are rated below A & B risk level

Page 25: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®25

Port Washington Harbor:Potential Impact Areas

Buffer Feet

LandValue

Improv.Value

Total Assessed

Value1,000 $38M $29M $67M

1,500 $53M $41M $94M

2,000 $63M $61M $124M

Page 26: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

D

D

Sheboygan Harbor:D: High Risk of Failure

Page 27: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®27

Sheboygan Harbor:$13.5M estimated cost to upgrade D rated structures to an acceptable level of risk (Level B)

Infrastructure:1. Public Park2. Harbor Centre Marina3. Residential4. Sheboygan Yacht Club5. Sheboygan Municipal

Auditorium and Armory6. US Coast Guard Station7. Apartment Building8. Harbor Resort Complex9. Retail Space10. Condos

D

Page 28: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®28

Sheboygan Harbor:Potential Impact Areas

Buffer Feet

LandValue

Improv.Value

Total Assessed

Value1,000 $47M $96M $143M

1,500 $92M $146M $238M

2,000 $115M $172M $287M

Page 29: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Manitowoc Harbor: B: Low Risk of Failure

Page 30: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®30

Manitowoc Harbor:

Infrastructure:1. Municipal Waste Water

Treatment Plant2. Lake Michigan Car

Ferry Terminal3. Utility Coal Storage4. Budweiser Brewing

Facility5. Wisconsin Maritime

Museum6. Best Western Hotel7. YMCA8. Manitowoc Marina9. Elementary School10. Residential Area

No reaches at Port Washington are rated below A & B risk level

Page 31: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®31

Manitowoc Harbor: Potential Impact Areas

Buffer Feet

LandValue

Improv.Value

Total Assessed

Value1,000 $16M $31M $47M

1,500 $22M $56M $78M

2,000 $27M $90M $117M

Page 32: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Two Rivers Harbor:B- Low Risk of Failure

Page 33: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®33

Two Rivers Harbor:

Infrastructure:1. US Coast Guard Station2. Two Rivers Waste Water

Treatment Plant3. City Utility Motor Pool4. Water Treatment Plant5. Sea Gull Marina6. Residential

No reaches at Port Washington are rated below A & B risk level

Page 34: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®34

Two Rivers Harbor: Potential Impact Areas

Buffer Feet

LandValue

Improv.Value

Total Assessed

Value1,000 $5M $18M $23M

1,500 $8M $32M $40M

2,000 $10M $43M $53M

Page 35: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

What Can Be Done?

Federal Funding►Funding request through the Federal Budget

process each fiscal year• Contract structural repair• Government floating plant repair

Local Funding►Mechanisms in place to accept local funding

Transfer to State/Local Entity►Section 216 Process

35

Page 36: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Questions?

36

Page 37: Coastal Structures Risk Communication of the Great · PDF fileCoastal Structures Risk Communication ... - Timber crib construction ... Harbor Structure Condition Assessments. Lake

BUILDING STRONG®

Purpose: Communicate the risk of breakwater and structure conditions to local stakeholders and navigation system users.

Target Audience: Stakeholders (port authorities, city/countyofficials, harbor masters, and other navigation interest groups)within selected region

Products: PowerPoint presentation, general overview brochure, and harbor specific infrastructure inventory summary

Potential Dates: 1st Meeting August 16, 2011 (Milwaukee,WI) plans for two addition meetings in FY11.

37

Coastal Structure Risk Outreach Meetings