227

Coipa 2016

Embed Size (px)

DESCRIPTION

Catalogo Aziendale

Citation preview

Page 1: Coipa 2016
Page 2: Coipa 2016
Page 3: Coipa 2016
Page 4: Coipa 2016

REASONS TO MAKE THE RIGHT CHOICE

.

Page 5: Coipa 2016

2

BELAZ is the world’s only company using assembly-line production of mining dump trucks. We provide complete design, production and delivery of a new dump truck within 2-5 months.

Being a valued BELAZ Customer you get: The best price/quality ratio among all world known mining dump truck producers Full compliance with ISO international standards confirmed by hundreds of users

The lowest cost of ton/kilometer of carried cargo along with lowest emissions level

Low maintenance costs and ability to train own stuff to save on each operation of the fleet High productivity multiplied by reliability and high availability rate etc – the list of benefits is imposing enough to get them acquired

Page 6: Coipa 2016

Best Custom Stand – Belaz Stand at AIMEX “The professionalism and creative response, coupled with fulfilling all the elements required by the client, made it a standout. The Belaz stand at AIMEX was simply breathtaking in its perfect match to the brief and the ultimate epic visual impact. The requirements for all aspects in the brief were 100% met. The submission was excellent and complete. A winner at all levels.”

September 2013 – OJSC “BELAZ” introduced the biggest mining dump truck in the world – BELAZ-75710 with payload capacity of 450 metric ton.

Page 7: Coipa 2016

BELAZ-7558 – word’s first mining dump truck with 90 MT payload capacity equipped with AC/AC electric drive system

“Leader of Innovative Best Sellers for the last 5 years”

BELAZ-7531E trolley assisted dump truck with payload capacity of 240 MT equipped with AC/AC drive system

“Revising the past, changing the future”

BELAZ-75137 dump truck with 130 MT payload capacity equipped with VG autonomous operation system

“Could be operated in standard – remote control – autonomous modes.”

Page 8: Coipa 2016

4

ENGINE Emission rate is in compliance with ЕРА Tier II Optimal engine power

High torque at low engine rpm

Electronic engine control and diagnostic system

Low noise level

Low fuel and lubricant consumption

Page 9: Coipa 2016

5

Stepless speed regulation

Maximum dump truck speed is 64 km/h

Downhill speed control

Antiskid system

Brake-track master system

Cruise control

Page 10: Coipa 2016

3

Cast-steel components employedin critical areas of the frame whereloads are the greatest.

Active video surveillance system Diagonal stairs Cab noise level less than 80 dB High voltage proximity warning system with platform lift lockout Easy access to dump truck’s main units

Short wheelbase – enhanced manoeuverability Original suspension design – the best traveling comfort as compared with the competitors –increase in

operator’s productivity Own dump truck frame design – operator safety in the event of a front-end collision with another dump

truck Design solutions – low maintenance cost, fast and easy educcation of customer’s own staff

SAFETY AND COMFORT

Page 11: Coipa 2016

Large capacity fuel tank makes it possible to work for more than 24 hours without refueling. The tank design enables easy water collection and removal with minimal fuel loss. Wiggins Fast Tanking System helps save time on

tanking to increase the productivity

Dual-cycle cooling system enables dump truck operation under various climatic conditions at temperatures ranging from -50°С to +50°С (from -58°F to +122°F).

Three-stage filter guarantees the efficiency of air cleaning of more than 99%.

Lincoln CentroMatic automatic centralized lubrication system significantly reduces the maintenance costs.

Electronic control and diagnostic system ensures permanent condition monitoring of units and systems and prevents emergency situations.

Page 12: Coipa 2016

COST-CUT’s EXAMPLES

SISHEN MINE in the Republic

of South Africa

Low purchase and operation costs

is the major reason for choosing

BELAZ

110-220MT trucks purchases:

2011 – first 5 units 2012 – intensive usage and comparison 2013 – over 20 units 2014-15 – over 60 to come

Page 13: Coipa 2016

7

90MT competitors trucks parked, BELAZ 110MT trucks – in operation

90MT competitors trucks parked, BELAZ 110MT trucks – in operation

During the recession periods mainly low cost equipment is used to

optimize the expenses and maintain the net profit level

Initial capital investment savings

up to 25%

Operating cost savings

up to 30%

Total cost of ownership savings

up to 30%

Page 14: Coipa 2016

Cost of one MT per km, rub Annual expenses for 1 dump truck, thousand of rub

BELAZ-75309

7 178 6 911

Cat 793D

7 001 BELAZ-75174

Dump truck annual productivity, MT per Km

0

10 000

20 000

30 000

40 000

50 000

60 000

70 000

BELAZ-75309 BELAZ-75174 САТ 793D

18 522 13 424

21 444

3 732 3 939

3 822 19 595 17 207

18 079

8 541

4 768

8 746 3 822

3 214

11 520 2 010

2 350

3 895

0,00 1,00 2,00 3,00 4,00 5,00 6,00 7,00 8,00 9,00

10,00

BELAZ-75309 BELAZ-75174 САТ 793D

2,58 1,94

3,06 0,52

0,57

0,55 2,73 2,40

2,52

1,19

0,69

1,27 0,53

0,47

1,67 0,28

0,34

0,56

Maintenance and technical support Overhaul

Tires

Fuel

Operator's expenses

Lease (5 years)

6,40

9,63

7,83

Page 15: Coipa 2016

7

Direct relations with main components suppliers

Integration of cooperation between main

component suppliers and BELAZ along with its dealers network

Building a strong, effective and reliable supply scheme through specially

established trading house “BELAZ-EUROPE”

Working on the basis of annual average slotting that provide BELAZ with

components availability and with pricing control

Constant work with suppliers in regards to quality control and availability

Joint research for improvements

Page 16: Coipa 2016

7

Foreign Countries

Russian Federation CIS countries

14 Dealers

10 Service centers

1 Trading and Distributing Center

8 Dealers 13 Service centers

1 Joint Venture 1 Joint Venture 23 Service Centers

19 companies OJSC “BELAZ” has a stake in

10 Dealers

Page 17: Coipa 2016

7

Dump truck spare parts delivery within whole lifecycle

Prompt elimination of failures within and beyond thewarranty period

Provision of the full range of repair and modernizationservices for the delivered products

Monitoring system application which controls theoperation of units and systems on-line

Training of the customer’s operators on site, as well as at BELAZ training center

Permanent presence of BELAZ specialists for assembling, commissioning and supervising of thedelivered products.

Page 18: Coipa 2016

14

Page 19: Coipa 2016

OJSC “BELAZ” – Management Company of Holding

“BELAZ-HOLDING”

40 let Oktyabrya 4, Zhodino, Minsk reg., Republic of Belarus, 222160

Tel: (+375 1775) 32313, 33970, 70838. Fax: (+375 1775) 33970.

E-mail: [email protected]

Page 20: Coipa 2016
Page 21: Coipa 2016
Page 22: Coipa 2016
Page 23: Coipa 2016
Page 24: Coipa 2016
Page 25: Coipa 2016
Page 26: Coipa 2016
Page 27: Coipa 2016
Page 28: Coipa 2016
Page 29: Coipa 2016
Page 30: Coipa 2016
Page 31: Coipa 2016
Page 32: Coipa 2016
Page 33: Coipa 2016
Page 34: Coipa 2016
Page 35: Coipa 2016
Page 36: Coipa 2016
Page 37: Coipa 2016
Page 38: Coipa 2016
Page 39: Coipa 2016
Page 40: Coipa 2016
Page 41: Coipa 2016
Page 42: Coipa 2016
Page 43: Coipa 2016
Page 44: Coipa 2016
Page 45: Coipa 2016
Page 46: Coipa 2016
Page 47: Coipa 2016
Page 48: Coipa 2016
Page 49: Coipa 2016
Page 50: Coipa 2016
Page 51: Coipa 2016
Page 52: Coipa 2016
Page 53: Coipa 2016
Page 54: Coipa 2016
Page 55: Coipa 2016
Page 56: Coipa 2016
Page 57: Coipa 2016
Page 58: Coipa 2016
Page 59: Coipa 2016
Page 60: Coipa 2016
Page 61: Coipa 2016
Page 62: Coipa 2016
Page 63: Coipa 2016
Page 64: Coipa 2016
Page 65: Coipa 2016
Page 66: Coipa 2016
Page 67: Coipa 2016
Page 68: Coipa 2016
Page 69: Coipa 2016
Page 70: Coipa 2016
Page 71: Coipa 2016
Page 72: Coipa 2016
Page 73: Coipa 2016
Page 74: Coipa 2016
Page 75: Coipa 2016
Page 76: Coipa 2016
Page 77: Coipa 2016
Page 78: Coipa 2016
Page 79: Coipa 2016
Page 80: Coipa 2016
Page 81: Coipa 2016
Page 82: Coipa 2016
Page 83: Coipa 2016
Page 84: Coipa 2016
Page 85: Coipa 2016
Page 86: Coipa 2016
Page 87: Coipa 2016
Page 88: Coipa 2016
Page 89: Coipa 2016
Page 90: Coipa 2016
Page 91: Coipa 2016
Page 92: Coipa 2016
Page 93: Coipa 2016
Page 94: Coipa 2016
Page 95: Coipa 2016
Page 96: Coipa 2016
Page 97: Coipa 2016
Page 98: Coipa 2016
Page 99: Coipa 2016
Page 100: Coipa 2016
Page 101: Coipa 2016
Page 102: Coipa 2016
Page 103: Coipa 2016
Page 104: Coipa 2016
Page 105: Coipa 2016
Page 106: Coipa 2016
Page 107: Coipa 2016
Page 108: Coipa 2016
Page 109: Coipa 2016
Page 110: Coipa 2016
Page 111: Coipa 2016
Page 112: Coipa 2016
Page 113: Coipa 2016
Page 114: Coipa 2016
Page 115: Coipa 2016
Page 116: Coipa 2016

Si fiSinofinnGlobal Innovation in New Energy Engineering

Page 117: Coipa 2016

ContentsContents

� Introduction

� Philosophy & Culture� Philosophy & Culture

� Organizational Structure

� Technology, Products & Projects

� Achievements� Achievements

� Contacts

Page 118: Coipa 2016

~Our Business~

Sinofinn operates through 3 main business divisions—

Our Engineering Division serves the clients with the world class solution to systems concerning energy, metal, paper mill and environmental protection.

Our Energy Developing Division is focused on investment construction operation andOur Energy Developing Division is focused on investment, construction, operation andmanagement on environment friendly projects including combined heat and power generation (CHP), coal refuse to energy, biomass to energy and wind power.

The Manufacturing Division partakes in design and development of products related to the two other division.

Core Focus Distribution:Core Focus Distribution:

Engineering Division

Energy Developing Division

M f i Di i iManufacturing Division

Page 119: Coipa 2016

About us

In the field of new energy development, Sinofinn has mastered the technologies of BFB biomass power generation system and 1.6MW & 3MW direct-drive permanent-magnet wind turbine. And also in China, Sinofinn is a leading investor and operator in the field of new and clean energy such as thermal power generation coal refuse power generation and wind energy etc with thesuch as thermal power generation, coal refuse power generation and wind energy etc with thetotal capacity of the systems under construction and put into operation amounting to 1500MW.

Sinofinn is the only enterprise in China which has four kinds of comprehensive desulphurization processes, including LIFAC (Limestone Injection into the Furnace and Activation of Calcium Oxide) introduced from Finland, SDA (Spraying Dry Absorption) introduced from Niro of Denmark, DCFS (Double Contact Flow Scrubber) introduced from MHI of Japan and CFB (Circulation Fluidized Bed) developed by Sinofinn independently. Sinofinn has established itself as a leader in wet desulphurization technology both at home and abroad through the execution and improvements in many engineering projects.

Page 120: Coipa 2016

~Philosophy~

Development Philosophy: Striving to serve the interest of China as well as Worldwide infrastructure industries with state of the art and modern technologies. To create a better future with New Energy development.

Marketing Philosophy: Advanced, reliable and economical.

Service Philosophy: Efficient sincere and quickService Philosophy: Efficient, sincere and quick.

Employing Philosophy: Providing the employees with a platform to display their talent and also provide ways to improve themselves, both professionally and personally. We believe that all the achievements of the company is a result of the efforts of our employees and wethat all the achievements of the company is a result of the efforts of our employees and westrive towards our goals, guided by a common philosophy.

Page 121: Coipa 2016

Company Culture

�Discipline

�D di i�Dedication

�Brainstormingg

�Co-ordination

�Learning

Page 122: Coipa 2016

Organizational Structure

Page 123: Coipa 2016

Our Technology,

Products

& Projects

Page 124: Coipa 2016

Engineering Division

Environment System

• FGD (SJXP,SDA,LIFAC,DCFS,ACFB,WCFB,WSA)

• De-Nox

• Water Treatment

Power System (Waste to Power System)

• Coal Mine Waste

• City Waste

• Bio-mass Energyo ass e gy

• Metallurgical Waste Gas

Material Handling SystemMaterial Handling System

• Pneumatic Handling System (Fly ash, Bottom ash, FGP Ash, Pebble Coal, Granular solids, Limestone & Sandstone, Special Material etc.)

• Mechanical Handling System

Page 125: Coipa 2016

E D l i Di i iEnergy Developing Division

� Wind power

� Residual-heat utilization

� Clean energy

� Cogeneration project

� Gas-steam combined cycle power plants� Gas steam combined cycle power plants

� Waste to power project

Yunnan Wind Farm DAZHOU Steel Plant

Page 126: Coipa 2016

Sinofinn Manufacture

Sinofinn has two active manufacturing plants:

One is TianChang factory & Uni Man Power (Anhui) factory ,the other one is in Haian

Some of our core products are :

Expansion Joint Our custom-made fabric expansion joint is affirmed by the clients for its rigid process, advanced TECHNOLOGY d li bl lit W l i d i l d f t i ti O f b i i j i tTECHNOLOGY and reliable quality. We supply various design proposal and manufacturing options. Our fabric expansion jointis widely used .

Damper and Gate are highly important equipments at power plant installed mainly in air and flue gas system of plants to adjust the flow quantity and regulate the medium velocity The efficiency and reliability of power plant is mostly decided by theadjust the flow quantity and regulate the medium velocity. The efficiency and reliability of power plant is mostly decided by theair and flue gas flowing and circulation.

FRP Spray Pipe is based on high temperature resistant ethylene resin (epoxy resin, Bakelite, unsaturated polyester resin, organic silicon), and fiber glass is used to make the pipe reinforcedg ) g p p

Page 127: Coipa 2016

Range of Productsg

Ash Handling Plant (AHP)

Fly Ash Conveying System

� Vacuum Conveying System

� Dense Phase Pressure Conveying System

� Dilute Phase Pressure Conveying System

Bottom Ash Conveying System

� Water Impounded Bottom Ash Hopper with Jet Pump

� Scraper Chain Conveyor

� Dry Bottom Ash Conveyor

� Slurry Transport System

� Lean Concentration Transport System (Centrifugal Slurry Pump)

� High Concentration Slurry Disposal System

Page 128: Coipa 2016

Coal Handling Plant (CHP)Coal Handling Plant (CHP)

� Common Belt Conveyor

� Tubular Belt Conveyor� Tubular Belt Conveyor

� Coal Unloading System

� Coal Conveying System� Coal Conveying System

� Screening and Crushing System

Mill R j t H dli S t (MRHS)Mill Reject Handling System (MRHS)

� Dry-type Conveying System

� Pressure Conveying System

� Vacuum Conveying System

� Wet-type Conveying System

(Hydraulic System)

Page 129: Coipa 2016

~Feather On Our Hat~

Typical acheivements:

Awarded ISO 9001:2000, ISO14001, OHSAS18001 accreditation and the title of “Shanghai Outstanding Hi-Tech Enterprise” and “AAA Class Credit Enterprise”.

First enterprise in China exporting the whole set of biomass power generation system

In China, Sinofinn is a leading investor and operator in the field of new and clean energy such as thermal power generation, coal refuse power generation and wind energy etc., with the total capacity of the systems under construction and put into operation amounting to 1500MW

Sinofinn has successfully introduced Positive Pressure Dense Phase Pneumatic Conveying Technology from Uni-Energy Oy of Finland. In2001, further improvement was made by developing a safe and reliable new dense phase PD conveyor system suitablemade by developing a safe and reliable new dense phase PD conveyor system suitablefor medium-and-long conveying distance from 600m to 1000m

We have become one of the few domestic enterprises to export the whole set of large-l t i l i tscale materials conveying system.

Last but not last, Sinofinn has emerged as a top class company, worldwide, in the field of materials conveying, especially in unique industries as mill reject handling system and metallurgy etcmetallurgy, etc.

Page 130: Coipa 2016

Some of our recent successful projects

Sasan UMPP, MP, India:

Sinofinn was contracted as EPC for Ash Handling Package of India SasanSinofinn was contracted as EPC for Ash Handling Package of India Sasan6×660MW UMPP. We provide a complete service including engineering design, equipment supply, erection and maintenance. Moreover, Sinofinn will provide 5-year operation service after the project starts its commercial p y p p jrunning. This is a very important achievement for Sinofinn and further establishes its capability in the market.

Site Picture of Sasan 6*660 UMPP, MP, India

Page 131: Coipa 2016

Jharsuguda Power Plant:

Sinofinn is the supplier of Ash Handling System for India Jharsuguda 4 600MW I d d t P St ti ith th d i h dli it4x600MW Independent Power Station, with the design handling capacityof 341t/h for each unit in this project. This is in the state of Orissa, India.

Site Picture of Jharsuguda 4*600MW Power Plant, Orissa , India

Page 132: Coipa 2016

National Power Group Penglai Power Plant 2*300MW FGD, Shandong Province, China

Guangxi LaiBin Power Plant 2*300 MW ,Guangxi , China

Page 133: Coipa 2016

~TRAINING AND DEVELOPMENT~

• Sinofinn follows its corporate culture and periodically sends its staff overseas for technical training each year.

• In July 2001, Sinofinn sent over 20 to MHI (Mitsubishi Heavy Industry) for technical training, including the demonstration of 1:1 scale Absorber Modeldemonstration of 1:1 scale Absorber Model.

• In December 2004, Sinofinn re-sent personnel to Japan for further technical training, enabling them to gain even better understanding of MHI DCFS technology. In turn Sinofinn applied the same in several practical FGD projects and has today fully grasped its practical functioning. Additionally, Sinofinn has made further advancement of this technology according to China’s current need making Sinofinn a leader in wetadvancement of this technology according to China s current need, making Sinofinn a leader in wetdesulphurization technology in China.

• In October 2006, Sinofinn sent technical personnel to Niro A/S in Denmark twice, for technical training of SDA (Spray Dry Absorbing) FGD technology.

• In January 2007, Sinofinn sent technical personnel to the Wind Power Research Center of Denmark for training in wind power generation technology.

• In May 2008, Sinofinn sent technical personnel to Solent Composite in Britain for training in wind power y ggeneration technology.

Page 134: Coipa 2016

~Development Strategy~

* Focusing on the comprehensive utilization of resources as well as the investment d ti f ffi i t l t h bi d li h t dand operation for energy-efficient power plants such as combined cooling, heat and

power generation (CCHP), etc.

* Focusing on the technical development of future-oriented new energy industries

* Focusing on development and manufacturing of high-efficiency integrated technology for large-scale systems related to energy industries

Page 135: Coipa 2016

K St th~Key Strength~

• Good reputation and objective identification amongst the clients in power & energy industries in China and abroad

• Huge investment for the supplementation and perfection of new facilities of manufacturing base and R&D Centre

• Perfect combination of technology acquisition and independent development• Perfect combination of technology acquisition and independent development,increasingly expanding the scope of application of our technology

• Reliable, near-perfect operation and popular products and technologies, optimal d i t i t & hi hl ffi i t t i t tdesign, strict & highly-efficient process system, precise management system

Page 136: Coipa 2016

Business PartnersBusiness Partners

o Mitsubishi Heavy Industries Co., Ltd.

o POCOTEC Control Technology Ltd.

COMPACT Global Po er Gro po COMPACT Global Power Group

o Air Product Inc.

o GEA Process Engineering A/S

o Uni- Energy Oygy y

o Fortum Oyj

Page 137: Coipa 2016

Chairman’s Vision……

Human beings today, are faced with conflicts between limited resources and their ever-expanding needs; therefore the development and application of new technologies, is the most effective solution Because of this reason the infrastructure industries withmost effective solution. Because of this reason, the infrastructure industries with centuries-old working systems are ready to embrace new technologies. With this ideology in mind, Sinofinn is striving to become an influential player in this emerging industry. C pa i ith ia t i th ld Si fi a b i all i i hi hComparing with numerous giants in the world, Sinofinn maybe is small in size, which however can neither prevent us from achieving our goals in fields of thermal power, new energy and environmental engineering nor deter our continuous endeavor and efforts t d thi di ti Th ll i i i th h Si fi ld lik ttowards this direction. The smallness in size is another reason why Sinofinn would like to partner with counterparts sharing a common vision. Sinofinn, without doubt, can prove to be an excellent working partner.

Page 138: Coipa 2016

Sinofinn New Energy Group Co., Ltd.Sinofinn New Energy Group Co., Ltd.

3000

Address: Zhangjiang Jidiangang, No. 3000 Longdong Avenue, Pudong NewAddress: Zhangjiang Jidiangang, No. 3000 Longdong Avenue, Pudong New

Area, Shanghai, P.R.C

Tel 021-61005858 Fax 021-61009658Tel 021 61005858 Fax 021 61009658

Post Code 201203

Page 139: Coipa 2016

Looking Forward for a Long Term & g gMutually Beneficial Business Relationship!

Page 140: Coipa 2016
Page 141: Coipa 2016
Page 142: Coipa 2016
Page 143: Coipa 2016
Page 144: Coipa 2016
Page 145: Coipa 2016
Page 146: Coipa 2016
Page 147: Coipa 2016
Page 148: Coipa 2016
Page 149: Coipa 2016
Page 150: Coipa 2016
Page 151: Coipa 2016
Page 152: Coipa 2016
Page 153: Coipa 2016
Page 154: Coipa 2016
Page 155: Coipa 2016
Page 156: Coipa 2016
Page 157: Coipa 2016
Page 158: Coipa 2016
Page 159: Coipa 2016
Page 160: Coipa 2016
Page 161: Coipa 2016
Page 162: Coipa 2016
Page 163: Coipa 2016
Page 164: Coipa 2016
Page 165: Coipa 2016
Page 166: Coipa 2016
Page 167: Coipa 2016
Page 168: Coipa 2016
Page 169: Coipa 2016
Page 170: Coipa 2016
Page 171: Coipa 2016
Page 172: Coipa 2016
Page 173: Coipa 2016
Page 174: Coipa 2016
Page 175: Coipa 2016
Page 176: Coipa 2016
Page 177: Coipa 2016
Page 178: Coipa 2016
Page 179: Coipa 2016
Page 180: Coipa 2016
Page 181: Coipa 2016
Page 182: Coipa 2016
Page 183: Coipa 2016
Page 184: Coipa 2016
Page 185: Coipa 2016
Page 186: Coipa 2016
Page 187: Coipa 2016
Page 188: Coipa 2016
Page 189: Coipa 2016
Page 190: Coipa 2016
Page 191: Coipa 2016
Page 192: Coipa 2016
Page 193: Coipa 2016
Page 194: Coipa 2016
Page 195: Coipa 2016
Page 196: Coipa 2016
Page 197: Coipa 2016
Page 198: Coipa 2016
Page 199: Coipa 2016
Page 200: Coipa 2016
Page 201: Coipa 2016
Page 202: Coipa 2016
Page 203: Coipa 2016
Page 204: Coipa 2016
Page 205: Coipa 2016
Page 206: Coipa 2016
Page 207: Coipa 2016
Page 208: Coipa 2016
Page 209: Coipa 2016
Page 210: Coipa 2016
Page 211: Coipa 2016
Page 212: Coipa 2016
Page 213: Coipa 2016
Page 214: Coipa 2016
Page 215: Coipa 2016
Page 216: Coipa 2016
Page 217: Coipa 2016
Page 218: Coipa 2016
Page 219: Coipa 2016
Page 220: Coipa 2016
Page 221: Coipa 2016
Page 222: Coipa 2016
Page 223: Coipa 2016
Page 224: Coipa 2016
Page 225: Coipa 2016
Page 226: Coipa 2016
Page 227: Coipa 2016