COMBUSTION CHAMBER ASSEMBLY DETAILS OF SIEMENS
GAS TURBINE SGT6 5000F
PRESENTED BYNAME:B.KAILASA RAJA
MECHANICAL ENGINEER FOR SIEMENS GAS TURBINES
AND COMBUSTION CHAMBERS
(DLN AND ULN)LOCATION :SAUDI ARABIA
NATIONALITY :INDIANPH NO:+918098533075
EMAIL:[email protected]
DLN ASSEMBLY INSTRUCTIONS
Flashback ThermocouplesDLN Support HousingDLN Pilot NozzleC-Stage Fuel Supply PipingUV DetectorsIgniters
ULN ASSEMBLY INSTRUCTIONS
Flashback ThermocouplesDLN Support HousingDLN Pilot NozzleC-Stage Fuel Supply PipingUV DetectorsIgniters
Installing the C-stage fuel ring
Leg boltC STAGE FUEL RING
Installing the feed pipe
FEED PIPE FEED BLOCK
FUEL RING
CYLINDER
Installing the feed block shimFEED BLOCK SHIM
Installing the assembly support tool
PORTAL SUPPORT
TURNBUCKLE
FEED BLOCK SUPPORT
Installing the thredolet
THREDOLET
FEED PIPE
BORE THROUGH SWAGELOK
Thredolet Assembly
Welding the thredolet to the cylinder
Feed pipe Assembly
Fuel ring leg shims
FUEL RING LEG
SHIM
Shims entering cross flame tube portal hole
Installing the Swagelok 90
SWAGELOK ELBOW
Basket installation
CROSS FLAMETUBE FLANGE
CROSS FLAME TUBE HOLE
BASKET
Basket after installation
Cross flame tube layout
Basket - cross flame tube assembly (Position #8)
MALE CROSSFLAME TUBE
Basket - cross flame tube assembly (Position #8)
MALE CROSSFLAME TUBE MARMAN
COUPLING
Cross flame tube shoulder gap
Sleeve to shoulder gap to be 2.5mm to 3.8mm
shoulder
sleeve
Comparison of PW9D15799G04 cross flame tube with current style
ULN Top hat installation
TOP HAT
Basket to top hat assembly
Flashback thermocouple assembly
DLN flashback thermocouple installation
Verification of thermocouple insertion in the flashback tube
Support housing installation (12K gas only configuration shown)
DLN Pilot Nozzle installation(12K gas only configuration shown)
DLN PILOT NOZZLE
PILOT GASKET
DLN dual fuel pilot nozzle orientation
Centering of pilot washer
12k gas only DLN combustion assembly
25K gas only DLN combustion assembly
25K dual fuel DLN combustion assembly
C-stage fuel supply piping installation
C-stage fuel supply piping installation
UV assembly at basket locations 14 and 15
UV pipe plug
UV Detector flange
Sweep tube
Cover plate gasket
Cover plate flange
UV gasket
M12 bolts & washers
Igniter installation(basket locations #6 and #7)
Igniter assembly
Igniter Gasket
Igniter gap1.8 mm (0.07”) minimum3.8 mm (0.15”) maximum
ULN Flashback thermocouple installation
Pilot T/C A Main T/C A
Main T/C B Pilot T/C B
INBOARD
OUTBOARD
Paint on pilot T/C for verifying proper insertion.
Verifying proper insertion of pilot T/C
Hole in T/Cend fitting
Verifying proper insertion of pilot T/C
Hole in T/C end fitting
Verifying proper insertion of pilot T/C
ULN support housing installation
ULN support housing(25k gas only shown)
ULN pilot nozzle
ULN pilot nozzle installation
Pilot gasket
ULN pilot nozzle
ULN gas only assembly
ULN dual fuel assembly
DLN GAS ONLY COMBUSTION ASSEMBLY (12K)
DLN Pilot Nozzle
DLN Support Housing
Top Hat Basket
Cross FlameTube Flange
CombustorPortal
FlashbackT/C Tube
2x FlashbackT/C and Fitting
DLN DUAL FUEL COMBUSTION ASSEMBLY (25K)
ULN GAS ONLY COMBUSTION ASSEMBLY (12K AND 25K)
ULN DUAL FUEL COMBUSTION ASSEMBLY (12K AND 25K)
C- STAGE FUEL RING ASSEMBLY DETAILS
C-STAGE PIPING ASSEMBLY
DLN C-STAGE PIPING / PORTAL CONFIGURATION
ULN C-STAGE PIPING / PORTAL CONFIGURATION
25K DLN ENGINE ASSEMBLY
25K ULN ENGINE ASSEMBLY
THANKS AND REGARDSNAME:B.KAILASA RAJA
MECHANICAL ENGINEER FOR SIEMENS GAS TURBINES
AND COMBUSTION CHAMBERS
(DLN AND ULN)LOCATION :SAUDI ARABIA
NATIONALITY :INDIANPH NO:+918098533075
EMAIL:[email protected]