20
Copyright © 2014 Boeing. All rights reserved. Defense, Space & Security | Global Services and Support (GS&S) Commercial Derivative Sustainment Overview 274374.pptx | 1 Sergio Parisi KC-767 Italy Tanker Program Site Manager 28 May 2015

Commercial Derivative Sustainment Overview

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Commercial Derivative

Sustainment Overview

274374.pptx | 1

Sergio Parisi

KC-767 Italy Tanker Program – Site Manager

28 May 2015

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Boeing Tanker/Transport History

60+ years of successful Tanker/Transport Sustainment

KC-135, K/DC-10 and 707 Tankers

C-17 Globemaster Integrated Sustainment Program

KC-767 Tanker (Japan and Italy)

KC-46A Tanker and C-40A (emerging products)

Commercial derivatives offer distinct customer advantages

Maximizes One Boeing military and commercial sustainment strengths

Leverage existing Commercial infrastructure

– Publications, training, commercial parts pool, etc.

– Low utilization maintenance program available if less than 1,200 annual flight hours

Yields significantly reduced initial customer ownership cost

Partnering with Boeing optimizes sustainment approach

274374.pptx | 2

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Spectrum of SupportTraditional Organic Support

Performance Based Support

Customer / Industry Share RiskCustomer Holds All Risk

Traditional Support Contractor Supply Role PBL at Subsystem Level PBL at System Level

Support concept can be tailored to specific customer needs

USAF C-17

• Customer responsible for

system performance

• Customer procures desired

hardware and services

• Customer manages

configuration

• Customer performs O/I/D-

level maintenance

• Minimal contractor

performance metrics

Japan Tanker

Korea AEWC

• Contractor responsible for

partial Supply Chain mgmt

• Customer has primary

Configuration Mgmt. role

• Contractor warehouses

customer-owned spares

• Contractor supplies to

customer O/I/D-level

maintenance

• Contractor supplies metrics

USN P-8A

USAF Tanker

Turkey AEWC

• Contractor responsible for

full Supply performance

• Contractor has primary

Configuration Mgmt role

• Long-term performance

based contract

• Contractor and customer-

owned spares

• Contractor responsible for

limited I/D-level maint.

Italy Tanker

CoA AEWC

• Contractor responsible for

Weapons Level sustainment

• Customer defined system level

performance metrics

• Long-term contract

• Industry owned spares and

support equipment

• Contractor provides virtually all

O/I/D-level maintenance

• Customer responsible for

deployed maintenance

274374.pptx | 3

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Performance Based Logistics

Long-term contractual agreement incentivizes investment

Clear outcome-related performance metrics

Contract incentives linked to performance metrics

Strong partnership between government and industry

Partnering Optimizes Readiness at Best Value

274374.pptx | 4

PBL partnership creates shared destiny to enable success

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Results of a Successful PBL

Reduced total ownership cost

Efficiency and readiness improvements

PBL reduces customer ownership cost while increasing fleet readiness

274374.pptx | 5

It’s a perfect solution in a more

for less operational environment

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

U.S. Air Force C-17 GISP PBL Program

Sustained average readiness rate of 85 percent for the past 10 years

Most dependable airlift aircraft with availability that is 10 percent above overall airlift fleet average

274374.pptx | 6

75

80

85

90

95

100

05 06 07 08 09 1070

04

$~1.1B Cost

Reduction

DP

FH

% (

CY

201

0$)

C-17 Dollar Per Flight Hour

Cost Reduction (%) *

Fiscal Year* Savings validated by U.S. Government customer

C-17 GISP reduced cost by 26 percent, resulting in savings of $1.1 billion

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Commercial Derivative PBL Case StudyItaly KC-767A Tanker Program

A PBL partnership providing unprecedented readiness rates

274374.pptx | 7

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

All Cargo All PassengerConvertible Combi

BOEING PROPRIETARY – Distribution Limited to Boeing Personnel

19 cargo pallets

BCA 767-200ER

200 passengers10 cargo pallets/100 passengers

Italy KC-767A Tanker Configurations

Copyright © 2014 Boeing. All rights reserved. 274374.pptx | 8

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Crew Rest Facilities

Remote Air

Refueling Operator

(RARO II) Station

Advanced Air

Refueling Boom

Cargo Door and

FloorClassic

Cockpit

Common Tanker Transport Configuration

767-200ER

BOEING PROPRIETARY

Convertible

Freighter

274374.pptx | 9

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Unique Italy KC-767A Tanker Transport Configuration

Wing Air

Refueling Pods

Centerline Hose

Drum Unit

Link 16Air Refueling

ReceptacleIncludes common

options plus additional

modifications shown

Certified

“Combi”

274374.pptx | 10

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Boeing is proud to support our amazing ItAF customer

Italy KC-767A PBL

PBL Structure/Approach Four aircraft fleet MOB: Pratica di Mare FFP “Award Fee” Contract with Italy MoD 5-year base PoP (through 2016) Boeing-owned Mission Spares Green hardware: LHT Responsibilities: Full PBL Line/Heavy maintenance (IG) Local supply management Engineering support Publication revisions Training

ItAF Customer Results Strong partnering with ItAF 98.9 percent cumulative mission

success rate Offloaded 22.6M+ pounds of fuel Achieved 10K FHs in 3.5 years Seamlessly surged FHs by 28 percent Executing optimized scheduled

maintenance program at PdM Includes equivalent C1-C4 checks Key for tailored Prime Availability metric

Reduced cost of ownership Boeing-owned Spares/SE Contractor maintenance staff FAA compliant sustainment practices

Overview and Results

274374.pptx | 11

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Italy KC-767A Tanker PBL Key Enabler

KC-767A is a Commercial Derivative Aircraft

Low utilization maintenance program at maximum 1,200 AFH

Commercial counterpart MPD designed for 3,000+ AFH

Phased maintenance approach

Blends A & Heavy 1C - 4C checks into phase packages

Eliminates need for expensive off-station depot visits

Work force stabilization mixes line and depot personnel

Improves aircraft availability

Commonly used by Small Commercial Operators

Reduces total cost of ownership

Extended LUMP basic intervals

A-Check equivalents from 90 to 120 days

C-Check equivalents from 24 to 32 months

FAA approved the new maintenance plan

Leveraging Commercial Maintenance Program

274374.pptx | 12

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Block vs. Phased Maintenance Savings

Results Summary:

20 percent decrease in man-hours due to LUMP with interval increase65 percent decrease in depot hours means high hourly rate reduction28 percent increase in O-level hours shifts costs to lower cost O-Level Labor rate

D-Level

O-Level

274374.pptx | 13

Lower cost of ownership and improved aircraft availability

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

From Theory to Field

Boeing Fleet Support Center at Pratica di Mare, Italy

Performs line maintenance and servicing

O-level and D-level maintenance

Aircraft configuration conversions

SB & AD incorporation

Goal: Balance workload to avoid peaks and extra costs

274374.pptx | 14

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Ultimate Test: 2014 Phase 32 Execution

Boeing team faced with AC 226 Phase 32 (4C) Check

Evaluated off-station options; settled on execution at PdM

Established 60-day inspection cycle to leverage existing staff

Contracted for surge and specialty support

Extensive planning performed; required material pre-staged

Exemplary Boeing/IG team performance

Executed 703 task cards encompassing ~6,000 inspection hours

Completed inspection efforts in exactly 60 days

Executed 150 pick-up tasks and returned FMC Tanker to ItAF

Facilitated highly active ItAF mission schedule w/remaining three jets

Unprecedented execution of 4C-equivalent check at MOB location

274374.pptx | 15

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Commercial Derivative Sustainment Summary

274374.pptx | 16

Italy KC-767A A/C Operating Summary

Sustained Excellent Performance

Supporting Customer Operations!!

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Commercial Derivative Sustainment Summary

274374.pptx | 17

Italy KC-767A Current Performance

Overall Consistent, World Class Performance at High Activity Levels

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

PBL Conclusions

Clear performance objectives and measurements

Reduced total ownership cost

Efficiency and readiness improvements

Financial incentives clearly linked to performance

Contractor assumes increased risk

Multi-year commitment for platform/system readiness

Contract that incentivizes industry investment

Business case transparency … best value to Government

Partnership and trust

Optimize existing fleet by minimizing operational cost (More for Less)

Model expandable to other platforms when initial investment is made

Characteristics of Successful PBL Programs

PBL buys affordable readiness – not just individual parts or services

274374.pptx | 18

Copyright © 2014 Boeing. All rights reserved.

Defense, Space & Security | Global Services and Support (GS&S)

Questions?

Copyright © 2014 Boeing. All rights reserved. 274374.pptx | 19

Copyright © 2014 Boeing. All rights reserved.