• Independent Service Provider(ISP) Capability

• Analyze Current State

• Propose Best Solutions

– Upgrades to Existing Components

– Support for Obsolete Components

• Improved Reliability and Support

Key Presentation Take-Aways

ISP CapabilitiesDesign Services

2D drawings

Production unit

3D rendering

Mechanical Design Electronic Design

Schematic design

and

reverse engineering

PCB layout

Production unit

WHAT TO LOOK FORSustainment Services

Repair

• Diagnose component failures

• Replace faulty and degraded components

• Test and confirm proper operation

Upgrade

• Perform Root Cause Analysis on failures

• Improve design, lessen or eliminate failure modes

• Assemble and test upgrade design, repeat if necessary

Manufacture New

• Reverse engineer sample; Review performance requirements

• Develop engineering documents

• Manufacture and test first article and production units

Root Cause Analysis – Why?

Addresses the root cause of failure, not just the symptoms

• Faulty or weak components

• External causes, e.g. power or environmental issues

• Improperly designed circuits, underrated components

Why RCA Is So Critical to Agency Budgets

• Extend MTBF (Mean Time Between Failures)

• Save LABOR costs

• Saves MATERIAL costs

• Prevent DOWNTIME

• Drives you to the OPTIMAL solution

• Avoid major RETROFITS or overhauls

• Prevent CATASTROPHIC failures before they happen

Why Improve vs. Replace?

• Increased reliability rather than simply replacing

• Addresses actual root cause of failures; corrects

the weak link

• Utilize existing inventory vs. buying new

• Prevents expensive retrofit costs

• Carry less inventory due to extended MTBF

Battery Charger – Under Rated Transformer

• Higher Power Transformer and Custom Adapter Board

• Higher Voltage Metal Oxide Varistors (MOVs)

• Replace all high failure parts including electrolytic

capacitors, voltage regulators and resistors

Battery Charger UpgradeCase Study

ORIGINAL –Back Plane

• Wire wrap design to connectors

• Vibration results in failure

• Difficult to repair

• Intermittent connections

• End of life

NEW–Back Plane

• Copper routed in PCB

• Flex circuits to outside connector

• Removal of vibration failure

• Easier to repair

• Current Design

Wire Wrap to Circuit Board UpgradeCase Study

Upgraded Circuit Board AssemblyCase Study

ORIGINAL

• Four board assembly

• Many failure prone connections

• Soldered jumper wires between boards

• Obsolete optocoupler

NEW DESIGN

• Single board solution

• Utilizes flexible circuit traces

• Eliminates over 100 connections

• Faster more accurate switching waveforms

• Current generation optocoupler

Power Supply Drop In ReplacementCase Study

High Failure Power Supply

• Quasi resonant controller to reduce switching losses

• Planar magnetics for lower losses

• Skip cycle mode for low standby power

• Cycle by cycle over current protection

• Hiccup mode for continuous overload protection

• Provided as a Kit or Service

• High Failure Original Motor

• Contamination

• Large Maintenance Expense

• Drop in Upgrade Kit

• Reduction in Failure Rates

Farebox Bill Transport UpgradeCase Study

• Tap Covers

• Brass Rollers

• Rubber Print Tires

• Axles

Printer Mechanical ComponentsCase Study

High Failure, Obsolete Printer Parts

• Cost Savings

• Replace only what is necessary

• New Fare system is the most

expensive option

• Known Reliability with Existing System

• Engineering Services

Sustainment ServicesIn Summary

Questions?

Aaron Lawson Director of Engineering

(734)558-7688

[email protected]

Contact:

Richard AldereteAccount Manager

(512)560-0021

[email protected]