Commercial Issues
• Yet to open LC for UI payment delays :
• TN default in UI & Reactive chargesTamilnadu still to pay 74Crs. as UI charges during 2011-12.
Due to shortage Wk 10 &11 UI disbursement not done
UTILITYLC AMOUNT
(Rs.Crs)Default for year
AP 10.2 2009-10
Puducherry 1 2009-10
TN 32.84 Current year
TALCHER II 1.4 Current year
• DELAY IN WEEKLY SEM DATA RECEIPT DURING OCT 2011
Andhrapradesh Karnataka Kerala Tamilnadu
StationsNo.of occassions
StationsNo.of occassions
Stations
No.of occassi
ons
Stations
No.of occassions
Kothagudam
3 Kadakola 1 Idukki 1Udumal
pet3
Mamidipally
1 Bellary 1 SV
chatram2
Mehboobnagar
1 Sedam 1 Arni 1
KTPP 1Yerandana
hally1
Kalpaka 1
• Time drift report receipt status:
ANDHRAPRADESH: No station is sending
KARNATAKA: Only Nelamangala sending – not regular
TAMILNADUOnly Gumdipundi , Hosur & Kuzhithurai sending regularly.
PONDICHERRYResumed sending
ISGS STATIONS:NTPC: RSTPS not regularNLC : NLC II and Expansion I not regular.MAPS : Not sending
Mock Exercise for the implementation of the RRF
• CERC directed to start mock exercise for the implementation of RRF w.e.f. 01.07.2011.
• SLRDC wrote to Beneficiaries on 05-07-11 requesting to make arrangements
Letter dt.05.07.11
Letter dt.01.08.11
Actions to be taken by statesStates to furnish: • a list of the wind farms and solar farms eligible for
RRF provision.• details of Contracts along with contracted price to
the concerned RPC and RLDC through the respective SLDC
• Forecasting data for wind and solar generation to the concerned SLDC/RLDC and RPC
• 15-minute block-wise data of schedule and actual generation from wind farm generation/ Solar Generation plants as recorded in the Special Energy Meters on a weekly basis
Solar Schedules vetting
• Solar generators may be advised to give availability of the generator, weather forecasting, solar insolation, season and normal solar generation curve etc. so as to enable SRLDC to vet the Generation schedules
Identify Nodal Officer• Furnish Details of Nodal developer who
shall be responsible for coordinating for the collective capacity on behalf of the group of developers on issues like SCADA, metering, scheduling, UI charges, RRF, forecasting data with the concerned SLDC/RLDC.
• States to identify a nodal officer for coordinating on the above matters.