45
C o m m i s s i o n i n g f o r S u s t a i n e d B u i l d i n g P e r f o r m a n c e Heifer Village Little Rock, AR 09/17/10 Retrocommissioning | RCx (Existing Building Commissioning | EBCx) University of Illinois Champaign, IL Damon McFall, PE, LEED AP www.fs.illinois.edu/retro

Commissioning for Sustained Building Performance Building Performance Heifer Village Little Rock, AR 09/17/10 Retrocommissioning | RCx (Existing Building

Embed Size (px)

Citation preview

Comm

issioning for Sustained Building Perform

ance

Heifer Village Little Rock, AR

09/17/10

Retrocommissioning | RCx(Existing Building Commissioning | EBCx)

University of IllinoisChampaign, IL

Damon McFall, PE, LEED APwww.fs.illinois.edu/retro

Commissioning for Sustained Building Performance

2

State Budget Gaps as of 7/15/10

Imag

es th

anks

to :

ww

p.gr

eenw

ichm

eanti

me.

com

/tim

e-zo

ne/u

sa

http://www.cbpp.org/cms/?fa=view&id=711

Commissioning for Sustained Building Performance

3

State Troubles = Public University Troubles

Commissioning for Sustained Building Performance

4

Current Financial Woes @ Universities

10%

How Are Public Institutions to React?

(Log

os c

opyr

ight

ed b

y U

nive

rsiti

es)

Commissioning for Sustained Building Performance

5

Current Financial Woes @ Universities

16%

How Are Public Institutions to React?

(Log

os c

opyr

ight

ed b

y U

nive

rsiti

es)

Commissioning for Sustained Building Performance

6

Current Financial Woes @ Universities

32%

How Are Public Institutions to React?

(Log

os c

opyr

ight

ed b

y U

nive

rsiti

es)

Commissioning for Sustained Building Performance

7

Current Financial Woes @ Universities

• “I have never seen such a difficult time for colleges and universities in my 40 years as an educator.” - SIU Pres. Mr. Glenn Poshard http://www.universitybusiness.com/newssummary.aspx?news_date=2009-09-25&news_id=20490

How Are Public Institutions to React?

(Log

os c

opyr

ight

ed b

y U

nive

rsiti

es)

Commissioning for Sustained Building Performance

8

Institutional Commitments to Fulfill

“…achieving energy independence for the U.S. as quickly as possible.”http://www2.presidentsclimatecommitment.org/html/commitment.pdf

Imag

e th

anks

to h

ttp:

//w

ww

.pre

side

ntsc

limat

ecom

mitm

ent.o

rg/

Commissioning for Sustained Building Performance

9

Reduce Energy UseChilled Water and Steam Meter Projects

Steam Trap ReplacementsLEED NC Silver Rating (NEW & REMODELS)

Lighting RetrofitsEnergy RetrofitsThermal Storage

Energy Service Companies (ESCO)

Retrocommissioning (RCx)Existing Building Commissioning (EBCx)

Commissioning for Sustained Building Performance

10

Retrocommissioning @ Illinois

H V A C

Commissioning for Sustained Building Performance

11

Retrocommissioning @ Illinois

H

“40% to 60%” - U.S. D.O.E.

V A C

Commissioning for Sustained Building Performance

12

Effective Institutional RCx Teams

• Optimal Solution– HVAC & Controls Expertise as Leaders– Experienced Control Programmers

Helmink McFall O’Brien NiebuhrMessman

Commissioning for Sustained Building Performance

13

Effective Institutional RCx Teams

• Optimal Solution– HVAC & Controls Expertise as Leaders– Experienced Control Programmers– Dedicated & Skilled Composite Crews

Helmink McFall

Commissioning for Sustained Building Performance

14

Funding in a Deficit Environment

• Students

• Energy Cost Avoidance

• State of Illinois Grants

(Logos copyrighted by companies)

http://developers.face.com/examples/tagger-widget/

Commissioning for Sustained Building Performance

15

Creating Synergy: Essential

• Encouraging Positive Working Relationships– Friendly staff – Weekly meetings – Immediate response

• Develop Team Environment– Team Responsibility– Team Decisions– Team Benefits

Commissioning for Sustained Building Performance

16

Succeeding One Building at a Time

“A great team to work with…” – Elizabeth Dennison, Coordinated Sciences Lab

“An excellent team to work with…” – Janet Kane, Physics

“One of the few areas of good news…” – Terry Ruprecht, Director of Energy

Campus Energy Use Index reduced 17.3% in part due to Retrocommissioning Efforts

Commissioning for Sustained Building Performance

17

RCx @ Illinois: History 101

3 years18 people

27 buildings$2,600,000 spent$3,100,000 saved

378,821,000,000 BTUs avoided

Commissioning for Sustained Building Performance

18

The Journey

Krannert Center for the Performing ArtsACES Library and Alumni CenterAnimal Sciences LaboratorySiebel Center for Computer Science

Commissioning for Sustained Building Performance

19

Shared Commonalities

19 of

Chilled Water Electrical Steam

Commissioning for Sustained Building Performance

20

Krannert Center for the Performing Arts

196720 of

Commissioning for Sustained Building Performance

21

Krannert Center for the Performing Arts

Pneumatic Controls

Commissioning for Sustained Building Performance

22

Krannert Center for the Performing Arts

Commissioning for Sustained Building Performance

23

Krannert Center for the Performing Arts

24/7$1,200,000

Commissioning for Sustained Building Performance

24

Krannert Center for the Performing Arts

Strategy: Occupancy Schedules

50%

100%

OFF

5 pm11 pm

7 am

Commissioning for Sustained Building Performance

25

Krannert Center for the Performing Arts

Strategy: Control System Upgrades

Commissioning for Sustained Building Performance

26

Krannert Center for the Performing Arts

35% $300,000

hans

enho

mes

aven

tura

.com

$190,000

Commissioning for Sustained Building Performance

27

ACES Library & Alumni Center

Commissioning for Sustained Building Performance

28

ACES Library & Alumni Center

14,000 CFM

Commissioning for Sustained Building Performance

29

ACES Library & Alumni Center

24/7$475,000

Commissioning for Sustained Building Performance

30

ACES Library & Alumni Center• Strategy: Occupancy Schedules

– (3) Distinct Calendar Periods• Spring / Fall Semesters: 8am to 11pm• Summer Semester: 8am to 9pm• Summer, Winter, Spring, Thanks Breaks: 8am to 5pm

– What Happens?• Exhaust Fans Stop• OA Dampers Close• Static Pressure Reduced 100%

100%100%

Commissioning for Sustained Building Performance

31

ACES Library & Alumni CenterStrategy: Control System Analysis

– Pneumatic Review– Confidence in thermostats– Faulty Humidity Sensor– Reheat System Schedule– Reduced the minimum VAV CFM

Commissioning for Sustained Building Performance

32

ACES Library & Alumni Center

42% $110,000

hans

enho

mes

aven

tura

.com

$70,000

Commissioning for Sustained Building Performance

33

Animal Science Laboratory

Commissioning for Sustained Building Performance

34

Animal Science Laboratory

Commissioning for Sustained Building Performance

35

Animal Sciences Laboratory

24/7$571,000

Commissioning for Sustained Building Performance

36

Animal Sciences LaboratoryStrategy: Occupancy Schedules Where PossibleStrategy: Review Lab Exhaust System

Commissioning for Sustained Building Performance

37

Animal Sciences Laboratory

25% $60,000

hans

enho

mes

aven

tura

.com

$102,000

Commissioning for Sustained Building Performance

38

Siebel Center for Computer Science

Commissioning for Sustained Building Performance

39

• Reheat Coil Issues• Control Sequences

– Occupancy Sensor– “Night Setback” / Unoccupied– Lack of dead band

Siebel Center for Computer Science

Commissioning for Sustained Building Performance

40

Siebel Center for Computer Science

24/7$1,300,000

Commissioning for Sustained Building Performance

41

• Connected occupancy sensors to HVAC• Modified DDC programming

• Night Setback Sequence• Increased dead band ranges on thermostats

• Recommended system cleanup• Recommended 100+ HW reheat valves

Siebel Center for Computer Science

Commissioning for Sustained Building Performance

42

Re-balanced entire building• Minimum VAV CFMs• Maximum VAV CFMs

Siebel Center for Computer Science

Lecture Hall Zone• VFDs• CO2 Monitoring• Scheduling

Commissioning for Sustained Building Performance

43

Siebel Center for Computer Science

42% $290,000

hans

enho

mes

aven

tura

.com

$277,000

Commissioning for Sustained Building Performance

44

• Install required DDC Controls• Implement Occupancy Schedules• Reduce / Eliminate EA & OA• CO2 and RH feedback• Improve Sequences of Operation• Continuous commissioning by

temperature control graphics• Support & Encourage Occupant &

Mechanic Behavioral Change

Strategies Frequently Used

Comm

issioning for Sustained Building Perform

ance

Heifer Village Little Rock, AR

09/17/10

Thank you!

University of IllinoisChampaign, IL

Damon McFall, PE, LEED [email protected]

www.fs.illinois.edu/retro

© Damon McFall, PE, LEED AP – August 2010Copy or distribution of this presentation is strictly permitted without direct written consent.