42
Board of Education Meeting November 13, 2012 (Postponed from the October 9, 2012, Board Meeting) COMMON CORE TECHNOLOGY PROJECT PLAN “Helping transform teaching and learning via 21st century technology” LOS ANGELES UNIFIED SCHOOL DISTRICT Dr. John Deasy Superintendent of Schools

COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

Board of Education Meeting

November 13, 2012 (Postponed from the October 9, 2012, Board Meeting)

COMMON CORE

TECHNOLOGY PROJECT PLAN

“Helping transform teaching and learning via 21st century technology”

LOS ANGELES UNIFIED SCHOOL DISTRICT

Dr. John Deasy

Superintendent of Schools

Page 2: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Common Core Technology Project Plan (CCTPP)

Table of Contents:

• Vision

• Project Structure

• Roll-Out and Demonstration Projects

• Training, Support, and Content

• Devices

• Security and Safety

• Funding

• Investment

• Appendix

2

Page 3: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Common Core Technology Project Plan (CCTPP)

VISION

We live in a time where students need a different and more diverse set of skills that their parents

were taught a generation ago. The changing nature of work, technology and competition requires

school systems to rethink their instructional delivery methods. In addition, the movement to The

Common Core State Standards and a new generation of assessments will require Los Angeles

Unified School District to equip students with new media and technology literacy skills to ensure

college and career readiness. Our goal is to provide an individualized, inter-active, and information

rich educational experience by:

Providing educators with tools (devices) to advance student learning and create learning

spaces that are designed to increase learner engagement

Supporting the CCSS implementation by providing all students with the opportunity to

engage with digital curriculum, interactive supports and adaptive assessments

Closing the “Digital Divide” by ensuring all students have access to 21st century skills and

technology

3

Page 4: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Common Core Technology Project Plan (CCTPP) VISION

Each student will receive more individualized instruction from educators, enabled by a personal

computing device. The computing devices will facilitate multiple activities. Key activities include the

following:

E-instruction: transform classroom instruction by providing teachers with the digital tools to engage

students and prepare them for the 21st century

E-curriculum – Individual devices will facilitate distribution of individualized curriculum and lesson plans

E-assessments – The CCSS adaptive computer assessment will be administered through the student-

computing device. Paired with a learning management system, additional assessments can be facilitated

through the individual computing device to personalize student education plans

E-textbooks – Advantages of e-textbooks include searchable and updateable content and potential cost

savings for the District over the purchase of traditional textbooks

E-tools – Calculators, audio/video players, digital camera and other tools will be accessible through the

individual computing device

E-administration – Students will be able to access, complete and turn in assignments, view grades and

receive feedback through their individual computing devices

E-mail & Collaboration – Recognized as an integral business communication tool throughout the world,

utilization of email and collaboration tools – social media, blogs, wikis, podcasts, etc. – prepares students

for life post-graduation and facilitate communication between students, their teachers and their peers

4

Page 5: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

5

Project Management LAUSD Project Manager

Vendor Project Manager (if applicable)

Executive Steering Committee Sr Dep Sup, CSO, CAO, CFE, Dir of Comm, COO, CFO, CIO, GC, Pers Dir,

Asst Sup of School Ops, Ch HR Officer, Dir of Proc, Exec Dir of Sp Ed, Ch of Intensive Sup & Inst

Advisory

Committees ITD

PMO

Members

Project Steering Committee

Office of Curriculum, Instruction, and School

Support; Facilities; ITD; Legal; Risk

Management; ; Procurement; Finance

Business Advisory Committee

Budget; Parent Collaborative; ESC

Administration; Principals (ES, MS, HS)

Subcommittees:

•Training/Prof. Dev., Curriculum, & Assessment

•Funding

•Devices, Infrastructure, Security & Safety

Instructional Technology Advisory Committee

Student; Parents; AALA; UTLA; Office

Curriculum, Instruction, and School Support;

ITD; ESC Administration; BOC

Project Facilitation Team

Project Manager; Instructional Leads; Contract

Support; Administrative Support

Project Technical Team

Office of Curriculum, Instruction, and School

Support; Facilities; ITD; OGC; OEHS;

Procurement

Rollout Team

ITD, Training

Project

Facilitation

Team

Project

Technical

Team

Business

Advisory

Committee

ITAC

Rollout

Team

Project Team

OCM

Instructional/

Content

Development

Training/Prof

Dev, Curriculum,

& Assessment

Devices,

Infrastructure,

Security &

Safety

Funding

Project Steering

Committee

CCTP Governance Structure

Page 6: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Roll-Out and Demonstration Projects 6

Phase 1a: Planning (Nov 2012 – Feb 2013)

& Readiness (Feb 2013 – Oct 2013)

Includes solution architecture, procurement activities, staffing, demonstration projects and initial implementation of infrastructure.

Phase 1b: Readiness & Demonstration Sites

(March 2013 – August 2013)

Includes an additional 100 demonstration projects (selected based on instructional vision and infrastructure readiness) plus staffing and administration for full roll-out.

Phase 2: Phased Roll-Out

(beginning in August 2013)

Continued implementation of infrastructure and full roll-out of CCTPP to all District schools.

A phased roll-out schedule will be implemented in alignment with the instructional strategy and

vision and will also take into consideration school site infrastructure readiness

Roll-Out

Page 7: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Roll-Out and Demonstration Projects 7

Schedule: A phased roll-out schedule will be implemented in alignment with the instructional

strategy and vision, which includes Common Core requirements, and will also take into

consideration school site infrastructure readiness (wireless school network), safety, and security.

Charters: The District’s rights and obligations to charter and other non-traditional schools,

including Partnership schools, may be dependent on the types of relationships the District

shares with each of them (e.g., affiliated charters vs. independent charters, Prop. 39, Public

School Choice, etc.) As such, various potential options and obligations are currently being

explored in consultation with the Office of General Counsel.

Roll-Out

Page 8: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Roll-Out and Demonstration Projects 8

The CCTPP will utilize a phased roll-out approach with phase one and two consisting of pilot projects.

The Schools for the Future demonstration project

Provides 13 secondary schools one-to-one access to devices for Common Core Standards-

based learning and assessment preparation, digital curriculum and e-textbook access.

Through a Web-accessible, integrated library and classroom instructional program, students will

access, evaluate, and effectively use information and ideas in student-centered, individual and

collaborative modes.

Program coordinates the efforts of the Office of Curriculum, Instruction, and School Support, the

Integrated Library and Textbook School Services, and the Information Technology Division.

In addition to the Schools for the Future demonstration project, we have several other

schools that are utilizing devices extensively. During Phase 1a: Planning & Readiness, we

will examine these projects for effective practices and potential challenges.

Demonstration Projects

Page 9: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Training, Support, and Content 9

Dual-mode content acquisition model

1. Purchase Curricular Content

• Vendor solicitation for system, technical assistance and professional development

1. Leverage Existing and Free Curricular Content

• Use existing e-textbooks

o K-6 ELA materials (CA Treasures)

o K-12 Math books

o History/Social Science texts

o Textbooks for HS opened in 2011-12 & 2012-13

• Use device features & Web-tools to author & share learning materials

The Common Core State Standards (CCSS) are one of the driving factors for the institution of one-

to-one computing in LAUSD. The CCSS standardizes curricular expectations across the US by

identifying the knowledge, concepts and skills that student should learn at each grade level in

English Language Arts (ELA) & Mathematics as well as the digital media / 21st century

technological skills vital to success in today’s global society. CCSS includes online, adaptive

assessments to ensure effective student engagement and retention of CCSS content.

Page 10: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Training, Support, and Content 1

0

• Trainers will support schools as they become familiar with the devices, both from a technical perspective as well as instructionally. Train-the-trainer model

• Explore how to integrate training on the device with existing professional development opportunities. Distribute devices to school staff prior to student distribution, allowing educators extra time to familiarize themselves with the devices.

Existing Professional Development

• Creation of a knowledge base or self-support database is proposed to help District stakeholders help themselves

Build knowledge database

• IT Customer Support Services (Help Desk Hotline and Field Services employees) will be restructured and re-trained to facilitate a number of support activities associated with the CCTPP.

IT Customer Support Services

• Processes associated with support, repair and replacement of (lost, stolen, damaged) devices will be addressed during the vendor selection process. Considerations can be included in provider contracts at the time of procurement.

Vendor Selection

Training and Support

Page 11: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Training, Support, and Content 11

Special Needs Students:

• Devices and curriculum will support students with visual, auditory, motor, and learning

disabilities with audio, zoom, display adjustments, visual alerts, keyboard shortcuts, and

word completion. It will also enhance current assistive technology tools for students with a

wide variety of learning needs.

• Specific software compatibility will need to be researched to ensure accessible text formats

for students with disabilities.

• Will enhance current assistive technology tools for students with a wide variety of learning

needs

• Full support and planning will be investigated during Phase 1a: Planning & Readiness.

English Language Learners:

• The apps and accessibility features of mobile devices will assist ELs and struggling

readers, by strengthening students’ overall language acquisition. Learning outcomes will

include:

• Enhance oral language development and writing skills

• Develop technology-enriched lessons that enable students to set their own goals and

assess their own literacy and language progress

• Explore formative and summative literacy and language assessments

• Access a vast array of language development resources

Additional considerations

Page 12: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Training, Support, and Content 1

2

Sharing: Lessons learned and sharing of successful strategies are a cornerstone to the

implementation of technology and surely a vital resource in pedagogy.

• The infrastructure for one-to-one computing will encourage exchange of educational

materials, classroom tactics and other aspects of device use in the classroom between

educators.

• Collaboration and sharing tools are key requirements of both the email system and

learning management system to be procured.

Additional considerations

Page 13: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Devices 1

3

Leasing of Devices: We are not pursuing a lease option.

Useful Life: We will be asking vendors to respond to how they can ensure a useful life of 10 years

for the devices.

Bring Your Own Device (BYOD):

• Full analysis/feasibility of allowing students to BYOD will be performed in demo projects

• Requires Mobile Device Management (MDM) & Identity Management systems (Phase 1a

infrastructure projects) to enable safe access into the District’s systems and block

inappropriate access to the internet on District issued and guest devices

Take Home/Non-Campus Intranet Access: At this point in time, implementation will focus on on-

campus device use only. Take-home use and non-campus Internet access will be fully investigated

during Phase 1a: Planning & Readiness.

Williams: Since CCTPP will focus on on-campus device use only at this point in time, the

continued use of textbooks will be used to fulfill the requirements of the Williams settlement.

A Request for Proposal will be issued to determine the best vendor(s) to support our instructional needs

Page 14: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Security and Safety 1

4

Security: In addition to increased student usage, new stakeholder groups will be introduced to the

District’s computing environment in alignment with the District’s Enterprise Architecture. Processes

associated with security, access and identity management will need to be reconsidered and re-

engineered to accommodate the District’s enlarged user community and increased technology usage.

• Physical Security - Additional work needs to be done to address the physical security of the

devices systemically. An assessment regarding current challenges and solutions to district

infrastructure (i.e. school layout, school and community crime rates, delivery, storage and

distribution of devices, locks, etc.) as well as technology infrastructure (i.e. surveillance and alarm

systems), needs to be conducted by school type. The results will provide criteria to measure and

improve physical security at all schools.

• Virtual/Data Security – This will be managed by a new Mobile Device Management system and

upgrades to the District’s Identity Management System. These systems will allow role-based

access to the Internet and District applications, thus providing a safer cyber experience.

Additionally, security policy measures will be addressed by the Office of the Information Technology

Security Coordinator.

• Development of a Cyber-Security Awareness Campaign to educate users in safe computing

behaviors, as prevention is a major tool in combating cyber-crime.

• Revise user acceptance policy to accommodate the CCTPP.

We will also collaborate with LA School Police and our Municipal agency law enforcement partners for

input on security.

Page 15: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Security and Safety 1

5

Microwave Levels: The Office of Environmental Health and Safety (OEHS) is developing

guidelines and regulations to ensure the safe utilization of devices on campus. Implementation

will follow the guidelines developed by OEHS. Additionally, we will conduct and assessment of

current device use on campus to ensure that usage is in line with the requirements developed by

OEHS.

Loss: Some level of loss and damage is to be expected. During Phase 1a: Planning &

Readiness, we will explore various options to address loss and damage, including, but not limited

to:

• Insurance options

• Device cases

• Tracking software

• Education around device safety

These components are currently being tested in the Schools For the Future pilot and the results

will help to inform policy on loss and damage. Additionally, we will examine existing policies

around textbook loss and damage (BUL 5509, BUL 5509, BUL 5510) that may apply to device

loss and damage.

Page 16: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Funding 16

Bond Funding: Legal counsel has reviewed and generally advised that the costs associated with

the acquisition of devices, acquisition, and initial installation of software and hardware

components, certain staffing components (the general train the trainer model for technical support)

– may be financed with proceeds from the sale of Measures R, Y and Q bonds.

Other Funds: The District will negotiate to ascertain the best price before purchase. During

vendor selection, we will ensure that the vendors highlight the quality and value of their offering.

In IT procurements, it is not uncommon to see significant discounts off of list prices.

General Funds: The CCTPP may require funding from sources other than bond. Phase 1a will

explore various options and develop a fully fleshed out budget with identified funding sources for

later phases.

Long Term Financial Plan: A number of factors support the feasibility of the program.

• The prices of both mobile devices and wireless networking technology have fallen

significantly within the past few years. We anticipate this trend to continue, resulting in

more affordable solutions as time passes, which will also decrease our ongoing costs

associated with school network modernization.

• Operational savings from the Data Center Modernization and Consolidation program.

• Current District organizations, such as the IT Customer Support Services (Help Desk and

Field Services), will be trained to support the program.

• Explore how to integrate training on the device with existing professional development

opportunities.

Page 17: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Investment 17

Update and Request for Phase 1b: In January 2013, we will return to the Bond

Oversight Committee with an update and a request for Phase 1b.

Network Modernization: The CCTPP is dependent upon the modernization of

District schools’ local area networks. The School Network Modernization program

was previously approved by the BOC & BOE. Sufficient funds (~$470M) must be

allocated to complete the program.

Comprehensive cost estimate: Planning performed in Phase 1a and 1b will

produce a comprehensive cost estimate for full implementation of the CCTPP

(Phase 2). Initial estimates for devices (device, case, warranty, integration,

deployment considerations) range from $400-$800/device. Based on this initial

estimate, funding for devices (device, case, warranty, integration, deployment

considerations) and necessary infrastructure modernization is estimated at

approximately $700M to $1B.

• (Note: Assumes $400-800 per device, ~600,000 devices and $470M of

infrastructure requirements)

Page 18: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Investment – Phase 1a 18

Page 19: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Phase 1a ($17.5M) – Funding Strategy 1

9

Available Early Education

Funding Phase 1a Funding Strategy

$16.3M Unallocated Balance

$10.2M Cancel So. Region

EEC #3

$7.3M Portion of unallocated

balance

$10.2M Cancel So. Region

EEC #3

$26.5M Total Available Early

Education CIPR

Funding

$17.5M Total Available Early

Education CIPR

Funding

• Early Education will retain $9M of the Unallocated Balance for priorities determined by

Early Education.

• All funds will be repaid with future bond funds.

Page 20: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Requested approval from the Citizens’ Bond

Oversight Committee

Funding for Planning & Readiness Phase 1a of CCTPP ($17,457,500)

20

Page 21: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Appendix 2

1

Page 22: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Roll-Out and Demonstration Projects 2

2

In addition to District pilot programs, lessons learned will be drawn from Project

Revolutionizing Education (Project RED), a national survey of classroom technology

initiatives.

• This program summarizes the experience of: 997 schools in 49 states and the

District of Columbia; 11 diverse education success measures; 22 categories of

independent variables and many subcategories; comparison of findings by student-

computer ratio (1:1, 2:1, 3:1, etc.); and comprehensive demographic data correlated

to survey results.

• The District is currently applying to be part of Project RED’s “Signature District”

program, which will allow the District to interact and share experiences with other

one-to-one implementing districts.

Project RED

Page 23: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Roll-Out and Demonstration Projects 2

3

• Valley Academy of Arts and Sciences

• Arts, Theatre, Entertainment

• LA River School

• School of History/Dramatic Art

• Art & Community Empowerment

• Social Justice Global Issues Academy

• Social Justice Fine Arts Academy

• Public Service Community School

• Communication & Technology

• Green Design

• Performing Arts Community

• South Region HS # 4

• Roosevelt HS

Schools for the Future Demonstration Projects – List of Schools

Page 24: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Roll-Out and Demonstration Projects 2

4

Some examples of additional demonstration projects underway

ESC Board

District School Grades Program Name Model Start Date # of devices Type of device

South 7 68th ES K-1 English Lang Arts 2 classrooms share 1 cart of I-Pads 8/14/12

3 carts - 90 total iPad

West 1 74th ES K-1 English Lang Arts 2 classrooms share 1 cart of I-Pads 8/14/12

3 carts - 90 total iPad

West 1 Western ES K-1 English Lang Arts 2 classrooms share 1 cart of I-Pads 8/14/12

3 carts - 90 total iPad

East 2 Politi ES K-1 English Lang Arts 2 classrooms share 1 cart of I-Pads 8/14/12

3 carts - 90 total iPad

East 5 Loreto ES K-1 English Lang Arts 2 classrooms share 1 cart of I-Pads 8/14/12

2 carts - 60 total iPad

North 6 Valerio ES K-1 English Lang Arts 2 classrooms share 1 cart of I-Pads 8/14/12

5 carts - 150 total iPad

North 3 Valley Academy of Arts and Sciences Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 1223 I-Pad ISIC 6 Arts, Theatre, Entertainment Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 478 I-Pad ISIC 5 LA River School Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 313 I-Pad ISIC 5 School of History/Dramatic Art Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 319 I-Pad ISIC 7 Art & Community Empowerment Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 309 I-Pad East 7 Social Justice Global Issues Academy Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 637 I-Pad East 7 Social Justice Fine Arts Academy Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 692 I-Pad ISIC 7 Public Service Community School Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 454 I-Pad ISIC 2 Communication & Technology Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 464 I-Pad ISIC 7 Green Design Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 445 I-Pad ISIC 7 Performing Arts Community Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 461 I-Pad ISIC 7 South Region HS # 4 Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 1289 I-Pad ISIC 2 Roosevelt HS Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 451 I-Pad

Page 25: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Roll-Out and Demonstration Projects 2

5

Some examples of additional demonstration projects underway – continued

ESC Board

District School Grades Program Name Model Start Date # of devices Type of device ISIC 2 Roosevelt HS Gr 9-12 Schools for the Future 1:1 for all staff and students 11/1/12 451 I-Pad

Norh 6 Mount Gleason MS 6 Wireless Gen Science & ELA 1:1 online adaptive content TBD Spring 2 classrooms

60 total Driod

ISIC 6 Maclay MS 6 Wireless Gen Science & ELA 1:1 online adaptive content TBD Spring 2 classrooms

60 total Driod

ISIS 1 Muir MS 7 Blended Learning Pilots 1:1 for7th grade Spring 2012 320 netbooks Dell

ISIC 2 NOW New Open World Academy RFK Complex

5, 6, & 9, 11 Blended Learning Pilots Shared 260 tablets

Spring 2012 260 Samsung

West 1 Menlo ES 4 Blended Learning Pilots Shared 1:2 12/5/12 100 Samsung West 4 Melrose ES K-5 Blended Learning Instruction K-2 shared 2:1 & 3-5 1:1 300 iPad K-2 iBook 3-5 South 5 Maywood ES K-5 Blended Learning Instruction K - 5 1:1 450 iPad K-2 iBook 3-5

XR 1 KIPP LA Empower ES 4 & 5 Blended Learning - Rotation 4 to 1 60 iPads and Desktops ISIC 2 NAVA Academy Gr 6-8 Blended Learning - Rotation 4 to 1 East 5 New Tech Jefferson HS Gr 9-12 Project Based 1:1 1:1 for all staff and students 9/1/08 500 PC Desktops ISIC 2 LA Global Studies HS Gr 9-12 Project Based 1:1 1:1 for all staff and students 9/1/08 500 PC Desktops XP 5 Huntington Park Gr 9-12 School initiated 1:1 for students 1000 iPads

ISIC 6 San Fernando Institute for Applied Media Gr 6-8 School initiated TBD

ISIC 5 Carver MS Gr 6-9 School initiated TBD North 3 North Hollywood HS 12 AP English Lit 1:1 for 3 AP Lit classes 90 iPads ISIC 2 Stevenson MS 6,7 and 8 PLAS/School to Home 1:1 school Netbooks East 2 Rosemont ES 4-5? School initiated 1:1 class Macbooks/iPads West 4 Marquez ES K-5 Blended Learning Instruction K-2 shared 2:1 & 3-5 1:1 500 Macbooks/iPads West 1 Carthay ES K-5 Pearson Pilot K-5 Shared 150 iPads West 4 Canyon ES K-5 Blended Learning Instruction K-5 Shared 225 Macbooks/iPads

Page 26: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Investment – Phase 1a 26

Phase 1a: Planning and Readiness

Supports Category Item Budget

1a only

Devices Individual Computing Devices $ 5,000,000

Infrastructure Mobile Device Management $ 100,000

Infrastructure Learning Management System * $ 100,000

Infrastructure Educational Cloud $ 50,000

Resources Staffing ** $ 4,007,500

full roll-out (phase 1a, 1b, &

2)

Infrastructure Email/Collaboration * $ 1,200,000

Infrastructure Identity Management * $ 1,000,000

Infrastructure Monitoring & Management System $ 5,500,000

Infrastructure Security Analytics* $ 500,000

Total $17,457,500 * IT Strategic Execution Plan projects approved by Board of Education in May 2012 ** Staffing includes CCTPP project development team, physical security planning, microwave assessment planning, legal counsel and security awareness development costs Note: full-cost elements have already gone through proof-of-concept, 1a only has not completed proof-of-concept

Page 27: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Investment Assumptions –

Devices and Infrastructure

2

7

Phase 1a: Planning and Readiness

Supports Category Item Budget Assumptions

1a only

Devices Individual Computing Devices $ 5,000,000

Estimate - 7,700 devices @ $650/device, includes device and case

Infrastructure Mobile Device Management $ 100,000 RFP solicitation w/ $100K cap

Infrastructure Learning Management System * $ 100,000 Estimate

Infrastructure Educational Cloud $ 50,000 Estimate

Resources Staffing ** $ 4,007,500 See “Investment Assumptions – Resources” slide

full roll-out (phase 1a,

1b, & 2)

Infrastructure Email/Collaboration * $ 1,200,000 RFP bid

Infrastructure Identity Management * $ 1,000,000 Estimate

Infrastructure Monitoring & Management System $ 5,500,000 Estimate

Infrastructure Security Analytics* $ 500,000 Estimate Total $17,457,500 * IT Strategic Execution Plan projects approved by Board of Education in May 2012 ** Staffing includes CCTPP project development team, physical security planning, microwave assessment planning, legal counsel and security awareness development costs Note: full-cost elements have already gone through proof-of-concept, 1a only has not completed proof-of-concept

Page 28: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Investment Assumptions –

Resources

2

8

Phase 1a - STAFFING (Resources)

Description Position FTE Budget Duration (yrs) Total

Manages the efforts of District staff and outside contractors and consultants in the planning, fund application, implementation and problem solving for Common Core Technology projects Project Manager 1 $170,000 1.5 $ 255,000 Assist project manager in analyzing the needs, managing and coordinating Common Core Technology projects

Certified & Classified Staff 7

$130,000 - $150,000 1.5 $ 1,545,000

Responsible for the operational design, planning, implementation, and architectural development of the District's mobile device management systems

Mobile Device Management Administrator 2 $125,000 1.5 $ 375,000

Responsible for the operational design, planning, implementation, and architectural development of the District's learning management systems

Learning Management System Support 1 $150,000 1.5 $ 225,000

Provides support of contract administration and procurement activities Contract Support 1 $100,000 1.5 $ 150,000 Collects, analyzes and compiles data and makes reports related to Common Core Technology projects

Administrative Support 3 $125,000 1.5 $ 562,500

Responsible for the administration of the District's cyber security awareness campaign including development of training modules

Cyber Security Awareness Training $ 200,000

Assessment regarding current challenges and solutions to district and technology infrastructure.

Physical security planning $ 470,000

Development of guidelines and regulations to ensure the safe utilization of devices on campus.

Microwave Level Assessment Planning $ 25,000

Bond Counsel Bond Counsel $ 50,000

Financial Advisor Financial Advisor $ 150,000 Total $ 4,007,500

Page 29: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Sites Ready for 1-1 (Infrastructure in place) 2

9

EDUCATION SERVICE CENTER

BOARD MEMBER LOC

CODE SITE NAME TYPE

W Board District 1 7110 3RD ST EL ELEMENTARY

XP Board District 2 2369 AMBSDR-GLOBAL EDUC ELEMENTARY

XP Board District 2 7771 AMBSDR-GLOBAL LDSHP SPAN (NOT MAG)

E Board District 7 7722 ANGELOU COMM FN ARTS SENIOR HIGH

E Board District 7 8563 ANGELOU COMM GLOB IS SENIOR HIGH

E Board District 2 4356 ANTON EL ELEMENTARY

S Board District 7 6886 BACA ARTS ACAD ELEMENTARY

N Board District 3 2269 BALBOA G/HA MAG MAG (SLF CONT ES)

N Board District 6 2438 BERTRAND EL ELEMENTARY

W Board District 1 2740 CANFIELD EL ELEMENTARY

N Board District 6 7401 CARDENAS EL ELEMENTARY

W Board District 1 2939 CARSON-GORE ACADEMY ELEMENTARY

E Board District 5 2308 CENTRAL REG EL #21 ELEMENTARY

XP Board District 6 7715 CHAVEZ LA-ARTES SENIOR HIGH

XP Board District 6 7717 CHAVEZ LA-ASE SENIOR HIGH

XP Board District 6 7716 CHAVEZ LA-SJ HUM AC SENIOR HIGH

XP Board District 6 8901 CHAVEZ LA-TCHR PREP SENIOR HIGH

N Board District 6 5016 COUGHLIN EL ELEMENTARY

W Board District 1 3288 CRESCENT HTS L/A/S/J MAG (SLF CONT ES)

E Board District 5 3329 DAHLIA HTS EL ELEMENTARY

N Board District 3 3438 DIXIE CANYON EL ELEMENTARY

N Board District 3 3545 EL ORO EL ELEMENTARY

S Board District 5 6873 ESCALANTE EL ELEMENTARY

S Board District 7 3640 ESHELMAN EL ELEMENTARY

E Board District 7 2942 ESTRELLA EL ELEMENTARY

116 sites are currently ready for 1-1 from an technology infrastructure standpoint (meet VLC-standards)

Page 30: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

0

EDUCATION SERVICE CENTER

BOARD MEMBER LOC

CODE SITE NAME TYPE

N Board District 6 4055 GARDEN GROVE EL ELEMENTARY

N Board District 3 4110 GAULT EL ELEMENTARY

XP Board District 2 2385 GRATTS LA FOR YS ELEMENTARY

E Board District 2 4301 GRIFFIN EL ELEMENTARY

S Board District 7 4315 GULF EL ELEMENTARY

S Board District 7 4425 HARBOR CITY EL ELEMENTARY

W Board District 1 8713 HAWKINS SH A SENIOR HIGH

W Board District 1 7665 HAWKINS SH B SENIOR HIGH

W Board District 1 7666 HAWKINS SH C SENIOR HIGH

N Board District 3 4473 HAYNES EL ELEMENTARY

XP Board District 2 2944 HUERTA EL ELEMENTARY

E Board District 2 4616 HUMPHREYS EL ELEMENTARY

E Board District 5 4671 IVANHOE EL ELEMENTARY

S Board District 7 6869 KNOX EL ELEMENTARY

N Board District 6 7399 KORENSTEIN EL ELEMENTARY

XP Board District 2 8501 LA HS ARTS @RFK SENIOR HIGH

W Board District 1 8741 LACES MAG SPAN MAGNET

N Board District 4 4764 LANAI EL ELEMENTARY

S Board District 7 4836 LELAND EL ELEMENTARY

E Board District 5 4904 LOGAN EL SPAN (NOT MAG)

E Board District 2 4982 LOS ANGELES EL ELEMENTARY

XP Board District 5 8866 MARQUEZ SH A SENIOR HIGH

XP Board District 5 7669 MARQUEZ SH C SENIOR HIGH

XP Board District 5 7725 MARQUEZ SH LIBRA SENIOR HIGH

W Board District 1 5178 MARVIN EL ELEMENTARY

116 sites are currently ready for 1-1 from an technology infrastructure standpoint (meet VLC-standards)

Sites Ready for 1-1 (Infrastructure in place)

Page 31: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

1

EDUCATION SERVICE CENTER

BOARD MEMBER LOC

CODE SITE NAME TYPE

W Board District 4 5219 MELROSE M/S/T MAG MAG (SLF CONT ES)

W Board District 1 5247 MENLO EL ELEMENTARY

S Board District 7 2313 MOORE M/S/T ACAD ELEMENTARY

N Board District 4 7402 MOSK EL ELEMENTARY

E Board District 5 5411 MT WASHINGTON EL ELEMENTARY

E Board District 2 5425 MULTNOMAH EL ELEMENTARY

E Board District 2 5438 MURCHISON EL ELEMENTARY

XP Board District 2 5173 NAVA LA-BUS&TECH SCH MIDDLE SCHOOL

XP Board District 2 8070 NAVA LA-SCH ART MIDDLE SCHOOL

N Board District 4 5452 NESTLE EL ELEMENTARY

XP Board District 2 7783 NEW OPEN WLD ACAD SPAN (NOT MAG)

S Board District 5 2378 NUEVA VISTA EL ELEMENTARY

XP Board District 1 6868 OBAMA GLBL PREP ACAD MIDDLE SCHOOL

S Board District 5 5153 ORCHARD ACADEMIES 2B MIDDLE SCHOOL

S Board District 5 5154 ORCHARD ACADEMIES 2C MIDDLE SCHOOL

N Board District 6 6068 PINEWOOD EL ELEMENTARY

E Board District 2 2384 POLITI EL ELEMENTARY

N Board District 3 2303 PORTER RANCH SCHOOL SPAN (NOT MAG)

S Board District 7 8868 RANCHO DOMINGZ PREP SPAN (NOT MAG)

N Board District 3 6315 RIVERSIDE DR CHT SC ELEMENTARY E Board District 2 6370 ROSEMONT EL ELEMENTARY

S Board District 5 6884 ROYBAL-ALLARD EL ELEMENTARY

S Board District 7 6870 S SHORES PER ARTS MG MAG (SLF CONT ES)

E Board District 5 6493 SAN PASCUAL EL ELEMENTARY

S Board District 7 8851 SAN PEDRO MAR/M/S MG MAG CTR SH

S Board District 7 8847 SAN PEDRO POL ACD MG MAG CTR SH

116 sites are currently ready for 1-1 from an technology infrastructure standpoint (meet VLC-standards)

Sites Ready for 1-1 (Infrastructure in place)

Page 32: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

2

EDUCATION SERVICE CENTER

BOARD MEMBER LOC

CODE SITE NAME TYPE

XP Board District 2 8206 SCH VIS ARTS/HUM@RFK SENIOR HIGH

N Board District 3 6699 SHERMAN OAKS EL CHTR ELEMENTARY

N Board District 3 8842 SOCES MAG SPAN MAGNET

XP Board District 2 7752 SOLIS LEARNING ACAD SENIOR HIGH

XP Board District 5 7708 SOTOMAYOR LA-ARTLAB SENIOR HIGH

XP Board District 5 7707 SOTOMAYOR LA-HADA SENIOR HIGH

XP Board District 5 8577 SOTOMAYOR LA-LARS SENIOR HIGH

W Board District 1 2311 SOUTH REGION EL #10 ELEMENTARY

W Board District 1 2312 SOUTH REGION EL #11 ELEMENTARY

S Board District 5 2309 SOUTH REGION EL #9 ELEMENTARY

XP Board District 7 8923 SOUTH REGION HS #12A SENIOR HIGH

XP Board District 7 7667 SOUTH REGION HS #12B SENIOR HIGH

S Board District 5 8921 SOUTH REGION HS #9A SENIOR HIGH

S Board District 5 7664 SOUTH REGION HS #9B SENIOR HIGH

S Board District 7 6867 SOUTH REGION SPAN #1 SPAN (NOT MAG)

XP Board District 7 7718 SRHS #2 COMM SENIOR HIGH

XP Board District 7 7719 SRHS #2 GREEN DESIGN SENIOR HIGH

XP Board District 7 7721 SRHS #2 PERF ARTS SENIOR HIGH

XP Board District 7 8867 SRHS #2 PUB SRV COMM SENIOR HIGH

S Board District 5 6918 STATE EL ELEMENTARY

N Board District 3 7007 SUPERIOR EL ELEMENTARY

N Board District 4 7192 TOLUCA LAKE EL ELEMENTARY

XP Board District 2 8606 TORRES ELA PERF ARTS SENIOR HIGH

XP Board District 2 7773 TORRES ENG SENIOR HIGH

XP Board District 2 7775 TORRES HUM/ART/TECH SENIOR HIGH

XP Board District 2 7772 TORRES RENAISSANCE SENIOR HIGH

116 sites are currently ready for 1-1 from an technology infrastructure standpoint (meet VLC-standards)

Sites Ready for 1-1 (Infrastructure in place)

Page 33: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

3

EDUCATION SERVICE CENTER

BOARD MEMBER LOC

CODE SITE NAME TYPE

XP Board District 2 7777 TORRES SOC JST LDSHP SENIOR HIGH

XP Board District 2 7780 UCLA COMMUNITY SCH SPAN (NOT MAG)

E Board District 2 7370 UTAH EL SPAN (NOT MAG)

N Board District 6 7384 VALERIO EL ELEMENTARY

N Board District 3 8898 VALLEY ACAD ARTS/SCI SENIOR HIGH

N Board District 6 2302 VALLEY REGION EL #13 ELEMENTARY

N Board District 6 7408 VALLEY REGION SPAN 1 SPAN (NOT MAG)

S Board District 5 8390 WALNUT PARK MS A MIDDLE SCHOOL

S Board District 5 5193 WALNUT PARK MS B MIDDLE SCHOOL

W Board District 4 8943 WESM HLTH/SPORTS MED MAG (SLF CONT SH)

W Board District 4 7649 WEST HOLLYWOOD EL ELEMENTARY

S Board District 7 7781 WILMINGTON PARK EL ELEMENTARY

S Board District 7 6872 WISDOM EL ELEMENTARY

S Board District 5 7904 WOODLAWN EL ELEMENTARY

116 sites are currently ready for 1-1 from an technology infrastructure standpoint (meet VLC-standards)

Sites Ready for 1-1 (Infrastructure in place)

Page 34: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

Scheduled Infrastructure Modernization Sites 3

4

Page 35: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

5 Scheduled Infrastructure Modernization Sites

Page 36: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

6 Scheduled Infrastructure Modernization Sites

Page 37: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

7 Scheduled Infrastructure Modernization Sites

Page 38: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

8 Scheduled Infrastructure Modernization Sites

Page 39: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

3

9 Scheduled Infrastructure Modernization Sites

Page 40: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

4

0 Scheduled Infrastructure Modernization Sites

Page 41: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

4

1 Scheduled Infrastructure Modernization Sites

Page 42: COMMON CORE TECHNOLOGY PROJECT PLAN RPT... · ITD, Training Project Facilitation Team Project Technical Team Business Advisory Committee ITAC Rollout Team Project Team OCM Instructional

LOS ANGELES UNIFIED SCHOOL DISTRICT

4

2 Scheduled Infrastructure Modernization Sites