Page 1: Community Development of Small Scale Hydropower

Community Development of Small Scale Hydropower

Castle Douglas Town Hall 19th February 2013

James BuchanCES Development Officer – Central Scotland & Fife

Page 2: Community Development of Small Scale Hydropower

Why Hydro? Small-scale hydropower one of the most cost-effective and reliable renewable energy technologies to be considered for providing clean

electricity generation.•High efficiency (70 - 90%)•High capacity factor (typically >50%), compared with 10% for solar and 30% for wind•High level of predictability•Slow rate of change•Good correlation with demand •Long-lasting and robust•Source of revenue (FIT’s)

Page 3: Community Development of Small Scale Hydropower

Most common uses Community hydro schemes - 3 broad categories;

•Off-grid - power for remote communities not connected to grid e.g. hydro on Eigg and Knoydart

•Off-grid or grid-connected schemes providing electricity and/or heat to a community building e.g. Abernethy Trust

•Income-generating projects to feed into the grid to provide long term community revenue e.g. Callander Community Development Trust

Page 4: Community Development of Small Scale Hydropower

How does it work?

Converts energy in falling water into electrical energy.

• Most small schemes ‘run of river’- divert flow using intake weir. •Weir incorporates screen to filter debris (may include fish pass).•Weir diverts water into ‘penstock’ (pipe which carries water downhill). •Water directed by pipeline into turbine -strikes a wheel, which turns a generator and produces electricity.•Water returns to river through a ‘tailrace’ •Electricity is sent through cables to the national grid or to the building it powers.

Page 5: Community Development of Small Scale Hydropower
Page 6: Community Development of Small Scale Hydropower
Page 7: Community Development of Small Scale Hydropower

Site Area and SuitabilityKey requirements :

•Head – drop in height over length of river / burn e.g. waterfall, old weir, gradual incline over distance•Flow – the greater the volume of water flowing downstream, the greater the potential energy of system.

Both low head/high flow and high head/low flow schemes common - combination of both will generate greatest amount of energy.

Page 8: Community Development of Small Scale Hydropower

The Flow Rate (Q) is the volume of water passing persecond (m³/sec).

The Gross Head (H) is the maximum available vertical fall in the water, from the upstream level to the downstream level (m).

The Net Head – after losses incurred when transferring the water into and away from the machine.

Page 9: Community Development of Small Scale Hydropower

Power & EnergyEnergy = amount of work done / ability to do work (Joules/ kWh)

Power = energy converted per second, i.e. rate of work being done (W / kW /MW)

Best turbines have efficiencies in range 80 - 90%. Micro-hydro systems (<100kW) tend to be 50 to 80%

If we take 70% as a typical water-to-wire efficiency for system, then power of system shown by:

P (kW) = 7 Q (m³/s) H (m)

Page 10: Community Development of Small Scale Hydropower

Other Site Requirements•Good access / routes for new track for construction of weir or dam, penstock , powerhouse. •Powerhouse located close to power lines / building it will be providing energy to - cuts down on energy losses / cost of laying cables long distances. •The river / burn should have good flow all year round to maximise power output / payback of the scheme• Most designed on the mean flow of river.• Sizing to peak flows not advised - turbine will not work as efficiently when the flows are lower for much of year.

Page 11: Community Development of Small Scale Hydropower

TurbinesSelection of turbine depends upon site characteristics - head / flow, running speed of generator and whether the turbine will be expected to operate in reduced flow conditions.

Reaction TurbinesEncased in waterFrances (spiral)PropellerKaplan

Impulse TurbinesJets of waterPeltonTurgoCrossflow

Page 12: Community Development of Small Scale Hydropower

Impulse and Reaction Turbines

Page 13: Community Development of Small Scale Hydropower

Developing a Community Hydro Project•Large number of communities progressing and successfully completing complex renewable generating projects •Reduce community dependence on fossil fuels•Greater awareness of energy issues• Increased energy efficiency across the community •Reduction in energy costs and carbon emissions • Income generated can be significant • Self sufficiency for community organisations and re-investment in the local area

Page 14: Community Development of Small Scale Hydropower

Pre-development Stages

Page 15: Community Development of Small Scale Hydropower

Development Stages

Page 16: Community Development of Small Scale Hydropower

Community consultation

•Essential when considering large community developed / owned renewable generation projects.•Local support essential to gain commitment of volunteer effort / resources to progress such a project. •Crucial in convincing funders that community really wants project. •If project is to benefit community, they need to have a say in how it progresses. •Community will also therefore ‘own’ the project in more than just the legal sense.

Page 17: Community Development of Small Scale Hydropower

There are three main initial areas which should be discussed:

•Is there a real need across your community for an energy generation project and / or a long –term source of revenue?

•Does your group have the commitment and capacity to take forward a large and complex project?

•What viable renewable energy resources do you have available within your locality?

Page 18: Community Development of Small Scale Hydropower

Site selection & Land Ownership

•Key is land ownership / gaining access •If community owns land should not be problem•If not, permission / access to be gained from landlord•Agree with landlord exclusive rights to develop /gain lease if planning consent gained •Needs to be for lifetime of project - 25-50 years•Important to secure access /use of site before planning granted and to include area for access /pipelines construction•Negotiate rental rates - professional opinion and market rates should be obtained.•If site leased rent could be fixed fee or vary according to power output

Page 19: Community Development of Small Scale Hydropower

Pre-feasibility StudyAny developer should seek independent professional advice before committing significant finance to the design and construction of a small-scale hydro scheme. http://www.british-hydro.org/

http://www.scottishrenewables.com/

•An experienced hydro professional should be able to indicate whether a site is worth considering•. Will typically require no more than 2-3 days’ work and will cost between £300 and £1000. •A minor investment at this stage could save much greater expense and potential complications later in the development process.

Page 20: Community Development of Small Scale Hydropower

Main issues that should be considered in a preliminary investigation are: •Existence of a suitable waterfall or weir and a turbine site•Consistent flow of water at a usable head•Acceptability of diverting water to a turbine•Site access for construction equipment•Prospect of a grid connection at reasonable cost•Social and environmental impact on the local area• land ownership /securing / leasing land at reasonable cost• Initial indication of design power and annual energy output Accuracy of information may only be +/- 25%Should be sufficient for deciding whether to proceed to a more detailed feasibility study.

Page 21: Community Development of Small Scale Hydropower

Full feasibility study•Uses accurate data and looks closely at costs•Can take project from initial idea to final design•Will support applications for project finance / licenses. •Cost of full feasibility study carried out by an independent consultant depends on its scope and on the specific characteristics of the site, but would typically be £7,500-£10,000. (grants from CES)

Page 22: Community Development of Small Scale Hydropower

Hydrological Survey.• Would produce a flow duration curve. •Modelling and using catchment rainfall information •Low Flows 2 software (used by SEPA and banks)•Based on long-term rainfall / flow data, together with knowledge of the catchment geology and soil types. • This long-term information might be backed up by short-term flow measurements.• The study should also include an estimate of the required compensation flow.

Page 23: Community Development of Small Scale Hydropower

Flow duration curve

Page 24: Community Development of Small Scale Hydropower

System design.•Would include a description of the overall project layout, including a drawing showing general arrangement of the site. •The prominent aspects of the works should be described in detail, covering: - Civil works (intake and weir, intake channel, penstock, turbine house, tailrace channel, site access, construction details) - The generating equipment (turbine, gearbox, generator, control system) - Grid connection

Page 25: Community Development of Small Scale Hydropower

System costing. A clear system costing would include a detailed estimate of the capital costs of the project, subdivided into: - Civil costs - The cost of grid-connection - The cost of electro-mechanical equipment - Engineering and project management fees

Estimate of energy output and annual revenue. Would summarise the source data (river flows, hydraulic losses, operating head, turbine efficiencies and methods of calculation) and calculate the output of the scheme in terms of the maximum potential output power (in kW) and the average annual energy yield (kWh/year) converted into annual revenue (£/year).

Page 26: Community Development of Small Scale Hydropower

Grid Connection•What might influence grid connection costs?•Remote areas – can be expensive for larger schemes•Grid designed to distribute power from large centralised generators to eventual small rural household loads.•DNO sometimes unenthusiastic – voltage rise and liability•Monopoly within defined areas means that connection costs may be unaccountably high•Beware additional costs: - HV connection earthing – (HV and LV earth systems) - Wayleave agreements with landowner

Page 27: Community Development of Small Scale Hydropower

Budget Study (~£500):•Apply to DNO – tell them where, why and size of generator•If there is capacity they will give approximate connection costs•Pro’s – cheap / only takes a month, Con’s – no place in queue

Network Study (~ £1500 - £3000):•Can be DNO or 3rd party•Can ask to explore different scenarios – e.g. We want 800kW but can we connect a 400kW any earlier•Takes 3 months – will look into capacity at that time with more accurate costs•Pro’s – more info / looks at a few options•Con’s – no place in queue / only capacity at that time

Page 28: Community Development of Small Scale Hydropower

Formal grid connection application (Free):

•No charge, but 3 months to get back•Will give costs for cheapest option•No different scenarios, will only look at what you ask•Will register you on the system•Will ask if you want to put down a deposit (%age of total costs)•Pro’s – Free, puts you in queue / books capacity•Con’s - If don't take offer within time limit lose place in queue•Time limit – SSE: 1 month / SP: 3 months

Page 29: Community Development of Small Scale Hydropower

Grid Connection deposit:

•Based on a specific generator / Turbine•If installed capacity goes up the have to re-apply•If location changes then void•If date of connection changes significantly then void•Cost of feasibility study if done comes off cost of deposit•Good to keep DNO updated as offer will lapse•Deposit refundable (less any work done) if showstopper e.g. no planning permission etc

Page 30: Community Development of Small Scale Hydropower

•Low voltage connection (<200kW/300kW): typically £10,000 - £30,000, depending on proximity of 11kV or 33kV network• No switchgear required <200kW, includes earthing and pole mounted transformer•High Voltage Connection (>300kW): typically £40,000 - £100,000 or more.•Additional costs of substation building (up to £25,000) to accommodate HV switchgear (above 200/300kW then need switching to turn it off), plus costs for the transformer / earthing•Earthing design and ground resistivity studies (up to £5,000) depending on site and conditions•Contestable and non-contestable works (3rd party usually for contestables as DNO expensive)•DNO does not usually guarantee timescales

Page 31: Community Development of Small Scale Hydropower

Finalise Legal Structure for Project•Essential to have proper, legally recognised group structure in place •Helps to ensure those undertaking the project are clearly accountable to community. •Most projects taken forward by subsidiary of main community organisation. •Company limited by shares, all shares held by the parent community body •Established non-profit distributing model - helps ensure community body has full control over the subsidiary - volunteers involved not personally liable.

Page 32: Community Development of Small Scale Hydropower

Project Design•Resource / feasibility assessments will drive project design. •Planning permission - need to submit full detail / design of project. •Communities advised to develop business model during project design to ensure costs and project makes financial sense. http://www.businesslink.gov.uk http://www.scottish-enterprise.com

•For detailed design community will need technical assistance to ensure site incorporated into area with minimal impact. •The feasibility study provides initial information required for design but additional work needed to ensure all impacts addressed.

Page 33: Community Development of Small Scale Hydropower

Planning Permission•Planning permission needed for all large renewable developments •Hydro projects up to 1 MW in size dealt with by local authority•Environmental Impact Assessment (EIA)•Site in 'sensitive area' />0.5 MW/dam -need for EIA must be considered• Impacts on hydrology - ecology should also be considered• Planning authority - definitive guidance to submit a robust application.

Page 34: Community Development of Small Scale Hydropower

Statutory Consultees

Page 35: Community Development of Small Scale Hydropower

Environmental Assessment (EA)

•Impact assessments - soil, hydrology, wildlife, visual ‘ noise impact, social, economic factors•Breeding season delays to planning•Assessment of impact on fish life•SEPA guidance on compensation flow•Designated areas – SSSI, SAC, SPA, NNR, AONB

Page 36: Community Development of Small Scale Hydropower

Some Important Flora and fauna

•Migratory fish•Bryophytes (Mosses and liverworts)•Freshwater mussels•Otters, water voles, bats and badgers•Large native trees•Invertebrates – e.g. Crayfish•Dippers, kingfishers, other birds etc•Amphibians and reptiles – frogs, toads, newts and snakes

Page 37: Community Development of Small Scale Hydropower

SEPA•Hydro schemes require water use licence from SEPA•Contact well in advance of application.•All developments require CAR authorisation for abstractions / weirs and dams / engineering

http://sepa.org.uk/water/hydropower.aspx

•Submit application same time as planning

Page 38: Community Development of Small Scale Hydropower

Information Required:•Head & Flow•Turbine efficiency•Installed capacity•Abstraction point / source type•Grid reference / maps•Intake structure•Construction method statement•Rate of abstraction•Discharge point / % returned•Operating regime•Rights to water

Page 39: Community Development of Small Scale Hydropower

Project costing and financial planning Project costs will arise from:

•Project development, planning consent ,consultancy work, planning report•Advice /setting up trading company •Grid connection costs •Financing costs – loan repayments, overdraft interest, accountancy advice •Insurance costs - construction / operation •Turbine and civil infrastructure costs

Page 40: Community Development of Small Scale Hydropower

Operational Costs:•Business rates •Land rental •Administration / salaries •Non warranty service and maintenance •Warranty •Turbine monitoring – BT lines etc •Contingency

•Example financial spreadsheet

Page 41: Community Development of Small Scale Hydropower
Page 42: Community Development of Small Scale Hydropower

Revenue & Feed in Tariffs

Page 43: Community Development of Small Scale Hydropower

Financing a revenue generating projectFor community groups financing of project is a large undertaking.Projects can cost over £1million and have significant operational costs

Stages of financing a large project; •Pre development •Planning preparation •Post planning through to construction

Community projects will require a mix of finance to become viable (debt (bank), grant and equity)

Page 44: Community Development of Small Scale Hydropower

•The initial stages of development / planning are the riskiest - will require secure funding

•Final phase, once planning consent and a grid connection have been confirmed, should attract commercial finance

•All funders will perform some due diligence on the project

Page 45: Community Development of Small Scale Hydropower

Scottish Government's Community and Renewable Energy Scheme (CARES)

•CARES Urban Support Programme•CARES Pre Planning Loan Fund (Rural Business and Communities)•CARES Post Planning Loan Fund (Open to Communities)•CARES Infrastructure & Innovation Fund•CARES Start Up Grant

Page 46: Community Development of Small Scale Hydropower

Construction of Project

•Contracts for hydropower installations tend to be on a turnkey basis

•Management of entire construction phase, turbine supply, infrastructure transport •Match between project design and installation is crucial

Page 47: Community Development of Small Scale Hydropower

Operation & Maintenance•Maintenance and servicing of technologies and infrastructure required for the lifetime of project. •Essential there is provision for these included in the supply of a turbine, and that this is accounted for in business and financial planning.•May be provided under warranty for first few years of the project•Can sometimes be extended throughout the lifetime of the project.•Also possible to outsource O&M services from other companies

Page 48: Community Development of Small Scale Hydropower

Many thanks for listening

James Buchan

CES is Scotland’s community energy charity. We are a membership organisation made up of community groups, with voluntary directors

elected by our members.

We have a membership scheme in which eligible groups can become members of CES for free.

Details can be found on our website and leaflets are available in the foyer.