28
Company Presentation 14.09.2019

Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

Company Presentation14.09.2019

Page 2: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

Management

NUMBER OF

EMPLOYEES

24 White / 62 Blue

10 NUMBER

OF

ENGINEERS

86

M2 TOTAL

CLOSED

AREA2700

Mr. Oğuzhan ArslanMan. Director (Ind. Eng.)

Mr. Kaan ArslanMan. Partner (Economics)

Head of Finance Mr. Saruhan Arslan(BA)

Tech. Manager Mr. Murat Arslan(Mech. Engineer)

AT A GLANCE

A family owned business.

Second generation in charge.

Page 3: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

MILESTONES

1971Founded as

Hidro Pres Castings

1980Moved to

Yenibosna

1993Foundation of

Arslan Makina

1995First Export:

Germany

2010Approval of

SVTI ASIT

Certification

2013Set-up of internal

powder painting

shop

2015Purchase of the

land of new plant

MRP II -> ERP

Implementation

2018New factory

construction

started

2005Full automated

HPDC machine

and CNC machine2006Entry to Automotive

(Finnveden -> Daimler)

2005Export firm: Arma

Metal Export rate

>70%

2003Approval of

ISO 9001

Page 4: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

PRODUCTION GENERAL OVERVIEW

POWDER

PAINTINGS

CNC

MACHINING

TOOL&

FIXTURE DESIGN

ALU DIE

CASTING

Page 5: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

CAPACITY/CAPABILITY INFORMATION

Tool & Fixture

Productions

Pressure & gravity die

castings & trimming

tool production

CAD Software => Solidworks

| CAM Software => ESPRIT

Tooling flow simulations

Die

Casting

Pressure die castings in

aluminium & zinc from 20g

to 6kg

Aluminium gravity die

castings up to 15kg

CNC

Machining

4 axis precise

milling, turning

operations

Page 6: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

CAPACITY/CAPABILITY INFORMATION

Assembly of the

components, helicoil

inserting etc

AssemblyPowder

Paintings

Multi color powder paint

shop

Custom Made

Equipment

Custom made equipment

can be made according

to specific requirements.

Page 7: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

CAPACITY/CAPABILITY INFORMATION

Quality / Project

PPAP, APQP, SPC, FMEA, 8D

studies can be handled for

Automotive customers.

MRP => ERP + BI

Implementation completed

for new ERP system.

Export Experience

We are exporting

products to various

European countries

since 1995.

Page 8: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

ALLOY TYPES & RELATED COLOR CODES

Page 9: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

REFERENCES FRANCE

SWITZERLAND

TURKEY

HUNGARY

ITALY

GERMANY

CZECHIA

CHINA

AUTOMATION

AUTOMOTIVE

AIR SYSTEMS

CASTING

DRIVE TECH.

ELECTRONIC

ENERGY

HYDRAULICS

INDUSTRIAL

LIGHTNING

TELECOM

Page 10: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

CERTIFICATES

Page 11: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

TEST CAPABILITIES

Dimensional Inspection - Mutitoyo Crysta 3D CMM

Porosity Level Test – Stereo Microscope

Coating Thickness Test

Chemical Analysis - WAS Spektrometer

Hardness Test - Affri Hardness Tester

X-Ray Inspection- YXLON – 225Kv – MU 2000 (2018)

Tensile Test – External Lab (Rm, Rp, %Elong.)(KOSGEB)

Special Test Fixtures & Gauges

Zeiss 3D CMM

Mahr Surface Roughness and Contour Measurement

RPT Density Control

Page 12: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

TEST CAPABILITIES

X-Ray Inspection

YxlonSurface Roughness and Contour Measurement

MahrSurf

Page 13: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

MEASUREMENT CAPABILITIES

Tool Measurement

Zoller3D CMM

Zeiss

Page 14: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

CASTING SIMULATION

New project designs,

optimised for better castings

with close customer

cooperation.

To enhance better results in

new projects Casting

Simulation Software

‘’ANYCASTING’’ is used for,

• Liquid Filling Analysis

• Solidification Patterns

Filling Time, Material Flow Particle Tracing

Air

Pressure

Runner Optimisation

Page 15: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

HUMAN RESOURCES

We can achieve competitiveness and

success only through teamwork and

focused efforts of an engaged, dedicated

and capable workforce

AIM: To employ promising, motivated

individuals and then help them to realise

their potential by enhancing their

capabilities and by increasing their

education so they become effective.

Since Q4 2016, we actively employ a

company wide Suggestion System with

rewards and systematic follow-ups to

engage every employee to increase our

efficiency.

Page 16: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

PHOTO GALLERY

Casting Shop

Page 17: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

PHOTO GALLERY

CNC Machining Shop

Page 18: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

PHOTO GALLERY

Tool & Fixture Workshop

Page 19: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

PHOTO GALLERY

Shot Blasting & Vibro Process

Page 20: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

PHOTO GALLERY

Washing / Helicoil Insert / Assembly

Page 21: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

PHOTO GALLERY

Final Control & Packaging

Page 22: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

INVESTMENT PLANS 2017-2019

Goal / Investment

New Zitai fully

automated Casting

Machine 250 T

3D CMM

2 new Brother CNC

Machining Centers

(R450 X1 & R650X1)

Description

• Extra squeze casting capability for gas tight parts,

• Including 3 robots,

• AutoLadler,

• Servo Programmable Sprayer

• Extractor

• Tool thermo regulator & Vacuum system

• Zeiss 3D CMM

• 4 axis,

•10K rpm,

• Renishaw Laser (TRS2) and Parts Probes (OMP40)

• High pressure internal coolant

• High speed machining for Alu parts

Planned Date

2017-Q3

2017-Q4

2018 Q3

Status

Completed

Completed

Completed

Page 23: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

INVESTMENT PLANS 2017-2019

Goal / Investment

XRAY

Mahr

Central Melting

Furnace

BOTTA (Italy)

Description

XRAY MACHINE

• YXLON YMU-200D / 225 KV

• CT Ready

Mahr CD 280

Contour and Surface Measurement

• Gas Powered

• Tower Type

• 1500 Kgs Holding

• 600 Kgs/Hour Melting capacity

Planned Date

2018 Q3

2018 Q4

2019 Q2

Status

Completed

Completed

Completed

Page 24: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

INVESTMENT PLANS 2017-2019

Goal / Investment

OMS

PRESS

Automated

Die Casting

Machine

(Italy)

Liquid Metal

Transfer System

DOGUS

Foundry

Degassing

Unit (FDU)

Description

• 480 Tons Locking Force

• Auto Ladler

• Auto Sprayer

• Electric Powered

• 500 Kgs Transfer Capacity

• 3 x Transfer pots for different alloys

• Plc Controlled

• 200-1200 Kgs Capacity

• Auto Flux Feeding System

Planned Date

2019-Q2

2019-Q2

2019-Q2

Status

Completed

Completed

Completed

Page 25: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

INVESTMENT PLANS 2017-2019

Goal / Investment Description Planned Date Status

Density

Index

Measurement

• Control and optimize the cleaning of the Melt.

• Density Index Equipment.

• Saving the measure results and SPC capability.

2019-Q4 Planned

New Zitai fully • Including 3 robots, 2019-Q4 Planned

Automated • AutoLadler,

Casting Machine • Auto Sprayer

730 Tons • Extractor

• Tool thermo regulator & Vacuum system

Page 26: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

MOVING TO A NEW PLANT

Description

New factory Building investment in the new

organized Industry area. (Hadımköy Industrial Area)

Location:

• 25 Km West Direction from Atatürk Airport.

• 27 Km South Direction from New 3rd Airport.

• Planned total closed area 13.000 sqm

Planned Date

2019-Q4 Current Factory

New Airport

27

KM

Current

Airport

New Factory

Page 27: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

MOVING TO A NEW PLANT

Description

New factory Building investment in the new

organized Industry area. (Hadımköy Industrial Area)

Location:

• 25 Km West Direction from Atatürk Airport.

• 27 Km South Direction from New 3rd Airport.

• Planned total closed area 13.000 sqm

Planned Date

2019-Q4

Page 28: Company Presentation - Arslan Makina Dokum · Presentation 14.09.2019. Management NUMBER OF EMPLOYEES 24 White / 62 Blue 10 NUMBER OF ENGINEERS 86 M2 TOTAL CLOSED AREA 2700 Mr. OğuzhanArslan

Thank you for your attention.