Upload
neveah
View
38
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Comparison of DC and RF conditioning. Jorge Giner-Navarro A.Degiovanni , N.Shipman , W.Wuensch and on behalf of the Breakdown studies and DC Spark team 09/04/2014 CLIC RF Structure Development Meeting. Conditioning history of TD26R05CC at XBOX1 (CERN). - PowerPoint PPT Presentation
Citation preview
Comparison of DC and RF conditioning
Jorge Giner-NavarroA.Degiovanni, N.Shipman, W.Wuensch
and on behalf of the Breakdown studies and DC Spark team09/04/2014
CLIC RF Structure Development Meeting
2
Conditioning history of TD26R05CC at XBOX1 (CERN)
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
3
History plot of TD24R05 at NEXTEF (KEK)
T. Higo CLIC Workshop 2014J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
1060 BDs 591 BDs
Conditioning BDR measurements
4
History plot of HRR Fixed-Gap System at DC Spark lab
(window= 50M Pulses)
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
Voltage pulse lengthtp=12 µs
Gap = 15µm
509/04/2014
Normalized Surface Electric Field
𝐸𝑠
𝑡𝑝−1 /6 BDR1/30
𝐸𝑠∝𝐸0∝𝑡𝑝− 1/6BDR1/30
Gradient scaling law
J. Giner-Navarro - CLIC RF Structure Development meeting
6
Normalized Surface Electric Field𝐸𝑠
𝑡𝑝−1 /6 BDR1/30
Same conditioning level at different number of BD
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
7
Normalized BreakDown Rate
BDR
E s❑30 𝑡𝑝
5
BDR∝ E s❑30 𝑡𝑝
5BDR scaling law
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
8
Thank you for your attention !
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
9
EXTRA SLIDES
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
10
Normalized BreakDown Rate per unit Area
BDR / AE s
❑30𝑡𝑝5
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
Area with 95% of the max Electric field:
TD26R05CC 646 mm2
TD24R05 612 mm2
FFG electrodes 5655 mm2
(approx estimation)
11
Evolution of BDR vs Surf E field
J. Giner-Navarro - CLIC RF Structure Development meeting
09/04/2014
• For the same Es , BDR decreases• We reach same level of BDR with
higher Es
HRR Fixed Gap System