COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity (MW) Projects Developer Subsidy Amount (` in lakh) Release Amount (` in lakh) Status HIMACHAL PRADESH 1. 7/1/2005- SHP (7/204/ 2005-SHP) Marhi, H.P. 5.00 M/s Sai Engg. Foundation, Sai Bhawan, Phase-2, Sector-4, New Shimla-171009 375.00 375.00 Commd. Funds released on 7/3/2008. 2. 7/2/2005- SHP (7/205/ 2005-SHP) Toss, Kullu, H.P. 5.00 M/s Sai Engg. Foundation, Sai Bhawan, Phase-2, Sector-4, New Shimla-171009 337.50 337.50 Commissioned on Nov 2008 3 7/14/2005- SHP Brahmganga, H.P. 5.00 M/s. Harrisons Hydel Construction Co. (P) Ltd. 315.00 315.00 Commd. Funds released on 26/8/2009. 4 7/15/2006- SHP Salag, Kangra, H.P. 0.150 M/s. Dhauladhar Hydro Power Systems (P) Ltd., Hamirpur 40,81,250 40,81,250 Commd. Funds released on 22/6/2007 5 7/22/2006- SHP Andhra Stage -II, H.P. 5.00 M/s Gowthami Hydro Electric Co. Ltd. Hyderabad 281.25 281.25 Commissioned on june 2009 Completed 6 7/24/2006- SHP Patikari, Mandi, H.P. 16.00 M/s. Patikari Power (P) Ltd., Delhi. 787.50 787.50 Commd. Funds released on 25/3/2009 7 7/29/2006- SHP Iku-II, Kangra, H.P. 5.00 M/s. Vamshi Industrial Power Ltd. Hyderabad (Lanco Group) 375.00 375.00 Commissioned on January 2009 8 7/30/2006- SHP Upper Khauli, Kangra H.P. 5.00 M/s. Vamshi Industrial Power Ltd. Hyderabad (Lanco Group) 258.75 258.75 Commissioned on December 2010 9 7/31/2006- SHP Drinidhar, Kangra, H.P. 5.00 M/s. Vamshi Industrial Power Ltd., Hyderabad (Lanco Group) 292.50 292.50 Commissioned on March 2010

COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

COMPLETE PROJECT (Settled Projects) (As on 31.03.2015)

Sl.No File No. Location of the Project

Capacity (MW)

Projects Developer Subsidy Amount

(` in lakh)

Release Amount

(` in lakh)

Status

HIMACHAL PRADESH

1. 7/1/2005-SHP (7/204/ 2005-SHP)

Marhi, H.P. 5.00 M/s Sai Engg. Foundation, Sai Bhawan, Phase-2, Sector-4, New Shimla-171009

375.00 375.00 Commd. Funds released on 7/3/2008.

2. 7/2/2005-SHP (7/205/ 2005-SHP)

Toss, Kullu, H.P. 5.00 M/s Sai Engg. Foundation, Sai Bhawan, Phase-2, Sector-4, New Shimla-171009

337.50 337.50 Commissioned on Nov 2008

3 7/14/2005-SHP

Brahmganga, H.P. 5.00 M/s. Harrisons Hydel Construction Co. (P) Ltd.

315.00 315.00 Commd. Funds released on 26/8/2009.

4 7/15/2006-SHP

Salag, Kangra, H.P. 0.150 M/s. Dhauladhar Hydro Power Systems (P) Ltd., Hamirpur

40,81,250 40,81,250 Commd. Funds released on 22/6/2007

5 7/22/2006-SHP

Andhra Stage -II, H.P.

5.00 M/s Gowthami Hydro Electric Co. Ltd. Hyderabad

281.25 281.25 Commissioned on june 2009 Completed

6 7/24/2006-SHP

Patikari, Mandi, H.P.

16.00 M/s. Patikari Power (P) Ltd., Delhi. 787.50 787.50 Commd. Funds released on 25/3/2009

7 7/29/2006-SHP

Iku-II, Kangra, H.P. 5.00 M/s. Vamshi Industrial Power Ltd. Hyderabad (Lanco Group)

375.00 375.00 Commissioned on January 2009

8 7/30/2006-SHP

Upper Khauli, Kangra H.P.

5.00 M/s. Vamshi Industrial Power Ltd. Hyderabad (Lanco Group)

258.75 258.75 Commissioned on December 2010

9 7/31/2006-SHP

Drinidhar, Kangra, H.P.

5.00 M/s. Vamshi Industrial Power Ltd., Hyderabad (Lanco Group)

292.50 292.50 Commissioned on March 2010

Page 2: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

10 7/32/2006-

SHP

Baner-III, Kangra

H.P. 5.00 M/s. Vamshi Industrial Power Ltd. Hyderabad

(Lanco Group) 326.25 326.25 Comm. in

Feb.2009

11 7/34/2006-SHP 7/201/2010-SHP (12/4/2010)

Palor-I, H.P. 3.00 M/s. Mangalam Energy Development Co. (P) Ltd., 605, Ansal Bhawan, 16 Kasturba Gandhi Marg, New Delhi-110001 011-30482845 (O) 011-30482844

260.00 260.00 Completed

12 7/38/2006-SHP

Taraila-II, Chamba, H.P.

5.00 M/s. Cimaron Constructions (P) Ltd., Hyderabad.

326.25 326.25 Completed

13 7/39/2006-SHP

Upper Taraila, Chamba, H.P.

5.00 M/s AT Hydro (P) Ltd. Hyderabad 303.75 303.75 Commissioned on September 2009

14 7/40/2006-SHP

Upper Awa, Kangra, H.P.

5.00 M/s. Astha Projects Ltd., Hyderabad 375.00 375.00 Completed

15 7/41/2006-SHP

Shyang, H.P. 3.00 M/s. Sai Foundation, Shimla 300.00 300.00 Completed

16 7/43/2007-SHP

Chandni, Sirmour H.P.

3.00 M/s. Himalayan Crest Power Ltd., A-60, Okhla, Industrial Area, Phase-II, New Delhi-110020 011-26387738,46598700(O), 011-26387804,26385181(Fax) [email protected] Mr. Yugal Kishor, 09818055221(M)

225.00 225.00 Completed

17 7/44/2007-SHP

Sabari-I, Kullu, H.P. 4.50 M/s. DSL Hydrowatt Ltd., Mumbai 356.00 356.00 Completed

18 7/76/2008-SHP (4/6/2008)

Gaj-II, Kangra, H.P.

1.50 M/s. Raheja Hydel Power Pvt. Ltd., B-27A, Sushant Lok-1, Gurgaon, Haryana

215.00 215.00 Commissioned on Jan 2011

19 7/79/2008-SHP (20/10/2008)

Sahu, Chamba, H.P.

5.00 M/s Him Kailash Hydro Power Pvt. Ltd., Plot No.6-3-668/10/49, 3

rd Floor, Durga Nagar

Colony, Panjagutta, Hyderabad.

375.00 375.00 Commissioned on April 2008

20 7/83/2008- Luni-III, Kangra, 5.00 M/s. Sri Sai Krishna Hydro Energies (P) Ltd., 375.00 375.00 completed

Page 3: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

SHP H.P. Plot No. 226, Road No.78, Phase-III, Jubilee Hills, Hyderabad-500033.

21 7(86)2009-SHP (5/3/2009)

Beaskund, Kullu, H.P.

9.00 M/s Kapil Mohan & Associates Hydro Power Pvt. Ltd. S.C.O. 140-141,Sector 34-A, Chandigarh 09779450009(M)172-2602863(O) 2602863(F) [email protected]

440.00 440.00 Completed

22 7(101)2009-SHP (7/12/2009)

Balsio, Chamba, H.P.

5.00 M/s. Ginni Global Pvt. Ltd., 2nd

Floor, Shanti Chamber, 11/6B, Pusa Road, New Delhi-110005 011-2586667,8,9,9871460038(M)

320.00 320.00 Completed.

23 7(103)2009-SHP (29/12/2009)

Sarbari-II, Kullu, H.P.

5.40 M/s. DSL Hydrowatt Ltd., Empire House, 3rd

Floor, 214, Dr. D.N. Road, Fort, Mumbai-400001

332 332 comm. on 25/8/2010.

24 7(104)2009-SHP (29/12/2009)

Jirah, Kullu, H.P. 4.00 M/s. Kapil Mohan & Associates Hydro Power (P) Ltd., SCO 140-141, Sector 34-A, Chandigarh(U.T.).

290.00 290.00 . Completed

25. 7(106)2010-SHP

Luni-II, Kangra, H.P.

5.00 M/s. Sri Sai Krishna Hydro Energies (P) Ltd., Plot No. 226, Road No.78, Phase-III, Jubilee Hills, Hyderabad-500033.

375.00 375.00 Comm. on 12/11/2009. Funds released on 24/05/2011.

26. 7/111/2010-SHP (10/2/2010)

Taraila-III, Chamba, H.P.

5.00 M/s. Tarela Power Ltd. Plot No.125, Road No.71, Navanirman Nagar, Film Nagar Post Office, Hyderabad-500033 040-23541603, 040-23541604 [email protected]

320.00 320.00 comm. in June, 2011.

27 7(112)2010-

SHP

(10/2/2010)

7(176)2003-

SHP

Baragran, Kullu, H.P. 1.90 M/s K.K.K. Hydro Pvt. Ltd., I-41, DLF Industrial

Area, Phase-I, Faridabad-121003

Project comm.

on 16/7/2008.

Funds released.

28 7(114)2010-SHP (10/2/2010)

Upper Joiner, Chamba, H.P.

12.00 M/s. Tejassarnika Hydro Energies (P) Ltd., Plot No.125, Navanirman Nagar, Road No.71, Jubilee Hills, Hyderabad-500033

530.00 530.00 Comm. on June 2009.

Page 4: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

040-23541603, 23541604

29 7(118)2010-SHP (25/2/2010)

Belij, Chamba, H.P. 5.00 M/s. Belij Hydro Power Private Ltd., Plot No. 227, Road No.2, Banjara Hills, Hyderabad-500034 040-23559922-25,23542420(Fax) [email protected]

320.00 288* Completed & commissioned in Dec, 2010.

30 7(119)2010-SHP 25/2/2010

Chirchind, Chamba, H.P.

5.00 M/s Chirchind Hydro Powor Ltd., 216-217-218, New Industrial Area-II, Mandideep-462046. Distract Raisen, Bhopal 07480-233068, 4250756 (Fax) [email protected]

320.00 320.00 commissioned on 7/4/2011.

31 7/122/2010-SHP (11/3/2010)

Gurhan, Mandi, H.P.

1.50 M/s. Sarabai Enterprises Pvt. Ltd., 4th Floor,

above Jagmohan Chohda & Co., Near Sainik Rest House, The Mall, Solan-173212 01905-286435, 286435 (Fax) 09427615500(M),

215.00 215.00 Comm. on June, 2010. Completed

32 7/144/2010-SHP (30/3/2010)

Manglad, Shimla, H.P.

4.50 M/s. Shree Bhavani Power Projects(P) Ltd., No.7, A-6, Maharani Bagh, New Delhi-110065 Tele-46514295,46514296(Fax) [email protected]

305.00 305.00 Comm. on 19/7/2010.

33 7/145/2010-SHP (8/4/2010)

Rakchad, Kinnaur, H.P.

5.00 M/s. Regent Energy Ltd., B-1/H-1, Mohan Co-op., Industrial Estate Mathura Road, New Delhi-110044 46007300 to 12,4007301(Fax), 9711185144(M) (Mr. Vinod) [email protected]

320.00 320.00 Commissioned on 24/2/2011.

34 7/147/2010-SHP (25/5/2010)

Sainj, Shimla, H.P 5.00 M/s. Himshakti Projects Pvt. Ltd., 1st Floor,

NBCC towen, 15, Bhikaji Cama Place, New Delhi -110066 9818884171(M)

320.00 320.00 Comm. on 9/5/2010.

35 7/156/2010-SHP (8/6/2010)

Seechi, Kullu, H.P. 4.50 M/s. Ascent Hydro Projects Ltd., 6,Shiv Wastu, Tejpal Scheme Road No 5, Vile Parle(E), Mumbai-400057 022-26826819/26826718(O),26834658(F)

305 305 Completed

36 7/176/2010-SHP (9/6/2010)

Brahl, Kangra, H.P. 4.00 M/s. Sodhi Brothers Hydro Power Pvt. Ltd., 25, Phase-I, Industrial Area, Nagrota Bagwan, District. Kangra, H.P.

290.00 290.00 Commissioned on September, 2010.

Page 5: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

01892-252109,252099(O),253123(Fax) [email protected]

37 7/179/2010-SHP (8/6/2010)

Chakshi, Kullu, H.P 2.00 M/s. Puri Oil Mills, 302, Jyoti Shikher Building, 8, District Centre, Janakpure, New Delhi-110058 011-25544415, 25544447(O), 25591222(Fax) [email protected]

230.00 (Total cost 1879.88 lakh)

115.00+115.00 Comm. in August, 2010.

38 7/180/2010-SHP (10/6/2010)

Dehar-II, Chamba, H.P.

1.50 M/s. Saini Techno Constructs (P) Ltd., 236, Bajri Co., Burmah Shell Road Pathakot. 0186-2222442(O), 09876491199(M), 0186-222003(Fax)

215.00 215.00 Comm. in December, 2009.

39 7/186/2010-SHP 20/5/2010

Mauhji-II, Kangra, H.P.

5.00 M/s. Dharmshala Hydro Power Ltd., Hyderabad., Plot No.30-A, Road No.1, Film Nagar, Jubilee Hills, Hyderabad-500033 040-23553459,23553460(O), 23607522(Fax)[email protected]

320.00 320.00 Commd. on 6/11/2010.

40 7/191/2010-SHP (5/5/2010)

Rukti-II, Kinnaur, H.P.

5.00 M/s. Door Sanchar Hydro Power Pvt. Ltd., 3rd

Floor, Rider House, 136, Sector -44, Gurgaon-122002 124-787000/01/02/03(O),4787004(Fax) www.srovanthigroup.com

320.00 320.00 commissioned on November, 2011

41. 7/201/2010-SHP (12/4/2010) 7/34/2006-SHP (6/10/2006)

Palor-I, Sirmour, H.P.

3.00 M/s. Mangalam Energy Dev. Co. Pvt. Ltd, 605, Ansal Bhawan, 16 Kasturba Gandhi Marg, New Delhi-110001 011-30482845 (O) 011-30482844

260.00 260.00 Commissioned on 10/11/2010.

42. 7/121/2010-SHP (11/3/2010)

Lower Baijnath, Kangra, H.P.

1.00 M/s Changer Vidyut Kranti (P) Ltd., Chankyapuri, Ghuggar, Palampur 176061 Director Kangra(HP) 01894-262211, 01894-232551 09418158899(M), 09418458211(M)

200.00 200.00 Commissioned on 15

th August,

2009.

43 7(203)2010-SHP

Binua Parai, Kangra, H.P.

5.00 M/s. Anubhav Hydel Power (P) Ltd, Plot No.226, road No.78, Phase-III, Jubilee Hills, Hyderabad-500033, A.P.

320.00 320.00 Commed.. on 9/5/2011.

44 7(255)2012-

SHP

Binwa –IV, District

Kangra, H.P.

4.00 Mr. Bhanu Pratap Singh, Director

M/s. Bhavani Renewable Energy (P) Ltd.,

290 290 Fund released on

30/9/2014

Page 6: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

D-21, !st Floor, Panchasheel Enclave, New Delhi-

110017

46514295(O), 46514296(Fax)

45 7(176)2003 Baragaon III H.P 3.00 M/s K.K.K. Hydro Pvt. Ltd., I-41, DLF

Industrial Area, Phase-I, Faridabad-121003

57.00 57.00 Commissioned on July 2008

46 7/28/2006-

SHP

Taraila, Chamba,

H.P.

5.00 M/s. Ginni Global Ltd., New Delhi

375.00 375.00 Commd. on

15/11/2007.

Funds released on

25/3/2009.

47 7/205/2011-

SHP

Dikleri, Chamba,

H.P.

2.00 M/s Manimahesh Hydel Power Project

Co-operative Society Ltd., Dhall House, Mohalla

Sapari, Chamba, H.P.

01899-222385(O), 222541(Fax)

230.00 230.00 Fund release on

09/12/2014

KARNATAKA

1 7/6/2005-SHP

Hemagiri, Mandya,

Karnataka

4.00 M/s. Trishul Power (P) Ltd., 396/24, ‘Ololiga

Complex’ Sampige Road, Malleswaram,

Bangalore-560003.

080-23313577,23561037(Telfax)

100.00+12.50 Commissioned &

CFA released .

2 7/7/2005-SHP

Sattegala, Karnataka 6.25 M/s. Bhoruka Power Corp. Ltd., 48, Lavelle Road,

Bangalore-560001

080-22630100,22272271(O)

[email protected]

Commissioned &

CFA released

3 7/8/2005-SHP

MGHE Tail Race,

Shimoga, Karnataka

22.00 M/s. Ambuthirithi Power (P) Ltd., Bangalore. Commissioned &

CFA released

4 7/13/2005-

SHP

(7/8/2005-

SHP)

(21/6/2005)

MGHE Tail Race,

Shimoga, Karnataka

22.00 M/s. Ambuthirithi Power (P) Ltd., # 137, 7th floor,

HMG Ambassador Building, Residency road

Bangalore-560025

41474800/01/02/03 (O), 41474804(Fax|).

337.50 Commissioned &

CFA released

5 7/15/2006-

SHP

Neria, Dakshin

Kannada, Karnataka

9.00 M/s. Bhoruka Power Corporation Ltd. Bangalore. 175.00 Commissioned &

CFA released

6 7/16/2005-SHP

Chayadevi, Gulbarga, Karnataka

24.00 M/s. Bhoruka Power Corporation Ltd. Bangalore.

362.50 362.50 Commd. Funds released on 31/3/2008 completed

7 7/17/2005-

SHP

Kadamane-I, Hassan,

Karnataka

9.00 M/s. Paschim Hydro Energy (P) Ltd., Hyderabad. 175.00 175.00 Commissioned &

CFA released

8 7/19/2005- Akkihebbal, Mandya, 4.50 M/s. Cauvery Hydro Energy Ltd., 106.875 Commissioned &

Page 7: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

SHP Karnataka # 67 , Lavina Courts, 102 1st Floor, 7th Cross

Road, Rajamahal Vilas Ext. Bangalore -560086

080-23618965, 23612825(O)

[email protected]

CFA released

9 7/36/2006-

SHP

Dandela, South

Kannada, Karnataka

13.00 M/s. Sagar Power (P) Ltd.,

C O, 4th Floor, Bhaskar Plaza, Road No.1

Banjara Hills, Hyderabad, 500034

040- 23392631,

(Mr. P.J. K. Reddy)

Contact no.09393333300

Commissioned &

CFA released

10 7/45/2007-SHP

Ranganathaswamy, Chamrajnagar , Karnataka

24.75 M/s. Pioneer Power Copr. Ltd., Hyderabad. 371.88 371.88 Completed

11 7/46/2007-

SHP

Perla, Dakshina

Kannada ,

Karnataka

24.00 M/s. AMR Power (P) Ltd., Plot No. 1071, Road

No. 44, Jubilee Hills, Hyderabad.

040-32915858,32946868, 040-2350287(Fax)

Commissioned &

CFA released

12 7/55/2007-SHP

Varahi Irrigation Weir Left Bank, Udupi, Karnataka

12.00 M/s. Shamili Hydel Power Project (P) Ltd.,’Shamili’, NH 17, Ambalpady, Udupi-576103 Karnataka. 0820-2526629,2533902(O),2532686(Fax) [email protected]

340.00 340.00 Commissioned on june 2009 Completed

13 7/66/2008-SHP (26/3/2008)

Manjadka, Kodagu, Karnataka

10.00 M/s. Bhoruka Power Corporation Ltd., 48, Lavelle Road, Bangalore-560001 080-22630100,22272271(O) [email protected]

300.00 300.00 Commissioned on June 2009

14 7(99)2009-SHP (27/10/2009)

Soham Mannpithu, Dakshin Kannada, Karnataka

15.00 M/s. Soham Mannapitlu Power Pvt. Ltd., #137, 7

th Floor, HMG Ambassador Building,

Residency Road, Bangalore-560025.

250.00 250.00 Commissioned on September 2009

15 7/162/2010-SHP (30/4/2010)

Kanchanguuda, Bellary, Karnataka

6.00 M/s. Pusal Power Project Pvt. Ltd., 1-7-510/E/3,Gemini Colony Musheerabad, Hyderabad-500020 040-27672526(O),27654029(F) [email protected]

137.50 137.50 Commissioned on 27/10/2005.

16. 7/65/2007-SHP 7/50/2007-

Sonna, Bijapur, Karnataka

10.50 M/s. Jasper Energy (P) Ltd., No.49, KHB Colony, 5th Block, Koramagala, Bangalore-560034.

Commissioned & CFA released

Page 8: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

SHP (19/4/2007)

080-25712944(O), 08025712943(Fax) Project commissioned on 4/8/2010. January, 2007 loan

17. 7/130/2010-

SHP

Ullankal,

Panthanamthitta,

Karnataka

7.00 M/s. Energy Development Company Ltd., 1st

Floor, Azim Ganj House, 7, Camac Street

Kolkata-700017

West Bengal.

033-30534983/30534990(O),22903298(F)

[email protected]

240.00 Commissioned on

13/11/2008 &

CFA released

1 7/23/2006-

SHP

Loharkhet,

Uttarkhand

4.80 M/s. Parvatiya Power (P) Ltd., Raipur 367.50 Commissioned &

CFA released

2 7/25/2006-

SHP

Debal, Chamoli.

Uttarakhand

5.00 M/s. Chamoli Hydro Power (P) Ltd., Hyderabad 375.00 Commissioned &

CFA released

3 7/26/2006-SHP

Bilanganga, Tehri Garwal Uttarakhand

21.50 M/s. Swati Power (P) Ltd., 111, Road 72, Jubilee Hills, Hyderabad-500033. 040-64626217-20 [email protected]

742.50 742.50 Completed

4 7/27/2006-SHP

Birahiganga , Chamoli, Uttarakhand

7.20 M/s. Birahi Ganga Hydro Power Ltd., 32-33, Nehru Place, Flat No.403, New Delhi-110019 26413144, 26415111 26414209 26467558 (Fax) Mr. Sushil (9810163805(M) [email protected]

3,70,57,500 3,70,57,500 Completed

5 7/68/2008-SHP (9/4/2008)

Bhilangana-III, Uttatakhand

24.00 M/s. Bhilangana Hydro Power Ltd., B-37, Sector-1, Gautam Budh Nagar, Noida-201301 (UP)

890.00 445.00+220+225 890

. Completed

6 7(185)2010-SHP (3/6/2010)

Agunda Thati, Tehri Garhwal, Uttarakand

3.00 M/s Gunshola Hydro Power Generation Pvt. Ltd., ‘Kalyan Kunj’ 179, Panditwari, Dehradun-248007 (Uttarakhand)

300.00 300.00 Commd. on 19/7/2009.

PUNJAB

Page 9: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

1 7(88)2009-SHP 5/5/2009

Channowal, Moga, Punjab

0.90 M/s. Abohar Power Generation Pvt. Ltd., B-37, Sector -1, Noida-201301 0120-4621300(O), 4621333(Fax)

108.00 108.00 Completed

2 7(89)2009-SHP (5/5/2009)

Akhara, Ludhiana, Punjab

1.10 M/s. Abohar Power Generation Pvt. Ltd., B-37, Sector -1, Noida-201301 0120-4621300(O), 4621333(Fax)

122.00 122.00 Completed

3 7(108)2010-SHP (9/2/2010)

Gholian, Moga, Punjab

0.80 M/s. Abohar Power Generation Pvt. Ltd.,B-37,Sector-1,Gautam Budh Nagar, Noida-201301 120-43682406, 43682447

96.00 96.00 Completed

4 7(109)2010-SHP (9/2/2010)

Khanpur Fall, Ludhiana, Punjab

1.10 M/s. Abohar Power Generation Ltd., B-37, Sector-1,Gautam Budh Nagar, Noida-201301

122.00 122.00 Commissioned April 2010.

5 7/110/2010-SHP (9/2/2010)

Sudhar Fall, Ludhiana, Punjab

1.40 M/s. Abohar Power Generation Ltd., B-37, Sector -1,Gautam Budh Nagar, Noida-201301 43682406, 43682447

128.00 128.00 Comm. on May, 2010.

6 7/123/2010-SHP (6/4/2010)

Terikiana, Hoshirapur , Punjab

0.65 M/s. Atlantic Power Private Ltd. H.No.1688, Sector - 33 D, Chandigarh, 0172-4008498,98159-12250 [email protected]

78.00 78.00 Comm. on 30/11/2010.

7 7(187)2004 Babehali 2.70 M/s. Gill Power Generation Co. Ltd. 75.075 75.075 Commissioned on August 2006.

MAHARASHTRA

1 7/77/2008-SHP

Nira Deogarh, Pune, Maharashtra

6.00 M/s. Celerity Power (P) Ltd, 421, Arun Chambers, Near A.C. Market, Tardeo, Mumbai-400034

220.00 220.00 Completed

2 7(92)2009-SHP (29/6/2009)

Darna Dam, Nasik, Maharashtra

4.90 M/s DLI Power (India) Pvt. Ltd., 6, Shiv Wastu, Tejpal Scheme Road No.5, Bile Parle(E), Mumbai-400057 022-26826819, 26826718(O),26834658(F)

198.00 198.00 Commissioned on 9/1/2011. Completed

3 7(95)2009-

SHP

(16/7/2009)

Tembhu, Satara,

Maharashtra

4.50 M/s. Tembhu Power (P) Ltd.

6-3-883/3, 5th

Floor, R.K. Plaza, Panjagutta,

Hyderabad-500082.

Project comm. on

21/4/2010.

4 7(102)2009-SHP (14/12/2009)

Radhanagari, Kolhapur, Maharashtra

10.00 M/s R. M. Mohite Textiles Ltd. R.S. No. 347, Off NH4 P.B. No.1, Vadgaon, Tal. Hatkanagale Kolhapur- 411112

300.00 300.00 Commissioned in March, 2011.

Page 10: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

7/10/2005-SHP (23/6/2005)

0230-2471230-33, 2471229, 09922444141(M) [email protected]

5 7/133/2010-SHP (14/5/2010)

Pench Kamptee Khaire RBC, Nagpur, Maharashtra

1.40 M/s. SMS Vidhyut Pvt. Ltd., ‘Narayani Hounse’,244, 2

nd Floor, Hill Road, Dhrampeth

Extention, Nagpur-440010 0712-2245006,2245626,3243724 (O), 2245050(F), www.smsl.co.in

128.00 128.00 Commissioned in February, 2012.

6 7/187/2010-SHP 20/4/2010

Deoghar, Sindhudurg, Maharashtra

1.50 M/s. Gadre Marine Export, 3298-A, Mirkarwada, Ratnagiri-415612 Maharashtra. 02352-232570/232268/232882(O) 023252-232121(Fax)

130.00 130.00 Commd. on July 2010.

7 7/189/2010-SHP (9/6/2010)

Chitri, Kolhapur, Maharashtra

2.00 M/s. Shree Tatya Saheb Kore Warana Sahakari Navashakti Nirman Sanstha, Ltd., Waranagar-416113 Kolhapur, Maharashtra 02328-224081-89(O), 224090(Fax) S.R. Patil (09922402602)

140.00 140.00 Commissioned. on 24/1/2011.

8 7/197/2010-SHP

Sonawade, Sangli, Maharashtra

4.00 M/s. Mahati Hydro Power Projects Pvt. Ltd., 32-33, Shankarshet Road, Behind S.T. Workshop Pune-411037 020-40100400(30lines)(O),24440776(Fax) [email protected],[email protected]

180.00 180.00 Commissioned on 14/9/2010.

9 7(97)2009-

SHP

Kasari, Kolhapur 2.50 M/s Vishwaj Energy Pvt. Ltd., ‘Sinhgad’ Opp.

BMC College, Agarkar Road, Shivajinagar, Pune-

411004

020-25659445(O), 25654875(F)

09822856240(M), 9423246651(Con)

[email protected]

150 142.50 commissioned on

May 2014

JAMMU KASHMIR

1 7/198/2010-SHP

Brenwar, Budgam, District J&K

7.50 M/s. P&R Engg. Services Pvt. Ltd. Quiet Office No.7, 1

st & 2

nd Floor, Sector, 35-A,

Chandigarh-160036

395.00 395.00 commissioned in April, 2011.

Page 11: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

0172-2647937,50181154(O),3076396(F) [email protected]

HARYANA

1 7(105)2010-SHP (5/1/2010)

Dadupur, Yamuna Nagar, Haryana

6.00 M/s. Bhoruka Power Corporation Ltd., 48, Labvelle Road, Bangalore-560001 080-22630100,22272271(O), 222455246 (Fax) [email protected]

220.00 220.00 Commissioned on march 2010. Completed

2 7/177/2010-SHP (8/6/2010)

Khukhni, Yamuna Nagar, Haryana

1.40 M/s. Puri Oil Mills, 302, Jyoti Shikher Building, 8, District Centre, Janakpuri, New Delhi-110058 011-25544415, 25544447(O), 25591222(Fax) [email protected]

128.00 128.00 Commissioned on March 2010

3 7/178/2010-SHP (8/6/2010)

Mussapur, Karnal, Haryana

1.40 M/s. Puri Oil Mills, 302, Jyoti Shikher Building, 8, District Centre, Janakpuri, New Delhi-110058 011-25544415, 25544447(O), 25591222(Fax) [email protected]

128.00 128.00 Commissioned on June 2011

4 7(113)2010-

SHP

(10/2/2010)

Iruttukanam, Idukki

Kerala

3.00 M/s Viyyat Power Ltd., Viyyat Kausthubham

Kariyavattom. P.O

Trivandrum-695681

0471-2418562, 2418562(Fax), 09447007534(M)

[email protected]

160.00+30.00 80.00+80.00+

(30.00 for

additional unit)

Commissioned

& CFA released

KERELA

1 7(113)2010-SHP (10/2/2010)

Iruttukanam, Idukki Kerala

3.00 M/s Viyyat Power Ltd., Viyyat Kausthubham Kariyavattom. P.O Trivandrum-695681 0471-2418562, 2418562(Fax), 09447007534(M) [email protected]

160.00+30.00 80.00+80.00+ (30.00 for additional unit)

Comm. in September, 2010.

2

GUJARAT

1 7/151/2010-SHP

Daman Ganga-I, Valsad, Gujarat

3.00 M/s. Tarini Infrastructure Ltd., D2, Amar Colony, Lajpat Nagar-IV, New Delhi-24

160.00 160.00 Commissioned on August 2010

Page 12: COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) … · 2016-06-24 · COMPLETE PROJECT (Settled Projects) (As on 31.03.2015) Sl.No File No. Location of the Project Capacity

(7/6/2010) 011-26479995(O),26477996(Fax) [email protected]

2 7/138/2010-

SHP

(28/5/2010)

Karjan Dam,

Narmada, Gujarat 3.00 M/s OREVA Energy Pvt. Ltd., 104,1st Floor,

Sumel-2 Near Gurudwara, S.G. Highway,

Ahmedabad-380051, Gujarat.

09898996001(M),079-26858595(Fax)

160 160 Commd. in

October 2013

WEST NENGAL

1 7/199/2010-SHP (20/1/2011)

Margaret’s Hope Dilaram Tea Garden,Darjeeling, West Bengal

1.00 M/s. Amgoorie India Ltd. “Camellia House”, 14, Gurusaday Road, Kolkata -700019 033-22873067,22878737(O), 22872577(Fax), [email protected]

12.00 12.00 First & final release 28/03/2013 Completed

ANDRA PRADESH

1 7/149/2010-SHP 8/6/2010

Nandigama Branch Canal, Khammam, Andhra Pradesh

1.60 M/s. Kallam Spinning Mills Ltd., NH5, Chowdavaram, Guntur-522019. A.P. 0863-2512004 to 6, 2512001(Fax) (O),09989997493 (M)

132.00 132.00 Commissioned on March 2011

2 7/61/2007-SHP

Nagavali 1.5 M/s Sardar Power Ltd., 104, Swarganivas Enclave, 7-619/A, East Srinivas Nagar, Ameerpet, Hyderabad-500038 Telfax-040-23738910

130.00 130.00 Commissioned on July 2008 Completed

3 7(195)2004 Mandageru 3.50 M/s. Bhoruka Power Corporation 106.25 106.25 Commissioned on March 2005.