Component-Level Energy Consumption Estimation for Distributed Java-Based Software Systems. Chiyoung Seo Yahoo!. Nenad Medvidovic University of Southern California. Sam Malek George Mason University. Motivation. Newly emerging computing platforms (sensors, PDAs, cell phones, etc.) - PowerPoint PPT Presentation
Citation preview
Component-Level Energy Consumption Estimation for Distributed Java-Based
Software Systems
Sam MalekGeorge Mason
University
Chiyoung SeoYahoo!
Nenad MedvidovicUniversity of Southern
California
Motivation Newly emerging computing
platforms (sensors, PDAs, cell phones, etc.)– Limited battery resources
There is a pressing need for energy-efficient software systems
If we could estimate a software system’s energy consumption at the level of its constituent components, we could take appropriate actions to prolong the system’s life-span– Offload least important components– Redeploy highly energy-intensive
components– Adapt the quality of the components
Host 1 (battery capacity: 21700 J) - AL (Alarm Logger) - LSIM (Local Sensor Information Management) - FAR (Fire Alarm Receiver)
Host 3 (battery capacity: 37500 J) - GSIM (Global Sensor Information Management) - IAR (Intrusion Alarm Receiver) - LSIM (Local Sensor Information Management)
Host 2 (battery capacity: 48500 J) - FAA (Fire Alarm Analyzer) - IAA (Intrusion Alarm Analyzer)
Sensors
...LSIM
FAR AL
FAA IAA
IAR
LSIM
GSIM
Distributed sensor application
running on 3 hosts
Component-Level Energy Consumption Estimation for Distributed Java-Based
Software Systems
Sam MalekGeorge Mason
University
Chiyoung SeoYahoo!
Nenad MedvidovicUniversity of Southern
California
Outline
Approach Framework
– Computational Energy– Communication Energy– Infrastructure Energy
Construction-Time Estimation Run-time Estimation Evaluation Conclusion
7 4
1 1
( ) ( ) ( )i i ji j
systemEC compEC c commEC c infraEC p
Computational and communication energy costs of all the components
Infrastructure energy overhead of all the JVM processes
H1
H2 H3
H4
C1
JVM P2
C2 C3 C6 C7
C4 C5
JVM P3
JVM P1 JVM P4
Overall Approach Energy consumption of a software
component– Computational energy cost
• CPU processing, memory & I/O operations
– Communication energy cost• Data exchange among software
components over the network
Infrastructure energy overhead– Operating system managing the execution
of a JVM process– JVM’s Garbage collection thread
Computational Energy Cost
Focus on a component’s constituent interfaces in modeling its energy consumption– More accurately estimate the energy cost
of a software component
11 1
1
( ) ( , )
: total # of interfaces for a component
: total # of invocations for an interface
( , ) : computational energy consumption due to each invocation of
imn
ii j
i i
i
compEC c iCompEC I j
n c
m I
iCompEC I j
iI
H1
C1 …
I1
I2
In
C4
C2
C6
C3
C5
C7
H2
H3
H4
Computational Energy Cost Cont.
255
, ,0 1
,
( , )
: # of times that each bytecode type is executed during the invocation
: Energy consumption of executing e
m
i k j k l j l j monitork l
k j
k
iCompEC I j bNum bEC fNum fEC mNum E
bNum k
bEC
,
ach bytecode type
: # of times that each native method is executed during the invocation
: Energy consumption of executing each native method
: # of the monitor operations executed
l j
l
j
k
fNum l
fEC l
mNum during the invocation
: Energy consumption for a monitor operationmonitorE
Energy cost of executing all the bytecodes
Energy cost of executing all the native methods
Energy cost of executing all the monitor operations
class Stack { int[] data; int top; public Stack(int size) { data = new int[size]; top=0; } public short synchronized push(int i) { if(top == data.length) return 0; data[top] = i ; top++; return 1; } …}
A sequence of bytecodes and monitor operations executed per push invocation:
- Monitor acquisition (energy cost: 5.4047 μJ)- getfield: loading the value of a field (top) into an operand stack (energy cost: 4.5098 μJ)- getfield: loading the value of a field (data.length) into an operand stack (energy cost: 4.5098 μJ)- if_icmpeq: comparing a top value with a data.length value (energy cost: 3.7744 μJ)- iload: loading a local integer variable i into an operand stack (energy cost: 3.1384 μJ)- iastore: storing a local variable i into an integer array data (energy cost: 3.5786 μJ)- getfield: loading the value of a field (top) into an operand stack (energy cost: 4.5098 μJ)- iadd: adding 1 into the loaded value (energy cost: 2.9485 μJ)- putfield: storing the added value into a field (top) (energy cost: 4.6758 μJ)- return: terminating push method by returning a value (energy cost: 3.8454 μJ)- Monitor release (energy cost: 5.3064 μJ)
( ) operations + 3 _
46.2
iCompEC push monitor getfield iload iastore if icmpeq iadd putfield return
J
Energy consumption of each type of bytecode and native method– Execute a class file that executes each bytecode (or native method) type repeatedly
Energy consumption of a monitor operation– Execute a class file invoking a method that should be synchronized among multiple threads
This measurement is just an one-time effort
Communication Energy Cost
11 1
1
( ) ( , )
: total # of interfaces for a component
: total # of invocations for an interface
( , ) : communication energy consumption
imn
ii j
i i
i
commEC c iCommEC I j
n c
m I
iCommEC I j
due to each invocation of iI
Target network environment is LAN (or WLAN) consisting of dedicated routers and either stationary or mobile hosts
H1
C1 …
I1
I2
In
C4
C2
C6
C3
C5
C7
H2
H3
H4
Communication Energy Cost Cont.
1 2 1 1 1 2 1 1
1
, ,
1
1
( , )
: Size of a transmitted message on a host during the th invocation
: Energy cost ( / ) on a host due to sending
i c c H H c c H H
H
iCommEC I j tEvtSize tEC tS rEvtSize rEC rS
tEvtSize H j
tEC Joule byte H
1 1
1
a unit of data
: Constant energy cost (Joule) on a host incurred by device state changes
and channel acquisition while sending data
: Size of a received message on a host durin
HtS H
rEvtSize H
1
1
1
1
g the th invocation
: Energy cost ( / ) on a host due to receiving a unit of data
: Constant energy cost (Joule) on a host incurred by device state changes
and channel acq
H
H
j
rEC Joule byte H
rS H
uisition while receiving data
Transmission energy cost Receiving energy cost
Modeling the communication cost based on UDP
– UDP is a much more lightweight protocol than TCP frequently used in embedded resource constrained settings
Infrastructure Energy Cost For each JVM process p, there is an additional energy
overhead due to – Garbage collection
• During the garbage collection, all threads except a GC thread within a JVM process stop temporarily
• Energy consumption is directly proportional to the time spent by a GC thread
– Implicit OS routines invoked for managing a JVM process• Context switching (including process rescheduling), page faults, page
reclaims• Energy consumption is directly proportional to the number of implicit
OS routines executed
( )
: time (sec) that the GC thread is active during the execution of a JVM process
: average energy consumption rate (Joule/sec) of the GC t
p p p p
p
infraEC p tGC gEC csNum csEC pfNum pfEC prNum prEC
tGC p
gEC
hread
: # of context switches occurred during the execution of process
: energy consumption (Joule) of processing a context switch
: # of page faults occurred during the execution of pr
p
p
csNum p
csEC
pfNum ocess
: energy consumption of processing a page fault
: # of page reclaims occurred during the execution of process
: energy consumption of processing a page reclaim
p
p
pfEC
prNum p
prEC
Energy cost of a GC thread
Energy cost of processing all the context switches
Energy cost of processing all the page faults and reclaims
Construction-Time Estimation Classify each component’s interfaces into one of the
three different types
– Type I interface: the amount of computation required is constant regardless of its input parameters’ values
• E.g., setTime interface of a Clock component
– Type II interface: the amount of computation required is a function of input parameters’ size or values
• E.g., encrypt interface of an Encryption component
– Type III interface: the amount of computation required is not a function of input parameters’ size or values
• E.g., query interface of a Database component
Construction-Time Estimation: Type I and II
Computational energy cost of Type I interface– Generate an arbitrary input– Calculate the computational cost of the arbitrary input
Computational energy cost of Type II interface– Generate a set of sample inputs and calculate the
computational energy cost of each input– Run multiple regression on a set of inputs and their energy
costs for getting an energy equation
Multiple Regression for find Interface of Shortest-Path Component
Estimated (J)
Actual (J)
119767
122688
Point 1
261905
245395
Point 2
351300
364891
Point 3
224201
215760
Point 4
341570
316622
Point 5
677319
710709
Point 6
X2 (Num. of edges)
Y (
En
erg
y,
μJ
)
Y (
En
erg
y,
μJ
)
X1 (Num. of nodes)
1
2
3
4
5
6
Construction-Time Estimation: Type III Type III interface with finite execution paths
– Generate a set of inputs covering all the execution paths by using symbolic execution
– Calculate the computational energy cost of each input (each execution path)
Type III interface with infinite execution paths– If the expected range of inputs is known,
• Calculate the computational energy cost of each input
– Otherwise, • Generate a set of sample inputs and calculate the average computational
energy cost per invocation
Runtime Estimation
Type I interface– Same as construction-time estimate
Type II interface– Monitor the input value of each invocation– Find the computational energy cost of each invocation
from the energy equation generated by multiple regression
Type III interface– Monitor the amount of computation for each invocation – Calculate the computational energy cost of each invocation
Experimental Setup
iPAQ 3800 handheld device running Linux and Kaffe 1.1.5 JVM HP 3458-a digital multimeter for measuring the current drawn
by iPAQ Data collection computer controls the digital multimeter and
reads the current samples from it
JavaComponents
PDA (iPAQ)
Power SupplyDigital
MultimeterData Collection
Computer
Measurement Setup
Evaluation: Computation
-6
-4
-2
0
2
4
6
1 2 3 4 5 6 7 8 9 10 11
Err
or
rate
(%
)
1 2 3 4 5 6 7 8 9 10 11
SHA
MD5
IDEA
Median
Filter
LZW Sort Jess DB
Shortest path
AVL Linked List
Error Rate = (estimated cost – actual cost) *100 / actual cost
Evaluated a large number of open-source Java components with various characteristics
Computational, memory, and communication intensive
Evaluation: Infrastructure
- 6
- 4
- 2
0
2
4
2 4 6 8 10
Number of simultaneously running components
Err
or
rate
(%
)
Error rates with respect to the number of simultaneously running components
Error Rate = (estimated cost – actual cost) *100 / actual cost
Evaluation: Overall Energy Cost
DBClient
iPAQ (host A)
Wirelessrouter
iPAQ (host B)
iPAQ(host C)FTP
Client
IDEA
LZW
DBServer
IDEA
FTPServer
IDEA
LZW
Distributed software system consisting of three hosts
Error Rate = (estimated cost – actual cost) *100 / actual cost
-3
-2
-1
0
1
2
3
3.3 6.2 12.2 18.3 24.4
Avg. size of a message (KB)
Err
or
rate
(%
)
-6
-4
-2
0
2
4
6
1.1 2.1 3.4 4.2 5.1 7.3 9.5
Frequency (times/sec)
Err
or
rate
(%
)
Evaluation: Overall Energy Cost Cont.
-5
-4
-3
-2
-1
0
1
2
3
4
3 hosts, 8components
5 hosts, 17components
7 hosts, 25components
9 hosts, 33components
Err
or
rate
(%
)Error Rate = (estimated cost – actual cost) *100 / actual cost
Conclusion A framework for estimating a distributed Java-based software
system’s energy cost Unlike previous approaches, the framework provides fine-grained
energy estimates for each software component in terms of its public interface
Our evaluation indicates that the energy estimates come within 5% of the actual energy consumption
Construction-time – Can be used to make appropriate design and configuration decisions
Run-time– Energy estimates can be refined further– Can be used to manage the energy consumption of the system through
dynamic reconfiguration