Issue No. 165 Summer 2016
«AddressBlock»
A Quarterly
Publication of:
2835 Lebanon Pike
P. O. Box 140350
Nashville, Tennessee 37214
Phone: 615-883-3243
529 Old Hickory Boulevard,
Ste. A
Jackson, Tennessee 38305
Phone: 731-668-1953
908 West Broadway Avenue
Maryville, Tennessee 37801
Phone: 865-984-9638
For more
information, please
visit our website
www.jrwauford.com
Ashley Richards, Editor E: [email protected] © Copyright 2016 J. R. Wauford & Company, Consulting Engineers, Inc.
2835 Lebanon Pike
Nashville, Tennessee 37214
Phone: 615-883-3243
Fax: 615-391-3710
Project Updates
Conferences
The annual meeting of the TENNESSEE MUNICIPAL
LEAGUE (TML) was held June 11-14 at the Gatlinburg
Convention Center. We enjoyed visiting with our
clients and friends at the Ice Cream Parlor.
The annual WATER PROFESSIONALS CONFERENCE (the
joint meeting of the KY-TN AWWA and WEA) was
held at the Knoxville Convention Center in Knoxville,
Tennessee, July 17-20. Our Ice Cream Social was
another great success and we certainly were pleased
to see so many of our clients at this event.
Pictured right are some of the guests enjoying the
topping station.
Adamsville, Tennessee
A review for Lagoon Treatment Capacity is being pre-
pared for submission.
Chapel Hill, Tennessee
A Sewer Master Plan and Corrective Action Plan have
been completed and submitted to the Owner and ap-
propriate regulatory agencies.
A report for a 2016 Community Development Block
Grant Sewer Rehabilitation project was submitted to
ECD and announcements are expected Fall 2016.
Volume 1, Issue 1
This story can fit 150-200 words.
One benefit of using your news-letter as a promotional tool is
that you can reuse content from other marketing materials, such
as press releases, market stud-
ies, and reports.
While your main goal of distrib-
uting a newsletter might be to sell your product or service, the
key to a successful newsletter is
making it useful to your readers.
A great way to add useful con-tent to your newsletter is to
develop and write your own
articles, or include a calendar of
upcoming events or a special offer that promotes a new prod-
uct.
You can also research articles
or find “filler” articles by ac-cessing the World Wide Web. You
can write about a variety of topics but try to keep your arti-
cles short.
Much of the content you put in
your newsletter can also be used
for your Web site. Microsoft Publisher offers a simple way to
convert your newsletter to a
Web publication. So, when you’re
finished writing your newsletter, convert it to a Web site and post
it.
If the newsletter is distributed
internally, you might comment
upon new procedures or im-provements to the business.
Sales figures or earnings will show how your business is
growing.
Some newsletters include a
column that is updated every issue, for instance, an advice
column, a book review, a letter
from the president, or an edito-
rial. You can also profile new
employees or top customers or
vendors.
This story can fit 100-150 words.
The subject matter that appears in newsletters is virtually end-
less. You can include stories that focus on current technologies or
innovations in your field.
You may also want to note busi-
ness or economic trends, or
make predictions for your cus-
tomers or clients.
Page 2 Company News
Caption describing picture
or graphic.
I n s i d e S t o r y H e a d l i n e
I n s i d e S t o r y H e a d l i n e
I n s i d e S t o r y H e a d l i n e
“To catch the reader's
attention, place an interesting
sentence or quote from the
story here.”
Page 2 Page 2 The Clarifier
Cleveland Utilities
Cleveland, Tennessee
The Automatic Read Water Meter System Phase 2 project is complete
and closed out.
Design of improvements to the Peak Wastewater Diversion Pumping
Station is underway.
Columbia, Tennessee
The Capacity Assessment Plan, Sewer System Evaluation Survey Work
Plan, Fats, Oils and Grease Control Program, Sanitary Sewer Overflow
Response Plan, Pump Station Operation and Preventive Maintenance Pro-
gram, Continuing Sewer System Assessment Program, Infrastructure Re-
habilitation Program, and Information Management Systems are complete
and approved by EPA as part of the Administrative Order of Consent.
The Capacity Assessment Report is complete and being submitted to EPA.
Cleary Construction was the low bidder on the Carters Creek Pumping
Station Renovation project in the amount of $651,000. Construction is
expected to begin late summer due to timing of pump delivery.
Crossville, Tennessee
Construction for the Holiday Drive and Lantana Estates Water Line Re-
placement Project, which consists of the replacement of 19,000 L.F. of 6-
inch asbestos cement water line, is underway with a completion date of
November 12, 2016. At this time, approximately 4,000 L.F. of 18,215 L.F.
of 6-inch pipe has been installed.
Dayton, Tennessee
A pre-construction conference was held July 13 for the Sewer System
Rehabilitation project, in the Kayser Roth area, in the amount of
$449,596, and has a completion date of April 2017. Dynamic Construc-
tion will be the Contractor on the job.
Modifications to an engineering report for improvements to the WWTP
are underway to allow project phasing.
Work on the Hwy 27 North White Oak Road sewer lines is complete.
Fentress County Utility District
Fentress County, Tennessee
The new 200,000 gallon Clarkrange
Elevated Tank project, with the low
bidder Phoenix Fabricators and
Erectors at $610,717, is under con-
struction. The steel erection crew
is on site and completion is ex-
pected late October 2016.
Fentress County Utility District
Fentress County, Tennessee (Cont’d)
The Highway 127/62 utility relocation project through TDOT has a let-
ting date of March 2017.
An engineering report for an ARC grant application has been submitted
for a 12-inch water transmission line from FCUD’s Clarkrange Tank to
the Industrial Park.
Halls, Tennessee
The NPDES Permit renewal application is complete and was accepted.
The draft for review is pending.
Henderson Water Utility
Henderson, Kentucky
The $10.5 million North Wastewater Treatment Plant expansion is near-ing completion with all new unit processes in operation. Only punch list
items remain.
Pictured above is 36.0 MGD Headworks Facility
Henderson, Kentucky
200,000 gallon elevated
tank pictured right
Fentress County
Utility District Pictured above 36.0 MGD Trojan Signa
U.V. Disinfection Facility
Henderson, Kentucky
Project Updates
This story can fit 150-200 words.
One benefit of using your news-letter as a promotional tool is
that you can reuse content from other marketing materials, such
as press releases, market stud-
ies, and reports.
While your main goal of distrib-
uting a newsletter might be to sell your product or service, the
key to a successful newsletter is
making it useful to your readers.
A great way to add useful con-tent to your newsletter is to
develop and write your own
articles, or include a calendar of
upcoming events or a special offer that promotes a new prod-
uct.
You can also research articles
or find “filler” articles by ac-cessing the World Wide Web. You
can write about a variety of topics but try to keep your arti-
cles short.
Much of the content you put in
your newsletter can also be used
for your Web site. Microsoft Publisher offers a simple way to
convert your newsletter to a
Web publication. So, when you’re
finished writing your newsletter, convert it to a Web site and post
it.
This story can fit 75-125 words.
Selecting pictures or graphics is an important part of adding
content to your newsletter.
Think about your article and ask
yourself if the picture supports or enhances the message you’re
trying to convey. Avoid selecting
images that appear to be out of
context.
If the newsletter is distributed
internally, you might comment
upon new procedures or im-provements to the business.
Sales figures or earnings will show how your business is grow-
ing.
Some newsletters include a
column that is updated every issue, for instance, an advice
column, a book review, a letter
from the president, or an editori-
al. You can also profile new em-
ployees or top customers or
vendors.
This story can fit 100-150 words.
The subject matter that appears in newsletters is virtually end-
less. You can include stories that focus on current technologies or
innovations in your field.
You may also want to note busi-
ness or economic trends, or
make predictions for your cus-
tomers or clients.
Volume 1, Issue 1
Caption describing pic-
ture or graphic.
Caption describing pic-
ture or graphic.
I n s i d e S t o r y H e a d l i n e
I n s i d e S t o r y H e a d l i n e
I n s i d e S t o r y H e a d l i n e
“To catch the reader's attention, place an
interesting sentence or quote from the story here.”
Issue No. 165 Page 3
Henderson Water Utility
Henderson, Kentucky (Cont’d)
Design is underway for replacement of the Atkinson Park and Myrene
Drive Sewage Pumping Stations including new 18-inch and 12-inch force
mains. The Geotechnical Report is complete and the Owner is acquiring
easements for the force mains.
Design of the South Water Treatment Plant Renovation is nearing com-
pletion. This project includes a new 4.0 MGD GE Water and Process
Technologies Membrane Filtration System, Flash Mix Structure, Solids
Contact Clarifier, and GAC Contactors.
Design of the North Wastewater Treatment Plant Final Clarifiers No. 1
& No. 2 Rehabilitation project is complete and plans and specifications
have been submitted to KDOW.
Construction of the 1.0 MG Vine Street Water Storage Tank Renovation
has been awarded to Preferred Sandblasting of Shelbyville, Tennessee at a
total contract amount of $845,700. Work is progressing on schedule and
construction of the new air conditioned equipment room is complete.
Hohenwald, Tennessee
The ARC/SRF project for Lewis County and Hohenwald that extends a 6
-inch water line approximately 28,000 L.F. along Summertown Hwy. is
ongoing with the Contractor having installed line WL-1. Work is under-
way on added line work and the booster pumping station. This
$557,194.47 project has a completion date of October 2016.
A semi-annual report in reference to the pretreatment program is in
progress.
The Appalachian Regional Commission recently announced award for the Water System Rehabilitation in the amount of $500,000.
Report for a 2016 Community Development Block Grant focusing on
Water Rehabilitation was submitted to ECD and announcements are
expected Fall 2016.
Hopkinsville Water Environment Authority
(HWEA), Hopkinsville, Kentucky
Construction on Phase 7 Priority No. 2 Sewer Rehabilitation Project is
complete.
Plans and specifications for Priority No. 3 Phase 7 are complete and have
been submitted to the Owner.
The U.S. Highway 41A water line project, which consists of approximate-
ly 15,300 L.F. of 20-inch water line to increase flow and pressure at the
Interstate 24 interchange, in the amount of $1,659,958, is in service and
the project is closed out.
Design is underway for sewer extension to Farm Credit Services and to
accommodate future growth.
Humboldt, Tennessee
An evaluation of the Wastewater Treatment Plant and Rate Study have
been submitted and are under review by Humboldt Utilities.
The 2015 CDBG Project for the Lagoon Aeration System and Sewer
Rehabilitation project is ongoing. The Contractor, SDT Contractors, has completed the point repairs and is working on installing the new aeration
system with a completion date of December 2016. This project cost is
$503,724.50.
Humboldt Utilities was awarded a Site Development Grant for a water-
line to the Industrial Park.
Jackson Energy Authority (JEA)
Jackson, Tennessee
Bids were opened for SRF funded improvements at the Miller Avenue
Wastewater Treatment Plant on July 25-bids are under review.
A $13.3M Disaster Community Development Block Grant was
awarded for five separate projects including Miller Avenue WWTP
work, sewer line replacement and rehabilitation, sewage pumping sta-
tion renovation, and dual South Fork Forked Deer River utility cross-
ings.
Lewisburg, Tennessee
The Cornersville WWTP Sludge Holding Tank with a bid of $119,000
is complete and closed out.
Plans and specifications for the State Route 50/431 Utility Relocation
have been submitted to TDOT. The project has been postponed until
December 2016.
Design of methanol and coagulant feed and storage facilities to en-
hance nutrient removal is complete and has been submitted to SRF.
Plans and specifications for the Snell Branch Sewage Pumping Station
are complete and have been submitted to SRF.
A report for inclusion in a 2016 CDBG Sewer Rehab project was sub-
mitted to ECD and announcements are expected Fall 2016. Plans and specifications for backwash and water supply improvements
to the Water Treatment Plant are complete and submitted to the
State and Owner.
Livingston, Tennessee
A WWTP Nutrient Optimization Plan was submitted to TDEC, late
summer 2015, which resulted in a revised NPDES Permit. Further
monitoring has been performed to confirm optimized plant operation.
A draft instream monitoring program and bio assessment program
that will have to be implemented August 1, 2016 to August 1, 2017 to
comply with NPDES Permit requirements is being completed. A nutri-
ent optimization total nitrogen and total phosphorous NPDES Permit
effluent limitation proposal is currently in process and will be submit-
ted August 2016.
J&M Grading Division, LLC was the low bidder for the TDOT SR 52
Utility Relocation project. Contractor is currently working intermit-
tently.
A report for the Monroe Booster Pumping Station Upgrade has been
submitted to the Owner for review.
A Drought Management Plan has been completed and approved by the
State pending City adoption.
Bids are scheduled to be opened Tuesday, August 30, for a project
providing for the clean out of Polishing Pond No.2 at the Wastewater
Treatment Plant.
This would be a good place to insert a short
paragraph about your organization. It might
include the purpose of the organization, its mission, founding date, and a brief history.
You could also include a brief list of the types of products, services, or programs your
organization offers, the geographic area covered (for example, western U.S. or Euro-
pean markets), and a profile of the types of
customers or members served.
It would also be useful to include a contact name for readers who want more infor-
mation about the organization.
ter a personal touch. If your
organization is small, you may
want to list the names of all
employees.
If you have any prices of stand-
ard products or services, you
can include a listing of those here. You may want to refer your
readers to any other forms of communication that you’ve cre-
ated for your organization.
You can also use this space to
remind readers to mark their
calendars for a regular event, such as a breakfast meeting for
vendors every third Tuesday of the month, or a biannual charity
This story can fit 175-225 words.
If your newsletter is folded and mailed, this story will appear on
the back. So, it’s a good idea to
make it easy to read at a glance.
A question and answer session is a good way to quickly capture
the attention of readers. You can
either compile questions that you’ve received since the last
edition or you can summarize some generic questions that are
frequently asked about your
organization.
A listing of names and titles of managers in your organization is
a good way to give your newslet-
auction.
If space is available, this is a good place to insert a clip art
image or some other graphic.
B a c k P a g e S t o r y H e a d l i n e
Caption describing picture or
graphic.
Business Name
2835 Lebanon Pike
P. O. Box 140350
Nashville, Tennessee 37214
Phone: 615-883-3243
Your business tag line here.
Organization
We’re on the Web!
example.com
A clean, adequate supply of water and properly treated wastewater... This is the business of J. R. Wauford & Company, Consulting Engineers, Inc.
Madisonville, Kentucky
Design is complete for approximately 3,500 L.F. of sanitary sewer line
replacement in the Madison Square area and has been submitted to
the Owner for submission to KDOW.
We have submitted a water model to assist Madisonville in determin-ing the efficacy of proposed system improvements to the north high
pressure zone.
Maryville, Tennessee
Water Quality Modeling work is underway to determine the impacts
of a reconfigured effluent discharge concept. The intensive field sam-
pling is complete and calibrated model was accepted by TDEC. Cur-
rently, scenarios are being prepared for permitting negotiations.
Ohio County Water District
Ohio County, Kentucky
Plans and specifications are complete and submitted to the Owner
for 21,000 L.F. of 3-inch and 4-inch water line on Baizetown and
Cave Ridge Roads.
Horsley Construction was the low bidder for Phase I Water Im-
provements, which include 15,876 L.F. of 16-inch North Transmission
Line, in the amount of $965,089. Construction is expected to be
complete in May 2017.
A Beneficial Reuse of Special Waste Permit Application was submit-
ted to KDOW on behalf of the Owner and specifications are com-
plete and submitted related to the cleanout of the Water Treatment
Plant solids lagoon.
Paducah McCracken Joint Sewer Agency (JSA)
Paducah, Kentucky
Construction of the Cook Street Sewer Basin Storage Facilities is
complete and closed out.
A final report for the Harrison Street CSO Elimination has been sub-
mitted to the Owner.
Lastly, a study of the current anaerobic digestion process at the
WWTP is underway.
Pulaski, Tennessee
Construction on the Johnson Controls Pumping Station and Sludge
Pump Replacement project has begun with the Contractor having
completed demolition and installing pipe. Richland, LLC is the Con-
tractor on the $233,000 project with a completion date of Septem-
ber 2016.
A report for a 2016 CDBG Raw Water Intake Improvements project
was submitted to ECD and announcements are expected Fall 2016.
Technical assistance with the pretreatment program is ongoing.
Ripley, Tennessee
The Local Limits were re-evaluated and submitted to the State for
approval.
Savannah, Tennessee
Phase I of the TDOT State Route 128 road widening is under con-
struction. This project includes relocation of water, sewer, and
natural gas utilities. Barsto Construction is the Contractor and the
scheduled completion date is September 2016. Phase II of the TDOT State Route 128 road widening utility reloca-
tion plans have been submitted to TDOT for a scheduled letting of
December 2016.
A Drought Management Plan has been completed and approved by
the State pending City adoption.
Scotts Hill, Tennessee
A Community Development Block Grant for water plant improve-
ments was awarded to Quinn Construction in the amount of
$271,740. The project has a completion date of November 9, 2016.
Shelbyville Power, Water & Sewerage System
(PW&SS), Shelbyville, Tennessee
Revised permits have been submitted to permitted Industrial Users
for their review.
The main interceptor sewer rehabilitation project is complete and
closed out.
Smithville, Tennessee
W&O Construction was the low bidder for the renovation of the
2.16 MGD SBR Wastewater Treatment Plant, in the amount of
$2,794,000. Award approval from ECD is pending. A 365 day con-
struction timeline is expected.
Local Limits have been adopted by the Owner and submitted to the
State.
The $227,116 Main Street Gravity Sewer Replacement Project is
ongoing with sewers and manholes installed and in service. Paving
remains to be completed.
The Drought Management Plan was approved by the State.
Trenton Light and Water
Trenton, Tennessee
The Capacity Assessment Plan and Engineering Report for the
WWTP have been completed and submitted to TDEC. A pre-construction meeting for the 2015 Community Development
Block Grant, that will include improvements at the WWTP, was
held July 22. Quinn Construction is the Contractor on the project
with a low bid of $499,000.
The design of a new 1.6 MGD Sequencing Batch Reactor
Wastewater Treatment Plant is in process.
NPDES Permit Renewal Application is complete and has been sub-
mitted.
Union City, Tennessee
Utility line relocation plans for the I-69, Phase II & III as well as State
Route 5 have been completed and are awaiting TDOT’s letting. SDT Contractors submitted the low bid for the project to replace
an 8-inch waterline on Martin Luther King Drive in the amount of
$61,689. The project has a completion date of August 24, 2016.
Design of the State Route 21 Utility Relocation project is nearing
completion.
Page 4