Upload
api-3856809
View
691
Download
1
Embed Size (px)
Citation preview
Integration Test Plan Module - Plant MaintenanceTest Scenario: configurable general maintenance task list
Maintenance Cycle Patch/ Reference
No BUSINESS PROCESS STEPS TRANS. CODE
INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)
1 Preliminary configuration settings for class type 300
SPRO>PM&CS>MASTER
DATA IN PM&CS>TECH.OBJECTS>
GENERAL DATA>DEFINE TYPES OF TECHNICAL OBJECTS
OK
3 Create characteristic: color
CT04
Name: COLORDescription: ColorStatus: Released.No.of characters: 5Value assignment: Single value is selected.Character value—description.
BLACK- Black
RED -- Red
GOLD – GoldValid from: 18-04-2007
DATA ACCEPTED. Characteristics COLOR is
created.Ok
3 Create characteristic: PUMPMDL CT04 Name: PUMPMDLDescription: PUMP MODELStatus: Released.No.of characters: 5Value assignment: Single value is selected.
DATA ACCEPTED. Characteristics COLOR is
created.
OK
Comments :
Tested By Test Date Approved By Approved Date K.Kiran Kumar 18/04/2007
Integration Test Plan Module - Plant MaintenanceTest Scenario: configurable general maintenance task list
Maintenance Cycle Patch/ Reference
No BUSINESS PROCESS STEPS TRANS. CODE
INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)
Character value—description.
RECP -- RECIPROCATING
PST - PISTON
Valid from: 18-04-2007
4 Create class: PUMP COLOR of class type: 300
CL02
Class: PUMPCOLORClass type: 300Description: PUMP COLORCharacteristic: COLOR and PUMPMDL are selected.Valid from: 18.04.2007
DATA ACCEPTED. Class PUMPCOLOR of
class type 300 is created.OK
05 Create dependencies CU01 Dependency: COLORDescription: Color of the pump.Status: 2(in preparation)Dependency type:Selection condition is selected.Then select dependency editor, enter the following
00010: color = ‘BLACK’ and PUMPMDL = ‘RECP’
is entered exactly as
DATA accepted,
Dependency: COLOR is created.
OK
Comments :
Tested By Test Date Approved By Approved Date K.Kiran Kumar 18/04/2007
Integration Test Plan Module - Plant MaintenanceTest Scenario: configurable general maintenance task list
Maintenance Cycle Patch/ Reference
No BUSINESS PROCESS STEPS TRANS. CODE
INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)
mentioned above, then select check function for verification.If there are no errors, save the dependencies.
06 Change the status of dependency: COLOR
From: 2 (in process) to 1(released) CU02
Dependency: COLOR
In dependency basic data,
Change the status field from 2 top 1(released)
DATA ACCPETED. Dependency: COLOR has
the status: 1OK
07 Assign class : PUMPCOLOR to the equipment :ACFLMC-004
IE02
Goto equipment header,Select class over view,
In the class over view screen ,
Class :PUMPCLASS,
Select : select standard class.
Under value for pump class,General tab, COLOR – select BLACK. PUMPMDL- RECIPROCATING
Save the equipment
Equipment ACFLMC-004 is assign with
class :PUMPCOLOR and value:BLACK.
OK
07 Assign Object dependencies: COLOR to the IA06 Grop:2 DATA accepted. OK
Comments :
Tested By Test Date Approved By Approved Date K.Kiran Kumar 18/04/2007
Integration Test Plan Module - Plant MaintenanceTest Scenario: configurable general maintenance task list
Maintenance Cycle Patch/ Reference
No BUSINESS PROCESS STEPS TRANS. CODE
INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)
operations 0010,0030 in general maintenance task list: 14 group counter: 1
In operations header, select operation 0010,0030Go to Extras>Object dependencies> Assignments
In Maintain dependency, Assignments tab,
Select dependency: COLORSelect assignment of dependency to next operation also.
Save the task list
Object dependency: COLOR is assigned to the operations in general task
list:14
08 Create configuration profile: PUMP_COLOR CU41 Select configurable object as : GM task list.
GM Task list : 14
Priority:01Profile name: PUMP_COLORClass type:300
Status: 01(released)
To the profile assign class By selecting class assignment,
DATA ACCEPTED.Configuration profile:
PUMP_COLOR is created.
OK
Comments :
Tested By Test Date Approved By Approved Date K.Kiran Kumar 18/04/2007
Integration Test Plan Module - Plant MaintenanceTest Scenario: configurable general maintenance task list
Maintenance Cycle Patch/ Reference
No BUSINESS PROCESS STEPS TRANS. CODE
INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)
Class: PUMPCOLOR
Standard class is selected.
No value is assigned to characteristics.
09 Create maintenance order for equipment: ACFLMC-004 and assign GM task list: 14
IW31
Order type: PM01Equipment: ACFLMC-004Planning plant:1000Business area:1000Go to order header, Extras>Task list selection>Direct entryIn task list selection screen enter,General task list selected.group :14group counter:1
characteristics:Colorchracteristic value: select BLACK characteristics:PUMPMDLchracteristic value: select BLACK
DATA accepted. In the order, Under
operation Tab,
Observed all 3 operations ,0010,0020,003
0
Are selected.
OK
Create maintenance order for equipment: ACFLMC-004 and assign GM task list: 2
IW31 Order type: PM01Equipment: ACFLMC-004Planning plant:1000Business area:1000
DATA accepted. In the order, Under
operation Tab,
OK
Comments :
Tested By Test Date Approved By Approved Date K.Kiran Kumar 18/04/2007
Integration Test Plan Module - Plant MaintenanceTest Scenario: configurable general maintenance task list
Maintenance Cycle Patch/ Reference
No BUSINESS PROCESS STEPS TRANS. CODE
INPUT DATA OUTPUT DATA / RESULT SAP Doc Reference/ OK / Error (support by Screen Shots)
Go to order header, Extras>Task list selection>Direct entryIn task list selection screen enter,General task list selected.group :2group counter:1
characteristics:Colorchracteristic value: select REDcharacteristics:PUMPMDLchracteristic value: select BLACK
Observed only operations0020
Is selected. which are not having any dependencies
assigned to them.
Comments :
Tested By Test Date Approved By Approved Date K.Kiran Kumar 18/04/2007